Acting for the entire supply chain bringing
together operators, contractors, suppliers
and people in the industry.
The Callater Project
Championing the UK Subsea Sector Across the World
Lunch and Learn
• Apache North Sea Limited
• Apache Projects Group
• The Callater Project
• Application of Mission Command
Project Management
Apache North Sea Limited
Apache Acreage
Apache Operated
Non Operated
Beryl
Buckland
Skene
Maclure
Nevis South
Nevis & Ness Complexes
Bacchus
Maule
Sage Gas Plant
Forties
Nelson
Oil Field
Gas Field
Tonto
Aberdeen
Central North Sea
Northern North Sea
10 Operated and 2 Non-Op Fields
8 Operated and 1 Non-Op Platform
SAGE Pipeline and Gas Plant
Callater
Corona
Seagull Discovery
North Sea Region
Apache Projects Group
Projects Group Mission
The mission of the Projects Group is
to provide Apache North Sea with safe
world class project delivery in order to
maximize the return on investment for
the Corporation.
Projects Group Culture
Pace, Innovation and Excellence
Unity of effort, focus and momentum whilst empowering
individuals to use their own discretion and initiative within the
implementation process
Delivery through Mission Command principles by maximising the
employment of:
• Leadership
• Sense of urgency
• Competence and capability
• Devolved decision making
• Accountability, authority and autonomy
• Best answers win
• Respect, integrity and trust
Mission Command Project Management
Mission Command is a philosophy of command,
with centralised intent and decentralised
execution, that is particularly suitable for complex,
dynamic and adversarial situations. It demands a
philosophy of command that promotes freedom of
action and initiative. Mission Command focuses
on outcomes, as it stresses the importance of
understanding what effect is to be achieved, rather
than specifying the ways by which it should be
achieved.
Mission Command Project ManagementMission Command Traditional Project Management
Assumes a project isProbabilistic Deterministic
Unpredictable Predicable
AcceptsDisorder Order
Uncertainty Certainty
Leads to
Decentralisation Centralisation
Spontaneity Coercion
Informality Formality
Loose Rein Tight Rein
Self-Discipline Imposed Discipline
Initiative Obedience
Cooperation Compliance
Acceptable Decisions Faster Optimal Decisions but Later
Ability at all Levels Ability Focused at the Top
Communication used
Implicit Explicit
Vertical and Horizontal Vertical
Interactive Linear
Organisation typeOrganic Hierarchic
Ad Hoc Bureaucratic
Leadership stylesDelegating Directing
Transformational Transactional
Appropriate forArt of Delivery Science of Delivery
Conduct of Operations Technical and Procedural Tasks
Outcomes
Cost $MM per Well
Bacchus $22m
Cost $MM per Well
Aviat $19m
Bacchus
Aviat
FNT $14m
FNT
The Callater Project
Callater Discovery
Buckland
NevisNess
Skene
Beryl
Callater
discovery
• First Apache drilled exploration well in the Beryl area (Apache 55%, Shell 45%)
• Risked mean reserve estimate of 45 mmboe
• Field can be produced via a short subsea tie-back to existing Beryl infrastructure
• Infrastructure design is focused on quick delivery for initial production while maintaining flexibility for further development in the area
Callater Reservoir
• Pay proven in 3 fault blocks, 4th to be drilled
• Formation pressures in range 7020-7500 psi (1750 psi overpressure)
• 40 - 430 API high GOR (3000 scf/bbl)
BERYL DEPTH MAP
9/19b-18Z
9/19b-18X
9/19b-18
1km416000 418000 420000 422000 424000 426000 428000 430000
416000 418000 420000 422000 424000 426000 428000 430000
65
84
00
06
58
60
00
65
88
00
06
59
00
00
65
92
00
06
59
40
00
65
96
00
0
65
84
00
06
58
60
00
65
88
00
06
59
00
00
65
92
00
06
59
40
00
65
96
00
0
0 500 1000 1500 2000 2500m
1:50000
BUCKLAND
SKENEK
Callater Facilities
Chemicals and
Hydraulics via Skene
13km Umbilical –
Electrical
Process and Export
via BA System
Transported via
Existing BA Bridge
Pipework
3.85km Bundle
Trailhead Manifold
3 Development Wells
Oil via Existing Skene
Bundle
Accesses RAT via
Existing Caisson
Bellmouth at Foot of
Riser A7
6 Slot Manifold with
Expansion
Callater Schedule
Callater Costs
Application of Mission
Command in Callater
Apply The Principles
• Leadership
• Sense of urgency
• Competence and capability
• Devolved decision making
• Accountability, authority and autonomy
• Best answers win
• Respect, integrity and trust
High
Low
Low HighEffort
Reward/Risk Cost/Time/Resource
£ £ £ £ £ £ £ £
Lean Teams
Risk Reward Contracting
Recommended Reading
Thank YouImage courtesy of Subsea 7
For more information please contact:
+44(0)845 505 3535
Or visit
www.subseauk.com
Championing the UK Subsea
Sector across the World