CONTRATISTA : VR.INICIAL OBRA : LOCALIZACIÓN :
VR. ADICIONAL No. :
VR. ADICIONAL No. : FECHA INICIACIÓN :
: 830,038,225-6 VR. TOTAL : PLAZO INICIAL :
DIRECCIÓN : CALLE 135 No. 52A - 35 ADICIONAL EN PLAZO No. :TELÉFONO : ANTICIPO % : ADICIONAL EN PLAZO No. :
INTERVENTOR : AMORTIZACIÓN ACTA No.1 : PLAZO TOTAL :
AMORTIZACIÓN ACTA No.2 : FECHA SUSPENSIÓN No. :NIT : FECHA REINICIACIÓN No. :DIRECCIÓN : CRA 13A NO 86A - 62 OF 202 :TELÉFONO : 6211490 SALDO POR AMORTIZAR : FECHA TERMINACIÓN ACTUAL :
BALANCE GENERAL ACTUALIZADO
OBRA EJECUTADA
PRESENTE ACTA ACUMULADO ANTERIOR ACUMULADO ACTUALCANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VR. EJECUTADO ($) % EJEC.
ML 21,33 11.630,00$ 248.067,90$ 21,33 248.067,90$ 0,00 0,00$ 21,33 248.067,90$
m² 317,00 9.360,00$ 2.967.120,00$ 317,00 2.967.120,00$ 0,00 0,00$ 317,00 2.967.120,00$
Gl 1,00 6.928.500,00$ 6.928.500,00$ 1,00 6.928.500,00$ 0,00 0,00$ 1,00 6.928.500,00$
M² 116,00 20.844,00$ 2.417.904,00$
M² 1,90 25.761,00$ 48.945,90$
M² 12,83 19.677,00$ 252.455,91$
ML 10,00 4.970,00$ 49.700,00$
ML 16,00 5.662,00$ 90.592,00$
ML 10,00 5.663,00$ 56.630,00$
ML 3,00 16.870,00$ 50.610,00$
M² 14,00 31.729,00$ 444.206,00$
M² 15,00 14.666,00$ 219.990,00$
M³ 14,32 35.639,00$ 510.350,48$
UND 2,00 41.138,00$ 82.276,00$
M² 11,10 20.103,00$ 223.143,30$
UND 14,00 23.010,00$ 322.140,00$
UND 2,00 367.557,00$ 735.114,00$
M² 2,50 72.098,00$ 180.245,00$
3
m3 2,00 1.031.188,00$ 2.062.376,00$
ML 40,00 161.877,00$ 6.475.080,00$
m3 4,00 82.783,00$ 331.132,00$
m3 3,00 1.045.035,00$ 3.135.105,00$
KG 1169,00 7.276,00$ 8.505.644,00$
m3 1,00 953.351,00$ 953.351,00$
M² 73,99 92.447,00$ 6.840.153,53$
ML 4,00 44.141,00$ 176.564,00$
ML 20,80 38.257,00$ 795.745,60$
ML 5,00 35.290,00$ 176.450,00$
M² 15,00 89.507,00$ 1.342.605,00$
M² 14,00 114.665,00$ 1.605.310,00$
M² 14,00 99.768,00$ 1.396.752,00$
UND 1,00 135.849,00$ 135.849,00$
ML 8,00 79.363,00$ 634.904,00$
UND 7,00 87.834,00$ 614.838,00$
5.1.1 UN 1,00 978.940,00$ 978.940,00$
INSTALACIONES ELÉCTRICAS5
ACOMETIDAS Y TABLEROS
Tablero eléctrico Tipo Pesado con espacio Totalizador 30 Ctos 3F. 5H. 225A, puerta
chapa y llave. Salidas Normales Iluminación y Tomas
RAMALES Y BAJANTES DE AGUAS LLUVIAS
Tubería PVC tipo NOVAFORT igual o similar A.LL 6" 110 mm
Accesorios PVC tipo NOVAFORT A.LL. igual o similar
4
4.1.1
4.1.2
MUROS EN MAMPOSTERIA
Mampostería en bloque No 5
Pocetas de aseo con muros en ladrillo tolete, con acabado en granito pulido y bordillos
en mediacaña
3.3.1
3.3.2
3,3
Dinteles en concreto de 3000 PSI
Suministro e Instalación muro en Super Board Una Cara, incluye pintura 2 manos
tipo 1
Suministro e Instalación Muro en Super Boad Doble Cara incluye pintura 2 manos
tipo 1
3.2.1
3.2.2
3.2.3
3.2.4
3.2.5
3.2.6
2.2.3
2.2.4
2.2.5
Suministro e Instalación Muro DRYWALL e= 0,12 mt, 2 caras, incluye aislamiento
acústico interior (tipo frescaza), perfileria galvanizada. Pintura 2 manos tipo 1
Dintel en Drywall
Perfil Metálico muro y cielo Drywall
3,2
2.1.8
2.1.9
2.1.10
2,2
2.2.1
2.2.2
Zapatas de cimentación concreto F'C 3000 PSI Mpa, con agregado D: 1" (No incluye
refuerzo).
MUROS EN DIVISIONES LIVIANAS
3,1
3.1.1
3.1.2
3.1.3
3.1.4
3.1.5
3.1.6
Acero de refuerzo 60.000 PSI
2
100,0%
ESTRUCTURA
Viga de Amarre en Concreto de 3000 PSI (0,25*0,20)
Base en recebo compactado a máquina e=0.20, incluye proctor modificado 95%
Columna en concreto F'C 4000 PSI (No incluye refuerzo).
2.1.3
2.1.4
2.1.5
ESTRUCTURA Y MAMPOSTERÍA
Vigas de cimentación
DESMONTES Y RETIROS VARIOS
Desmonte de puerta y marcos en madera < de 1,00
Desmonte de ventanas y vidrios
Desmonte de lámparas de sobreponer
Desmonte y Reubicación de Aire Acondicionado
Desmonte de estructura metálica y teja existente incluye retiro
Regatas en muros
Demolición de Dinteles en concreto
Demolición de Placa de Concreto e= 0,20. Incluye Trasiego y Retiro de Escombros
Demolición muro en Drywall por dos caras
Excavación manual espesor 15 cms, incluye retiro
2,1
2.1.1
2.1.2
2.1.6
2.1.7
DEMOLICIONES
Demolición muros en mampostería e=.15 incluye trasiego y retiro de escombro
Demolición de Pisos y plantilla incluye trasiego y retiro de escombro
Demolición de enchapes incluye trasiego y retiro de escombro
Demolición de guarda escoba en granito incluye trasiego y retiro de escombro
Regata con pulidora en piso
FECHA: 21
SEPTIEMBRE 2015
1
DEMOLICIONES Y DESMONTES
1,1
1,2
1,3
Levantamiento, Ajuste Diseños y Replanteo
Licencia de construcción (Los planos de construcción, diseño y documentos
exigidos serán adelantado por la Unidad de Recursos Físicos de esta corporación)
pero los costos serán incluidos por el contratista.
17 DE ENERO DE 2016
103.277.244,00$
413.108.976,00$
LETICIA -AMAZONAS
18 SEPTIEMBRE DE 2015
4 MESES
PRELIMINARES
Unidad de Infraestructura Fisica
4 MESES
ÍTEM DESCRIPCIÓN UN PRECIO
UNITARIO
516.386.220,00$
-$
-$
CANTIDAD VALOR TOTAL
MAYORES Y MENORES CANTIDADES DE OBRACONDICIONES ORIGINALES DEL CONTRATO
CELQO SAS
NIT
900090780.
4796575
100,0%Cerramiento en lona verde (polisombra) incluye parales en madera y altura de 3,5m
100,0%
CANTIDAD VALOR TOTAL ($) (+/-)
Sala Administrativa
ACTA MENSUAL DE CORTE DE OBRA No. 1
OBJETO:
Direccion Ejecutiva de Administracion Judicial
CONTRATO DE OBRA No. (Indicar No. y fecha de firma día, mes y año)
CORRESPONDIENTE AL MES DE: SEPTIEMBRE
DE 2015
Consejo Superior de la Judicatura
VISUAR SAS
Código: F-URFI-ACMPU
Versión: 00
COPIA CONTROLADAPág. 1 de 5
CONTRATISTA : VR.INICIAL OBRA : LOCALIZACIÓN :
VR. ADICIONAL No. :
VR. ADICIONAL No. : FECHA INICIACIÓN :
: 830,038,225-6 VR. TOTAL : PLAZO INICIAL :
DIRECCIÓN : CALLE 135 No. 52A - 35 ADICIONAL EN PLAZO No. :TELÉFONO : ANTICIPO % : ADICIONAL EN PLAZO No. :
INTERVENTOR : AMORTIZACIÓN ACTA No.1 : PLAZO TOTAL :
AMORTIZACIÓN ACTA No.2 : FECHA SUSPENSIÓN No. :NIT : FECHA REINICIACIÓN No. :DIRECCIÓN : CRA 13A NO 86A - 62 OF 202 :TELÉFONO : 6211490 SALDO POR AMORTIZAR : FECHA TERMINACIÓN ACTUAL :
BALANCE GENERAL ACTUALIZADO
OBRA EJECUTADA
PRESENTE ACTA ACUMULADO ANTERIOR ACUMULADO ACTUALCANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VR. EJECUTADO ($) % EJEC.
FECHA: 21
SEPTIEMBRE 2015
1
17 DE ENERO DE 2016
103.277.244,00$
413.108.976,00$
LETICIA -AMAZONAS
18 SEPTIEMBRE DE 2015
4 MESES
PRELIMINARES
Unidad de Infraestructura Fisica
4 MESES
ÍTEM DESCRIPCIÓN UN PRECIO
UNITARIO
516.386.220,00$
-$
-$
CANTIDAD VALOR TOTAL
MAYORES Y MENORES CANTIDADES DE OBRACONDICIONES ORIGINALES DEL CONTRATO
CELQO SAS
NIT
900090780.
4796575
CANTIDAD VALOR TOTAL ($) (+/-)
Sala Administrativa
ACTA MENSUAL DE CORTE DE OBRA No. 1
OBJETO:
Direccion Ejecutiva de Administracion Judicial
CONTRATO DE OBRA No. (Indicar No. y fecha de firma día, mes y año)
CORRESPONDIENTE AL MES DE: SEPTIEMBRE
DE 2015
Consejo Superior de la Judicatura
VISUAR SAS
5.1.2 UN 2,00 525.604,00$ 1.051.208,00$
5.1.3 UN 4,00 35.368,00$ 141.472,00$
5.1.4 UN 1,00 36.754,00$ 36.754,00$
5,2
5.2.1 ML 17,00 102.718,00$ 1.746.206,00$
5.2.2 ML 47,94 40.797,00$ 1.955.808,18$
5.2.3 ML 35,00 55.595,00$ 1.945.825,00$
5.2.4 ML 45,00 45.887,00$ 2.064.915,00$
5,3
5.3.1 UN 35,00 97.660,00$ 3.418.100,00$
5.3.2 UN 17,00 106.905,00$ 1.817.385,00$
5.3.3 UN 1,00 137.752,00$ 137.752,00$
5.3.4 UN 1,00 144.814,00$ 144.814,00$
5.3.5 UN 10,00 87.555,00$ 875.550,00$
5.3.6 UN 5,00 94.192,00$ 470.960,00$
5.3.7 UN 47,00 115.379,00$ 5.422.813,00$
5.3.8 UN 15,00 114.917,00$ 1.723.755,00$
5.3.9 UN 5,00 268.863,00$ 1.344.315,00$
5.3.10 UN 2,00 131.629,00$ 263.258,00$
5,4 0,00$
5.4.1 UN 5,00 329.388,00$ 1.646.940,00$
5.4.2 UN 6,00 286.783,00$ 1.720.698,00$
5.4.3 UN 8,00 167.585,00$ 1.340.680,00$
5,5 0,00$
5.5.1 UN 2,00 118.033,00$ 236.066,00$
5.5.2 UN 2,00 129.670,00$ 259.340,00$
5.5.3 UN 10,00 96.380,00$ 963.800,00$
5.5.4 UN 4,00 31.323,00$ 125.292,00$
5.5.5 ML 200,00 13.338,00$ 2.667.600,00$
5.5.6 ML 150,00 12.465,00$ 1.869.750,00$
5,6 0,00$
5.6.1 UN 10,00 7.281,00$ 72.810,00$
5.6.2 UN 10,00 8.668,00$ 86.680,00$
5.6.3 UN 8,00 146.778,00$ 1.174.224,00$
5.6.4 ML 350,00 7.120,00$ 2.492.000,00$
5.6.5 UN 1,00 634.926,00$ 634.926,00$
5.6.6 UN 8,00 176.998,00$ 1.415.984,00$
5.6.7 UN 8,00 37.106,00$ 296.848,00$
5.6.8 UN 1,00 403.839,00$ 403.839,00$
5.6.9 UN 1,00 634.926,00$ 634.926,00$
5.6.10 UN 1,00 1.135.487,00$ 1.135.487,00$
5.6.11 UN 1,00 7.649.872,00$ 7.649.872,00$
5,7 0,00$
Suministro e Instalación de Multitoma cat 6A para Gabinete Metálica para Rack
Suministro e instalación de Patch Panel de 48 puertos Cat 6A
Suministro e Instalación de Switch de 24 Puertos CAT 6A tipo HP V1910-24G
Suministro e instalación de UPS 2KVA L/120VAC, incluye ON/OFF en sitio, transporte,
pruebas y puesta en funcionamiento.
TRAMITES
Troqueles lógicos, con pintura electrostática
Toma doble RJ 45 completo (incluye jack y Face Plate de 2 puertos), cat 6 en AMP
Suministro e instalación cable utp cat 6A AMP
Suministro e instalación de Patch Panel de 48 puertos Cat 6A
Certificación de puntos de voz y datos
Patch cord de 3 pies Cat 6A para administración
Salida de micrófonos incl. tubería pvc conduit 1-1/4, caja galvanizada y toma. Hasta 3
mts
Suministro e Instalación de Canaleta Plástica 32mm x 12mm para interconexión de
mueble a salida de pared
Suministro e instalación de cable eléctrico 3x12 thhn
Acometida cable encauchetado 3x14
CABLEADO ESTRUCTURADO
Troqueles eléctricos sencillos, con pintura electrostática
Lámparas de emergencia recargables tipo LED. Incluye baterías y bombillos, Se
debe garantizar al menos 1 horas de servicio.
Suministro instalación y montaje Panel LED para empotrar de 06 x 0,6 43W 3700L
Bala ITK 227/2T42641/Eunv 7WMASTER LED/120VIncluye cableado y bornera
desconexión mantenimiento.
SALIDA PARA COMUNICACIONES
Salida sonido en Sala de Audiencias ductos de 1/2" PVC. LIBRES interconectados a
Caja Central Bajo Mueble Secretario
Salida Cámara en Sala de Audiencias ductos de 3/4" PVC. LIBRES interconectados a
Caja Central Bajo Mueble Secretario
Salida interruptor conmutable doble, incluye interruptor
Salida luminaria techo tubo EMT (Panel LED 60x60 o Similar)
Salida luminaria techo tubo EMT (LED circular 18w opalizada)
SALIDAS PARA LAMPARAS DE EMERGENCIA desde el tablero normal. Incluye
caja, adaptadores, ducto EMT y cableado en 2#12AWG + tierra., Tipo Mickey con
Luz LED, autonomía de 3 horas
Salida secador de manos Secamanos en Baños 5-20R, no incluye secador.
LUMINARIAS
SALIDAS ELECTRICAS
SALIDA PARA TOMACORRIENTE DOBLE MONOFÁSICO CON
POLO A TIERRA. Incluye: ducto, cajas, curvas, conductores, toma doble 15A tierra
aislada COLOR BLANCO, marquilla acrílica y demás elementos necesarios para su
correcta operación
SALIDA PARA TOMACORRIENTE DOBLE MONOFÁSICO CON POLO A TIERRA
REGULADA GRADO HOSPITALARIO. Incluye:
ducto, cajas, curvas, conductores, toma doble de 15A 120V COLOR NARANJA, marquilla
acrílica y demás elementos necesarios para su correcta operación
SALIDA BIFASICA 208 V PARA CAFETERA. Incluye: tubería, cajas, toma 20A- pata
cruzada con polo a tierra, marquilla acrílica, cableado en 2*10+12+10T y demás
elementos necesarios para su correcta operación.
SALIDA PARA TOMACORRIENTE DOBLE MONOFÁSICO de
seguridad tipo GFCI CON POLO A TIERRA Incluye: ducto, cajas, curvas,
conductores, toma doble de 15A 120V COLOR NARANJA, marquilla acrílica y demás
elementos necesarios para su correcta operación
Salida interruptor sencillo, incluye interruptor
Interruptor Automático Enchufable 1x20 A
BANDEJA PORTACABLES Y CANALETAS
Suministro e instalación bandeja tipo escalerilla de 30x8 incluye: soporte de anclaje
y fijación.
Suministro e instalación de canaleta plástica 12x5, incluye curvas y remates
Ducto EMT de 1" interconectando la canaleta perimetral con la vertical y/o con la
bandeja portacables, en general, descolgada por el cielo raso o por los muros según
sea el caso y con los puesto de trabajo. Incluye accesorios EMT y fijación unistrut.
Ducto EMT de 3/4" interconectando la canaleta perimetral con la vertical y/o con la
bandeja portacables, en general, descolgada por el cielo raso o por los muros según
sea el caso y con los puesto de trabajo. Incluye accesorios EMT y fijación unistrut.
Interruptor Automático Industrial Fijo 3x60 A 240 V 20 KA
Interruptor Automático Enchufable 1x15 A
Código: F-URFI-ACMPU
Versión: 00
COPIA CONTROLADAPág. 2 de 5
CONTRATISTA : VR.INICIAL OBRA : LOCALIZACIÓN :
VR. ADICIONAL No. :
VR. ADICIONAL No. : FECHA INICIACIÓN :
: 830,038,225-6 VR. TOTAL : PLAZO INICIAL :
DIRECCIÓN : CALLE 135 No. 52A - 35 ADICIONAL EN PLAZO No. :TELÉFONO : ANTICIPO % : ADICIONAL EN PLAZO No. :
INTERVENTOR : AMORTIZACIÓN ACTA No.1 : PLAZO TOTAL :
AMORTIZACIÓN ACTA No.2 : FECHA SUSPENSIÓN No. :NIT : FECHA REINICIACIÓN No. :DIRECCIÓN : CRA 13A NO 86A - 62 OF 202 :TELÉFONO : 6211490 SALDO POR AMORTIZAR : FECHA TERMINACIÓN ACTUAL :
BALANCE GENERAL ACTUALIZADO
OBRA EJECUTADA
PRESENTE ACTA ACUMULADO ANTERIOR ACUMULADO ACTUALCANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VR. EJECUTADO ($) % EJEC.
FECHA: 21
SEPTIEMBRE 2015
1
17 DE ENERO DE 2016
103.277.244,00$
413.108.976,00$
LETICIA -AMAZONAS
18 SEPTIEMBRE DE 2015
4 MESES
PRELIMINARES
Unidad de Infraestructura Fisica
4 MESES
ÍTEM DESCRIPCIÓN UN PRECIO
UNITARIO
516.386.220,00$
-$
-$
CANTIDAD VALOR TOTAL
MAYORES Y MENORES CANTIDADES DE OBRACONDICIONES ORIGINALES DEL CONTRATO
CELQO SAS
NIT
900090780.
4796575
CANTIDAD VALOR TOTAL ($) (+/-)
Sala Administrativa
ACTA MENSUAL DE CORTE DE OBRA No. 1
OBJETO:
Direccion Ejecutiva de Administracion Judicial
CONTRATO DE OBRA No. (Indicar No. y fecha de firma día, mes y año)
CORRESPONDIENTE AL MES DE: SEPTIEMBRE
DE 2015
Consejo Superior de la Judicatura
VISUAR SAS
5.7.1 GL 1,00 3.316.350,00$ 3.316.350,00$
5,8 0,00$
5.8.1 UND 6,00 178.477,00$ 1.070.862,00$
5.8.2 UND 2,00 184.719,00$ 369.438,00$
5,9 0,00$
5.9.1 ML 40,00 49.221,00$ 1.968.840,00$
5.9.2 UND 2,00 2.611.814,00$ 5.223.628,00$
5.9.3 UND 4,00 3.726.286,00$ 14.905.144,00$
5.9.4 UND 2,00 4.635.305,00$ 9.270.610,00$
5.9.5 UND 8,00 131.959,00$ 1.055.672,00$
5,10 0,00$
5.10.1 UN 1,00 176.731,00$ 176.731,00$
5.10.2 UN 1,00 80.704,00$ 80.704,00$
6
6,1
6.1.1 M² 25,00 26.303,00$ 657.575,00$
6.1.2 M² 27,40 21.979,00$ 602.224,60$
6,2
6.2.1 M² 70,00 95.350,00$ 6.674.500,00$
6.2.2 M² 50,00 107.489,00$ 5.374.450,00$
6.2.3 ML 5,00 76.141,00$ 380.705,00$
6.2.4 UND 48,00 151.061,00$ 7.250.928,00$
7
7,1
7.1.1 M² 70,00 53.051,00$ 3.713.570,00$
7.1.2 M² 70,00 96.143,00$ 6.730.010,00$
7.1.3 M² 35,00 241.995,00$ 8.469.825,00$
7.1.4. KG 496,00 10.287,00$ 5.102.352,00$
7,2
7.2.1 M² 70,00 116.082,00$ 8.125.740,00$
7,3
7.3.1 ML 63,00 28.181,00$ 1.775.403,00$
7,4
7.4.1 M² 80,00 23.169,00$ 1.853.520,00$
8,0
8,1
8.1.1 M² 22,08 226.480,00$ 5.000.678,40$
8.1.2 UND 9,00 430.551,00$ 3.874.959,00$
8,2 0,00$
8.2.1 UND 8,00 423.398,00$ 3.387.184,00$
8.2.2 UND 3,00 432.820,00$ 1.298.460,00$
9
9.1.1 ML 1,00 976.590,00$ 976.590,00$
10
10,1
10.1.1 UND 2,00 822.603,00$ 1.645.206,00$
10.1.2 UND 2,00 535.146,00$ 1.070.292,00$
10.1.3 UND 2,00 850.150,00$ 1.700.300,00$
APARATOS SANITARIOS Y ACCESORIOS
ACCESORIOS
SECADOR ELECTRICO para manos libres en Acero Inoxidable 304 satinado Tipo
Accesorios & Acabados Ref. 1 AA igual o mejor.
Dispensador de jabón líquido para instalar en la pared con tornillos escondidos. Cuerpo
en acero inoxidable satinado y botón pulsador
A.B.S. Capacidad de 1.2 lts, ventanilla de recarga superior con llave, nivel de jabón y
push frontal.
Gabinete para toallas de papel para sobreponer en la pared, en acero inoxidable
satinado 304. Capacidad para 300 toallas o dos (2) paquetes y cerradura con llave.
Suministro e instalación de ventana con marco en PVC, (marco consta de 2 hojas
corredizas hacia el centro y perillas de seguridad), (1,20x1,55) mts
PUERTAS
Suministro e instalación de puerta entamborada. Incluye cerraduras y herrajes
Suministro e instalación de Puerta Celosía en lámina CR cal. 18. Incluye marco y
montante en lámina, pisavidrios, manija, perfiles según diseño. Incluye
soldaduras, pernos de anclajes y complementarios, anticorrosivo aplicado en
dos (2) capas. PARA CUARTOS TÉCNICOS
ENCHAPES
Mesón de atención en mármol/granito (Para ventanillas de atención)
Suministro e instalación guarda escoba en tableta de granito
MANTENIMIENTO DE PISOS
Pulida y brillada de pisos existente
CARPINTERÍA METÁLICA Y MADERA
CARPITERIA METÁLICA
Suministro e instalación de Ventana FIJA cen PVC. Incluye vidrio laminado incoloro
3+3 mm instalado con silicona estructural, alfajía respectiva en aluminio (si aplica),
anclajes respectivos, perfiles según diseño.
Placa base concreto 0,08m
Placa metálica tipo metal-deck
Suministro e instalación malla electrosoldada Q-5
PISOS EN CERAMICA
Suministro e instalación piso en baldosa granito 33 * 33
GUARDAESCOBAS
Suministro e instalación de cubierta termo acústica tipo sandwich HD
Suministro e instalación de canal en lámina calibre 24 para aguas lluvias
Perlines 160x60x20 para estructura de cubierta. bloque 3
PISOS
BASE PISOS Y AFINADOS
Afinado piso en mortero 1:4 e=0.04
PAÑETES Y CIELO RASO
PAÑETE MUROS INTERIORES
Resane de placa, techo y muros
Pañete muros en mortero 1:4
CIELO RASO Y CUBIERTA
Suministro e instalación de cielo raso en PVC, incluye perfilería
Suministro e instalación y puesta en funcionamiento de aire acondicionado
tipo minisplit de 18.000 BTU marca carrier, york o superior incluye ( tuberías de
cobre 10 mts 1/2", aislamientos, accesorios de cobre, soldadura de plata, anclajes,
y todos los accesorios necesarios)
Suministro e instalación y puesta en funcionamiento de aire acondicionado
tipo minisplit de 24.000 BTU marca carrier, york o superior incluye ( tuberías de
cobre 10 mts 1/2", aislamientos, accesorios de cobre, soldadura de plata, anclajes,
y todos los accesorios necesarios)
Punto para desagüe de aire acondicionado en tubería pvc 3/4"
ANTENA DE TV
Salida para toma antena tv con cable rg6
Mástil 1" para antena en cubierta
SISTEMA CCTV
Salidas para Cámaras CCTV - Solo Ducto EMT 3/4"
Salidas para TV - Solo Ducto EMT 3/4"
AIRE ACONDICIONADO
Tubería de cobre aislamiento y accesorios
Suministro e instalación y puesta en funcionamiento de aire acondicionado
tipo minisplit de12.000 BTU marca carrier, york o superior incluye ( tuberías de
cobre 10 mts 1/2", aislamientos, accesorios de cobre, soldadura de plata, anclajes,
y todos los accesorios necesarios)
Certificación RETIE y RETILAP
Código: F-URFI-ACMPU
Versión: 00
COPIA CONTROLADAPág. 3 de 5
CONTRATISTA : VR.INICIAL OBRA : LOCALIZACIÓN :
VR. ADICIONAL No. :
VR. ADICIONAL No. : FECHA INICIACIÓN :
: 830,038,225-6 VR. TOTAL : PLAZO INICIAL :
DIRECCIÓN : CALLE 135 No. 52A - 35 ADICIONAL EN PLAZO No. :TELÉFONO : ANTICIPO % : ADICIONAL EN PLAZO No. :
INTERVENTOR : AMORTIZACIÓN ACTA No.1 : PLAZO TOTAL :
AMORTIZACIÓN ACTA No.2 : FECHA SUSPENSIÓN No. :NIT : FECHA REINICIACIÓN No. :DIRECCIÓN : CRA 13A NO 86A - 62 OF 202 :TELÉFONO : 6211490 SALDO POR AMORTIZAR : FECHA TERMINACIÓN ACTUAL :
BALANCE GENERAL ACTUALIZADO
OBRA EJECUTADA
PRESENTE ACTA ACUMULADO ANTERIOR ACUMULADO ACTUALCANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VR. EJECUTADO ($) % EJEC.
FECHA: 21
SEPTIEMBRE 2015
1
17 DE ENERO DE 2016
103.277.244,00$
413.108.976,00$
LETICIA -AMAZONAS
18 SEPTIEMBRE DE 2015
4 MESES
PRELIMINARES
Unidad de Infraestructura Fisica
4 MESES
ÍTEM DESCRIPCIÓN UN PRECIO
UNITARIO
516.386.220,00$
-$
-$
CANTIDAD VALOR TOTAL
MAYORES Y MENORES CANTIDADES DE OBRACONDICIONES ORIGINALES DEL CONTRATO
CELQO SAS
NIT
900090780.
4796575
CANTIDAD VALOR TOTAL ($) (+/-)
Sala Administrativa
ACTA MENSUAL DE CORTE DE OBRA No. 1
OBJETO:
Direccion Ejecutiva de Administracion Judicial
CONTRATO DE OBRA No. (Indicar No. y fecha de firma día, mes y año)
CORRESPONDIENTE AL MES DE: SEPTIEMBRE
DE 2015
Consejo Superior de la Judicatura
VISUAR SAS
11
11,1 M² 30,00 17.698,00$ 530.940,00$
11,2 ML 8,00 14.156,00$ 113.248,00$
11,3 M² 10,00 35.207,00$ 352.070,00$
11,4 M² 20,00 21.452,00$ 429.040,00$
11,5 M² 15,00 24.729,00$ 370.935,00$
11,6 ML 15,00 28.272,00$ 424.080,00$
12
12,1 UND 8,00 5.247,00$ 41.976,00$
13
13,1
13.1.1 M² 5,00 147.944,00$ 739.720,00$
13.1.2 UND 5,00 31.664,00$ 158.320,00$
13.1.3 M² 10,00 68.488,00$ 684.880,00$
13.1.4 M² 20,00 64.842,00$ 1.296.840,00$
14
14,1 M² 70,00 5.462,00$ 382.340,00$
14,2 VJ 2,00 203.813,00$ 407.626,00$
1
1,1 M2 350,00 20.458,00$ 7.160.300,00$
1,2 M2 180,00 28.546,00$ 5.138.280,00$
1,3 ML 660,00 10.634,00$ 7.018.440,00$
1,4 M2 450,00 13.521,00$ 6.084.450,00$
1,5 M2 150,00 19.069,00$ 2.860.350,00$
1,6 Ml 115,00 23.463,00$ 2.698.245,00$
2
2,1 M2 960,00 9.014,00$ 8.653.440,00$
2,2 M2 960,00 114.425,00$ 109.848.000,00$
3
3,1 M2 20,00 167.816,00$ 3.356.320,00$
3,2 M2 15,00 107.409,00$ 1.611.135,00$
3,3 UND 4,00 450.076,00$ 1.800.304,00$
3,4 M2 100,00 189.712,00$ 18.971.200,00$
4
4,1
UND 8,00 220.046,00$ 1.760.368,00$
5
5,1 UND 1,00 290.375,00$ 290.375,00$
5,2 Ml 20,00 82.039,00$ 1.640.780,00$
VARIOS
Suministro e instalación de reja similar a la existen debe ser soldada a la actual en un
ancho de 2,3m, dimensión de la reja 1,5m x 2,3m, incluye pintura en esmalte a toda la
reja
Suministro e instalación de pasamanos en tubo de acero inoxidable para escaleras,
incluye todos los soportes en el mismo material, diámetro 2 1/2 pulgada, e=1,5mm
Construcción de muro en mampostería, incluye dos columnetas, una puerta y dos
ventanas, debe quedar con todos los acabados, pañete, estuco y pintura, además
incluye la apertura de dos vanos para ventana sobre muro, las ventanas tienen
dimensiones 0,80m x 0,60m debe colocárseles rejillas en aluminio
Suministro e instalación de muro en Dry Wall, incluye dos puertas y dos ventanas de
dimensiones 0,80m x 0,80m, el muro debe quedar con todos los acabados
suministro e instalación de ventanas en aluminio color anolock, incluye el vidrio,
dimensiones, dos de 0,45m x 0,70m y dos de 0,73m x 0,45 debe instalarse los vidrios
correspondientes
Retiro de techo en Dry Wall y reemplazarlo por techo en láminas de PVC, incluye toda la
estructura
ILUMINACIÓN
Suministro e instalación Reflector para exterior de LED. 4000°K, Eléctrico, 7500
lúmenes, Balasto electrónico multi-voltaje THD ≤ 10%120-277V, Acabado, Cuerpo
en color negro, Óptica aluminio, semi-especular, baja iridiscencia, Montaje Muro,
incluye cableado y tubería MT en una longitud cada una de 30ml, deben quedar
con circuitos independientes incluye los breackers. Debe cumplir con la Norma Retie
Suministro y aplicación de pintura a dos manos, sobre techos
Suministro y aplicación de pintura epoxica, sobre vigas-canales en concreto, dos
componentes, recubrimiento epóxico con endurecedor tipo poliamida, de rápido secado,
empleado para proteger y decorar superficies de concreto, Pintusant o similar,
Incluye limpieza de la zona a aplicar e imprimación, las dimensiones son alto 30cm y
ancho 25cm
CUBIERTAS
Retito de cubierta existente, en teja eternit No. 4 y No. 5, incluye limpieza y retiro
de matas enredaderas de otra cubierta en 50m2
Suministro e instalación de teja termo acústica, cuya conformación sea lámina tipo
sándwich (Acero, asfalto, aluminio, laca anti hongos), Incluye ajustes de la estructura de
soporte actual
MUROS VENTANAS Y TECHOS
Suministro e instalación de película anti-solar 50%, con filtro UV incluye desmonte
de la existente cuando sea necesario y limpieza de área a instalar.
Suministro e instalación de película tipo sand-blasting completa opaca, incluye
desmonte de la existente cuando sea necesario y limpieza de área a instalar.
ASEO GENERAL FINAL
Aseo y limpieza general
retiro de escombros viajes de 6m3 resultante del aseo
B- MANTENIMIENTO GENERAL DEL INMUEBLE
CERRADURAS Y VIDRIOS
Tope para puerta
VIDRIOS, ESPEJOS Y CERRADURAS
VIDRIOS Y ESPEJOS
Suministro e instalación de cristal crudo transparente de 5mm sobre fachada
Desmonte de Persianas metálicas, con su respectiva estructura, incluye acarreo
horizontal y retiro de escombros.
Pintura muros vinilo tipo 1, 2 manos incluye resanes ( incluye filos y dilataciones)
Pintura muros 3 manos franjas menores de 50 cm
Suministro y aplicación de esmalte a base de aceite sobre Rejillas / Celosías metálicas
(indiferente de si es en vano de puerta o ventana), tres (3) capas aplicadas con pistola,
incluye preparación de superficie y diluyente. Incluye marco y las dos caras vistas.
Pintura para Exterior tipo koraza
Pañete impermeabilizado 1: 4 Muros
Suministro y aplicación de esmalte sobre lamina lineal
PINTURA
APLICACIÓN DE PINTURA
Suministro y aplicación de pintura sobre muros, Koraza Pro 750 de pintuco o de similar
características, a dos manos, color blanco almendra mate
Suministro y aplicación de pintura “Protección Techos Sherwin Williams o de
similares características, sobre teja de Zinc
Suministro y aplicación de pintura sintética a base de aceite, a dos manos, color negro
mate, sobre guarda escobas
Suministro y aplicación de pintura sintética a base de aceite, a dos manos, color gris
mate, sobre muros
Código: F-URFI-ACMPU
Versión: 00
COPIA CONTROLADAPág. 4 de 5
CONTRATISTA : VR.INICIAL OBRA : LOCALIZACIÓN :
VR. ADICIONAL No. :
VR. ADICIONAL No. : FECHA INICIACIÓN :
: 830,038,225-6 VR. TOTAL : PLAZO INICIAL :
DIRECCIÓN : CALLE 135 No. 52A - 35 ADICIONAL EN PLAZO No. :TELÉFONO : ANTICIPO % : ADICIONAL EN PLAZO No. :
INTERVENTOR : AMORTIZACIÓN ACTA No.1 : PLAZO TOTAL :
AMORTIZACIÓN ACTA No.2 : FECHA SUSPENSIÓN No. :NIT : FECHA REINICIACIÓN No. :DIRECCIÓN : CRA 13A NO 86A - 62 OF 202 :TELÉFONO : 6211490 SALDO POR AMORTIZAR : FECHA TERMINACIÓN ACTUAL :
BALANCE GENERAL ACTUALIZADO
OBRA EJECUTADA
PRESENTE ACTA ACUMULADO ANTERIOR ACUMULADO ACTUALCANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VR. EJECUTADO ($) % EJEC.
FECHA: 21
SEPTIEMBRE 2015
1
17 DE ENERO DE 2016
103.277.244,00$
413.108.976,00$
LETICIA -AMAZONAS
18 SEPTIEMBRE DE 2015
4 MESES
PRELIMINARES
Unidad de Infraestructura Fisica
4 MESES
ÍTEM DESCRIPCIÓN UN PRECIO
UNITARIO
516.386.220,00$
-$
-$
CANTIDAD VALOR TOTAL
MAYORES Y MENORES CANTIDADES DE OBRACONDICIONES ORIGINALES DEL CONTRATO
CELQO SAS
NIT
900090780.
4796575
CANTIDAD VALOR TOTAL ($) (+/-)
Sala Administrativa
ACTA MENSUAL DE CORTE DE OBRA No. 1
OBJETO:
Direccion Ejecutiva de Administracion Judicial
CONTRATO DE OBRA No. (Indicar No. y fecha de firma día, mes y año)
CORRESPONDIENTE AL MES DE: SEPTIEMBRE
DE 2015
Consejo Superior de la Judicatura
VISUAR SAS
5,3 Ml 20,00 63.040,00$ 1.260.800,00$
5,4 Un 2,00 154.411,00$ 308.822,00$
5,5 Un 1,00 895.301,00$ 895.301,00$
5,6 VJ 1,00 289.797,00$ 289.797,00$
404.058.614,80$
RESUMEN EJECUTIVO
VALOR TOTAL COSTO DIRECTO 404.058.075,00$ 10.143.688,00$ 0,00$ 10.143.688,00$
A. I. U. 27,80 % 112.328.145,00$ 27,80 2.819.945,00$ 27,80 0,00$ 27,80 2.819.945,00$
ADMINISTRACIÓN 21 % 84.852.196,00$ 21 2.130.174,00$ 21 0,00$ 21 2.130.174,00$
IMPREVISTOS 1,8 % 7.273.045,00$ 1,8 182.586,00$ 1,8 0,00$ 1,8 182.586,00$
UTILIDAD 5 % 20.202.904,00$ 5 507.184,00$ 5 0,00$ 5 507.184,00$
VALOR TOTAL OBRA 516.386.220,00$ 12.963.632,00$ 0,00$ 12.963.633,00$
0 % 0,00$ 0,00$ 0,00$
VALOR A PAGAR EN ACTA 12.963.632,00$ 12.963.632,00$ 0,00$ 12.963.633,00$
A PAGAR EN LA PRESENTE ACTA
SON:
Aseo y retiro de escombros viajes de 6m3 resultante del aseo
Doce Millones Novecientos sesenta y tres
seiscientos treinta y dos pesos
Suministro e instalación de cinta antideslizante con franja fotoluminiscente
Suministro e instalación de persianas de dimensiones 1,15m *1,01m
Lavado y desinfección de tanque enchapado, dimensiones, 3,20m x 2,6m y h=1,5m,
incluye el suministro e instalación de dos flotadores eléctricos
%
%
%
COSTO DIRECTO TOTAL DEL CONTRATO
%
%
%
12.963.632,00$
%
%
JORGE ARMANDO VINASCO MUÑOZRepresentante Legal Constructor
VISUAR SAS
CARLOS ENRIQUE ESCOBAR LEGUIZAMORepresentante Legal Consultor Interventoría
CELQO SAS
AMORTIZACIÓN AL ANTICIPO
Coordinador(a) del Proyecto
Unidad de Infraestructura Fisica
DANIEL HUMBERTO BARRANTES PARRA
Código: F-URFI-ACMPU
Versión: 00
COPIA CONTROLADAPág. 5 de 5