ACCOMPLISHED PROJECTS FOR CY 2015€¦ · ACCOMPLISHED PROJECTS FOR CY 2015 11. Lagundi Pipeline...

10
ACCOMPLISHED PROJECTS FOR CY 2015 1. Ma. Ramona Subd. To Ma. Lourdes Subd. Pipeline Project Location : Brgy. Tabang, Plaridel, Bulacan Description : Pipeline Size 4” diameter PVC – 298 Lm. Date : October 20, 2014 December 19, 2015 B: P430,746.70.00 E: P274,724.74.00 2. Bulihan Phase 2 Pipeline Project Location: Brgy. Bulihan, Plaridel, Bulacan Description: Pipeline Size 8” diameter PVC – 468 lm. Pipeline Size 6” diameter PVC – 498 lm. Date: December 29, 2014 March 27, 2015 B: P1,475,551.00 E: P1,007,694.06

Transcript of ACCOMPLISHED PROJECTS FOR CY 2015€¦ · ACCOMPLISHED PROJECTS FOR CY 2015 11. Lagundi Pipeline...

Page 1: ACCOMPLISHED PROJECTS FOR CY 2015€¦ · ACCOMPLISHED PROJECTS FOR CY 2015 11. Lagundi Pipeline Project Location: Brgy. Lagundi, Plaridel, Bulacan Description: Pipeline Size 3”

ACCOMPLISHED PROJECTS FOR CY 2015

1. Ma. Ramona Subd. To Ma. Lourdes Subd. Pipeline Project

Location : Brgy. Tabang, Plaridel, Bulacan

Description : Pipeline Size 4” diameter PVC – 298 Lm.

Date : October 20, 2014 – December 19, 2015

B: P430,746.70.00 E: P274,724.74.00

2. Bulihan Phase 2 Pipeline Project

Location: Brgy. Bulihan, Plaridel, Bulacan

Description: Pipeline Size 8” diameter PVC – 468 lm.

Pipeline Size 6” diameter PVC – 498 lm.

Date: December 29, 2014 – March 27, 2015

B: P1,475,551.00 E: P1,007,694.06

Page 2: ACCOMPLISHED PROJECTS FOR CY 2015€¦ · ACCOMPLISHED PROJECTS FOR CY 2015 11. Lagundi Pipeline Project Location: Brgy. Lagundi, Plaridel, Bulacan Description: Pipeline Size 3”

ACCOMPLISHED PROJECTS FOR CY 2015

3. Plaridel Heights - Sta.Ines Pipeline Project

Location : Brgy. Sta. Ines, Plaridel, Bulacan and Brgy. Tabang, Plaridel, Bulacan

Description : Pipeline Size 4” diameter PVC – 974 Lm.

Pipeline Size 6” diameter PVC – 18 lm.

Date : December 15, 2014 – January 27, 2015

B: P526,706.40 E: P505,540.69

4. Sta. Ines Well Drilling Project

Location: Brgy. Sta. Ines, Plaridel, Bulacan

Description: Pipeline Size 4” diameter PVC – 1,158 lm/

Date:

B: P2,138,010.00 E: P2,111,250.35

Page 3: ACCOMPLISHED PROJECTS FOR CY 2015€¦ · ACCOMPLISHED PROJECTS FOR CY 2015 11. Lagundi Pipeline Project Location: Brgy. Lagundi, Plaridel, Bulacan Description: Pipeline Size 3”

ACCOMPLISHED PROJECTS FOR CY 2015

5. Rocka Village Phase 6 Pipeline Project

Location : Brgy. Tabang, Plaridel, Bulacan

Description : Pipeline Size 4” diameter PVC – 1,044 Lm.

Pipeline Size 3” diameter PVC – 486 Lm.

Pipeline Size 2” diameter PVC – 42 Lm.

Location : December 22, 2014 – June 26, 2015

B: P1,212,255.00 E: P835,429.37

6. Bagong Silang Phase 3 Pipeline Project

Location: Brgy. Bagong Silang, Plaridel, Bulacan

Description: Pipeline Size 4” diameter PVC – 636 lm.

Pipeline Size 3” diameter PVC – 654 lm.

Date: October 20, 2014

B: P696,924.80 E: P470,697.17

Page 4: ACCOMPLISHED PROJECTS FOR CY 2015€¦ · ACCOMPLISHED PROJECTS FOR CY 2015 11. Lagundi Pipeline Project Location: Brgy. Lagundi, Plaridel, Bulacan Description: Pipeline Size 3”

ACCOMPLISHED PROJECTS FOR CY 2015

7. Lalangan Pipeline Project

Location: Brgy. Lalangan, Plaridel, Bulacan

Description: Pipeline Size 4” diameter PVC – 1,158 lm.

Date:

B: P708,444.00 E: P543,611.75

8. Sitio Pulong Bato, San Jose Pipeline Project

Location: Brgy. San Jose, Plaridel, Bulacan

Description: Pipeline Size 4” diameter PVC – 480 lm.

Date: On-going

B: P312,251.50 E: P239,330.71

Page 5: ACCOMPLISHED PROJECTS FOR CY 2015€¦ · ACCOMPLISHED PROJECTS FOR CY 2015 11. Lagundi Pipeline Project Location: Brgy. Lagundi, Plaridel, Bulacan Description: Pipeline Size 3”

ACCOMPLISHED PROJECTS FOR CY 2015

9. Parulan Torres St. Pipeline Project

Location : Brgy. Parulan, Plaridel, Bulacan

Description: Pipeline Size 2” diameter PVC – 120 lm.

Date: June 11, 2015 – June 18, 2015

B: P70,977.50 E: P52,501.70

10. Dampol Patubig Pipeline Project

Location: Brgy. Dampol, Plaridel, Bulacan

Description: Pipeline Size 3” diameter PVC – 606 lm.

Date: September 2, 2015 – October 16, 2015

B: P321,431.00 E: P208,870.36

Page 6: ACCOMPLISHED PROJECTS FOR CY 2015€¦ · ACCOMPLISHED PROJECTS FOR CY 2015 11. Lagundi Pipeline Project Location: Brgy. Lagundi, Plaridel, Bulacan Description: Pipeline Size 3”

ACCOMPLISHED PROJECTS FOR CY 2015

11. Lagundi Pipeline Project

Location: Brgy. Lagundi, Plaridel, Bulacan

Description: Pipeline Size 3” diameter PVC – 708 lm.

Date: September 14, 2015 – October 21, 2015

B: P315,568.00 E: P281,690.13

12. Parulan Patubig Makati St. Pipeline Project

Location: Brgy. Parulan, Plaridel, Bulacan

Description: Pipeline Size 4” diameter PVC – 810 lm.

Date: November 3, 2015 – ON GOING

B: P460,630.50 E: P321,991.82

Page 7: ACCOMPLISHED PROJECTS FOR CY 2015€¦ · ACCOMPLISHED PROJECTS FOR CY 2015 11. Lagundi Pipeline Project Location: Brgy. Lagundi, Plaridel, Bulacan Description: Pipeline Size 3”

ACCOMPLISHED PROJECTS FOR CY 2015

13. Parulan Dike Pipeline Project

Location: Brgy. Parulan, Plaridel, Bulacan

Description: Pipeline Size 2” diameter PVC – 360 lm.

Date: November 11, 2015 – January 6, 2016

B: P120,890.00 E: P83,956.11

14. Bintog Patubig Pipeline Project

Location: Brgy. Bintog, Plaridel, Bulacan

Description: Pipeline Size 4” diameter PVC – 870 lm.

Date: November 23, 2015 - ONGOING

B: P545,352.50 E: P377,007.00

Page 8: ACCOMPLISHED PROJECTS FOR CY 2015€¦ · ACCOMPLISHED PROJECTS FOR CY 2015 11. Lagundi Pipeline Project Location: Brgy. Lagundi, Plaridel, Bulacan Description: Pipeline Size 3”

OTHER PROJECTS

1. Plaridel Water District Fence

Location: Plaridel Water District Administrative Bldg.

Contractor: Herminio S. Salonga

Date: June 8, 2015

P19,500.00

Page 9: ACCOMPLISHED PROJECTS FOR CY 2015€¦ · ACCOMPLISHED PROJECTS FOR CY 2015 11. Lagundi Pipeline Project Location: Brgy. Lagundi, Plaridel, Bulacan Description: Pipeline Size 3”

2. Phone Locker

P5,000.00

3. Fabrication of Plastic Sign / Calendar Box / Suggestion Box

P12,900.00

Page 10: ACCOMPLISHED PROJECTS FOR CY 2015€¦ · ACCOMPLISHED PROJECTS FOR CY 2015 11. Lagundi Pipeline Project Location: Brgy. Lagundi, Plaridel, Bulacan Description: Pipeline Size 3”

ON-GOING PROJECTS

1. Bulihan Phase 3 Pipeline Project

Location: Brgy. Bulihan, Plaridel, Bulacan

Date: ON-GOING

Budget: 1,574,349.00

2. Rocka Village Phase 4 and Annex 5 Pipeline Project

Location: Brgy. Tabang, Plaridel, Bulacan

Date: ON-GOING

Budget: 2,829,928.50

3. Rocka Village Phase 6 and 5 Pipeline Project

Location: Brgy. Tabang, Plaridel, Bulacan

Date: ON-GOING

Budget: 2,522,394.00

4. Horizontal Boring at Daang Maharlika H-way

Location: Brgy. Tabang, Plaridel, Bulacan

Date: ON-GOING

Budget: 165,000