ABET Automated Program Evaluator’s Report (APEVR)
SE 685 Monmouth University
Practicum Team
Presented By:
Simon BaikDavid Best
Samuel CrutcherRahul Patel
Grzegorz SzpuraJoseph Tran
![Page 2: ABET Automated Program Evaluator’s Report (APEVR)](https://reader035.fdocuments.net/reader035/viewer/2022072014/56812c9f550346895d9145c3/html5/thumbnails/2.jpg)
2
Today’s Presentation….. Introduction/Background Solution Key Features Prototype Demonstration Schedule Milestones Lessons Learned Questions
![Page 3: ABET Automated Program Evaluator’s Report (APEVR)](https://reader035.fdocuments.net/reader035/viewer/2022072014/56812c9f550346895d9145c3/html5/thumbnails/3.jpg)
3
Introduction/Background
Accreditation Board for Engineering and TechnologyAccreditation Board for Engineering and Technology (ABET) ABET) Inc., Inc., The accreditor for college and university programs in various technology The accreditor for college and university programs in various technology
programsprograms Wants to improve the Accreditation Report Preparation ProcessWants to improve the Accreditation Report Preparation Process Before and during the visit each Program Evaluators (PEVs) prepares their Before and during the visit each Program Evaluators (PEVs) prepares their
reportsreports Manual Process in PlaceManual Process in Place
o All reports and forms are in word document formatAll reports and forms are in word document formato All reports and forms are hand written by Program Evaluators (PEVs) All reports and forms are hand written by Program Evaluators (PEVs) o Process is time consumingProcess is time consuming
PEVs have great difficulty ensuring consistency among the various reportsPEVs have great difficulty ensuring consistency among the various reports
![Page 4: ABET Automated Program Evaluator’s Report (APEVR)](https://reader035.fdocuments.net/reader035/viewer/2022072014/56812c9f550346895d9145c3/html5/thumbnails/4.jpg)
4
Solution Proposing a PC based processProposing a PC based process
Developing a stand-alone systemDeveloping a stand-alone system All forms can be filled out using the systemAll forms can be filled out using the system All forms will follow a consistent formatAll forms will follow a consistent format Certain parts of the forms will be auto-generatedCertain parts of the forms will be auto-generated Recommended Accreditation Action will be determined Recommended Accreditation Action will be determined
automatically by the systemautomatically by the system Value-AddedValue-Added
Will save time for each EvaluatorsWill save time for each Evaluators Process will be fasterProcess will be faster Easy to track consistency among the various reportsEasy to track consistency among the various reports
![Page 5: ABET Automated Program Evaluator’s Report (APEVR)](https://reader035.fdocuments.net/reader035/viewer/2022072014/56812c9f550346895d9145c3/html5/thumbnails/5.jpg)
5
Key Features Fill out the following forms:
Program Evaluator Basic Information Sheet Curriculum Analysis Form Transcript Analysis Form Program Evaluator Worksheet Program Audit Form
Generate the following forms: Exit Statement Recommended Accreditation Action Form
Basic: Load Save Auto-Save Print
Combine Exit Statements
Merge Program Audit Forms
Microsoft Word Format
![Page 6: ABET Automated Program Evaluator’s Report (APEVR)](https://reader035.fdocuments.net/reader035/viewer/2022072014/56812c9f550346895d9145c3/html5/thumbnails/6.jpg)
6
Prototype Demonstration
![Page 7: ABET Automated Program Evaluator’s Report (APEVR)](https://reader035.fdocuments.net/reader035/viewer/2022072014/56812c9f550346895d9145c3/html5/thumbnails/7.jpg)
7
Schedule Milestones
Project StartProject Start September 8, 2009September 8, 2009
Phase Anticipated Date Submission
Date
Planning 11/10/200911/10/2009 10/16/200910/16/2009
Requirements 12/01/200912/01/2009 11/30/200911/30/2009
Design 01/22/201001/22/2010 02/07/201002/07/2010
Development 03/12/201003/12/2010 OngoingOngoing
Testing 04/06/201004/06/2010 TBD*TBD*
Customer Documentation 04/15/201004/15/2010 TBD*TBD*
Close Down 04/27/201004/27/2010 TBD*TBD*
*To Be Determined (TBD)*To Be Determined (TBD)
![Page 8: ABET Automated Program Evaluator’s Report (APEVR)](https://reader035.fdocuments.net/reader035/viewer/2022072014/56812c9f550346895d9145c3/html5/thumbnails/8.jpg)
8
Lessons Learned
Frequent communication between all stakeholder
Requirements needs to be clear and concise
Central repository for project artifacts