ACN/PCN module in PEP Monique FUERI Director Operational Performance Presented by:

23
ACN/PCN module in PEP Monique FUERI Director Operational Performance Presented by:

Transcript of ACN/PCN module in PEP Monique FUERI Director Operational Performance Presented by:

Page 1: ACN/PCN module in PEP Monique FUERI Director Operational Performance Presented by:

ACN/PCN module in PEP

Monique FUERIDirector Operational Performance

Presented by:

Page 2: ACN/PCN module in PEP Monique FUERI Director Operational Performance Presented by:

April 2007 ACN/PCN module in PEP Page 2© A

IRB

US

S.A

.S.

All

right

s re

serv

ed.

Con

fiden

tial a

nd p

ropr

ieta

ry d

ocum

ent.

Content

ACN/PCN method

ACN determination

ACN/PCN PEP module

Conclusion

Page 3: ACN/PCN module in PEP Monique FUERI Director Operational Performance Presented by:

April 2007 ACN/PCN module in PEP Page 3© A

IRB

US

S.A

.S.

All

right

s re

serv

ed.

Con

fiden

tial a

nd p

ropr

ieta

ry d

ocum

ent.

Content

ACN/PCN method

ACN determination

ACN/PCN PEP module

Conclusion

Page 4: ACN/PCN module in PEP Monique FUERI Director Operational Performance Presented by:

April 2007 ACN/PCN module in PEP Page 4© A

IRB

US

S.A

.S.

All

right

s re

serv

ed.

Con

fiden

tial a

nd p

ropr

ieta

ry d

ocum

ent.

ACN/PCN method

• Aim:Considering a runway with a given bearing strength, can a

given aircraft with a given load operate on this runway without damaging the pavement ?

• Numerous methods developed:44 methods in USA in the 80’s

• 1982: ACN/PCN method developed by ICAO

• Former official ICAO method: LCN (Load Classification Number) still sometimes used.

Page 5: ACN/PCN module in PEP Monique FUERI Director Operational Performance Presented by:

April 2007 ACN/PCN module in PEP Page 5© A

IRB

US

S.A

.S.

All

right

s re

serv

ed.

Con

fiden

tial a

nd p

ropr

ieta

ry d

ocum

ent.

• The PCN expresses the bearing capacity of a pavement for unlimited operation

• The PCN is provided by airport authorities

• The PCN is qualified by:Pavement typeSubgrade strength categoryTire pressure categoryPavement calculation method

ACN/PCN method

Pavement Classification number:

Page 6: ACN/PCN module in PEP Monique FUERI Director Operational Performance Presented by:

April 2007 ACN/PCN module in PEP Page 6© A

IRB

US

S.A

.S.

All

right

s re

serv

ed.

Con

fiden

tial a

nd p

ropr

ieta

ry d

ocum

ent.

Pavement Classification Number:

• The PCN expresses the bearing capacity of a pavement for unlimited operation

• The PCN is provided by airport authorities

• The PCN is qualified by:Pavement typeSubgrade strength categoryTire pressure categoryPavement calculation method

ACN/PCN method

Pavement typePavement typeR : rigidF : flexible

Pavement typePavement typeR : rigidF : flexible

Page 7: ACN/PCN module in PEP Monique FUERI Director Operational Performance Presented by:

April 2007 ACN/PCN module in PEP Page 7© A

IRB

US

S.A

.S.

All

right

s re

serv

ed.

Con

fiden

tial a

nd p

ropr

ieta

ry d

ocum

ent.

Pavement Classification Number:

• The PCN expresses the bearing capacity of a pavement for unlimited operation

• The PCN is provided by airport authorities

• The PCN is qualified by:Pavement typeSubgrade strength categoryTire pressure categoryPavement calculation method

ACN/PCN method

Subgrade strength Subgrade strength categorycategoryA : highB : mediumC : lowD : ultra low

Subgrade strength Subgrade strength categorycategoryA : highB : mediumC : lowD : ultra low

Page 8: ACN/PCN module in PEP Monique FUERI Director Operational Performance Presented by:

April 2007 ACN/PCN module in PEP Page 8© A

IRB

US

S.A

.S.

All

right

s re

serv

ed.

Con

fiden

tial a

nd p

ropr

ieta

ry d

ocum

ent.

Pavement Classification Number:

• The PCN expresses the bearing capacity of a pavement for unlimited operation

• The PCN is provided by airport authorities

• The PCN is qualified by:Pavement typeSubgrade strength categoryTire pressure categoryPavement calculation method

ACN/PCN method

Tire pressure categoryTire pressure category(maximum permissible tire pressure)W : no limitX : to 1.5 MPaY : to 1.0 MPaZ : to 0.5 MPa

Tire pressure categoryTire pressure category(maximum permissible tire pressure)W : no limitX : to 1.5 MPaY : to 1.0 MPaZ : to 0.5 MPa

Page 9: ACN/PCN module in PEP Monique FUERI Director Operational Performance Presented by:

April 2007 ACN/PCN module in PEP Page 9© A

IRB

US

S.A

.S.

All

right

s re

serv

ed.

Con

fiden

tial a

nd p

ropr

ieta

ry d

ocum

ent.

Pavement Classification Number:

• The PCN expresses the bearing capacity of a pavement for unlimited operation

• The PCN is provided by airport authorities

• The PCN is qualified by:Pavement typeSubgrade strength categoryTire pressure categoryPavement calculation method

ACN/PCN method

Pavement calculation methodPavement calculation methodT : technicalU : using a/c experience

Pavement calculation methodPavement calculation methodT : technicalU : using a/c experience

Page 10: ACN/PCN module in PEP Monique FUERI Director Operational Performance Presented by:

April 2007 ACN/PCN module in PEP Page 10© A

IRB

US

S.A

.S.

All

right

s re

serv

ed.

Con

fiden

tial a

nd p

ropr

ieta

ry d

ocum

ent.

ACN/PCN method

PCN 58 R / B / W / TExample :

The bearing capacity of a rigid pavement rigid pavement restingon a foundation of medium strength has given,by technical assessment, a PCN = 58.There is no tire pressure restriction.

Page 11: ACN/PCN module in PEP Monique FUERI Director Operational Performance Presented by:

April 2007 ACN/PCN module in PEP Page 11© A

IRB

US

S.A

.S.

All

right

s re

serv

ed.

Con

fiden

tial a

nd p

ropr

ieta

ry d

ocum

ent.

• The ACN expresses the relative effect of an aircraft on a pavement for a specified standard subgrade

• ACN depends on aircraft parameters and runway parameters:

Aircraft parameters: weight, C.G. position,landing gear geometry (twin gear or

bogie), tire pressure

Runway parameters: pavement type, subgrade category

ACN/PCN method

Aircraft Classification number:

Page 12: ACN/PCN module in PEP Monique FUERI Director Operational Performance Presented by:

April 2007 ACN/PCN module in PEP Page 12© A

IRB

US

S.A

.S.

All

right

s re

serv

ed.

Con

fiden

tial a

nd p

ropr

ieta

ry d

ocum

ent.

ACN/PCN method

• Unrestricted operation if ACN is less or equal to PCN

• Overload operation is possible depending on country and airport policy.

ICAO rule for overload operations:– 10% PCN margin for flexible pavements– 5% PCN margin for rigid pavements– Annual number of overload movements less than 5% of total

annual movements

Page 13: ACN/PCN module in PEP Monique FUERI Director Operational Performance Presented by:

April 2007 ACN/PCN module in PEP Page 13© A

IRB

US

S.A

.S.

All

right

s re

serv

ed.

Con

fiden

tial a

nd p

ropr

ieta

ry d

ocum

ent.

ACN determination

• ACN for Airbus aircraft can be determined using the Airplane Characteristics for Airport Planning Manual

Page 14: ACN/PCN module in PEP Monique FUERI Director Operational Performance Presented by:

April 2007 ACN/PCN module in PEP Page 14© A

IRB

US

S.A

.S.

All

right

s re

serv

ed.

Con

fiden

tial a

nd p

ropr

ieta

ry d

ocum

ent.

Content

ACN/PCN method

ACN determination

ACN/PCN PEP module

Conclusion

Page 15: ACN/PCN module in PEP Monique FUERI Director Operational Performance Presented by:

April 2007 ACN/PCN module in PEP Page 15© A

IRB

US

S.A

.S.

All

right

s re

serv

ed.

Con

fiden

tial a

nd p

ropr

ieta

ry d

ocum

ent.

ACN determination

Page 16: ACN/PCN module in PEP Monique FUERI Director Operational Performance Presented by:

April 2007 ACN/PCN module in PEP Page 16© A

IRB

US

S.A

.S.

All

right

s re

serv

ed.

Con

fiden

tial a

nd p

ropr

ieta

ry d

ocum

ent.

ACN determination

Page 17: ACN/PCN module in PEP Monique FUERI Director Operational Performance Presented by:

April 2007 ACN/PCN module in PEP Page 17© A

IRB

US

S.A

.S.

All

right

s re

serv

ed.

Con

fiden

tial a

nd p

ropr

ieta

ry d

ocum

ent.

Content

ACN/PCN method

ACN determination

ACN/PCN PEP module

Conclusion

Page 18: ACN/PCN module in PEP Monique FUERI Director Operational Performance Presented by:

April 2007 ACN/PCN module in PEP Page 18© A

IRB

US

S.A

.S.

All

right

s re

serv

ed.

Con

fiden

tial a

nd p

ropr

ieta

ry d

ocum

ent.

ACN/PCN PEP module

• With the increasing number of Airbus aircraft and Airbus operators, more and more destinations have low strength runways.

• Runway loading aspects start playing an important role in landing fee determination.

• ACN determination with the curves presently published may be fastidious and lead to errors.

Page 19: ACN/PCN module in PEP Monique FUERI Director Operational Performance Presented by:

April 2007 ACN/PCN module in PEP Page 19© A

IRB

US

S.A

.S.

All

right

s re

serv

ed.

Con

fiden

tial a

nd p

ropr

ieta

ry d

ocum

ent.

ACN/PCN PEP module

• New PEP module: ACN and LCN calculationACN/PCN

Runway CalculationACN/PCN methodLCN method

DRAFT

Page 20: ACN/PCN module in PEP Monique FUERI Director Operational Performance Presented by:

April 2007 ACN/PCN module in PEP Page 20© A

IRB

US

S.A

.S.

All

right

s re

serv

ed.

Con

fiden

tial a

nd p

ropr

ieta

ry d

ocum

ent.

ACN/PCN PEP module

• Compute ACN and LCN for every pavement type for given aircraft data

• Compute maximum aircraft weight for a given runway

• Possibility to introduce the PCN value of each runway in the airport database managed by the airport manager is being studied

• Provide a graphical output: ACN function of aircraft C.G. for a given pavement type

Page 21: ACN/PCN module in PEP Monique FUERI Director Operational Performance Presented by:

April 2007 ACN/PCN module in PEP Page 21© A

IRB

US

S.A

.S.

All

right

s re

serv

ed.

Con

fiden

tial a

nd p

ropr

ieta

ry d

ocum

ent.

ACN/PCN PEP module

• Center of Gravity Position Influence

A330-200 ACN's Flex Cat. B

MTOW 230 000 kg

MLW 182 000 kg

MZFW 170 000 kg

Flight --><-- Take-Off & Landing

Take-Off -->

Landing -->

<-- Flight

110

130

150

170

190

210

230

250 15

10

20 25 30 35

15 20 25 30 35 40 45

40

ACN 65 F/B

ACN 60 F/B

ACN 55 F/B

ACN 50 F/B

ACN 45 F/B

ACN 40 F/B

ACN 35 F/B

ACN 30 F/B

110

130

150

170

190

210

230

250

45

Tires 1400x530R23 PR36Tire Pressure (loaded): 14.2bar (206psi)

max aft CG Position: 37.5% MACMax Taxi Weight: 230.9t

Same ACN but several tons of Payload/Fuel difference

ACN’s definedat MRW andmax aft CG

Page 22: ACN/PCN module in PEP Monique FUERI Director Operational Performance Presented by:

April 2007 ACN/PCN module in PEP Page 22© A

IRB

US

S.A

.S.

All

right

s re

serv

ed.

Con

fiden

tial a

nd p

ropr

ieta

ry d

ocum

ent.

Content

ACN/PCN method

ACN determination

ACN/PCN PEP module

Conclusion

Page 23: ACN/PCN module in PEP Monique FUERI Director Operational Performance Presented by:

April 2007 ACN/PCN module in PEP Page 23© A

IRB

US

S.A

.S.

All

right

s re

serv

ed.

Con

fiden

tial a

nd p

ropr

ieta

ry d

ocum

ent.

Conclusion

• New ACN/PCN module will be fully integrated in the PEP user-friendly interface

• It will allow:ACN computation of a given aircraftMaximum aircraft weight for a given runwayLCN computation

• Availability: mid-2008