Abosso GoldFields LtdAbosso GoldFields LtdDamang MineDamang Mine
An Overview
222
Management TeamManagement Team
� Brendan Walker (South Africa) V-P Ghana� Alan Thompson (Australia) General Manager� Charles Taschereau (Canada) Mill Manager� Alfred Baku (Ghana) Mining Manager� Paul Kitto (Australia) Exploration Manager� Clifton Potter (Canada) Environmental Manager� Robert Siaw (Ghana) Local Affairs Manager� Ben van Wyk (South Africa) HR Manager� Bashir Malik (UK) F&A Manager� Mike Jordaan (South Africa) Security Manager� Patrick Spathelf (South Africa) Chief Geologist� Mark Haywood (Australia) Chief Mining Engineer� Philip Engelbrecht (South Africa) Metallurgical Superintendent
333
Damang Mine Damang Mine Facts & FiguresFacts & Figures
� 18.4Mt Mined F2003 � 14.8Mt Forecast F2004� 4.9Mt Milled F2003 � 5.2Mt Forecast F2004� 299koz Gold produced F2003 � 298koz Forecast F2004� $234/oz Operating Cost F2003 � $220/oz Forecast F2004 � 1200 employees and contractors � 38 expats
444
Damang Mine Damang Mine -- HistoryHistory� 1989 � Ranger Minerals starts exploration in the area� 1990-95 � Discovery and exploration of Damang ore body� 1996-97 � Construction of Mine, Mill, Power line.� Nov 97 � First gold poured� Jun 1999 � Plant upgraded (pebble crusher)� Jan 2002 � Change of ownership to Gold Fields Ltd / IamGold � Dec 2003 � Completed shareholders loan repayment
� Ownership- GOLDFIELDS Ltd 71.1%- IAMGOLD Corp. 18.9%- Government of Ghana 10%
555
GhanaGhana
DAMANG
666
GeologyGeology
Mineralisation at Damang occurs at the faulted culmination of a regional anticline
Similar Proterozoic/PhanerozoicExamples
� Telfer� Just about all deposits in Pine
Creek� Bendigo - Slate Belt Style
777
Current ReservesCurrent Reserves--ResourcesResources
Million Tonnes (Mt)
Grade (g/t)
Gold (000oz)
RESERVEProved 5.1 1.7 271Probable 3.1 2.5 244Total Open Cut 8.2 2.0 515Proven Surface Stockpile 9.1 1.4 405Grand Total (Open Cut + Stockpile) 17.3 1.7 919RESOURCEMeasured 8.1 1.7 448Indicated 7.7 2.0 488Inferred 2.9 1.9 175Total Open Cut 18.8 1.8 1,111Measured Stockpile 9.1 1.4 405Grand Total (Open Cut + Stockpile) 27.9 1.7 1,516
Note : Reserves/Resources as of 1st July 2003
888
Cost DistributionCost Distribution
� Total Operating Budget $65.6M� Cost/oz $221/oz F2004 to date
Damang Gold Mine Costs 2004
9%
24%
12%36%
6% 6% 4% 3%
PayrollStoresPowerMining ContractorsOther ContractorsExplorationOther CostsGeneral & Admin
999
Operating Costs Operating Costs
F2003 F2004 (to date)
$/ton Processed $14.40/ton $12.84/tonOperating Cost $235/oz $221/ozTotal Cash Cost $243/oz $234/ozOperating Margin 31% 39%
101010
OperationsOperationsPerformance Performance
Ore Tonnes Mined
0100000020000003000000400000050000006000000700000080000009000000
F1998 F1999 F2000 F2001 F2002 F2003 F2004ForecastYears
Ore
Ton
nes
Min
ed
111111
OperationsOperationsPerformance Performance
Tonnes Milled
2000000
2500000
3000000
3500000
4000000
4500000
5000000
5500000
F1999 F2000 F2001 F2002 F2003 F2004Forecast
Years
Tonn
es M
illed
� Blend 65% Fresh Ore, 35% Oxides
121212
OperationsOperationsPerformance Performance
Gold Produced (oz)
050000
100000150000200000250000300000350000400000
1998 F1999 F2000 F2001 F2002 F2003 F2004ForecastYears
Tonn
es M
illed
131313
MiningMining
� Mining via contractor (AMS) under AGL supervision.� Daily production 70kt; Yearly Production 18.4Mt� Currently mining in three pits: Damang, Lima and
Kwesie
141414
Mine DevelopmentsMine Developments
� Mining in Huni 3&4 Completed Q3F2004.
� Main Damang Pit Completed in F2005
� Mining Juno SE will begin in Q3F2004
� Lima pit started in Jan�03� Mining in Kwesie started in
Apr�03� Planning for development of
new pits ongoing� AMS contract to be extended
for 3 years� Study of underground
potential in Damang pit� Planning for Rex
development
151515
MillingMilling
� CIL Plant� Milled Tonnes 5.1Mtpa� Throughput 625tph� % Fresh Ore 65%� Availability 95%� Head Grade 2.0g/t� Recovery 91%� Gravity Rec. 20%
161616
MillingMilling
171717
Mill Mill UtilisationUtilisation
� Focus on planned/preventive maintenance� YTD Utilization at 95.0% (excluding Girth Gear Shutdown)
Mill Utilisation - Total Running Time
89.00%
90.00%
91.00%
92.00%
93.00%
94.00%
95.00%
96.00%
1998-1999 1999-2000 2000-2001 2001-2002 2002-2003Excluding StrikeExcluding SAG
Motor FailureExcluding Pebble
Crusher Tie-in
181818
Mill ThroughputMill Throughput
3,000,000
3,500,000
4,000,000
4,500,000
5,000,000
5,500,000
F199
9
F200
0
F200
1
F200
2
F200
3
F200
4(F
orec
ast)
Mill Throughput (Tonnes)
� Without Major Capital Investments� Improved Availability� Improved Process
191919
Health & SafetyHealth & Safety� Excellent safety record.
- Long Term Lost Time Accident Frequency 0.5 per million hours worked
- One year without LTI reached in January 2004� Emphasis on prevention, education and training.� Regular Monitoring of dust, noise and ground
vibrations.
0
5
10
15
Damang Australia USA Canada
Lost Time Accidents Rate - Open-pit Metal Mines
Note: International Data is for 2001-2002
202020
Environmental ProtectionEnvironmental Protection� An excellent environmental record.
- Best Record of all Mines in Ghana in last EPA grading.� ISO 14001 Certified � Regular External Audits.� Full compliance with environmental permits.� High standard required from contractors and suppliers.� Committed to Follow the International Cyanide Guidelines
on mine site � will be audited in a few months.
212121
ReclamationReclamation� Extensive Reclamation program ongoing even during
operation� Reclamation Bond agreement signed with EPA in 2001 for
rehabilitation of site. � Achievement of a $0.78M reduction in the reclamation bond
in 2003 in recognition of the level of rehabilitation achieved in specific areas of the mine.
� Stakeholders consultation to develop end land-use plan (mixed agriculture, wood and cash crops)
222222
ReclamationReclamation� Total of over 250 hectares in rehabilitation
program (total area disturbed is 650 ha).� The following plants are used in the reclamation
projects:- Legumes (Leucenia, Cacia, Grecida, Pueraria, Acacia);- Timber Species (Ofram, Emire, Mahogany, Wawa,
Cedrella, Teak, Pericorpsis, Kusia, Cieba);- Farm Plantations (Oil palm, Pineapple, Plantain,
Cocoyam, Cassava);- Medicinal Tress (Neem).
232323
Stakeholder InteractionStakeholder Interaction
� Keep an open approach in our dealings with local communities.
� DMCCC (Damang Mine Communities Consultative Committee).- Composed of Mine Management, Traditional Leaders, Youth
groups, Local Business Leaders, etc (over 40 members).- Present company activities that might affect communities and
receive requests and concerns from stakeholders.- Meets every 2 months
� Damang applies �open door� policy and stakeholders are welcome to bring their concerns.
� Quick response to stakeholders complaints, requests and enquiries.
242424
Sustainable DevelopmentSustainable Development
� Focus on Education, Health, Water and Sanitation.� As objectives are being reached, there will be a
shift toward income generating projects as fish farming, improved agricultural techniques, etc.
252525
Sustainable DevelopmentSustainable Development
� 2003 � 8 major projects completed at the cost of $250k.
� Construction and renovation of school blocks at Bompieso, Koduakrom, Damang and Huni Valley.
� Construction and installation of water and sanitation facilities.
� Establishment of Scholarship schemes� Educational assistance � subsidizing teachers
wages (to raise standard to urban levels)� Construction, development and ongoing support of
community libraries � Damang, Huni Valley, Abosso
262626
ExplorationExploration
272727
Southern Ashanti BeltTotal Gold Endowment
Southern Ashanti BeltTotal Gold Endowment
Hydrothermal
Palaeoplacer
Hydrothermal& Palaeoplacer
MINERALISATION STYLES
282828
292929
PRIORITIES 2004-2005 EXPLORATION PROGRAMSPRIORITIES 2004-2005 EXPLORATION PROGRAMS
� Damang ML� Tomento North & East� Rex*� Amoanda *� Damang Underground? *� Old Abosso Underground
� Damang Adjoining Leases� Bonsa River F. R. (PL2/376)� Bonsa (PL2/151)� Subiri (PL 2/370)
� Gyata - District Acquisitions � Wassa Breman PLA*� Epieso PLA � Nsuaem PLA* � Atwere Broanda PLA* � Ghana Manganese* - JV?(* Hydrothermal targets)
6200
00 m
E
6300
00 m
E
6400
00 m
E
620000 mN
610000 mN
590000 mN
600000 mN
EPIESOEPIESOEPIESOEPIESOEPIESOEPIESOEPIESOEPIESOEPIESOAPPLICATIONAPPLICATIONAPPLICATIONAPPLICATIONAPPLICATIONAPPLICATIONAPPLICATIONAPPLICATIONAPPLICATION
SUBIRISUBIRISUBIRISUBIRISUBIRISUBIRISUBIRISUBIRISUBIRIPL 2/370PL 2/370PL 2/370PL 2/370PL 2/370PL 2/370PL 2/370PL 2/370PL 2/370
LIMALIMALIMALIMALIMALIMALIMALIMALIMA
KWESIEKWESIEKWESIEKWESIEKWESIEKWESIEKWESIEKWESIEKWESIE
DAMANG PITDAMANG PITDAMANG PITDAMANG PITDAMANG PITDAMANG PITDAMANG PITDAMANG PITDAMANG PIT
AMOANDAAMOANDAAMOANDAAMOANDAAMOANDAAMOANDAAMOANDAAMOANDAAMOANDA
BONSA FORESTBONSA FORESTBONSA FORESTBONSA FORESTBONSA FORESTBONSA FORESTBONSA FORESTBONSA FORESTBONSA FORESTPL 2/151PL 2/151PL 2/151PL 2/151PL 2/151PL 2/151PL 2/151PL 2/151PL 2/151
BONSA FORESTBONSA FORESTBONSA FORESTBONSA FORESTBONSA FORESTBONSA FORESTBONSA FORESTBONSA FORESTBONSA FORESTPL 2/376PL 2/376PL 2/376PL 2/376PL 2/376PL 2/376PL 2/376PL 2/376PL 2/376
DAMANGDAMANGDAMANGDAMANGDAMANGDAMANGDAMANGDAMANGDAMANG
TOMENTOTOMENTOTOMENTOTOMENTOTOMENTOTOMENTOTOMENTOTOMENTOTOMENTO
CHIDACHIDACHIDACHIDACHIDACHIDACHIDACHIDACHIDA
ABOSSOABOSSOABOSSOABOSSOABOSSOABOSSOABOSSOABOSSOABOSSO
DAMANGDAMANGDAMANGDAMANGDAMANGDAMANGDAMANGDAMANGDAMANGML 1409/96ML 1409/96ML 1409/96ML 1409/96ML 1409/96ML 1409/96ML 1409/96ML 1409/96ML 1409/96
REXREXREXREXREXREXREXREXREX
CHIDA SOUTHCHIDA SOUTHCHIDA SOUTHCHIDA SOUTHCHIDA SOUTHCHIDA SOUTHCHIDA SOUTHCHIDA SOUTHCHIDA SOUTH
303030
� Damang ML� Tomento North & East� Rex*� Amoanda*� Damang Underground?*� Old Abosso Underground
� Damang Ajoining Leases� Bonsa River F. R. (PL2/376)� Bonsa (PL2/151)� Subiri (PL 2/370)
� Gyata District Acquisitions� Epieso PLA� Wassa Breman PLA*� Nsuaem PLA*� Atwere Broanda PLA*� Ghana Manganese* JV?(* Hydrothermal targets)
GFL/IAMGOLD Area of Interest
ProposedGyata/GMC JV
Gyata PLA
ProposedGyata/Leo JV
PRIORITIES 2004-2005 EXPLORATION PROGRAMSPRIORITIES 2004-2005 EXPLORATION PROGRAMS
313131
6200
00 m
E
6300
00 m
E
6400
00 m
E
620000 mN
610000 mN
590000 mN
600000 mN
EPIESOEPIESOEPIESOEPIESOEPIESOEPIESOEPIESOEPIESOEPIESOAPPLICATIONAPPLICATIONAPPLICATIONAPPLICATIONAPPLICATIONAPPLICATIONAPPLICATIONAPPLICATIONAPPLICATION
SUBIRISUBIRISUBIRISUBIRISUBIRISUBIRISUBIRISUBIRISUBIRIPL 2/370PL 2/370PL 2/370PL 2/370PL 2/370PL 2/370PL 2/370PL 2/370PL 2/370
LIMALIMALIMALIMALIMALIMALIMALIMALIMA
KWESIEKWESIEKWESIEKWESIEKWESIEKWESIEKWESIEKWESIEKWESIE
DAMANG PITDAMANG PITDAMANG PITDAMANG PITDAMANG PITDAMANG PITDAMANG PITDAMANG PITDAMANG PIT
AMOANDAAMOANDAAMOANDAAMOANDAAMOANDAAMOANDAAMOANDAAMOANDAAMOANDA
BONSA FORESTBONSA FORESTBONSA FORESTBONSA FORESTBONSA FORESTBONSA FORESTBONSA FORESTBONSA FORESTBONSA FORESTPL 2/151PL 2/151PL 2/151PL 2/151PL 2/151PL 2/151PL 2/151PL 2/151PL 2/151
BONSA FORESTBONSA FORESTBONSA FORESTBONSA FORESTBONSA FORESTBONSA FORESTBONSA FORESTBONSA FORESTBONSA FORESTPL 2/376PL 2/376PL 2/376PL 2/376PL 2/376PL 2/376PL 2/376PL 2/376PL 2/376
DAMANGDAMANGDAMANGDAMANGDAMANGDAMANGDAMANGDAMANGDAMANG
TOMENTOTOMENTOTOMENTOTOMENTOTOMENTOTOMENTOTOMENTOTOMENTOTOMENTO
CHIDACHIDACHIDACHIDACHIDACHIDACHIDACHIDACHIDA
ABOSSOABOSSOABOSSOABOSSOABOSSOABOSSOABOSSOABOSSOABOSSO
DAMANGDAMANGDAMANGDAMANGDAMANGDAMANGDAMANGDAMANGDAMANGML 1409/96ML 1409/96ML 1409/96ML 1409/96ML 1409/96ML 1409/96ML 1409/96ML 1409/96ML 1409/96
REXREXREXREXREXREXREXREXREX
CHIDA SOUTHCHIDA SOUTHCHIDA SOUTHCHIDA SOUTHCHIDA SOUTHCHIDA SOUTHCHIDA SOUTHCHIDA SOUTHCHIDA SOUTH
� 2004 Fiscal Year = US$3.75M� Tomento Central & Southern� Chida South � Abosso� Amoanda� Rex� Bonsa River F. R.� Subiri
� 2005 Fiscal Year� Bonsa River F. R.� Subiri� Epieso PLA� Wassa Breman PLA� Nsuaem PLA� Atwere Broanda PLA� Ghana Manganese JV?
Exploration BudgetExploration BudgetExploration Budget
323232
Damang Damang �� In ResumeIn Resume
� 300,000oz/year� Good Cash Cost � $221/oz F2004 to date� Good Cash Flow � Net earnings $13.6M F2004 to date� Established operation � Low Risk� Sound Health, Safety, Environmental and Local Affairs
Management� Reserves Expansion On-going
333333
Future DirectionsFuture Directions
� Finding and developing new reserves.� Continue mine and mill optimisation programs to
reduce costs and increase efficiencies.� Maintaining and improving on the standards sets
in Environmental protection, Health & Safety.� Helping the local communities developing
alternative livelihood and sustainable development.