ABT Tarrif Presentation

download ABT Tarrif Presentation

of 21

Transcript of ABT Tarrif Presentation

  • 8/20/2019 ABT Tarrif Presentation

    1/53

  • 8/20/2019 ABT Tarrif Presentation

    2/53

  • 8/20/2019 ABT Tarrif Presentation

    3/53

  • 8/20/2019 ABT Tarrif Presentation

    4/53

  • 8/20/2019 ABT Tarrif Presentation

    5/53

  • 8/20/2019 ABT Tarrif Presentation

    6/53

  • 8/20/2019 ABT Tarrif Presentation

    7/53

  • 8/20/2019 ABT Tarrif Presentation

    8/53

  • 8/20/2019 ABT Tarrif Presentation

    9/53

  • 8/20/2019 ABT Tarrif Presentation

    10/53

  • 8/20/2019 ABT Tarrif Presentation

    11/53

  • 8/20/2019 ABT Tarrif Presentation

    12/53

    ABT / IEGC CLAUSES

      While making or revisingtheir declaration of

    capability, the generatorshall ensure that theirdeclared capability duringpeak hours is not less thanthat during other hours.

      ABTSchedule-I ara ! "iii#

    "age iii# 

    Capability Declaration during Peak hours:

  • 8/20/2019 ABT Tarrif Presentation

    13/53

    ABT / IEGC CLAUSES

     The generating units

    operating at about $%%&of their '() shall becapable of "and shall notbe prevented from # going

    at least up to $%*& oftheir '() +henfreuency falls suddenly.

     I( (hapter-/,

     ara /.0"g#"age /.0# 

    Generation beyond DC

  • 8/20/2019 ABT Tarrif Presentation

    14/53

    ABT / IEGC CLAUSES

     

    ABTSchedule-I  ara1"ii#

    "agev#

    S2( for Thermal Stations

    shall be the 3(, +ith allbefore-the-fact revisions 4updating. The declared

    capacity shall not e5ceedthe installed capacity. 

    Generation beyond DC

  • 8/20/2019 ABT Tarrif Presentation

    15/53

    ABT / IEGC CLAUSES

      In case it is observed that thedeclaration of its capability by

    the generator is on lo+er sideand the actual generation ismore than 3(, then 6I chargesdue to the generator on

    account of such e5trageneration shall be reduced to7ero and the amount shall becredited to+ards 6I account ofbene8ciaries in the ratio of

    ABT Schedule-$  ara-/

    "age vi# 

    Generation beyond DC

  • 8/20/2019 ABT Tarrif Presentation

    16/53

    ABT / IEGC CLAUSES

     

    In case of gas turbine 4combined cycle stations,the generator shall give3( for units 4 modules ongas fuel and 3( for units 4modules on liuid fuelseparately.

      ABTSchedule-I  ara 1

    "9ote $#"age v#

    Separate Schedules for Gas/Liquid

  • 8/20/2019 ABT Tarrif Presentation

    17/53

    ABT / IEGC CLAUSES

      ):3( may direct the

    S:3(s4 ISS toincrease4decrease theirdra+al 4 generation in

    case of contingenciese.g. overloading of lines 4transformers, abnormalvoltages, threat tos stem securit .

      I((hapter-;ara ;.1.<

    "age-;.!# 

    Revision of Schedules initiated by RLDCs

  • 8/20/2019 ABT Tarrif Presentation

    18/53

    ABT / IEGC CLAUSES

      ):3( may revise the

    schedule in the interestof better systemoperation +.e.f 1th  time

    block.

      ABTSchedule-$ara-!"5v#

    Revision of Schedules initiated by RLDCs

  • 8/20/2019 ABT Tarrif Presentation

    19/53

    ABT / IEGC CLAUSES

      )evision of declared capability by

    generator "s# and reuisition bybene8ciary"ies# for the remainingperiod of the day +ill also bepermitted +ith advance notice.)evised schedules 4 declaredcapability in such cases shallbecome e=ective from the /th timeblock, counting the time block in+hich the reuest for revision has

    been received in ):3( to be the

    ABTSchedule-$ ara "5iv#

     "age "iv#

    Revision of schedules at the request of Generators/States

  • 8/20/2019 ABT Tarrif Presentation

    20/53

    ABT / IEGC CLAUSES

      While 8nalising the above dailygeneration schedules for the

    ISS, ):3( shall ensure thatthe same are operationallyreasonable, particularly interms of ramping-up4ramping-

    do+n rates and the ratiobet+een minimum andma5imum generation levels.

     

    I((hapter-;ara ;.*.;"age ;.*#

    Raping!up/Raping!do"n

  • 8/20/2019 ABT Tarrif Presentation

    21/53

    ABT / IEGC CLAUSES

      The )egional :oad 3espatch

    (entre may give suchdirections and e5ercise suchsupervision and control as

    may be reuired for ensuringintegrated grid operationsand for achieving thema5imum economy and

    e>ciency in the operation of

    I( (hapter-0

    ara 0.0. "0#"age 0-$#

    #ntegrated Grid $perations and %conoey

  • 8/20/2019 ABT Tarrif Presentation

    22/53

    ABT / IEGC CLAUSES

     The primary ob?ective of integratedoperation of the )egional grids is toenhance the overall operationaleconomy and reliability of theentire electric po+er net+orkspread over the geographical area

    of the interconnected States.articipant utilities shall co-operate+ith each other and adopt ood6tility ractice at all times for

    satisfactory and bene8cialo eration of the )e ional rid.

      I((hapter-/ara /.$

    "a# "age /-$# 

    #ntegrated Grid $perations and %conoey

  • 8/20/2019 ABT Tarrif Presentation

    23/53

    ABT / IEGC CLAUSES

     

    I(

    (hapter0ara0./"$#

    "age0-1#

    Sub?ect to the provisions ofsub-section **"!# of the Act,

    State :oad 3espatch (entre ina State may give suchdirections and e5ercise suchsupervision and control as may

    be reuired for ensuring theintegrated grid operations andfor achieving the ma5imum

    economy and e>ciency in theo eration of the o+er s stem

    #ntegrated Grid $perations and %conoey

  • 8/20/2019 ABT Tarrif Presentation

    24/53

    ABT / IEGC CLAUSES

      The system of each State

    shall be treated and operatedas a notional "@e5ible# controlarea. The summation ofscheduled dra+al from ISS

    and any bilateral inter-changeshall provide the dra+alschedule of each State, andthis shall be determined in

    advance on daily basis.

      I( (hapter-;ara ;.1 "0#

     "age ;-0#

    #ntegrated Grid $perations and %conoey

  • 8/20/2019 ABT Tarrif Presentation

    25/53

    ABT / IEGC CLAUSES

      The )egional grids shall be operated asloose po+er pools in +hich the Statesshall have full operational autonomy, andS:3(s shall have the total responsibilityfor-

    i# scheduling 4 despatching their o+ngeneration "including the generation oftheir captive licensees#,

    "ii# regulating the demand of their

    customers,

    "iii# scheduling their dra+al from the ISS"+ithin their shares in the respectiveplants capability#,

     

    I((hapter-;ara ;.1"$#"age ;-$# 

    #ntegrated Grid $perations and %conoey

  • 8/20/2019 ABT Tarrif Presentation

    26/53

    ABT / IEGC CLAUSES

      Based on the reuisitions

    given by the bene8ciaries andtaking into account technicallimitations on varying thegeneration and also taking

    into account transmissionsystem constraints, if any,):3( shall prepare theeconomically optimalgeneration schedules.

      ABT Scheduleara ! "vi#

     "age iii#

    #ntegrated Grid $perations and %conoey

  • 8/20/2019 ABT Tarrif Presentation

    27/53

    Existing Tariff Availability Based Tariff  

    Based on K.P.Rao CommitteeReport

    Based on E.C.C Report

    Two Part Tariff 

    I. Fixed Carges

    II. !ariable Carges

    Tree Part Tariff 

    I. Capa"ity Carges

    II. Energy Carges

    III. #.I.Carges

    Fixed "arges re"overy

    proportional to $rawal.It t%sbe"omes single part tariff 

    Capa"ity "arges re"overy

    proportional to Entitlement & Allo"ation of Capa"ity 'are

    F.C. f%lly re"overed at ().*+,P-F in"l%ding deemed

    generation

    C.C.f%lly re"overed at T.A. of+, as de"lared by te

    /enerating Company.

    TARIFF COMPARISON

  • 8/20/2019 ABT Tarrif Presentation

    28/53

    What is Availability

     Availability means te readiness of te generating station todeliver Ex.B%s o%tp%t expressed as a per"entage of its rated

    Ex.B%s o%tp%t "apability as per rated "apa"ity.

    0 It is different from te existing terminology1 present

    term in"l%des only te stat%s weter in servi"e 2 3,4 or

    o%t of servi"e 2 ,4.

    0  Te term availability in te present "ontext "o%ld be

    defined as te 56 "apability of te generator for s%pplying tote grid after a""o%nting for te planned and %nplanned

    o%tages and d%ration d%e to non availability of a%xiliaries1 f%el

    and water.

    TARIFF COMPARISON

  • 8/20/2019 ABT Tarrif Presentation

    29/53

    Existing Tariff Availability Based Tariff  

    Te f%el ris7 is generallypassed on to te benefi"iaries. Te f%el ris7 is wit 8TPC.

    Te Rate of Ret%rn sall be3(,

    Te Rate of Ret%rn at 39, isprote"ted.233+9:la"s&yr4

    Interest on -oan is at a"t%als; passed on to tebenefi"iaries.

    +.:,of fixed "arge2+.:, of+9(3

  • 8/20/2019 ABT Tarrif Presentation

    30/53

    Existing Tariff Availability Based Tariff  

    Te >;5 Carges are ).:,of "%rrent "apital "ostes"alated ?3, per ann%m.

    Te base level od >;5 sallbe average of a"t%al >;5expenses in te last five years23@@:@( to 3@@@) 4es"alated twi"e ?3, tobring it to 3@@@ ) level.

    Es"alation in >;5 "ost to beprovided on te basis of aweigted pri"e index of CPI

    29,4 and 6PI 2(,4.Base >;5 to be es"alated atte rate of (, per ann%m forte tariff period.2)3@=la"s&yr4

    TARIFF COMPARISON

    TARIFF COMPARISON

  • 8/20/2019 ABT Tarrif Presentation

    31/53

    Existing Tariff Availability Based Tariff  

    In "ase a"t%al es"alation is

    witin ), of tis1 it sall beabsorbed by te %tility.$eviation beyond ), will bead%sted for wi" petition willave to be filled.

     All Tax on in"ome in"l%dingin"entive is pass tro%g.

    'ame sall "ontin%e.Tax on teoter in"ome streams a""r%ing tote "ompany sall not be passtro%g.

    Tax Es"row a""o%nt to be opened byea" benefi"iaries.

    Tax to be billed on regional basis sotat benefi"iaries paying iger "ostof new stations are also provided

    advantage of tax oliday.

    TARIFF COMPARISON

    TARIFF COMPARISON

  • 8/20/2019 ABT Tarrif Presentation

    32/53

    Existing Tariff Availability Based Tariff  

    Interest on wor7ing "apital

    in"l%des

    Existing pra"ti"e to "ontin%e

    Coal3.: mon1se" f%el)mon

    >;5 exp3mon23,Es"4

    Re"eivables)mon2f"Dv"4

    =3: la"s2)(*4

    TARIFF COMPARISON

    a4 F%el "ost for one mont

    and f%el sto"7 of 3: days

    for pit ead stations ; =

    days sto"7 for non pit ead

    stations "al"%lated on

    normative P-F basis.b4 ( days sto"7 of

    'e"ondary f%el oil"al"%lated on normative

    P-F basis."4 >peration ;

    5aintenan"e expenses2Cas4 for one mont.

    TARIFF COMPARISON

  • 8/20/2019 ABT Tarrif Presentation

    33/53

    Existing Tariff Availability Based Tariff  

    0d4 5aintenan"e spares

    maxim%m of 3, of "apital "ostb%t not ex"eeding one yearsre%irement less one fift ofinitial spares already"apitalised.

    e4 Re"eivables e%ivalent totwo monts average billing"al"%lated on normative P-Fbasis.

    Existing pra"ti"e to "ontin%e.

    TARIFF COMPARISON

     

    TARIFF COMPARISON

  • 8/20/2019 ABT Tarrif Presentation

    34/53

    Existing Tariff Availability Based Tariff  

    8o provision of $evelopment

    '%r"arge.

    Te generating "ompany sall

    be entitled to a developments%r"arge of :, on every billfor fixed "arges raised by it.

    Te $.C.sall not be payablefor plants operating ex"l%sivelywitin a state.

    -evy of $evelopment'%r"arge sall be s%be"t tote following "onditionsG

    TARIFF COMPARISON

  • 8/20/2019 ABT Tarrif Presentation

    35/53

    Existing Tariff Availability Based Tariff  

    :, F.C. re"overable even at

    Hero P-F

    Proportionate re"overy of C.C

    for Availability between to+,

    Co%ld be in"reased to +: ,s%bse%ently at any time if te

    experien"e di"tates s%" are%irement

    Tis1 owever "o%ld be"onsidered for relief after d%e

     %stifi"ation for plants aving

    operational problem.

    /ross /eneration ; $eemed/eneration is Certified by REB

     Availability is determined byREB based on de"lared

    "apability for ea" time blo"7.

  • 8/20/2019 ABT Tarrif Presentation

    36/53

    Existing Tariff Availability Based Tariff  

    For Certifi"ation of Ba"7ingdown1 te "apability to bedetermined by #nrestri"ted/eneration d%ring Pea7Period.Ba"7ing down sall be

    te differen"e between"apability and te a"t%algeneration.

    8o Provision for "ertifi"ation of$eemed /eneration.

    !ariable Carges sall be paidon ea" %nit of A"t%al Energysent o%t from te station.

    Energy Carges sall be paidon te Ex.B%s '"ed%leEnergy.

  • 8/20/2019 ABT Tarrif Presentation

    37/53

    It is te re"overy of variable "arges

    based on s"ed%le generation in a time blo"7.

    Energy Carges sall be wor7ed o%t on te basis of a

    paisa&7w rate on exb%s energy s"ed%le to be sent o%tfrom tr generating station.

    E.C. = RATE OF ENERGY CARGES ! SCE"ULE GENERATION

    # E! BUS $

    E%&'(y )ha'(&s*

    Te rate of variable "arges as well as F%el pri"e ad%stment

    sall be governed as per notifi"ation iss%ed by />I.

  • 8/20/2019 ABT Tarrif Presentation

    38/53

    Existing Tariff A.B.T

      O+&'ati%( N,'-s

    . &at Rat&

    C,al Bas& Stati,%

      'tabilisation G )( K"al&Kw

    '%bse%ent Period G ): K"al&Kw

    29 K"al&Kw sall be ded%"ted in : 56 %nits forele"tri"ally driven BFP4

    Gas / Li01i Bas& Stati,%

      6ito%t 8ox Control 6it 8oxControl

    >pen Cy"le =3: K"al&Kw =3@K"al&Kw

      Combined Cy"le )3 K"al&Kw )3):K"al&Kw

    Existing to

    "ontin%e)9(9.)@7"al&7w4

     APC*.@=,s

    'P >I-)ml&7w

  • 8/20/2019 ABT Tarrif Presentation

    39/53

    Existing Tariff A.B.T

    2. A13ilia'y P,4&' C,%s1-+ti,%

    C,al Bas& Stati,%

      6itC.T 6ito%t C.T

      ) 56 'eries @.:, @.,

      : 56 'eries

    6it T$BFP +., *.:,

      6it 5$BFP @.:, @.,

    Gas / Li01i Bas& Stati,%

      >pen Cy"le 3.,

      Combined Cy"le =.,

    2$%ring te stabilisation period1 normative APC sallbe re"7oned at .:, over and above te fig%respe"ified above.4

    Existing to "ontin%e

     APC*.@=,

  • 8/20/2019 ABT Tarrif Presentation

    40/53

    Existing Tariff A.B.T

    5. S&),%a'y 61&l Oil C,%s1-+ti,%

      'tabilisation Period :. ml&Kw

      '%bse%ent Period =.: ml& Kw

    9. Stabilisati,% P&'i,  'tabiliation period"ommen"ing from te date of "ommer"ialoperation sall be re"7oned as follows G

    Coal Based & Termal 'tation 3+ $ays

    >pen "y"le /as ; 8apta based station @

    $aysCombined "y"le gas ; 8apta based station @ $ays

    Existing to"ontin%e

    'p.>il )ml&7w

  • 8/20/2019 ABT Tarrif Presentation

    41/53

    Existing Tariff A.B.T

    7. "at& ,6 C,--&')ial O+&'ati,% Th& at&,6 ),--&')ial ,+&'ati,% ,+&'ati,% ,6 i%ivi1al1%its shall b& '&)8,%& as 6,ll,4s *

      C,al Bas& / Th&'-al Stati,% N,t &3)&&i%( 9:ays 6',- th& at& ,6 sy%)h',%isati,%.

      Gas / Li01i Bas& Stati,% F',- th& at& ,6Sy%)h',%isati,%

    Existing to"ontin%e

  • 8/20/2019 ABT Tarrif Presentation

    42/53

    Existing Tariff Availability Based Tariff  

    In"entive is payable ? 3Paisa & Kw for every 3,in"rease in P-F 2In"l%dingdeemed generation4 above(+.9@ , .

    Target availability+,.): paise&%nit flat rate.

    In"entive billing in te ratio ofFixed Carges billed.

    In"entive billing in te ratio ofEnergy '"ed%led bybenefi"iaries beyond targetP-F.

  • 8/20/2019 ABT Tarrif Presentation

    43/53

    Existing Tariff Availability Based Tariff  

    8o provision for #ns"ed%ledInter"ange Carges.

    #ns"ed%led Inter"angeCarges sall be appli"able onte differen"e between a"t%algeneration & drawal and tes"ed%le generation & drawal.

    #.I. 'all be wor7ed o%t onea" 3: min%te time blo"7.

    #.I. Rate be based on teaverage fre%en"y of te timeblo"7.

  • 8/20/2019 ABT Tarrif Presentation

    44/53

    Existing Tariff Availability Based Tariff  

    8o provision for #ns"ed%ledInter"ange Carges.

    Te #.I. Rates are as %nder.0:.: J and above < Hero

    [email protected] and below < 9)P&Kw

    0Between [email protected] ; :.: Jte #I rate is linear in steps of.) J wi" is 9.+ Paisa

  • 8/20/2019 ABT Tarrif Presentation

    45/53

    ;7:

    7.

  • 8/20/2019 ABT Tarrif Presentation

    46/53

    Availability ta'i66 i-+l&-&%tati,%

    S)h&1l&

    S,1th&'% R&(i,% :.:;.2::

    East&'% R&(i,% :.:7.2::

    N,'th&'% R&(i,% :.:?.2::

    W&st&'% R&(i,% :.:9.2::

     As re%ested by CT#1 CERC as extended implementation of

     ABT in 8R ; 6R.

    N,'th&'% R&(i,% :.:?.2::

    W&st&'% R&(i,% :.:9.2::

  • 8/20/2019 ABT Tarrif Presentation

    47/53

    O+&'ati,% St'at&(y

    0 A"ieve iger "apa"ity availability so tat fixed "ost

    "an be re"overed %i"7ly.

    0 Improvement in performan"e parameters so tat tese

    "an be 7ept well below te normative val%es1 t%s

    spending less for te same Ex.B%s energy.

    0 Reg%lating te generation as per te fre%en"y profile

    and ba"7down wen system fre%en"y is ig.6en #I

    pri"e is lower tan te marginal "ost of generation.

    To ma7e te rigt de"ision1 weter to generate or ba"7

    down 1 te marginal "ost line 2 variable "arges4 "an be

    s%perimposed on te #I pri"e&fre%en"y "%rve.

    0 8o loss is s%ffered so long as te generation follows

    te s"ed%le irrespe"tive of system "onditions.

  • 8/20/2019 ABT Tarrif Presentation

    48/53

    9@. :.:

    STATION  @ . C.#+aisa/84h

      A 7:

    B ::

      C

  • 8/20/2019 ABT Tarrif Presentation

    49/53

    O+&'ati,% St'at&(y

    0  It sall be desirable for te ma"ines to followfre%en"y in "oordinated "ontrol wit fre%en"y infl%en"e

    on. Te dead bands "an be "osen for ea" ma"ine

    based on marginal "ostI pri"e relation.

  • 8/20/2019 ABT Tarrif Presentation

    50/53

    P'&'&01isit& / I%6'ast'1)t1'& R&01'i-&%t 6,'

    Availability Ta'i66 

    0 Reliable and dedi"ated voi"e ; data "omm%ni"ation

    -in7 between ea" generating station 1 R-$C ; R

    0 'etting %p regional "ontrol rooms for "ontin%o%s monitoring

    and intera"tion wit R-$C&REB and stations.0  Installation of spe"ial energy meters for re"ording te

    system parameters at a spe"ified time interval23:min4.

    0  'ystem for Certifi"ation of Availability.

    0  Finalisation of modalities & arrangements for %nloading of

    data from te meters and ele"troni" transfer of te same to

    R-$C and REB.

  • 8/20/2019 ABT Tarrif Presentation

    51/53

    P'&'&01isit& / I%6'ast'1)t1'& R&01i'&-&%t

    6,' Availability Ta'i66 

    0 $evelopment of software for "e"7ing te Regional energy

    a""o%nt.

    0 Transparent settlement me"anism and energy

    a""o%nting metodology.

    0 Transparent >perating R%les 1 Agreements and

     'ystem /%idelines.

  • 8/20/2019 ABT Tarrif Presentation

    52/53

    A)ti,% R&01i'& Iss1&s 

    0 Tere so%ld be software system s%pport available to te

    operating personnel to de"lare availability and to ta7e de"isionregarding #.I.

    0  Tere is a need to wor7 o%t te a"t%al "ost inp%t for

    generation at different P-F. To wor7 o%t te margin available

    at different loading of te ma"ine for de"iding abo%t te #.I.

    0  Tere is a need to develop "ommer"ially oriented wor7

    "%lt%re.

    0  Tere is a need for vario%s se"tions to a"t as internal

    "%stomer to ea" oter to optimise te "apa"ity1 reso%r"es and

    brea7down time.

  • 8/20/2019 ABT Tarrif Presentation