ACQUATICS FACILITY STUDY

31
ACQUATICS FACILITY STUDY City of Vincennes Department of Parks & Recreation

description

ACQUATICS FACILITY STUDY. City of Vincennes. Department of Parks & Recreation. Concerns and Problems with Rainbow Beach. Overall image is poor, facility is tired and no longer an attraction. The facility lacks vitality. Visitors are being lost to other venues. - PowerPoint PPT Presentation

Transcript of ACQUATICS FACILITY STUDY

Page 1: ACQUATICS FACILITY STUDY

ACQUATICS FACILITY STUDYCity of Vincennes

Department of Parks & Recreation

Page 2: ACQUATICS FACILITY STUDY

• Overall image is poor, facility is tired and no longer an attraction. The facility lacks vitality.

• Visitors are being lost to other venues.

• The condition of the bathhouse is substandard.

• Without shade, the oversized concrete pool deck is oppressive in the summer heat.

• Pool mechanical system is antiquated and is past its life expectancy.

• The concrete deck all around the pools has an irregular surface at expansion joints and settlement cracks.

• Water from both the competition and wading pools is circulated through a single circulation pump violating current swimming pool codes.

• Maintaining chemical balance for this pool is difficult.

• It is reported that the pool loses approximately 1”-2” of water overnight due to leaks in the pool system located under the concrete pool shell.

City of Vincennes – Aquatic Facility Study

Concerns and Problems with Rainbow Beach

Page 3: ACQUATICS FACILITY STUDY

1. Slides and / or Diving Boards

2. Play Apparatus / Structure for all ages

3. Zero Depth Entry

4. Competition / Recreation Combination – Uniqueness of 50 Meter Pool

5. Upgraded Bathhouse

6. Improved Concessions

7. ADA Accessibility

8. Variety of Experiences – Water Basketball, Water Volleyball, Etc.

9. Shade Structures and Lounge Seating

10. Sound System and Wi-Fi

11. Planned Activities and Programs

City of Vincennes – Aquatic Facility StudyCity of Vincennes – Aquatic Facility StudyCity of Vincennes – Aquatic Facility Study

Recommendations

Page 4: ACQUATICS FACILITY STUDY

City of Vincennes – Aquatic Facility Study

Pool Amenities

Page 5: ACQUATICS FACILITY STUDY

Slides

City of Vincennes – Aquatic Facility Study

Page 6: ACQUATICS FACILITY STUDY

Zero Depth Entry

City of Vincennes – Aquatic Facility Study

Page 7: ACQUATICS FACILITY STUDY

Shade Structures

City of Vincennes – Aquatic Facility Study

Page 8: ACQUATICS FACILITY STUDY

Play Apparatus

City of Vincennes – Aquatic Facility Study

Page 9: ACQUATICS FACILITY STUDY

Spray Parks

City of Vincennes – Aquatic Facility Study

Page 10: ACQUATICS FACILITY STUDY

Recreation/Competition Combination

City of Vincennes – Aquatic Facility Study

Page 11: ACQUATICS FACILITY STUDY

Bathhouse, Locker Facilities and Party Facilities

City of Vincennes – Aquatic Facility Study

Page 12: ACQUATICS FACILITY STUDY

City of Vincennes – Aquatic Facility Study

Options for Rainbow Beach

Page 13: ACQUATICS FACILITY STUDY

Option A: Addition of a spray park to the existing facility

City of Vincennes – Aquatic Facility Study

Page 14: ACQUATICS FACILITY STUDY

Description and Cost

•Existing Recreation Pool and Bathhouse to Remain…………………….....................….......

•Remove existing Wadding Pool and Deck………………………………………………………….….

•Create New Splash Park………………………..……………………………………………………………

•Provide Associated Site Improvements…………………….…………………………………….…....

Shade Structures, Pavement, Fencing, Etc.

•Contractor General Conditions/Overhead & Profit…………………………………………..………..

Construction Range of Magnitude Budget………………..…………………………….….……..

•Add new deck around the existing pool…………………………………………………………….…….

$

$

$

$

$

$

0

10,000

140,000

85,000

22,000

257,000

?????

City of Vincennes – Aquatic Facility Study

Option A: Addition of a spray park to the existing facility

Page 15: ACQUATICS FACILITY STUDY

City of Vincennes – Aquatic Facility Study

Option B: Renovation of the existing facility

Page 16: ACQUATICS FACILITY STUDY

Description and Cost

•Minor Renovations to Existing Bathhouse.……………….….........................................

•Renovation Existing 10 Lane 50 Meter Lap Pool………………....………………….............

•Infill Diving Well, Create New Slide Well, Create Zero Depth Entry,

New Pool Filtration & Chemical Systems, Piping & Equipment

•Demolition, New Equipment Building, MEP, Pool Deck, Fencing &

Shade Structures……………….…………….………………………………………………..…......…

•Provide New Water Slide………………………………………………………………………….......

•New Water Features/Play Apparatus……………………….………………………………...…..

•Contractor General Conditions/Overhead & Profit.………………………………………..….

Construction Range of Magnitude Budget……….………………………………….........…

$

$

$

$

$

$

$

100,000

1,800,000

810,000

175,000

165,000

305,000

3,355,000

-$300,000

-$3,480,000

City of Vincennes – Aquatic Facility Study

Option B: Renovation of the existing facility

Page 17: ACQUATICS FACILITY STUDY

City of Vincennes – Aquatic Facility Study

Option B.1: Renovation of the existing facility

Page 18: ACQUATICS FACILITY STUDY

Description and Cost

•Minor Renovations to Existing Bathhouse………………….….....................................

•Renovation Existing 10 Lane 50 Meter Lap Pool………………....………………….........

•Infill Diving Well, Create New Slide Well, Create Zero Depth Entry,

New Pool Filtration & Chemical Systems, Piping & Equipment

•Demolition, New Equipment Building, MEP, Pool Deck, Fencing &

Shade Structures……………………………………………………………………………………...

•Provide New Water Slide…………………………………………………………………………...

•New Water Features/Play Apparatus.………………………………………………………....

•Add Spray Park and Associated Site Improvements……………………………………….

•Contractor General Conditions/Overhead & Profit…………………………………..……

Construction Range of Magnitude Budget………………………………………..…….…

$

$

$

$

$

$

$

$

100,000

1,800,000

810,000

175,000

165,000

160,000

321,000

3,531,000

-$300,000

-$3,656,000

City of Vincennes – Aquatic Facility Study

Option B.1: Renovation of the existing facility

Page 19: ACQUATICS FACILITY STUDY

City of Vincennes – Aquatic Facility Study

Option C: Construction of a replacement facility

Page 20: ACQUATICS FACILITY STUDY

Description and Cost

•Minor Renovations to Existing Bathhouse…………………………….….....................

•Create New Pool………………………………………………………………....………..........

•Eight Lane – 25 Yard Lap Pool, Zero Depth Entry,

Slide Well, New Pool Filtration & Chemical Systems,

Piping & Equipment

•Demolition, New Equipment Building, MEP, Pool Deck, Fencing &

Shade Structures, etc…………………………………………………………..………………...

•Provide New Water Slide……………………………………………………….....................

•New Water Features/Play Apparatus……………….…………………….………………...

•Contractor General Conditions/Overhead & Profit………………….………............

Construction Range of Magnitude Budget……………………………....................

$

$

$

$

$

$

$

100,000

1,250,000

740,000

175,000

165,000

243,000

2,673,000

-$300,000

-$2,798,000

City of Vincennes – Aquatic Facility Study

Option C: Construction of a replacement facility

Page 21: ACQUATICS FACILITY STUDY

City of Vincennes – Aquatic Facility Study

Option C.1: Construction of a replacement facility

Page 22: ACQUATICS FACILITY STUDY

Description and Cost

•Minor Renovations to Existing Bathhouse…………………………….….....................

•Create New Pool………………………………………………………………....………………

•Eight Lane – 25 Yard Lap Pool, Zero Depth Entry,

Slide Well, New Pool Filtration & Chemical Systems,

Piping & Equipment

•Demolition, New Equipment Building, MEP, Pool Deck, Fencing &

Shade Structures, etc…………………………………………………………..………………..

•Provide New Water Slide………………………………………………………...................

•New Water Features/Play Apparatus…..………………………………….………………..

•Add Spray Park and Associated Site Improvements……………………………………

•Contractor General Conditions/Overhead & Profit………………….…………………

Construction Range of Magnitude Budget……………………………....................

$

$

$

$

$

$

$

$

100,000

1,250,000

740,000

175,000

165,000

160,000

259,000

2,849,000

-$300,000

-$2,974,000

City of Vincennes – Aquatic Facility Study

Option C.1: Construction of a replacement facility

Page 23: ACQUATICS FACILITY STUDY

City of Vincennes – Aquatic Facility Study

Option C.2: Construction of a replacement facility

Page 24: ACQUATICS FACILITY STUDY

City of Vincennes – Aquatic Facility Study

Description and Cost

•Minor Renovations to Existing Bathhouse…………………………….…............

•Create New Pool………………………………………………………………....………

•Eight Lane – 50 Meter Lap Pool, Zero Depth Entry,

Slide Well, New Pool Filtration & Chemical Systems,

Piping & Equipment

•Demolition, New Equipment Building, MEP, Pool Deck, Fencing &

Shade Structures, etc…………………………………………………………..………..

•Provide New Water Slide………………………………………………………...........

•New Water Features/Play Apparatus…..………………………………….………..

•Add Spray Park and Associated Site Improvements…………………………..

•Contractor General Conditions/Overhead & Profit………………….………..

Construction Range of Magnitude Budget……………………………..........

$

$

$

$

$

$

$

$

100,000

2,300,000

810,000

175,000

165,000

160,000

371,000

4,081,000

-$300,000

-$4,206,000

Option C.2: Construction of a replacement facility

Page 25: ACQUATICS FACILITY STUDY

City of Vincennes – Aquatic Facility Study

Option C.3: Construction of a replacement facility

Page 26: ACQUATICS FACILITY STUDY

City of Vincennes – Aquatic Facility Study

Description and Cost

•Create New Pool………………………………………………………………....…………

•Eight Lane – 50 Meter Lap Pool, Zero Depth Entry,

Slide Well, New Pool Filtration & Chemical Systems,

Piping & Equipment

•New Equipment Building, MEP, Pool Deck, Fencing &

Shade Structures, etc…………………………………………………………..…………..

•Provide New Water Slide……………………………………………………….............

•New Water Features/Play Apparatus………………..………………………………..

•Add Spray Park and Associated Site Improvements……………………………..

•Add New Bathhouse with Concessions……………………………………………….

•Contractor General Conditions/Overhead & Profit………………….…………..

Construction Range of Magnitude Budget…………………………….............

2,300,000

810,000

175,000

165,000

160,000

625,000

423,000

4,658,000

$

$

$

$

$

$

$

$

-$300,000

-$4,783,000

Option C.3: Construction of a replacement facility

Page 27: ACQUATICS FACILITY STUDY

City of Vincennes – Aquatic Facility Study

Cost Comparison

Page 28: ACQUATICS FACILITY STUDY

Cost Comparison of Other Facilities

Year Built

Pool S.F.

Original Pool Cost

2012 Pool Cost

Description

Baker Park PoolNew Castle, Indiana

2007 7,546 $999,000 $1,158,00025 yard pool, zero depth entry, small participatory

feature, slide

City of Vincennes – Aquatic Facility Study

Page 29: ACQUATICS FACILITY STUDY

Cost Comparison of Other Facilities

Year Built

Pool S.F.

Original Pool Cost

2012 Pool Cost

Description

Rochelle-Landers PoolEvansville, Indiana

2009 7,966 $1,152,000 $1,258,00025 yard pool, zero depth entry, large participatory play feature, tot slide, medium sized slide, spray

park features in zero depth entry

City of Vincennes – Aquatic Facility Study

Page 30: ACQUATICS FACILITY STUDY

Cost Comparison of Other Facilities

Year Built

Pool S.F.

Original Pool Cost

2012 Pool Cost

Description

Bethel Park Aquatic CenterIndianapolis, Indiana

2011 6,691 $1,146,000 $1,180,00025 yard pool, zero depth entry, large participatory

play feature, “run-out” slide

City of Vincennes – Aquatic Facility Study

Page 31: ACQUATICS FACILITY STUDY

Questions?