Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional...

76
Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium – October 8, 2014

Transcript of Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional...

Page 1: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges

New Conventional Bridge Construction Methods

North Central State Consortium – October 8, 2014

Page 2: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Today’s Presentation Outline

Who is CONTECH and How Can We HelpReline of Culverts

Reline of Small Span BridgesABC for Conventional Construction Methods

One free Service

Page 3: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Site Solutions for Bridge, Storm water, Drainage,Retaining Walls, Erosion Control, & Sanitary

Page 4: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Real World Savings Available with RelineNew York DOT - Trumansburg, NY

Existing Historic Stone Arch

Replace for $2,000,000 Reline for $260,000

Page 5: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Assemble and Slip line.

Page 6: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Back grout.

Page 7: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Structural Check HS-25 Live Load

Page 8: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Save $ 1.74 million !!

Page 9: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Popular Plastic Pipes, Innerflow - Smooth Wall HDPE, DuroMaxx, Steel Reinforced Polyethylene, A-2000 – Corrugated PVC with Smooth Interior

Page 10: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Round and Pipe Arch Shapes - Corrugated Metal Pipe

Galvanized Aluminized (ALT2) Aluminum Polymeric Coated Smooth Lined Metal

Page 11: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Aluminum Box Culvert (One of many type of Plate Options)TEXAS Department of Transportation

Saved $50,000 over replacing the bridge while still maintaining traffic flow

Page 12: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

CON/SPAN – Three Sided Concrete Arch MRW 314 - Morrow County Ohio

Page 13: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Design Considerations:

1) Hydraulics2) Structural Capacity – AASHTO LRFD

3) Construction Practicality

Page 14: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

HydraulicsInlet Control

vs.Outlet Control

Page 15: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

End treatmentso Projectingo Mitered to conform to fill slopeo Headwallo Headwall & Wingwalls

Page 16: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Grout in Lifts to Prevent Pipe Floatation

2nd lift

3rd lift

1st liftGrout ports

End View

Grout

Vertical Brace

Page 17: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

WDOT Mitchell Interchange – 54’ AL-T2 reline of Concrete Pipe - 2012

Page 18: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Wisconsin DOT STH 16, Pewaukee, WIPolymeric Smooth-Cor Pipe Arch - 2012

Page 19: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Illinois DOT I-74, Moline, Illinois144” Polymer Smooth-Cor Pipe Arch - 2013

Page 20: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

MnDOT – Rat Creek – Reline of concrete box under 20’ of cover - 2000

Page 21: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

2-Flange Tunnel Liner Plate - Coatings

Galvanized Steel Uncoated “Black” Steel

Aluminized Steel Type 2 Aluminum Alloy

Page 22: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

MINNESOTA DOT – RAT CREEK - RELINE OF EXISTNG 10’ X 10’ FAILING CONCRETE BOX CULVERT under 20’ cover

Page 23: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

.

Staging of 2-Flange Tunnel Liner Plate Material. Each individual plate can be handled without equipment.

Page 24: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Channels placed in existing concrete floor. Assembly of Plates inside RCB. Plates are bolted together circumferentially and longitudinally .

Page 25: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Assembly of Tunnel Liner Plate Arch

25

Page 26: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Tunnel Liner Plate Arch 14-years after construction

Page 27: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

MNDOT Project 5205-31 Nicollet Co TH 22, St Peter, MN Reline of twin 10’ X 10’ concrete pipe with Tunnel Liner Plate - 2013

Page 28: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

MNDOT Project 5205-31 Nicollet Co TH 22, St Peter, MN Reline of twin 10’ X 10’ concrete pipe with Tunnel Liner Plate - 2013

Page 29: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

MNDOT Project 5205-31 Nicollet Co TH 22, St Peter, MN Reline of twin 10’ X 10’ concrete pipe with Tunnel Liner Plate - 2013

Page 30: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

MNDOT Project 5205-31 Nicollet Co TH 22, St Peter, MN Reline of twin 10’ X 10’ concrete pipe with Tunnel Liner Plate - 2013

Page 31: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

MNDOT Project 5205-31 Nicollet Co TH 22, St Peter, MN Reline of twin 10’ X 10’ concrete pipe with Tunnel Liner Plate - 2013

Page 32: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

MNDOT Project 5205-31 Nicollet Co TH 22, St Peter, MN Reline of twin 10’ X 10’ concrete pipe with Tunnel Liner Plate - 2013

Page 33: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

.

Two Harbors, MN 2 – 13’ span 2-Flange Tunnel Liner PlateState Aid Project 38-620-06, Bridge 92774 - 2006

Page 34: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

CSX Southern, IL Bridge QSD 97.77 – Tunnel Liner Plate Reline - 2014

34

Page 35: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

MNDOT State Aid 118-130-005, Duluth, MN2nd St and 13th Avenue over Chester Creek - AL-T2 Flange Liner Plate Arch - 2012

35

Page 36: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Rocksylvania Ave over Rock Run Creek , Hardin Co, Iowa Falls, Iowa 8’7” span X 4’2” rise O.D. 2-Flange Tunnel Liner Plate - 2013

Page 37: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Iowa DOT , Hwy 136 N of US 67, Clinton IA 14’9” Span X 7’9” Rise Tunnel Liner Plate Arch - 2010

Page 38: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Main Street Tunnel – Lisle, Illinois 11’2” X 5’8” Tunnel Liner Plate Arch - 2013

38

Page 39: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Fond Du Lac, WI – 28’ span Bridge Cor reline of CN Rail Road Bridge - 1999

Page 40: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

MULTI-PLATE®

Aluminum Structural PlateAluminum Box CulvertSUPER-SPAN™SUPER-PLATE® BridgeCor™

CON/SPAN® BEBO®

Continental® Bridges (Pedestrian)

Steadfast EXPRESS (Pedestrian)

U.S. Bridge (Vehicular)

Plate, Precast & Truss

Page 41: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

MULTI-PLATE Super Span Horizontal Ellipse - 33’ Span X 20’ RiseSlip Line of Old Concrete Bridge – Davis CO, IA Highway 2

Before After

Page 42: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Construction Plans

Page 43: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Traffic Continues on Highway During Construction whichEliminates Road Close Time

Page 44: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Photos during the construction process.

Page 45: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Project Under ConstructionBackfilling around new structure

Page 46: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Bridge Deck Left in PlaceVoids of bridge filled with grout

Page 47: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

No Bridge Deck Means; No deck freezing in winter, no deck maintenance, & wider shoulder for safe traffic

Page 48: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

OHIO DOT Dayton Road - Clark County, Ohio CON/SPAN Reline of Concrete Bridge

Page 49: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

OHIO DOT Dayton Road - Clark County, Ohio CON/SPAN Reline of Concrete Bridge

Page 50: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

OHIO DOT Dayton Road - Clark County, Ohio

CON/SPAN Reline of Concrete Bridge

Page 51: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

OHIO DOT Dayton Road - Clark County, Ohio

CON/SPAN Reline of Concrete Bridge

Page 52: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Express Foundations for ABC

Page 53: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Express Foundations loaded off the truck

Page 54: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Express Foundations ready for Aluminum Box Culvert

54

Page 55: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

EXPRESS Foundations

Filled with CIP Concrete

22’9” Span X 5’4” Rise Aluminum Box Culvert

Page 56: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

ALBC on Express Foundation ready for grout fill

Page 57: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Concrete is poured in void space of the Express Foundation

Page 58: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Finished Project – Culvert under Trunk Highway

Page 59: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

One year after installation

59

Page 60: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Pleasant Prairie, WI – Park and Ride 2014 – ABC!Structure 1 – Precast CON/SPAN on Express Foundations

Page 61: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Express Foundations Delivered on a Flat Bed Trailer

Page 62: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Express Foundations Lifted into Place

Page 63: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Connecting wing wall footing

Page 64: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Setting CON/SPAN Precast Structures

Page 65: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

CON/SPAN with Express Foundations One week after start of placing Express Foundations

Page 66: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Pleasant Prairie, WI – Park and Ride 2014 – ABC!Structure 2 – Truss Bridge on Express Foundations

Page 67: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Express Foundations Set

Page 68: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Lifting Abutment Wall into Place

Page 69: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.
Page 70: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Abutment sitting on Express Foundation

Page 71: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Placing Abutment Wing Wall – Front Side Photo

Page 72: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Abutment wall – Rear Side Photo

Page 73: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Pouring Concrete in Express Void Space

Page 74: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Steel Truss Bridge – One week after Construction Start

Page 75: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

Truss Bridge Cost – 55k, Express Foundation 59K

Page 76: Accelerated Bridge Construction Methods Reline of Culvert and Small Span Bridges New Conventional Bridge Construction Methods North Central State Consortium.

• Providing assistance to the engineering community since 1904• Nationwide support with local representative to help you• Engineer Staff to help with drawings, plans, and specifications• Outstanding Free Design Tools on our Website for Bridge and Storm

Water applications

Your Project Partner