Abc with CIS presentation

72
Ken Manning President

description

 

Transcript of Abc with CIS presentation

Page 1: Abc with CIS presentation

Ken Manning

President

Page 2: Abc with CIS presentation

ACTIVITY-BASED ACTIVITY-BASED COSTING:COSTING:

Its More Than Just a Costing Its More Than Just a Costing ToolTool

Page 3: Abc with CIS presentation

So What is ABC?

• “ABC cost ontology enables the mapping of resource drivers to our resource cost units; whereas, the resource cost assignment of ABC is achieved through the cost micro-theory for the resource cost point of an activity.” ( US Government)

Page 4: Abc with CIS presentation

Let’s try this

• Activity-based costing is a method of costing products or services based upon the activities required to produce the product or service.

• Producing products or services does not use resources, but, instead, uses activities.

• ABC identifies and associates the costs required to perform the activity.

Page 5: Abc with CIS presentation

SHIPMENT CROSS-SUBSIDIES CAN BE VERY LARGE

ABC is needed...

...To avoid cross-subsidization

Costs

Shipments

Average $ Cost

High VolumeLeast Complex

Low VolumeMost Complex

Over Cost

Under Cost

Page 6: Abc with CIS presentation

ABC is also:• a flexible Pricing Tool• a tool for Simulation or “what if” analysis• an invaluable Repository of

– Marketing Data– Operating Data– Productivity Data

Waiting to be mined with the right tools

Page 7: Abc with CIS presentation
Page 8: Abc with CIS presentation
Page 9: Abc with CIS presentation
Page 10: Abc with CIS presentation
Page 11: Abc with CIS presentation
Page 12: Abc with CIS presentation
Page 13: Abc with CIS presentation
Page 14: Abc with CIS presentation
Page 15: Abc with CIS presentation
Page 16: Abc with CIS presentation

TruckingReality

• An increase in revenue does not necessarily increase profit

• Some shipments are money makers and some are money losers

• The “losers” sometimes outweigh the “winners”

• Is anyone sure where money is being made and lost?

Page 17: Abc with CIS presentation

ACTIVITY-BASED COSTING:ACTIVITY-BASED COSTING:

an LTL Overviewan LTL Overview

Page 18: Abc with CIS presentation

Ask Yourself These Questions.

Page 19: Abc with CIS presentation

• Do you know the profitability of each customer you do business with?

• Does your current system highlight opportunities for cost improvement?

• Do you understand the various activities performed in your company?

• Do you have tools needed to estimate the profitability of prospective customers?

• Can you simulate the profitability of freight under forecast operating conditions and cost?

Page 20: Abc with CIS presentation

Cost of ServiceCost of Service

Labor Operating Expenses

OverheadOther

Traditional Cost Model

Page 21: Abc with CIS presentation

Amount Per Shipment

Revenue 10,000,000$ 125.00$

Labor 5,100,000 63.75$ Oper. Exp. 3,050,000 38.13$ Overhead 1,500,000 18.75$

Other 250,000 3.13$

Total Exp. 9,900,000$ 123.75$

Oper. Inc. 100,000$ 1.25$

No. of Shipments 80,000

Traditional Costing

Page 22: Abc with CIS presentation

P&D Dock Linehaul B & CCost of Providing Service

Labor

Di r e c t

Labor

Di r e c t

Di r e c t

Di r e c t

Labor

Labor

Overhead

Traditional Cost Model - Advanced

Page 23: Abc with CIS presentation

ABC Basic Premise

• Providing a service (freight transportation) consumes activities

• Activities consume resources

• The consumption of resources is what drives cost

• Each activity has independently associated overhead costs

Page 24: Abc with CIS presentation

Cost of Providing Service

Activity-Based Cost Model

P&D Dock Linehaul B & C

Di r e c t

Di r e c t

Di r e c t

Di r e c t

Labor

Labor

Labor

Labor

Ovhd.

Ovhd.

Ovhd.

Ovhd.

Ovhd.

Ovhd.

Ovhd.

Ovhd.

Page 25: Abc with CIS presentation

OK, so how is this useful?

• Trucking does not transport hundredweight.

• Trucking does not transport average shipments.

• Trucking does transport specific shipments with specific characteristics.

Page 26: Abc with CIS presentation

A Specific Shipment

• Canada Trucking, Ltd did $10 million revenue, 80,000 shipments, and 1,025,000 cwt.

• Shipment no. 576389 is 1,090 lbs from Toronto to Chicago with revenue of $180.00.

• The shipment consists of 30 loose pieces with 8 lbs/cu.ft. density.

Page 27: Abc with CIS presentation

Canada Trucking decides to implement ABC.

Analyze Activities

Gather Cost

EstablishOutput

Measures

Link Activitiesto Providing Service

Linehaul, P&D, Dock?, Trailer Pool?

General Ledger, statistics

Per mile, per minute, per day?

Page 28: Abc with CIS presentation

Canada Trucking is clicking!Activity-based Costing

Amount Per Shipment

Revenue 10,000,000$ 125.00$ Linehaul 3,500,000 43.75$ B&C/Ovhd/Other 610,000 7.63$ LINEHAUL Activity 4,110,000 51.38$

P&D 3,025,000 37.81$ B&C/Ovhd/Other 535,000 6.69$ P&D Activity 3,560,000 44.50$

Dock 1,850,000 23.13$ B&C/Ovhd/Other 380,000 4.75$ Dock Activity 2,230,000 27.88$

Oper. Exp. 9,900,000$ 123.75$

Oper. Inc. 100,000$ 1.25$

Page 29: Abc with CIS presentation
Page 30: Abc with CIS presentation

What is the True Cost?

Revenue 125.00$

Linehaul(Cost Driver) 57.85 P&D(Cost Driver) 37.30 Dock(Cost Driver) 26.00

Tot Cost 121.15$

Profit(Loss) 3.85$

Oper. Ratio 96.9%

130.00

93.2%

Page 31: Abc with CIS presentation

Why does this make a difference?

• To discover opportunities for cost improvement (process engineering)

• To improve strategic decision making

• To identify money makers & money losers

• To compare different options– Pricing Adjustments– Operating Adjustments

Page 32: Abc with CIS presentation

• The ABC System must be able to associate The ABC System must be able to associate different handling characteristics to the cost of different handling characteristics to the cost of providing service.providing service.

• May not be practical to allocate all costs to May not be practical to allocate all costs to activities.activities.

• The allocation must be based upon use of The allocation must be based upon use of resources not arbitrary assumptions.resources not arbitrary assumptions.

• Establishing an ABC system is not an accounting Establishing an ABC system is not an accounting project.project.

Page 33: Abc with CIS presentation

ACTIVITY-BASED COSTING:ACTIVITY-BASED COSTING:

a Truckload Overviewa Truckload Overview

Page 34: Abc with CIS presentation

Activity Based Costing for Irregular Route Carriers

• Unit Costs

• Application

• Round Trip Accounting

Page 35: Abc with CIS presentation

Direct Unit Costs• Linehaul Cost per Mile

• Linehaul Cost per Stop*

• Rail Linehaul and Drayage

• Trailer Pools

• Extra Costs (Accessorials)

• Billing & Collecting per Load

• Loss & Damage Components

• Local (Hourly) Drivers * Tailored to Driver Pay Basis

Page 36: Abc with CIS presentation

Application

• Cost of activities specific to a customer to be borne by that customer.

• Activities specific to a trip to be borne by all customers served on that trip.

Page 37: Abc with CIS presentation

Activities Specific to a Customer

• Loading and Unloading

• Loaded Miles

• Trailer Pools

• Accessorial Services

Page 38: Abc with CIS presentation

Activities Specific to a Trip

• Empty Miles

• Layovers

Page 39: Abc with CIS presentation

Traditional Cost Analysis

Loaded Miles + Assigned Empties = Total Miles

Total Miles x Unit Cost Per Mile = Cost of Load

Page 40: Abc with CIS presentation

New Concepts

• Cost is incurred for the entire trip required to serve the customer.

• That cost is NOT divisible using cost per mile.

• Round trip cost must be jointly allocated to specific loads based on contribution.

U.S. Patent 6,604,081

Page 41: Abc with CIS presentation

Cost of Material

10 lbs @ $1 per pound = $10

Page 42: Abc with CIS presentation

Cost of Material

10 lbs @ $1 per pound = $10

Page 43: Abc with CIS presentation

Cost of Material

5 lbs @ $1 per pound = $5

Page 44: Abc with CIS presentation

Cost of Material

5 lbs @ $1 per pound = $5

Page 45: Abc with CIS presentation

Cost of Material

UNIT PRICE IS IRRELEVANT

Cost =

Total Cost of Material

Less the Value of the “Leftovers”

Page 46: Abc with CIS presentation

Leftovers

• Waste

• Scrap

• Byproduct

Page 47: Abc with CIS presentation

Cost of Material

UNIT PRICE IS IRRELEVANT

Cost =

Total Cost of Material

Less the value of the “leftovers”

Page 48: Abc with CIS presentation

Round Trip is Your Cost

When you send a driver out on a trip, there is an implicit understanding that you will, eventually, pay for

his return.

U.S. Patent 6,604,081

Page 49: Abc with CIS presentation

Cost of a Load

COST PER MILE IS IRRELEVANT

Cost of a Load =

Total Cost of Round Trip

Less the Value of the “Leftovers”

U.S. Patent 6,604,081

Page 50: Abc with CIS presentation

Leftovers

• Waste

• Scrap

• Byproduct

Page 51: Abc with CIS presentation

Leftovers

• Deadhead

• Scrap

• Byproduct

Page 52: Abc with CIS presentation

Round Trip with Two Loads

Load OR = 85

Domicile

Page 53: Abc with CIS presentation

Round Trip with Two Loads

Load OR = 85

Round Trip OR = 160!

Domicile

Page 54: Abc with CIS presentation

Leftovers

• Deadhead

• Scrap

• Byproduct

Page 55: Abc with CIS presentation

Leftovers

• Deadhead

• Backhaul

• Byproduct

Page 56: Abc with CIS presentation

Round Trip with Two Loads

Load A

Load B

Domicile

Page 57: Abc with CIS presentation

Cost of Each Load Based on all Activities

Load A

Load B

Domicile

90 O/R

130 0/R

Round Trip: 110 0/R

Page 58: Abc with CIS presentation

Cost of Each Load Based on all Activities

Load A

Load B

Domicile

110 O/R

110 0/R

Round Trip: 110 0/R

Page 59: Abc with CIS presentation

TCG Philosophy:

If you’re not making money on the round trips run to serve a customer, you’re not making money on that customer.

Page 60: Abc with CIS presentation

Leftovers

• Deadhead

• Backhaul

• Byproduct

Page 61: Abc with CIS presentation

Leftovers

• Deadhead

• Backhaul

• Other Headhaul Loads on the Same Trip

Page 62: Abc with CIS presentation

Multi-Load Round Trips

TerminalRound Trip: 90 0/R

60 O/R

120 O/R 160 O/R

70 O/R

110 O/R

Page 63: Abc with CIS presentation

Multi-Driver Loads

60 O/R

110 O/R

Driver A Round Trip = 110 O/R

90 O/R

120 O/R

Driver B Round

Trip = 80 0/R

Load A =

75 0/R

Page 64: Abc with CIS presentation

Multi-Driver Loads

80 O/R

80 O/R

Driver A Round Trip = 110 O/R

110 O/R

110 O/R

Driver B Round

Trip = 80 0/R

Load A =

95 0/R

Page 65: Abc with CIS presentation

LTL Trip with Truckload

Outbound LTL

TL return

Terminal

Page 66: Abc with CIS presentation

LTL Trip with Truckload

Outbound LTL

TL return

Terminal

90 OR

130 0/R

Round Trip: 110 0/R

Page 67: Abc with CIS presentation

LTL Trip with Truckload

Outbound LTL

TL return

Terminal

110 OR

110 0/R

Round Trip: 110 0/R

Page 68: Abc with CIS presentation

Cost of Outbound LTL:

Total Round Trip Cost

Less Net Revenue from Load B

U.S. Patent 6,604,081

Page 69: Abc with CIS presentation

Balance Concept

• Cost is incurred for the entire trip required to serve the customer.

• That cost is NOT divisible using cost per mile.

• Round trip cost must be jointly allocated to specific loads based on contribution.

U.S. Patent 6,604,081

Page 70: Abc with CIS presentation

Three Essential Ingredients:

Data Completeness

Data Consistency

Data Integrity

GIGO = Garbage In, Garbage Out

Page 71: Abc with CIS presentation

SHIPMENT CROSS-SUBSIDIES CAN BE VERY LARGE

ABC is needed...

...To avoid cross-subsidization

Costs

Shipments

Average $ Cost

High VolumeLeast Complex

Low VolumeMost Complex

Over Cost

Under Cost

Page 72: Abc with CIS presentation

TRANSPORTATIONCOSTING GROUP

ACTIVITY-BASED COSTING SYSTEMS1-800-328-9700