Active Target Multistatic Receiver Preliminary Design Review

13
Project Renovatio Joshua Fraser Alastair Fraser Ruofei Fu Chao Jiang Cheng Zhen Dacheng Zheng Tien Truong

description

Active Target Multistatic Receiver Preliminary Design Review. Group D: Sam Buchanan Haiji Wang Robby Willer. System analysis. ATMR calibration mode diagram (Level 0). System analysis. ATMR bistatic receiver mode diagram (Level 0). System analysis. ATMR system diagram (Level 1). - PowerPoint PPT Presentation

Transcript of Active Target Multistatic Receiver Preliminary Design Review

Page 1: Active  Target  Multistatic Receiver Preliminary Design  Review

Project Renovatio

Joshua FraserAlastair FraserRuofei FuChao JiangCheng ZhenDacheng ZhengTien Truong

Page 2: Active  Target  Multistatic Receiver Preliminary Design  Review

System-Level Schematic

Page 3: Active  Target  Multistatic Receiver Preliminary Design  Review

WBS: System Decomposition

Page 4: Active  Target  Multistatic Receiver Preliminary Design  Review

WBS: System Decomposition

Page 5: Active  Target  Multistatic Receiver Preliminary Design  Review

WBS: System Decomposition

Page 6: Active  Target  Multistatic Receiver Preliminary Design  Review

Testing PlansPower (Current/Volt meter & Management systems)

-Battery discharge and recharge rate and duration-Verify power conversion efficiencies

Motor (G sensors, GPS, Speedometer and/or Dynamometer)-Top speed, acceleration, duration, etc.

-Acceleration/Speed sustainability

Heat (Temperature sensors and IR Camera)-Max temperature of motor and charger-Water/coolant temperature-Temperature range of batteries

Page 7: Active  Target  Multistatic Receiver Preliminary Design  Review

Testing PlansWater/Rain Susceptibility (Hose or Sprinkler)

-Power/battery systems are water tight-Wiring is properly insulated-No large potential differences between chassis and ground

Safety Shutoffs (Crash, Ground Fault, and Hand Switches)-Crash sensor works properly

-GFI’s properly detect current imbalances and shut off power-Hand switches properly disconnect power systems

Page 8: Active  Target  Multistatic Receiver Preliminary Design  Review

Component Specifications

Page 9: Active  Target  Multistatic Receiver Preliminary Design  Review

Risk Mitigation Plan

Page 10: Active  Target  Multistatic Receiver Preliminary Design  Review

WBS: Project Organization

Page 11: Active  Target  Multistatic Receiver Preliminary Design  Review

Organization Chart

Page 12: Active  Target  Multistatic Receiver Preliminary Design  Review

Project Schedule

Page 13: Active  Target  Multistatic Receiver Preliminary Design  Review

Questions?● Project Site:

o project-renovatio.bitballoon.com