ABR CV 2009

6
CURRICULUM VITAE ANTHONY BRIAN ROBINSON CURRICULUM VITAE Proposed role in the Project: TEAM LEADER 1. Family name: ROBINSON 2. First names: Anthony Brian 3. Date of birth: 1944 4. Nationality: British 5. Civil status: Married 6. Key Qualifications: Institution [Date from - Date to]: Degree(s) or Diploma(s) obtained: [1962-1966]; University of Aston, Birmingham, UK BSc. in Civil Engineering; [1979-1982]; Institution of Accounting and Finance Certified Diploma in Accounting & Finance 7. Language skills: Indicate competence on a scale of 1 to 5 (1 - excellent; 5 - basic) Language Reading Speaking Writing English Mother tongue Turkish 5 4 5 8. Membership of Professional Bodies: - Member, Institution of Civil Engineers (1970) - Fellow, Institution of Water and Environmental Management (1985) 9. Present Position: Not presently employed 10. Years within the firm: Not Applicable 11. Key Qualifications Mr. Robinson is a Chartered Civil engineer who has spent his whole career working in the water sector out of which more than 25 years has been in the management of Projects in the water and wastewater sector in the UK, Eastern Europe, Iraq and Turkey. Mr Robinson is also familiar and experienced in the preparation and implementation of Projects in accordance with EC Directives in the environment sector. His area of expertise covers the preparation of Master Plans, Feasibility Reports and tender documents. Also the supervision of contracts including organizing and conducting formal training sessions and workshops for public authorities. Several of these projects also included the preparation of Environmental Impact Assessments & solid waste disposal, which were undertaken by other Key Experts Moreover, Mr Robinson is an experienced Team Leader with a proven track record in Eastern Europe (working on EU funded Projects), as will as other major water projects in Turkey, Iraq and in the UK. He is effective at creating, motivating and leading teams on special projects, including management of expatriate and local specialists and liaison with team members and partners. Mr. Robinson has proven written and oral communication skills covering plans, reports, appraisals, and communication with project partners and beneficiaries through workshops and PAGE 1 OF 7

Transcript of ABR CV 2009

Page 1: ABR CV 2009

CURRICULUM VITAE ANTHONY BRIAN ROBINSON

CURRICULUM VITAE

Proposed role in the Project: TEAM LEADER

1. Family name: ROBINSON2. First names: Anthony Brian3. Date of birth: 19444. Nationality: British5. Civil status: Married6. Key Qualifications:

Institution [Date from - Date to]: Degree(s) or Diploma(s) obtained:[1962-1966]; University of Aston, Birmingham, UK

BSc. in Civil Engineering;

[1979-1982]; Institution of Accounting and Finance

Certified Diploma in Accounting & Finance

7. Language skills: Indicate competence on a scale of 1 to 5 (1 - excellent; 5 - basic)Language Reading Speaking Writing

English Mother tongueTurkish 5 4 5

8. Membership of Professional Bodies:- Member, Institution of Civil Engineers (1970)- Fellow, Institution of Water and Environmental Management (1985)

9. Present Position: Not presently employed 10.Years within the firm: Not Applicable11.Key Qualifications Mr. Robinson is a Chartered Civil engineer who has spent his whole career working in the water sector out of which more than 25 years has been in the management of Projects in the water and wastewater sector in the UK, Eastern Europe, Iraq and Turkey. Mr Robinson is also familiar and experienced in the preparation and implementation of Projects in accordance with EC Directives in the environment sector. His area of expertise covers the preparation of Master Plans, Feasibility Reports and tender documents. Also the supervision of contracts including organizing and conducting formal training sessions and workshops for public authorities. Several of these projects also included the preparation of Environmental Impact Assessments & solid waste disposal, which were undertaken by other Key Experts

Moreover, Mr Robinson is an experienced Team Leader with a proven track record in Eastern Europe (working on EU funded Projects), as will as other major water projects in Turkey, Iraq and in the UK. He is effective at creating, motivating and leading teams on special projects, including management of expatriate and local specialists and liaison with team members and partners. Mr. Robinson has proven written and oral communication skills covering plans, reports, appraisals, and communication with project partners and beneficiaries through workshops and training programmes. He is fully familiar with all EU/IFI procedures and reporting requirements and he has extensive experience in TA for coordination of preparation of Tender Dossiers and Evaluation of Tenders for Waste Water and Water Infrastructure Projects. During his career, he has had assignments as Team Leader, Project Manager, Task Manager and Senior Design Engineer, under which he developed project applications to be financed by ISPA/IFI or budgetary funds.

12.Other SkillsExcellent communicator working in close co-operation/liaison with funding agencies, clients and beneficiaries

13.Specific experience in the region:

Country Date from - Date toRomania, Bulgaria and Albania (Shkodra) 2001 to 2008Turkey 1993 to 2000

PAGE 1 OF 6

Page 2: ABR CV 2009

CURRICULUM VITAE ANTHONY BRIAN ROBINSON

Europe and Middle East 1976 –1993 incl. 2 years in Iraq (1985 to 1987)

PAGE 2 OF 6

Page 3: ABR CV 2009

CURRICULUM VITAE ANTHONY BRIAN ROBINSON

14.Professional experienceDate Locatio

nCompan

yPosition Description

Jan 2008toJuly 2008

Sofia Bulgaria

SCE-PM-WMI

Team Leader

Team Leader for the EC Cohesion funded Project in Bulgaria ref EuropeAid/120187/D/SV/BG entitled “Technical Assistance for Project Preparation in the Target Towns of Veliko Tarnovo, Kurdzhali, Pernik, Vidin, Plovdiv, Dobrich and Yambol” for the following main activities: Data collection and review, preparation and completion of Inception Reports. Analysis and development of data collected. Survey and Modeling of water and sewerage networks. Preparation of Master Plans for the Target towns Preparation of Long Term Development Plans for further financing by the Bulgarian Authorities in accordance with European

DirectivesOct 2006toDec 2006

MoEW, Bulgaria

Louis Berger/ Iberinsa

Evaluator for Works Tenders

Evaluator for the MoEW in Bulgaria for Works Tenders prepared under “TA for Implementation of ISPA Measures for Wastewater collection and treatment Projects” for Sevlievo and Lovech WWTP’. The tender evaluation was done in accordance with Practical Guide rules and Yellow Book Conditions of Contract.

Sept 2005 to Sept.2006

Balchik,Bulgaria

GKW Consult, Mannheim German

Task Manager

Task Manager for the design phase of the Euro 22 M EC ISPA funded Project in Bulgaria entitled “Balchik Integrated Water Supply Project” The Scope of Work for the first phase of the Project includes technical assistance for the following major activities: - Analysis and development of project documentation, including data collection and review, geotechnical stabilization and soil and groundwater surveys, preparation of the detailed design of the rehabilitation and extension of the existing water supply and sewerage networks and preparation of a Detailed Design Report for the water supply and sewerage networks rehabilitation and extension. - Production of tender documents in accordance with FIDIC (Red Book) ;- Review of the design for a new WWTP prepared by the Contractor in accordance with FIDIC (Yellow Book) Conditions of Contract;- Analysis of the existing drinking water system to identify a future project for further financing by the Bulgarian Authorities;- Finalisation of detailed Specifications and Bills of Quantities for the Project in accordance with Bulgarian Regulations

Jan 2004 to Oct 2004

Galati / Romania

MWH ConsultantLa Helped,Belgium

Team Leader

Team Leader for the ISPA EC/EIB funded project in Romania entitled “Technical Assistance for Project Preparation in the City of Galati, Romania” for the construction of a new WWTP and outfall collector sewer. The scope of work for the Project included:- Master Plan for the period 2004 to 2029 regarding water and wastewater services;- Feasibility Study for the new works proposed to be constructed and commissioned during the ISPA Project period (2006-2010);- Review of Financial and Operational Performance Improvement Programme (FOPIP) prepared for the Water Company in Galati- Environmental Impact Assessment for the site of new WWTP, which included public consultation and assistance in obtaining an

Environmental Permit, sludge disposal strategy for medium / long term and Industrial Effluent Action Plan to ensure effluents discharged to sewers in Galati meet both Romanian and EU standards;

- ISPA Application for a new Project having an estimated value of Euro 70M; - Preparation of Plan to assist the PIU in its Public Awareness needs and PR issues. Also to promote the ISPA measure in Galati;- Tender Dossier for the new WWTP, Interceptor collector and Pump stations based on FIDIC (Yellow Book) Conditions of Contract;- Tender Dossiers for construction supervision;

PAGE 2 OF 6

Page 4: ABR CV 2009

CURRICULUM VITAE ANTHONY BRIAN ROBINSON

Date Location

Company

Position Description

Aug 2002 to Dec 2003

Focsani / BucharestRomania

GKW Consult; Mannheim, Germany

Team Leader

Team Leader for an ISPA EC/EIB funded project “Technical Assistance for the Management and Supervision of ISPA Contracts in Focsani, Romania” - the extension and rehabilitation of both the existing WWTP and the sewerage system in Focsani. The major components of work include:-Data collection and design review, preparation of a Master plan, Sludge disposal Strategy and Industrial Effluent Action Plan.- Preparation of Tender Dossiers for the extensions to the WWTP, based on FIDIC Yellow Book Conditions of Contract and the extensions to the sewerage system, based on FIDIC Red Book Conditions of Contract;-Management of Financial and Operational Performance Improvement Programme, which including development of internal procedures and On-the-job training of the staff of the PIU;- Preparation of Plan to assist the PIU in its Public Awareness needs and any PR issues. Also to promote the ISPA measure in Focsani;- Adjudication of Tenders for both the WWTP (FIDIC Yellow Book Coca) and the extension to the sewerage system (FIDIC Red Book)

Jan 2001 to Aug 2002

Sofia, Bulgaria

GKW Consult Mannheim Germany

Project Manager/Team Leader

Project Manager/Team Leader for an EC PHARE funded project in Bulgaria entitled “Project Preparation for Priority WWTPs for Sevlievo, Popovo, Lovech, Montana and Sevlievo” for the design and construction of new wastewater treatment plants and interceptor collectorsThe major project components of the five Priority Wastewater Treatment Works included:- Data collection and design review, Feasibility Studies, which included financial and economical analysis and cost benefit analysis of three alternative designs of WWTP ;- Preliminary designs for WWTP and Interceptor collector mains for each town based on the selected alternative;- Preparation of Tender Dossiers for Works based on FIDIC Condition of Contract (Yellow Book) for each town;- Preparation of ISPA Application Forms for all five towns, which had an estimated value of Euro 70M;- Preparation of Tender Dossiers for construction supervision;

Aug 1993 to Jun 2000

Turkey Thames Water Int. Ltd/ PWT Projects

Resident Manager

Resident Manager/ for UK’s largest Water Supply Company, Thames Water Authority & associated Companies TWI /PWT Ltd, which established a Branch office in Turkey following the award of an $865M Build-Operate-Transfer (BOT) Contract to the company and its local Turkish Civil Construction partners. This IFI funded water project in Turkey is the largest of its kind worldwide.Duties as Resident Manager/Team leader included responsibility for developing all the Company's new‘ Private Sector Participation (PSP) business opportunities for key projects in Turkey, which required the management of all project stages from the proposal preparation, negotiations of contract, and Management of construction supervision, commissioning until taking over. Key projects included the following:BOT Projects for the cities of Ankara (Rehabilitation and extensions of Vedic Water Treatment Plant) and Istanbul (Istranca-Ikitelli Project), a large Operation and Management (O&M) 'Concession' opportunity for Antalya Water and Sewerage Administration, which was funded by the World Bank, the development of opportunities for Operation and Management type contracts with the Municipalities of Manavgat and Cesme.

Jul 1976 to June 1990

UK Paterson Candy Int./ PWT Projects Ltd

Team Leader /Senior Project Manager

Senior Project Manager (Wastewater), managing three project teams, with responsibility of technical assistance for preparation of detailed designs and tender dossiers for the following new wastewater treatment plant projects, which were designed to meet EC Directive 91/271/EEC:- Silchester (Thames Water) – 10Ml/d Biological Aerated Filter (BAF) Plant- Tilbury – 30 Ml/d Deep Shaft Aeration WWTP- Parr (South West Water) – 8Ml/d BAF plantProject Manager (Potable Water) for new or rehabilitated WTPs. Responsibilities included identifying opportunities in the potable water treatment market in the UK that needed to be built or rehabilitated

From July 1985 to Sept

Iraq Paterson Candy Int. Ltd./ PWT Projects Lt

Branch Manager

Branch Manager of PCI/PWT office in Baghdad, Iraq working on a $200M contract for the process design and supply of equipment for a new 1350M ℓ/d water treatment plant at Karkh and another $30M contract for the updating and rehabilitation of an existing plant at Sabah Nissan. Responsibilities included management of the Iraq office staff, client liason, technical assistance and contract management

PAGE 3 OF 6

Page 5: ABR CV 2009

CURRICULUM VITAE ANTHONY BRIAN ROBINSON

Date Location

Company

Position Description

1987

PAGE 4 OF 6