ACCOMPLISHED PROJECTS FOR CY 2015€¦ · ACCOMPLISHED PROJECTS FOR CY 2015 11. Lagundi Pipeline...
Transcript of ACCOMPLISHED PROJECTS FOR CY 2015€¦ · ACCOMPLISHED PROJECTS FOR CY 2015 11. Lagundi Pipeline...
ACCOMPLISHED PROJECTS FOR CY 2015
1. Ma. Ramona Subd. To Ma. Lourdes Subd. Pipeline Project
Location : Brgy. Tabang, Plaridel, Bulacan
Description : Pipeline Size 4” diameter PVC – 298 Lm.
Date : October 20, 2014 – December 19, 2015
B: P430,746.70.00 E: P274,724.74.00
2. Bulihan Phase 2 Pipeline Project
Location: Brgy. Bulihan, Plaridel, Bulacan
Description: Pipeline Size 8” diameter PVC – 468 lm.
Pipeline Size 6” diameter PVC – 498 lm.
Date: December 29, 2014 – March 27, 2015
B: P1,475,551.00 E: P1,007,694.06
ACCOMPLISHED PROJECTS FOR CY 2015
3. Plaridel Heights - Sta.Ines Pipeline Project
Location : Brgy. Sta. Ines, Plaridel, Bulacan and Brgy. Tabang, Plaridel, Bulacan
Description : Pipeline Size 4” diameter PVC – 974 Lm.
Pipeline Size 6” diameter PVC – 18 lm.
Date : December 15, 2014 – January 27, 2015
B: P526,706.40 E: P505,540.69
4. Sta. Ines Well Drilling Project
Location: Brgy. Sta. Ines, Plaridel, Bulacan
Description: Pipeline Size 4” diameter PVC – 1,158 lm/
Date:
B: P2,138,010.00 E: P2,111,250.35
ACCOMPLISHED PROJECTS FOR CY 2015
5. Rocka Village Phase 6 Pipeline Project
Location : Brgy. Tabang, Plaridel, Bulacan
Description : Pipeline Size 4” diameter PVC – 1,044 Lm.
Pipeline Size 3” diameter PVC – 486 Lm.
Pipeline Size 2” diameter PVC – 42 Lm.
Location : December 22, 2014 – June 26, 2015
B: P1,212,255.00 E: P835,429.37
6. Bagong Silang Phase 3 Pipeline Project
Location: Brgy. Bagong Silang, Plaridel, Bulacan
Description: Pipeline Size 4” diameter PVC – 636 lm.
Pipeline Size 3” diameter PVC – 654 lm.
Date: October 20, 2014
B: P696,924.80 E: P470,697.17
ACCOMPLISHED PROJECTS FOR CY 2015
7. Lalangan Pipeline Project
Location: Brgy. Lalangan, Plaridel, Bulacan
Description: Pipeline Size 4” diameter PVC – 1,158 lm.
Date:
B: P708,444.00 E: P543,611.75
8. Sitio Pulong Bato, San Jose Pipeline Project
Location: Brgy. San Jose, Plaridel, Bulacan
Description: Pipeline Size 4” diameter PVC – 480 lm.
Date: On-going
B: P312,251.50 E: P239,330.71
ACCOMPLISHED PROJECTS FOR CY 2015
9. Parulan Torres St. Pipeline Project
Location : Brgy. Parulan, Plaridel, Bulacan
Description: Pipeline Size 2” diameter PVC – 120 lm.
Date: June 11, 2015 – June 18, 2015
B: P70,977.50 E: P52,501.70
10. Dampol Patubig Pipeline Project
Location: Brgy. Dampol, Plaridel, Bulacan
Description: Pipeline Size 3” diameter PVC – 606 lm.
Date: September 2, 2015 – October 16, 2015
B: P321,431.00 E: P208,870.36
ACCOMPLISHED PROJECTS FOR CY 2015
11. Lagundi Pipeline Project
Location: Brgy. Lagundi, Plaridel, Bulacan
Description: Pipeline Size 3” diameter PVC – 708 lm.
Date: September 14, 2015 – October 21, 2015
B: P315,568.00 E: P281,690.13
12. Parulan Patubig Makati St. Pipeline Project
Location: Brgy. Parulan, Plaridel, Bulacan
Description: Pipeline Size 4” diameter PVC – 810 lm.
Date: November 3, 2015 – ON GOING
B: P460,630.50 E: P321,991.82
ACCOMPLISHED PROJECTS FOR CY 2015
13. Parulan Dike Pipeline Project
Location: Brgy. Parulan, Plaridel, Bulacan
Description: Pipeline Size 2” diameter PVC – 360 lm.
Date: November 11, 2015 – January 6, 2016
B: P120,890.00 E: P83,956.11
14. Bintog Patubig Pipeline Project
Location: Brgy. Bintog, Plaridel, Bulacan
Description: Pipeline Size 4” diameter PVC – 870 lm.
Date: November 23, 2015 - ONGOING
B: P545,352.50 E: P377,007.00
OTHER PROJECTS
1. Plaridel Water District Fence
Location: Plaridel Water District Administrative Bldg.
Contractor: Herminio S. Salonga
Date: June 8, 2015
P19,500.00
2. Phone Locker
P5,000.00
3. Fabrication of Plastic Sign / Calendar Box / Suggestion Box
P12,900.00
ON-GOING PROJECTS
1. Bulihan Phase 3 Pipeline Project
Location: Brgy. Bulihan, Plaridel, Bulacan
Date: ON-GOING
Budget: 1,574,349.00
2. Rocka Village Phase 4 and Annex 5 Pipeline Project
Location: Brgy. Tabang, Plaridel, Bulacan
Date: ON-GOING
Budget: 2,829,928.50
3. Rocka Village Phase 6 and 5 Pipeline Project
Location: Brgy. Tabang, Plaridel, Bulacan
Date: ON-GOING
Budget: 2,522,394.00
4. Horizontal Boring at Daang Maharlika H-way
Location: Brgy. Tabang, Plaridel, Bulacan
Date: ON-GOING
Budget: 165,000