Accelerated Lifetime Test - Phase 3gan/talk/5050_2-7-15.pdf2015/02/07 · Accelerated Lifetime Test...
3
Accelerated Lifetime Test - Phase 3 • November 2014 started four D opto-boards in 50º C / 50 % RH – Boards fabricated throughout production (4041, 4209, 4151, 4311) – Have accumulated 4125 hours running time • Run PIN arrays at 5 V bias • Run VCSELs at 40 MHz (50% duty cycle), 10mA pk-pk
Transcript of Accelerated Lifetime Test - Phase 3gan/talk/5050_2-7-15.pdf2015/02/07 · Accelerated Lifetime Test...
Accelerated Lifetime Test - Phase 3 • November 2014 started four D opto-boards in 50º C / 50 % RH
– Boards fabricated throughout production (4041, 4209, 4151, 4311) – Have accumulated 4125 hours running time
• Run PIN arrays at 5 V bias• Run VCSELs at 40 MHz (50% duty cycle), 10mA pk-pk
Accelerated Lifetime Test - Phase 3 • Optical power during 4125 hours in 50º C / 50 % RH
4041 4209
Accelerated Lifetime Test - Phase 3 • Optical power during 2897 hours in 50º C / 50 % RH
4151 4311