Agenda• TecumsehProductsCompanyOverview• FlowManagementSystem(FMS)ImplementaIon• Tupelo,MSFMSproject• TupeloPOOGIresults• BrazilFMSproject• Brazilprojectresults• Nextsteps
©2016TOCICO.AllRightsReserved.
2016TOCICOInternaIonalConference
Tecumseh Products Company (TPC) Overview
« AnnArbor,Michigan
CompanySnapshot
GlobalManufacturingFootprint« HeadquartersManufacturingandAssemblyFaciliCes
§ Founded:1934
§ Headquarters:AnnArbor,MI
§ Employees:~6,000
§ 1,600+customersforcompressors&condensingunits
§ Productsaresoldinapprox.100countries§ Brands:Tecumseh,L’UniteHermeIque,
Masterflux,Silensys,Celseon,Vector&others
TecumsehisaLeadingIndependentGlobalManufacturerofHermeCcallySealedCompressors&CondensingUnits
ProductsOverview
Reciproca)ngCompressors
RotaryCompressors
ScrollCompressors
CondensingUnits
EndMarkets
CommercialRefrigera)on(Commercial)
HouseholdRefrigerators&Freezers(R&F)
Residen)alandSpecialtyAC&HeatPumps(AC)
SelectCustomers
©2016TOCICO.AllRightsReserved.
2016TOCICOInternaIonalConference
Aylmer,Ontario,Canada
Paris,Tennessee
Tupelo,Mississippi
Monterrey,Mexico
SaoCarlos,Brazil
BarenCn,France
Ballabgarh,India
Selangor,Malaysia
Hyderabad,India
CTEJVShanghai,China
Brazil
NorthAmerica
India
Europe
China&Malaysia
TPC Overview- Global Manufacturing Footprint
TecumsehManufacturesCompressorsintheU.S.,Brazil,FranceandIndiaandOperatesSeveralAssemblyFacili)esWorldwide
TotalofNineManufacturingFacili)esCompressorsareAssembled&DistributedBasedonLocalMarketNeedsandRegionalSpecial)es
Cessieu,France LaMure,France
©2016TOCICO.AllRightsReserved.
2016TOCICOInternaIonalConference
• CMSMonteraprovidesConsulIngandSo`waretoenableGrowththroughProducIvity
AboutCMSMontera
©2016TOCICO.AllRightsReserved.
2016TOCICOInternaIonalConference
Flow Management System Objectives – Supply Chain
Push–forecastdriven Pull–demanddriven
Forecast,incombinaIonwithfirmorders,drivesproducIonofcomponentsandfinishedgoods,capacityandworkingcapitalplanning,aswellaspurchasingofrawmaterials
Forecast,incombinaIonwithfirmorders,drivescapacityandworkingcapitalplanningStockBuffertargetsdrivepurchasedparts,manufacturedcomponentsandfinishedgoodsbuyandmakedecisions
Inventoryisanoutcomeofforecasterror,customerschangingtheir“firm”ordersandoverproducIon
InventorytargetsareplannedandcontrolledforeachSKU–purchasedandmanufactured-raw,componentsandfinishedgoods
InventorytargetsaredynamicallyadjustedbasedonactualconsumpIonandforecasttrends
LeadImesarehighlyvariableStandardleadImesareQuadrantspecific-determinedbyrawmaterial,componentandfinishedgoodsstockbufferreplenishmentpolicies
Current FMSSoluCon
©2016TOCICO.AllRightsReserved.
2016TOCICOInternaIonalConference
ProducIonflowcontrolledbylotsofmanualintervenIonandspreadsheets
ProducIonflowcontrolledbyestablishingacontrolpoint/Drumineachvaluestream
Mostorderspromisedbasedonforecastedarrivalofmaterialsandunconstrainedcapacity
MTOsalesorderspromisedoncontrolpoint/Drumcapacityloadandmaterialavailability
Primarymeasureisefficiencyandunitsproducedpershi`orday
Primarymeasuresareadherencetothecontrolpoint/DrumscheduleandacIvaIon–producingtherightpartattherightIme
MaterialnotsynchronizedtoproducIonschedule–mostmaterialpushedtotheplantbasedonforecast
Materialsynchronizedtocontrolpoint/Drumschedule–basedonpull
ConInuousimprovementdrivenbycostreducIon
ConInuousimprovementdrivenbyissuesthatmosto`enhinderflowacrosseachvaluestream–FIR
LeadImeslengthenedduetoWIPbuildupandmaterialshortagesandunnecessarychangeovers
LeadImesminimizedandresourceuIlizaIonopImized
Current FMSSoluCon
Flow Management System Objectives - Operations
©2016TOCICO.AllRightsReserved.
2016TOCICOInternaIonalConference
FMS Synchronization Vision
StockBuffer
TimeBuffer
DDR
DBR
CompanywideFlowManagementSystem(FMS)u)lizingStockBuffers(DDR)andTimeBuffers(DBR)withKeyControlPointsateachmanufacturingloca)ondrivenbyCMSRoadRunnersoSware
Tupelo
Canada Mexico
Paris
NorthAmerica
HyderabadBalagarh
DCs
INDIA
Cessieu LaMure
BarenCn
Vaulx-Milieu
EUROPE
SaoCarlos
Foundry Motors
BRAZIL
BusinessInter-dependencecreatedamajorchallengeforcustomerresponsiveness
©2016TOCICO.AllRightsReserved.
2016TOCICOInternaIonalConference
FMS Implementation – Tupelo, MS
StockBuffer
TimeBuffer
DDR
DBR
CompanywideFlowManagementSystem(FMS)u)lizingStockBuffers(DDR)andTimeBuffers(DBR)withKeyControlPointsateachmanufacturingloca)ondrivenbyCMSRoadRunnersoSware
Tupelo
Canada Mexico
Paris
NorthAmerica
HyderabadBalagarh
DCs
INDIA
Cessieu LaMure
BarenCn
Vaulx-Milieu
EUROPE
SaoCarlos
Foundry Motors
BRAZIL
BusinessInter-dependencecreatedamajorchallengeforcustomerresponsiveness
©2016TOCICO.AllRightsReserved.
2016TOCICOInternaIonalConference
FMS Implementation - Tupelo, MS Plant
Dehydrate/Weld/Paint OilLine
Kit-Machine,Assemble,Finish
HousingBrazing
TerminalAssemblyLine
FinishingComponents
©2016TOCICO.AllRightsReserved.
2016TOCICOInternaIonalConference
Dehydrate/Weld/Paint OilLine
Rotor&Stator(Paris)
Kits(fromIndia)
Kit-Machine,Assemble,Finish
HousingBrazing
FinishingComponents
Housings
CrankshaZ,Crankcase,Head,
Pistonetal,
Components
1. Stock-outs 2. % BR
1. Schedule Adherence / Activation 2. Flow Issue Reporting (FIR) Pareto DPS
1. Red Zone Holes 2. FIR Pareto
MTSMTO
TerminalAssemblyLine
FinishingComponents
• ImplementedDrum-Buffer-Rope(DBR)andDemandDrivenReplenishment(DDR)• Decoupledfromtheoutsidesuppliers(India,France,Paris,TN)• Protectedfrominternalvariability• CreatedaPOOGIprocessandanewscorecard
FMS Implementation - Tupelo, MS Plant
©2016TOCICO.AllRightsReserved.
2016TOCICOInternaIonalConference
HighVolume:(40%volume)
(15%ofFGskus)
Lowvolume:Keycustomers(54%volume)
(30%ofFGskus)
LowVolume:Othercustomer(4%volume)
(42%ofFGskus)
MaketoStock
MaketoOrder
PurchasetoStock
PurchasetoOrder/Forecast
1 LT=1–2days
2 LT=2weeks
3 LT=1–2days
1
2 4
PurchasedCompressors(2%volume)
(1%ofFGskus)
3
4 LT=3months
• LeadTimeMatrixusedformarketsegmentaIon• 42%ofcompressorvolumetobeshippedwithin2days• 96%ofcompressorvolumetobeshippedwithin2weeks• 42%ofFinishedCompressorSKUshavealongLeadTime(approx.3months)• AsimilarmatrixwasdevelopedforCondensingUnits
• AllleadImesaredependentoncomponent/compressorbufferstatusØ IfbufferisemptytheleadAmeextends
Compressors
FMS Implementation - Tupelo, MS Customer Lead Time Matrix
©2016TOCICO.AllRightsReserved.
2016TOCICOInternaIonalConference
CondensingUnits
HighVolume
Lowvolume
LowVolume
1
2 4
PurchasedCompressors3
MTO
MTS
PTS PTO
Compressors
CommercialRefrigera)on
Refrigerators&Freezers(R&F)
Components
Compressors(Make)Q1–279Q2–615
Total-2022
Units(Make)Q1–69Q2–29Total543
Components(Buy)2100Replenished
3300NonReplenishedTotal-5400
ImplicaCons:• Manycomponentsareneededtoassembleafinishedgood(compressororunit)• BuffersizingofonefinishedgoodhasanimplicaIononmanysub-components• Neededaso`waretooltoaligncomponentswithfinishedgoodsandsizebuffers
FMS Implementation - Tupelo, MS Customer Lead Time Matrix
©2016TOCICO.AllRightsReserved.
2016TOCICOInternaIonalConference
#ofacCveFinishedGoodsforthisitem(MTO&MTS)
ItemAvg.DailyConsumpConusedforbuffersizing
BlendedforecastfromMTOandMTSrequirements
• KeepingALLcomponentsinstockiskey• Neededtodefineamonthlyre-sizingprocesstoensuremaximumavailability
• Unitsfirst,thencompressors,andthenothercomponents• HavingforecastvisibilityreducedourforecasIngerrorJ
FMS Implementation - Tupelo, MS Component / Finished Goods Alignment
©2016TOCICO.AllRightsReserved.
2016TOCICOInternaIonalConference
• POOGIprocessedfocusedontheControlPoint/Drum
• AKkitquality• Noiseissuevariousfamilies• Massspectrometerthroughput
FMS Implementation - Tupelo, MS Plant Flow Issue Reporting (FIR)
©2016TOCICO.AllRightsReserved.
2016TOCICOInternaIonalConference
• POOGIprocessedfocusedonallflowstreamworkcentres
Latesupplyonthrustpate
• SmallrunsincreaseonTermLinecreatedfocusonfasterchangeovers
• IncreasedprocessingCmeofAKfamilyduetokitqualityissue
FMS Implementation - Tupelo, MS Plant Flow Issue Reporting (FIR)
©2016TOCICO.AllRightsReserved.
2016TOCICOInternaIonalConference
• TerminalAssemblylineSetupreducIon• Kitqualityimprovement• Slowdownofthecompressorflowstream
FMS Implementation - Tupelo, MS Plant Flow Issue Reporting (FIR) - Actions
©2016TOCICO.AllRightsReserved.
2016TOCICOInternaIonalConference
WIP
TerminalAssembly
De-Hydrate
Weld
WeldTest
PaintLine
CoolDown
FinalTest
Pack
Pack
SinglePack
FinalTest
OilLine
FMS Implementation - Tupelo, MS Compressor Flow Stream Improvement
©2016TOCICO.AllRightsReserved.
2016TOCICOInternaIonalConference
WIP
TerminalAssembly(24s)
• 2separateOilLines(FinalTestandPack)• 1“Off-line”SinglePackarea
• “WeldTest”requires3operatorstosupportthe12slinespeedcreaIng24secwaitIme• ExisIngprocessrequirescompressorstobestagedat“WIP”tocooldown(12h
duraIon)• Thispreventscompressorsfrombeingoiledandtesteddirectlyfromthepaintline
becauseofinsufficientcoolingImetoresetinternaloverloadmechanism• SinglePackprocessrequiresaddiIonalmanpowerandWIPatpaintdropstagingarea
De-Hydrate(24s)
Weld
(21s)
WeldTest(12s)
PaintLine(12s)
CoolDown(12h)
FinalTest(16s)
Pack
Pack
SinglePack
FinalTest(16s)
OilLine
3operators24swait)me
30minconveyortravelCme
FMS Implementation - Tupelo, MS Compressor Flow Stream Improvement
©2016TOCICO.AllRightsReserved.
2016TOCICOInternaIonalConference
TerminalAssembly(24s)
HadtoSLOWDOWNthea`er“Weld”processesinorderto:• EliminateoneoftwoFinalTestlinesandCombinePacklines• Shutdownonecureoven(inPaintLine)• Increase“CoolDown”conveyortravelImefrom1hto3h(byslowingdown)• Reducemanpower–35%inPackand50%inWeldTest(30%total)• ReduceWIP• IncreasethroughputanddecreaseoverallleadTime(bydetecIngsmallquality
problemsearlier)• ReduceOE(energyusageandpackagingmaterial)–12%gasconsumpIon
savings
De-Hydrate(24s)
Weld
(21s)
WeldTest(24s)
PaintLine(24s)
CoolDown(24s)
FinalTest(24s)
Pack
OilLine
Slowercycle)me1operator
NOwait)me
3hrconveyortravelCme
FMS Implementation - Tupelo, MS Compressor Flow Stream Improvement
©2016TOCICO.AllRightsReserved.
2016TOCICOInternaIonalConference
• 12%inventoryreducIon(6montha`erimplementaIon–target30%)• OTDIncreaseto95%atthesameIme• T/OEproducIvity-verystabledespitesignificantmarketchallenges
77%82%
64%
81%
62%
77%
54%
65%
80%
95%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
3
3.5
4
4.5
5
5.5
6
6.5
7Jan,14
Feb,14
Mar,1
4Ap
r,14
May,1
4Jun,14
Jul,1
4Au
g,14
Sep,14
Oct,14
Nov,14
Dec,14
Jan,15
Feb,15
Mar,1
5Ap
r,15
May,1
5Jun,15
Jul,1
5Au
g,15
Sep,15
Oct,15
Nov,15
Dec,15
Jan,16
Feb,16
Mar,1
6Ap
r,16
Inventory&OTD
Inventory OTD
FMS Implementation - Tupelo, MS Results
©2016TOCICO.AllRightsReserved.
2016TOCICOInternaIonalConference
FMS Implementation – Brazil
StockBuffer
TimeBuffer
DDR
DBR
CompanywideFlowManagementSystem(FMS)u)lizingStockBuffers(DDR)andTimeBuffers(DBR)withKeyControlPointsateachmanufacturingloca)ondrivenbyCMSRoadRunnersoSware
Tupelo
Canada Mexico
Paris
NorthAmerica
HyderabadBalagarh
DCs
INDIA
Cessieu LaMure
BarenCn
Vaulx-Milieu
EUROPE
SaoCarlos
Foundry Motors
BRAZIL
BusinessInter-dependencecreatedamajorchallengeforcustomerresponsiveness
©2016TOCICO.AllRightsReserved.
2016TOCICOInternaIonalConference
• ReduceinventorylevelsofFinishedGoods,WIPandRawMaterials• EstablishappropriatecustomerleadImesandensureonIme
delivery• Decouplereplenishmentofrawmaterials,components,and
finishedgoodsfromforecastedsalesandproducIonordersbyestablishingDemandDrivenReplenishment(DDR)
• ExploitoutputofmanufacturingfloorbyimplemenIngDrum-Buffer-Rope(DBR)producIonplanningandexecuIon
• CreateConInuousImprovementprocessbasedonFlowIssuesReporIng(FIR)
• ImplementCMSRoadRunnerMxtoenabletheabovesoluIons
FMS Implementation – Brazil Objectives
©2016TOCICO.AllRightsReserved.
2016TOCICOInternaIonalConference
Fundamental Problem to Solve • TooreliantonthedetailedFORECASTforbuyingandmaking• WeareincreasingDEPENDANCEbetweendepartments,on
suppliersandoncustomers• TheprimarymeasureofEFFICIENCYincreasesDEPENDANCE
• teamdefinedrootcauseproblems• excellentcommitmentand“compeIIon”betweencountriesJ
• 11flowstreamsvs.3inTupelo• approx.3000personnel• Foundry,motors,compressorplants
FMS Implementation – Brazil Objectives
©2016TOCICO.AllRightsReserved.
2016TOCICOInternaIonalConference
ChangeAgentSkills
ManagingResistance
ImplementaConProjectPlanning&Management
CascadingSponsorship
MoCvaCon Vision
Measures
ExecuCveSponsorship
• SUSTAINING CHANGE
• INITIATING CHANGE
• ChangeManagementFrameworkusedtodirectsteeringcommiree
FMS Implementation – Brazil Prerequisites for Implementing Change
©2016TOCICO.AllRightsReserved.
2016TOCICOInternaIonalConference
FinalProcessAssembly
AE2
OutsideProcess-Electricals
KitAE2
StampingAE2
WeldingAE2
OBBAE2
PistonMachining
CrankcaseMachiningAE2
Cranksha`MachiningAE2
ValvePlateMachining
CylinderHeadMachiningMBU3
4.5 Days
PP
PP
0.5 day
PPPP
4.5 Days
CompelaPP
PerpetualInventoryinCMSRoadRunner
PP
PP
KITPACKMBU3
PPRotor
Stator
FMS Implementation – Sao Carlos, Brazil Plant
©2016TOCICO.AllRightsReserved.
2016TOCICOInternaIonalConference
59.5
52.3
45.3
53.2
46.043.9
37.4
43.1 45.142.7 42.4 42.4
-
10.0
20.0
30.0
40.0
50.0
60.0
70.0
$60,000
$65,000
$70,000
$75,000
$80,000
$85,000
$90,000
$95,000
Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16
TdBInventoryPerformance
ActualInventory IDO
Dec.2016target=51.3
Sep.2017target=39.5
• InventoryDollarDays(IDOs)droppedbyapprox.28%fromJune2015–2016targetachieved
• NeedaddiIonal3-dayreducIontoaccomplishSept.2017objecIve
FMS Implementation – Sao Carlos, Brazil Results
©2016TOCICO.AllRightsReserved.
2016TOCICOInternaIonalConference
• FinalizeFMSimplementaIoninNorthAmerica• IniIateFMSimplementaIoninEuropeandIndia• DefineprofitablemarketsegmentsusingThroughputEconomicsapproach
• ImplementCCPMintheNewProductDevelopmentprocess
FMS Implementation – Next Steps
©2016TOCICO.AllRightsReserved.
2016TOCICOInternaIonalConference
Presenter Bios • Jack Warchalowski is the President of CMS Montera. • Prior to CMS, Jack was the head of operations for the High Tech
manufacturer, Ernst & Young management consultant, and a project engineer with Babcock & Wilcox.
• Jack is a Certified Management Consultant and a Professional Engineer registered in Ontario. He holds an MBA degree from the Wilfrid Laurier University and a Bachelor of Applied Science in Mechanical Engineering from the University of Waterloo in Waterloo, Ontario. In addition, Jack is certified by the TOCICO in all aspects of TOC.
• Jennifer McIntosh is the Global Director of Sales, Inventory and
Operations Planning for Tecumseh Products Company. She is responsible for global finished good inventory and demand planning.
• Jennifer is completing her Bachelors of Science Degree in Global Management. She is also a team leader for Tecumseh’s implementation of TOC based Flow Management System globally.
• Jennifer has worked with Tecumseh for 9 years. She was the Supply Chain and Operations Manager for the Canadian operations before being put in the global position.