1 PUBLIC COMMITTEE REPORT Planning Committee 26/06/2014 APPLICATION No. - FUL/2014/1098 Description of Development - Erection of a National Automotive Innovation Centre for academic and business use, including café and showroom, landscaping including water features, parking, access, boundary treatment, external lighting, roof top solar PV panels, below ground water attenuation tank, fuel storage tank and fuel interceptor and tyre storage building Site Address - Warwick University Land off University Road Applicant - University Of Warwick Ward - Westwood RECOMMENDATION: Planning Committee are recommended to grant planning permission subject to conditions. INTRODUCTION: Site Description The irregular shaped application site covers an area of 2.5 hectares in area within the University of Warwick (UoW) campus to the south-west of the City and is located close to the administrative boundary with Warwick District Council. The site is located between Millburn Hill Road to the north, University Road to the south and to the south-east of University House, Kirby Corner Road. The site bounds Academic Road to the south east of the site with the International Manufacturing Centre (IMC) located on the opposite side of that road. Abutting the site to the east is the multi-storey element of UoW Car Park 15. Other surrounding land is within the ownership of the University and includes car parks, landscaping/woodland, Science Park buildings and the University’s Boiler House. ABC

Transcript of ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014...

Page 1: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

1

PUBLIC

COMMITTEE REPORT

Planning Committee 26/06/2014 APPLICATION No. - FUL/2014/1098 Description of Development - Erection of a National Automotive Innovation Centre for academic and business use, including café and showroom, landscaping including water features, parking, access, boundary treatment, external lighting, roof top solar PV panels, below ground water attenuation tank, fuel storage tank and fuel interceptor and tyre storage building Site Address - Warwick University Land off University Road Applicant - University Of Warwick Ward - Westwood RECOMMENDATION: Planning Committee are recommended to grant planning permission subject to conditions. INTRODUCTION: Site Description The irregular shaped application site covers an area of 2.5 hectares in area within the University of Warwick (UoW) campus to the south-west of the City and is located close to the administrative boundary with Warwick District Council. The site is located between Millburn Hill Road to the north, University Road to the south and to the south-east of University House, Kirby Corner Road. The site bounds Academic Road to the south east of the site with the International Manufacturing Centre (IMC) located on the opposite side of that road. Abutting the site to the east is the multi-storey element of UoW Car Park 15. Other surrounding land is within the ownership of the University and includes car parks, landscaping/woodland, Science Park buildings and the University’s Boiler House.

ABC

Page 2: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

2

Much of the site is greenfield land and dominated by maintained grass with scattered trees, hedgerows and scrub. It includes part of the introduced landscaped Oval Plaza with live Willow fencing to the northern side of University Road and also a shared pedestrian-cycle way linking University House to University Road. Whilst much of the site is ‘green’ it does also include the surface car park element of Car Park 15 comprising 97 car parking spaces (91 standard; 6 disabled). This car park has one vehicular access point, off Academic Road. The site is relatively flat but there is a slight fall from north to south of approximately 3m (ranging from 83.5 to 80.5 AOD). Two watercourses are present within the site in two separate ditches along the south-western/southern site boundary. The watercourse to the south-western boundary is a tributary to the Westwood Brook and this joins the brook/culvert to the south of the site further along University Road. This brook ultimately discharges into the Canley Brook upstream of the Tocil Lakes approximately 500m southeast of the site. The application site is on land included within the UoW Masterplan (covering the period between 2008-2018) which was granted outline planning permission in October 2009. Although the site is identified within the approved Masterplan as a development site, the building exceeds the residual capacity for academic uses on this part of the campus and therefore a full application, rather than reserved matters application, has been submitted. Proposed Development Planning permission is sought for the erection of a high quality designed National Automotive Innovation Centre for academic and business use. The proposed building, designed to BREEAM excellent rating, will have a floorspace of 33,964 m² spread over four levels with a ground floor level of 82.5 AOD. The new building will have a sizeable footprint covering much of the existing grassland and also the site of the existing Car Park 15 surface car park. The development is a joint venture between UoW, Jaguar Land Rover (JLR), Tata Motors European Technical Centre (TMETC) and Warwick Manufacturing Group (WMG). These partners together with the UK Government’s Higher Education Funding Council England (HEFCE) have committed the significant figure of approximately £100 million to the creation and operation of a National Automotive Innovation Centre at the UoW. It is anticipated that approximately 1,060 people will be employed at the site and there will be provision for apprentice training and other youth initiatives including an academy for young engineers. A break-down of the expected employee numbers is below:

Page 3: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

3

Organisation/Area Staff numbers JLR 600 TMETC 395 WMG 60 Café 5 TOTAL permanent staff 1060 The Planning Statement indicates that the vision for the NAIC is “to link people, research and world-leading infrastructure to create and develop novel technologies for the automotive industry” and it will facilitate longstanding research and development collaboration between the partners within a state of the art environment. It further states that “NAIC is designed to create a collaborative space, bringing together a range of different activities into one building to create a national centre for innovation in automotive engineering, and a meeting and teaching place for academia and industry”. The siting of the development on the University campus is seen as important to enable collaboration between academics and key players in the automotive industry. The site has also been chosen as it is already within the University’s Masterplan for development of up to four and five storeys, has outline planning permission, and is also partially within an employment allocation defined within the Coventry Development Plan. A range of activities are proposed within the building including bespoke research and development facilities, engineering hall, virtual reality lab, design workshops, teaching facilities, offices, a collaborative hub/atrium (including meeting rooms, library and break out space, innovation room), reception area, outdoor car viewing garden, a publicly accessible showroom and café (providing 150 covers and external seating areas). The building will be mixed use, with elements of the building being within B1 (Business), D1 (Non-residential institutions) and A3 (restaurants and cafes) and the table below sets out the floorspace of each use. Activity Use Gross Internal Area

(GIA) m² Café A3 582.36 Research office and collaborative hub

B1a 12,369.9

Design (studios, milling, paint-shop, showroom and VR), front of house (reception, exhibition)

B1b 10,278.58

Engineering (Engineering hall, dyno labs and labs)

B1c 8,285.5

WMG Teaching and Research Facilities

D1 1,532.95

A glazed façade will characterise public facing elements of the building to the southwest of the building including the café (with outdoor seating), entrance

Page 4: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

4

and reception area and student project space, whilst there will also be upper floor external terraces for further visual interest. Materials proposed include anodised aluminium, glass, brickwork and engineered timber and the building is to have a horizontal emphasis reflecting surrounding buildings. A precision engineered timber roof is a key element of the design and the building will benefit from large roof lights and north lights, the latter adjoining south facing solar PV panels on the roof. A detailed hard and soft landscaping scheme is proposed for the outside of the building envelope. This includes tree and shrub planting, a realigned pedestrian/cycle route linking the IMC and University House, seating and lighting. Several water features are also proposed to the north-west and south-west of the building to provide visual interest, ecological benefits and to allow for elements of sustainable drainage to be incorporated into the landscape design. They include a shallow pond to the building frontage, development of an existing shallow channel to the south-west boundary and incorporation of several shallow swales and reflection pools to the building north-west and south-west of the building. The development proposed will result in the felling of around 80 trees comprising varying tree categories, approximately 72 metres of hedgerow and 100 metres of live Willow fence. Only 17 car parking spaces are to be provided within the site, including 3 disabled spaces. These car parking spaces will be located to the north-western side of the building and will be accessed off the cul-de-sac, Millburn Hill Road. Additional car parking to replace the loss of the surface car park and to serve the development is to be provided elsewhere within the campus, including a proposed new multi-storey car park accessed off Lynchgate Road. However, other than the 17 spaces there will be no car parking dedicated solely to the NAIC development. An entrance track to the north-east of the site will lead to a service yard to the rear of the building. Within the service area a tyre store building and underground fuel storage tank and interceptor and water storage tanks are proposed. The existing vehicular access into Car Park 15 will be retained solely as a vehicular exit for fuel tankers. A secure cycle parking facility is proposed for 101 cycles to the west of the site within a covered bespoke shelter. The local planning authority have provided an Environmental Impact Assessment Screening Opinion and confirmed on 1st April 2014 that as the impacts of the development are localised an Environmental Statement is not required. Supporting Information In addition to a number of plans, a plethora of documents have been submitted to support the application and these are listed below:

Page 5: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

5

Design and Access Statement Planning Statement Statement of Community Involvement Landscape Design and Access Statement Transport Assessment and Travel Plan Ecological Assessment Arboricultural Impact Assessment Historic Environment Desk-Based Assessment Flood Risk Assessment Noise Assessment Ground Conditions Preliminary Risk Assessment External Lighting Planning Statement Air Quality Assessment Ventilation and Extraction Statement Sustainability Statement Site Waste Management Plan Foul Sewage and Utilities Statement.

RELEVANT PLANNING HISTORY: The main application of relevance to the assessment of this application is the 2009 outline planning permission for a University Masterplan: 54044 Development for University purposes including construction of buildings for academic teaching, research, social and administrative uses, sports and cultural facilities, residential accommodation for staff, students and visitors, other ancillary facilities including for the purposes of energy generation, access improvements for pedestrians, cyclists and vehicular traffic including public transport services, car parking, site infrastructure including drainage and main services, hard and soft landscaping including structural planting (Outline application), Approved, 9th October 2009 The Masterplan was also approved by Warwick District Council under application reference W/07/1120. Zone 2 of the Masterplan (Central Campus East), in which the application site is located, allows 74,000 m² of development up to a maximum of 5 storeys in height, of which 36,300 m² can be utilised for ‘academic uses’. To date approximately 16,100 m² is either completed, under construction or at planning stage thus leaving approximately 20,000 m² of remaining capacity for academic uses, thus less than that currently proposed. As highlighted above, the site is an identified development site within the Masterplan. Other applications of particular relevance to this application and have been submitted concurrently/or at a similar time are listed below. The significance of the applications is that they provide car parking which will partly serve the NAIC development and also one of the applications is for altered access arrangements into Car Park 15 which is necessary as this development will

Page 6: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

6

remove the surface park element of that development and thus remove access into the existing multi-storey car park. FUL/2014/1161 Erection of a multi-storey car park and surface car parking spaces, new roundabout on Lynchgate Road including improved pedestrian crossings, alterations to Lynchgate link road, new barrier controls, culvert, car park access, drainage, balancing pond, extension to existing shared footway/cycle path, lighting, landscaping and services, Pending (to be considered at the same Planning Committee as this application) FUL/2014/1162 Extension to Car park 1A including erection of additional car park decks, lowering of existing decks, access ramps, access alterations, reconfiguration of existing spaces, boundary treatment, landscaping and drainage, Pending RM/2014/1163 Submission of reserved matters (access, appearance, landscaping, layout, scale) for the extension of Car Park 2, alteration of fire access, relocation of access barrier and drainage pursuant to outline planning permission 54044 (Warwick University Masterplan) approved on 9th October 2009, Approved 9th June 2014 FUL/2014/1142 Car park 15 access alterations comprising new vehicular access and barrier controls, pedestrian footways, associated alterations to car park elevations, drainage and landscaping, Pending (to be considered at the same Planning Committee as this application) FUL/2014/1230 New and diverted underground services and related infrastructure, Pending RELEVANT PLANNING POLICIES: Coventry Development Plan 2001 (CDP) OS4 – Creating a more sustainable city OS6 – Change of land use OS9 – Access by disabled people EM2 – Air quality EM4 – Flood risk and development EM5 – Pollution protection strategy EM6 – Contaminated land EM8 – Light pollution EM9 – Waste strategy E1 – Overall economy and employment strategy E2 – Consolidating and strengthening the City’s employment base E3 – Diversification of the local economy E5 – Office development E6 – Principal employment sites BE2 – The principles of Urban Design BE15 – Archaeological sites BE20 – Landscape design and development BE21 – Safety and security

Page 7: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

7

GE8 – Control over development in urban green space GE14 – Protection of landscape features GE15 – Designing new development to accommodate wildlife S10 – Catering outlets AM1 – An integrated, accessible and sustainable transport strategy AM9 – Pedestrians in new developments AM12 – Cycling in new developments AM22 – Road safety in new developments SCL9 – University of Warwick SPD ‘Delivering a more sustainable city’ National Planning Policy Framework (NPPF) and National Planning Policy Guidance The NPPF published in March 2012 replaced all previous national planning policy and sets out the Government’s planning policies for England and how these are expected to be applied. It sets out the Government’s requirements for the planning system only to the extent that is relevant, proportionate and necessary to do so. The NPPF promotes sustainable development and amongst other matters good design is recognised as a key aspect of this. CONSULTATION RESPONSES: No objections from:

West Midlands Fire Service CCC Urban Design CCC Public Health Health and Safety Executive

No objections subject to conditions/informatives from: Environment Agency – subject to a condition requiring conformity with

the Flood Risk Assessment and that floor levels shall be set 82.2m above Ordnance Datum (AOD). Comments also made relating to water quality and Sustainable Drainage

WCC Ecology – recommend conditions requiring a Combined Ecological and Landscaping Scheme with mitigation to ensure that there is no net loss to biodiversity and tree protection for mature trees. Informatives relating to lighting, invasive species, nesting birds and reptiles and amphibians

Severn Trent Water - subject to a standard drainage condition requiring detailed drainage plans for the disposal of surface water and foul water sewage

West Midlands Police – no objections although have provided detailed advice about designing out crime

CCC Local Highway Authority – no objections subject to conditions including a condition preventing occupation of the building until the proposed multi-storey car park (FUL/2014/1161) has been constructed and is available for use

Page 8: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

8

CCC Environmental Protection – recommend conditions relating to external plant/extraction systems and gas protection measures. The applicant has satisfactorily responded to comments made by the officer.

CCC Conservation and Archaeology – recommend a condition to secure a programme of archaeological work to be carried out ahead of the development

CCC Landscape Design – The applicant has responded to comments largely to the satisfaction of the officer. Whilst generally praising the scheme criticism of the lack of planting around the lake

CCC Sustainability Services – recommend a condition requiring the applicant to provide evidence to verify the achievement of the BREEAM rating. Also requested an assessment of the predicted energy demand for the building with the method and source of the data used clearly stated; and details of the installed capacity and estimated output of renewable/low carbon energy options installed as part of the proposal

CCC Tree Preservation Officer – Does not directly object although does recommend retention of the category B trees in group G8 which should remain in their entirety. Recommend further details relating to replacement planting and tree protection.

Comments are awaited from:

CENTRO CCC Flood risk and drainage

Any comments received will be reported as a late item. No comments received from Warwick District Council although they were notified out of courtesy as the development does not directly affect or adjoin their administrative area. Prior to the submission of the application the applicants have engaged with the Local Planning Authority and Local Highway Authority together with community consultation with residents and Ward Councillors. The following engagement events have been held:

A Development Forum meeting on 16th September 2013, chaired by Cllr Blundell and attended by residents and local Councillors (approximately 50 attendees). The meeting provided an opportunity for the development proposals to be explained and the views of those attending to be discussed with the project team

A public exhibition held at Cannon Park Shopping Centre on 8th October 2013 where invitations were sent to around 1,000 residents, businesses and organisations within the surrounding area. Approximately 70 people attended and 21 feedback forms were received.

Consultation relating to new and extended car parks within the University campus which are required, in part, to support the NAIC development. This included a public exhibition on 26th March 2014 at Cannon Park Shopping Centre which also provided an update on NAIC. A further

Page 9: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

9

Development Forum took place on 3rd April, again chaired by Cllr Blundell and attended by residents and local Councillors to present an update on NAIC and the proposed car park proposals.

Statements of Community Involvement submitted with this application and the car park applications provide full details of the results of the consultations. The Statement of Community Involvement submitted as part of this application highlights that feedback was generally supportive relating to the benefits of the development associated with increased access to highly skilled jobs, investment in the engineering and automotive industry and the sustainability of the building. The report identifies the main cause for concern being the perceived increase in levels of traffic generated by the proposals and issues over parking on local roads. The document suggests that ‘Pinchpoint’ improvements (more in the ‘Highways Considerations’ section) will provide advance mitigation for the traffic impacts that may arise as a result of the additional car parking. 25 neighbouring properties and the Cannon Park Community Association (CPCA) were sent letters notifying them of the proposed development on 10th April 2014 and local Ward Councillors were sent e-mails informing them of the application on the same date. 4 site notices were erected on street furniture around the perimeter of the site on 15th April 2014 and the application was advertised in the Coventry Telegraph on 1st May 2014. There have been 12 representations in opposition to the application and 1 representation in support. Included within the representations in opposition to the application are comments from CPCA. Comments in support:

Inspirational architecture which should be welcome in Coventry The CPCA endorses the NAIC project in principle and welcome the

prospect of a research centre employing 1,000 personnel (although owing to traffic/inadequate transport infrastructure request the application is refused)

Comments in opposition:

Loss of open/green space – eroding the open character of the campus and removing land suitable for recreational use

Impact on sunlight and daylight on adjoining properties within Viscount Centre 2

Concern over cars associated with NAIC will park within Viscount Centre 2 car park

Noise and disturbance to properties on adjoining land Access / egress to multi-storey car park via Lynchgate Link resulting in

increased traffic levels on an already busy road affecting access into Cannon Park housing estate

Cannon Park residents feel trapped in their housing estate and the roundabout will exacerbate issues as inbound vehicles will have priority; will cause gridlock within the Science Park

Page 10: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

10

Inadequate infrastructure. Lack of capacity of nearby junctions and roundabouts particularly given the traffic from the Science Park and Tesco (with JLR using 270 spaces at Tesco car park as a Park and Ride)

Emergency service vehicles will struggle to reach an incident Additional traffic could adversely affect pedestrian and highway safety Concern Lynchgate Link will ultimately become a through route into the

University Concern that this application and the application for a multi-storey car

park off Lynchgate Road will not be considered at the same time The date of the traffic survey was not representative of usual traffic The barrier leading into the multi-storey car park will cause further

impacts upon local traffic flow Concern that consultations have been undertaken during the Easter

holidays CPCA recommend a satellite campus and that an immediate moratorium

be imposed on all further development in the locality until the infrastructure issue has been resolved

The development is contrary to the NPPF and development plan policies as over 90% of staff are expected to travel by car

Overly large, over-development of the site, out of scale with adjacent buildings, no scope for expansion

An industrial building is incompatible with neighbouring University House and the materials are out of character

Vehicular access is ill-considered, deficient and tortuous Any improvement in traffic flow from ‘Pinchpoint’ schemes is probably

only marginal Failure to look at traffic impacts in area comprehensively UoW has failed its obligation to provide Park & Ride facilities remove

from the campus Question the value to Coventry of the additional jobs when 2007

statistics indicate that only 20% of University staff lived in Coventry/Kenilworth.

A further objection has been received from Cllrs Blundell, Sawdon and Crookes specifically objecting “on the basis that it is outside of the master plan, overdevelopment and unacceptable to residents”. They have also criticised the timing of the application consultation period during the Easter break and also that they believe the development and car park applications should have been submitted as one comprehensive application. It has been agreed with local Ward Councillors that applications FUL/2014/1098, FUL/2014/1161 and FUL/2014/1142 will all be presented to and considered at the same Planning Committee.

Page 11: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

11

APPRAISAL: The main issues in determining this application are: the Principle of Development including economic benefits; Design; Highway Considerations; Ecology and Impact on trees; and Sustainability. There are a number of other important considerations which will also be fully appraised. Principle of development Policy E1 of the CDP seeks to consolidate and strengthen the economic base of the City and maximise employment and skill levels within the City. Policy E2 also supports the modernisation and expansion of existing employers in Coventry. CDP policy E3 states that favourable consideration will be given to proposals which foster or reinforce clusters of expertise and production in which new technologies are developed and exploited. UoW and JLR are major employers in the City and this development will strengthen their impact on the City’s economy whilst providing significant employment opportunities. The NAIC will provide a collaborative approach to research and development and will have a focus on developing new technologies. The proposal can therefore be considered to be supported by these overarching employment policies. The application site partly lies within the University of Warwick Development Plan area (primarily the existing surface car park) as defined by the CDP. The remainder of the site is an allocated Principal Employment site referred to in CDP Policy E6 as an International/National Sector site known as ‘University of Warwick Science Park’. Such sites are reserved for employment uses and therefore the development, which will support approximately 1,060 jobs (of which 535 are existing staff located at UoW and University of Warwick Science Park), is supported by the policy. CDP policy SCL9 states that proposals directly associated with the growth of the University will be considered in relation to the University Development Plan as well as other relevant Plan policies. Although the site does not lie wholly within the University area, as defined by the CDP, it is considered that the University Masterplan, granted approval more recently in 2009, essentially supersedes that boundary. The applicant has stated that the on-going implementation of their Masterplan is required to support the UoW’s Vision 2015 which is to make the University a universally acknowledged world centre of higher education by 2015, firmly within the top 50 world universities. Even though it is inevitable that not every job will be taken by a Coventry resident, Officers consider that the significant additional job creation including a number of high skilled employment opportunities will have substantial economic benefits to the City whilst the state

Page 12: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

12

of the art building with world leading processes will enhance the profile of UoW and the City of Coventry and therefore the development is welcomed. As indicated earlier in this report, full planning permission is required as the development exceeds the total permitted floorspace for ‘academic uses’ within this part of the University Campus. The site is however identified as a development site within the Masterplan and the development proposed accords with various principles of the Masterplan including building heights, landscaping and car parking limits. Therefore, subject to the detailed considerations elsewhere in this report, the proposal is acceptable in principle. Policy E5 states that proposals for the development or expansion of business offices will be subject to:

Compatibility with nearby uses; Accessibility by a choice of means of transport; and Compatibility with other Plan policies.

The policy also highlights that proposals will be encouraged within or immediately adjacent to the City Centre, the Major District Centres or sites which are or can be made highly accessible by public transport. Whilst the policy is not applicable for the part of the site which benefits from a Principal Employment Site allocation, this policy is relevant to the remainder of the site as the development includes offices. The site is surrounded by other University buildings and Science Park buildings and it is considered that a building to be used for research and development, engineering and academic purposes will be compatible with neighbouring uses. UoW campus is highly accessible by public transport with a number of regular services. The campus is also accessible by bicycle with an expanding cycle network around the area. The remainder of the report will demonstrate that the proposal is compatible with other Plan policies and for these reasons the proposal accords with CDP Policy E5. As the development includes a café, policy S10 of the CDP is relevant. This states that catering outlets should be located within defined Centres and employment areas and will generally be discouraged outside those locations. Proposals within defined centres and employment areas will be permitted provided that they would:

Be compatible with nearby uses; Not cause harmful cumulative impact due to the existence of any

existing or proposed outlet; and Be compatible with other Plan policies.

The site is within an employment area and a café use is compatible with nearby uses. There does not appear to be any other large cafes in the vicinity and therefore there will be no harmful cumulative impact. This report will demonstrate that the proposal accords with relevant development plan policies. Design / Landscaping Policy BE2 of the CDP requires development to be of good design, Policy BE20 promotes a good standard of landscape design and boundary treatment whilst

Page 13: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

13

Policy AM9 encourages convenient and well-designed pedestrian routes. The NPPF further emphasises the importance of good design with paragraph 56 highlighting that good design is a key aspect of sustainable development and is indivisible from good planning. To support the application a detailed Design and Access Statement and a Landscape Design and Access Statement have been produced which set out the design rationale behind the development. The applicant has indicated that the building materials, including anodised aluminium, glass, brickwork and engineered timber, have been chosen to create a modern, high quality development and are also required to meet specific technical demands including the requirement to achieve BREEAM ‘Excellent’, to meeting required performance criteria (including maintenance, acoustic performance and fire performance) and to provide a flexible working environment. The proposed building design is visually interesting and will provide an attractive landmark building in a prominent location on University Road on the approach to the campus from Scarman Roundabout. The design of a three storey glazed façade to the front is attractive and will offer an active frontage. It relates well to neighbouring buildings in terms of scale, building line and its unique design whilst integrates into and enhances existing landscape features, such as the water course to the south of the site, as well as maintaining and improving existing pedestrian and cycle routes. Design features such as the precision engineered timber roof are visually attractive whilst the building will benefit from large roof lights to allow natural light, solar PV panels and solar control systems all of which are considered to be positive aspects of the design. Significant thought has been put into the hard and soft landscaping scheme and the incorporation of a number of water features will add visual interest as well as being beneficial for drainage and biodiversity. The café with outdoor seating area located in an attractive landscaped setting will bring vibrancy to the area. A new landscaped public meeting area is also proposed to the front of the site with outdoor seating, high quality hard and soft landscaping and water features all of which are welcomed and will create an attractive environment. The location of the service yard and access in areas less visible from busy pedestrian and vehicle routes is supported. External lighting is proposed to help create a welcoming and safe atmosphere during hours of darkness and the strategy aims to minimise light pollution. Subject to a condition relating to external lighting, the development is considered to accord with Policy EM8. Overall, the proposed design of the development is of high quality and relates well to existing buildings and landscaping and does not conflict with the Masterplan. Therefore, the proposal accords with Policies BE2, BE20 and AM9

Page 14: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

14

of the CDP and the NPPF. The Council’s Urban Design and Landscape Design officers raise no objections. Conditions are recommended relating to detailed matters such as landscaping and sample materials. Highway considerations CDP policy AM1, in harmony with Policy OS4, recommends that developments are planned in accessible locations and it promotes the use of alternative modes of transport to the private car. Policy AM22 is concerned with highway safety. The NPPF supports the locating of developments where the need to travel will be minimised and supports development that facilitates the use of sustainable modes of transport. The application site is located within a sustainable location within the University campus. Over 265 buses arrive at the University on a daily basis via a number of services and a new bus interchange at the University is to be delivered in 2014/15. There is also a network of cycle routes around the campus, linking Coventry and Kenilworth via the University and there are generally good pedestrian routes from the site thus further encouraging the use of alternative modes of transport. The car parking spaces to be lost on Millburn Hill Road as a result of the development will be replaced with 11 standard car parking spaces and 3 publicly available disabled spaces. Regular deliveries to the site will be via a secure service yard to the rear of the building which is accessed off Millburn Hill Road with an exit for fuel tankers only onto Academic Road via an existing retained access (the existing access to Car Park 15). It is anticipated that there would be up to 10 HGV and 30 LGV arrivals per day. Refuse will be stored in dedicated rooms next to Millburn Hill Road and collection will be from Millburn Hill Road where vehicles can utilise the existing retained turning head. There will be two designated car parking spaces on Milburn Hill Road for couriers delivering to the building and two vehicle drop-off bays will be provided (one on University Road and one on Academic Road) providing 5 spaces. The proposal also includes an exceptional drop-off route from University Road to the front door of the development and there is no provision for parking or waiting in this area. 91 car parking spaces and 6 disabled spaces will be lost in Car Park 15 to accommodate the new building. Whilst no significant new car parking is provided within this application, additional car parking will be brought forward primarily under a separate application (FUL/2014/1161), although two further car park applications have also been submitted, and the detailed assessment of the highway impacts associated with the additional car parking is considered under the Transport Assessment for the car park application. All NAIC users will have the same parking availability and conditions of use as other users of the University and they will be able to use all car parks including nearby CP9, CP15 and CP16.

Page 15: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

15

A further application (FUL/2014/1142) will be submitted for the relocation of the entrance to the existing Car Park 15 as the current surface car park and access will be lost owing to the NAIC proposal. All three applications will be considered at the same Planning Committee. The Transport Assessment (TA) and Travel Plan highlight the highways measures agreed within the Masterplan and the associated S106 Agreement which the University is working with CCC to deliver. It also provides detail on the ‘Pinchpoint’ funding bid success for a scheme known as the ‘University of Warwick and Westwood Business Park Congestion Relief Scheme’, which was approved for funding by Central Government in late 2013. The scheme is a partnership between CCC and UoW to undertake measures with the aim of reducing traffic congestion in this part of Coventry. The full details of which junctions are to be improved through the scheme is set out in the Transport Assessment and it is envisaged that these will be delivered by CCC in the financial year 2014/2015 with some works already underway. In an assessment of existing traffic conditions, the TA acknowledges that there are some issues of congestion on nearby roads although proposed improvement works as part of the Pinchpoint funding should improve this situation. It also notes that traffic flows during the peak period are lower now than they were in 2004. The TA indicates that there have been 11 recorded personal injury accidents within the area between 1st December 2008 and 30th November 2013, one of which being classed as serious. However, since the data was collected a fatal accident occurred in Lynchgate Road involving a pedestrian and a lorry and this is still under a Police investigation. The TA has assessed the Traffic Impacts of the NAIC development and this demonstrates that even with a robust assessment of additional traffic arising from the NAIC, the overall University traffic flows will be 5% and 10% below the 2007 levels of the AM and PM peaks respectively and will thus be below the targets set in the Masterplan S106 Agreement. The assessment indicates that whilst the trips generated by this development are not expected to breach the requirements of the S106 Agreement, it will be necessary to carry out junction assessments as part of the applications for additional car parking. In an assessment of car parking demand the TA indicates that car parking demand arising from the development will be significant because of the high level of single occupancy car drivers. However, it highlights that 535 members of the JLR/TMETC staff are already located at the University and its Science Park and therefore are already using the existing car parks. This leaves 460 new staff from JLR/TMETC to arrive at the University along with 65 UoW staff. After taking into consideration some backfilling of existing office space and Travel Plan targets together with JLR/TMETC improving the sustainable travel mode share of their staff, the TA arrives at a future parking demand of around 580 spaces. The Assessment further suggests that if JLR/TMETC staff begin to reflect the travel characteristic of the UoW staff (and evidence suggests that

Page 16: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

16

they are committed to sustainable travel) then the car parking demand is likely to fall to around 480 spaces. It is envisaged that construction for the development will span a period of between 20-24 months and the applicant has indicated that this can be managed through a Construction Phase Traffic Management Plan. However, the report concludes that the level of vehicles to and from the site will not have a significant impact on the operation of the local road network. The TA highlights that the proposed additional car parking proposed under the application for a multi-storey car park (629 spaces) along with applications FUL/2014/1162 (131 spaces) and FUL/2014/1163 (32 spaces) will provide a total of 792 spaces. 430 spaces will have been lost since 2009 by the time this development will be constructed thus giving a net increase in parking spaces of +363, which is within the 442 allowed by the Masterplan permission and S106 Agreement. The Local Highway Authority have raised no objections to the proposal. The development will reduce vehicular traffic around the application site given the loss of the 97 spaces and additional traffic impacts as a result of other proposed car parks will be considered under those applications. As the NAIC development with the potential for over 1,000 employees has no dedicated car parking and will result in the loss of 97 existing car parking spaces it is imperative that additional car parking is provided and the TA has demonstrated that there is a need for a significant level of car parking to serve this development. Therefore, a condition is required to ensure that the multi-storey car park, under application FUL/2014/1161, is constructed and available for use by University staff prior to the first use of the NAIC. Overall, subject to relevant conditions including the provision of further off-site car parking prior to the opening of the NAIC, the proposed development is considered to be sustainable and would have an acceptable impact upon the highway network. Other conditions proposed include: no occupation of the building until car parking/servicing delivery areas shown on the plans have been provided; cycling parking; submission of a Parking Management Plan; submission of a Construction Management plan; and a condition relating to minor highway works. The development therefore accords with Policies AM1 and AM22 of the CDP together with the NPPF. CDP policy AM12 indicates that cycle parking must be provided in accordance with standards set out in SPD. The applicant has proposed 101 cycle parking spaces which is below the amount that SPD ‘Delivering a more sustainable City’ recommends. However, the cycle parking is to be of high quality where both wheels of bicycles can be locked and it is to be housed in a bespoke shelter and therefore in this instance the quality of the cycle parking means that officers are happy to relax the requirement. Notwithstanding this, officers have requested that the applicant seeks to provide some additional cycle parking and Committee will be updated on this matter verbally or through the late representations document.

Page 17: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

17

Ecology and Impact on Green space and Trees Whilst the loss of a large area of green space with scattered trees and hedges is unfortunate, outline planning permission has already been granted for this site to be developed and the site has also been identified as a Principal Employment site in the CDP. Therefore, policy GE8 is not considered to be relevant in this instance and the loss of the green space is acceptable in principle. Policies GE14 seeks to protect important landscape features of value to the amenity or history of a locality including trees and hedgerows whilst Policy GE15 indicates that new development should design new development to accommodate wildlife. Chapter 11 of the NPPF is also concerned with conserving and enhancing the natural environment. An Ecological Assessment has been submitted which highlights that the amenity grassland covering much of the site is well maintained and therefore is limited in ecological value. The report finds that whilst there is green space and trees on the site, there is limited connectivity to the surrounding environment as the site is surrounded by University buildings. No evidence of Badger, Water Vole and amphibians including Great Crested Newts were found and it is unlikely that the existing site has the potential to support these species. However, scattered trees may provide limited foraging and commuting habitat and to ensure conditions on the site remain unsuitable for amphibians it is recommended that Reasonable Avoidance Measure (RAMs) are put in place throughout construction works. The scattered trees, scrub, and hedgerows also provide foraging and nesting opportunities for a range of relatively common bird species. Whilst a Local Nature Reserve (LNR), a Local Wildlife Site (LWS) and Ecosites are found within the desktop search area, these are considered to be of sufficient distance from the site not to be impacted by the development.

The Ecological Assessment also recommends that works to trees are undertaken outside of the nesting bird season and if that is not possible a qualified ecologist should carry out checks a maximum of 24 hours in advance of clearance works to ensure no nesting birds are present. WCC Ecologists have welcomed the broad intentions to create habitats and increase biodiversity. They have recommend that a Biodiversity Impact Assessment (BIA) is carried out to determine how much biodiversity loss or gain there will be from the proposed development. This will form part of a Combined Ecological and Landscaping Scheme and a condition is recommended to ensure that there is no net loss to biodiversity in accordance with NPPF and GE15. A condition is also recommended relating to tree protection measures for mature trees that will be retained whilst a number of

Page 18: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

18

informatives are proposed relating to lighting, nesting birds, reptiles and amphibians and invasive species. In addition to the Ecological Assessment an Arboricultural Impact Assessment has been submitted. This highlights that there are no trees on site that are the subject of a Tree Preservation Order and that there are no ancient woodlands or veteran trees on site, as defined by the NPPF. None of the trees were noted as having features suitable to support roosting bats and due to the suitability of trees for nesting birds the same recommendation is made relating to birds as in the Ecological Assessment.

The majority of on-site trees are considered to be low to moderate value. A total of 2 individual trees, 5 tree groups and part of 4 further groups (totalling 80 trees) are proposed to be removed and these comprise a mixture of values. Of these trees, part of Group G8 (adjacent to Academic Road), a Category A group are proposed to be lost whilst T3, G4, G6 and Part of G14, all of which are Category B trees will also be felled. In addition to the loss of trees, approximately 72 metres of hedgerow and 100 metres of live Willow fence will also be removed. The Assessment highlights that the majority of trees require removal as they fall directly within the footprint of the new building whilst the removal of others is to provide adequate operational land around the building. It concludes that the greatest impact of the tree removal will be on visual amenity. Whilst the development proposes the partial loss of Group G8 (13 Field Maples and 1 Claret Ash) the report suggests that this group has a high value (‘A’ category) owing to good condition and amenity value, rather than maturity and as such it may be possible to mitigate for their loss with new planting. 9 young Red Oak trees (G13) are proposed to be transplanted elsewhere to the northern boundary of the site and the report considers that these are of an age and size that this option is possible. As with the Ecological Assessment the report proposes tree protection measures for retained trees and the details of the type and position of the fencing have been provided. The report concludes that whilst the development will result in a reduction in trees within the survey area, this can adequately be offset by new planting across the University campus.

The Council’s Tree Preservation Officer has recommended retention of Group G8 in their entirety and have indicated that they have no objections to the proposed hedgerow removals as these are young, non-established or decorative. Further details relating to tree protection and replacement planting are recommended. Whilst retention of valuable trees is important this must be

Page 19: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

19

weighed against the significant economic benefits that the development brings. The concerns have been raised with the applicant and Committee will be updated on this matter and the recommendation of officers. Sustainability Sustainability is a key aspect of the NPPF whilst CDP Policy OS4 and SPD ‘Delivering a more sustainable city’ seek to encourage sustainable development. The ‘highways considerations’ section of the report also highlights how the development is located in a highly accessible location for a range of travel modes. The Sustainability Statement highlights a number of key sustainable design elements including:

Provision for waste and recycling storage onsite during both construction and operation

The harvesting of rainwater to reduce the building’s water consumption (for WC flushing)

The use of SUDS drainage principles to drain surface water and reduce the building’s surface water drainage output

The use of Combined Cooling Heat & Power (CCHP) to generate electricity (connection to UoW district heating scheme)

A target to achieve a BREEAM ‘Excellent’ rating High thermal performance insulation and windows High efficiency lighting including advanced lighting control including

daylight sensing and automatic dimming High efficiency boiler plant, cooling plant and other engineering services Monitoring of building energy usage through an Energy Management

System (EMS) In addition to these measures the development will house a significant amount of solar photovoltaics on the roof thus providing on site renewable energy. The Council’s Sustainability Services team have been consulted and whilst raising no objections have requested further information including a pre-assessment estimator for the BREEAM rating and also an assessment of the predicted annual energy demand for the building and details of the installed capacity and estimated output of renewable/low carbon energy options to be installed. They have also recommended a condition, in accordance with the SPD, requiring the applicant to provide evidence to verify the achievement of the BREEAM rating. A draft Site Waste Management Plan has been prepared to improve the environmental performance of the development and is to be used for ‘designing out waste’. The template sets out good practice but does not provide specific details relating to the project. Therefore, a condition is recommended requiring a detailed Site Waste Management Plan to be submitted to and approved by the Local Planning Authority to ensure conformity with Policy EM9 which relates to waste handling.

Page 20: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

20

For the reasons above, sustainability appears to have been given adequate consideration as part of the development of the plans and therefore the proposal accords with the NPPF and relevant development plan policies. Flood Risk / Drainage CDP policy EM4 states that development should be designed and located to minimise the risk of flooding to maximise the absorption of surface run-off by the ground. The NPPF also provides detailed guidance on flood risk and drainage. The Westwood Brook, a tributary of the Canley Brook flows through the site as both an open channel and within culverts. The site is currently served by existing surface and foul water sewerage infrastructure which is privately owned, operated and maintained by UoW. The Flood Risk Assessment (FRA) submitted as part of the application correctly identifies the site as being entirely within Flood Zone 1 and therefore the site is at low risk of fluvial flooding. Given this location, development on the site is in accordance with the principles laid out in the NPPF and as such the Sequential Test is satisfied and the Exception Test is not required. Although the site is within Flood Zone 1, fluvial analysis has been undertaken of the Westwood Brook to determine the potential extent of flooding from the 100 year flood event. The data has confirmed that the NAIC site is at low risk of fluvial flooding and that the impact of a 50% blockage of the Westwood Brook culvert would not pose a significant risk to the NAIC site owing to local topography and overland flow paths of the area encouraging water to flow to the south-east, away from the site. The report confirms that the bedrock underlying the site is a Principal Aquifer, meaning that the bedrock has the potential of containing large quantities of water. Ground investigation data has been collected and this generally encountered ground water levels between 3m to 4m below ground level. However, an artesian aquifer was encountered approximately 10m below ground level. The report finds that although groundwater is present in underlying strata (particularly the bedrock), the material nearer the surface has poorer water bearing potential, as indicated by the low rates of infiltration measures on site. Consequently groundwater will not be flood risk consideration to the majority of the site. However, the FRA indicates that excavations should mitigate against encounters from 3m and the artesian aquifer approximately 10m below existing ground level. The applicant has considered de-culverting and this has been discounted for a variety of reasons. However, the development proposes to introduce new surface water infrastructure and the FRA indicates that a surface water management strategy has been developed based on contemporary sustainable drainage principles.

Page 21: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

21

The Environment Agency have confirmed that they have had extensive pre-application discussions with the applicant in relation to the development and the associated modelling of the local watercourse. They have approved the modelling and the appropriate finished floor level as part of that process. A condition is therefore recommended requiring the development to be carried out in accordance with the details contained within the Flood Risk Assessment submitted as part of the application and that the finished floor levels shall be set no lower than 82.2m above Ordnance Datum (AOD). Further advice has been requested from the Environment Agency surrounding the issue of below ground excavations to see if any further conditions are required relating to these. No comments have been made by CCC Flood Risk and Drainage team. Severn Trent Water have recommended a standard drainage condition requiring detailed drainage plans for the disposal of surface water and foul water sewage. Overall, the development appears to be at low risk of flooding and the surface water infrastructure proposed including sustainable drainage principles are welcomed and will assist in minimising the potential for flooding. The application therefore is consistent with the aims of the NPPF and CDP policy EM4. Impact on neighbouring amenity / Noise Paragraph 17 of the NPPF seeks to protect the amenities of all existing and future occupants of land and buildings. Policy EM5 of the CDP seeks to minimise pollution including pollution through noise. The nearest residential property is located around 240m away from the application site and therefore it is considered, given the size and scale of the building, that there would be no harm to the amenities of residents through a loss of privacy, overshadowing or overbearing effects. Whilst the development will be located near to Viscount Centre (to the north of the site), given the separation between the buildings is around 23m and both are commercial premises in the ownership of UoW, this is considered acceptable. The Noise Assessment found that the dominant noise source during daytime hours was road traffic from University Road whilst the dominant noise source during night-time was found to be predominantly from the plant located at the nearby University Boiler House. The assessment identifies internal ambient noise requirements whilst also stating that all facades will require a minimum glazing (glazing and frame) performance of Rw+Ctr 30dB and the building is to be mechanically ventilated throughout. Plant noise limits for the nearest noise receptors are set out in the report and further recommendations are made about hours of work, noise and vibration best practice during construction works.

Page 22: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

22

CCC Environmental Protection have confirmed that the noise report is acceptable and that they agree with the glazing specifications set out in the report and the design levels for external plant. They also do not consider noise emanating from the building to be significant enough to impact upon any residential properties. Subject to these conditions the proposal is acceptable in terms of its impact upon neighbouring amenity and therefore it accords with Policy EM5 and the NPPF. Heritage Assets CDP policy BE15 relates to archaeological remains and Section 12 of the NPPF is also concerned with protecting heritage assets. An Historic Environment Desk-Based Assessment accompanies the application indicating that the site is within an area of multi-period archaeological activity and that there are no listed buildings on or adjacent to the site. The report highlights that with the exception of the surface car park, the site remains undeveloped within the limits of a previously enclosed post-medieval field boundary. Therefore, the potential for below-ground archaeological deposits is high and as such the report recommends that further archaeological investigations should be undertaken with trial trenching of 4% of the undeveloped areas of the site. The Council’s Conservation & Archaeology officer agrees with the conclusions of the report and recommends a condition to secure a programme of archaeological work to be carried out ahead of construction works. Subject to this condition, the development will have an acceptable impact upon heritage assets and potential archaeology and therefore the development accords with CDP policy BE15 together with the NPPF. Contaminated Land In harmony with guidance contained within the NPPF, CDP Policy EM6 states that development on or adjacent to contaminated land will be permitted only if any measures for remediation and protection required to ensure the health and protection required to ensure the health and safety of the development proposed and its users are identified and implemented. Policy EM5 also is concerned with pollution. A Ground Conditions Preliminary Risk Assessment has been undertaken including historic mapping dating back to 1885 which indicates very little development within the area until mid-1950s when the City expanded and the Teacher Training College was constructed to the north of the site. The main University campus began development on previously greenfield land with further expansion taking place during the late 20th century and into the 21st century. The report identifies the application site as greenfield land except for the surface car park.

Page 23: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

23

Results from soil and water samples found no evidence of ground contamination, with all determinants being significantly below the commercial Generic Acceptance Criteria (GACs). It highlights that the risk of contamination from the existing car park would be very minimal as interceptors and drainage capture design features are likely to be present. Whilst the assessment identifies potential contamination from leaks and spills from storage of paint spraying materials and handling and operational activities of the NAIC, it suggests that mitigation measures to reduce the impact of any pollution incident such as accidental spills and leaks would be included within the building design. Gas monitoring was undertaken as part of the assessment and whilst this was found to be of low risk, high levels of methane were found. Given that there is no clear source for the gas, the report recommends that the gas risk is mitigated by providing a sealed and taped gas membrane beneath the reinforced ground slab for the development. The report concludes that there is very little evidence to suggest the presence of significant soil or groundwater contamination beneath the site. The Council’s Environmental Protection team concur with the results of the contaminated land survey and agree that no further investigation is required. They also agree that standard gas protection measures should be incorporated into the building design given the elevated and unusual levels of methane recorded. Therefore, a condition is recommended relating to this matter and the proposal is considered to accord with Policies EM5 and EM6 of the CDP and the NPPF. Air Quality CDP policy EM5 relates to the control of pollution whilst policy EM2 specifically states that where likely damage to air quality cannot be satisfactorily mitigated, development will not be permitted. Paragraph 124 of the NPPF also seeks to protect air quality. An Air Quality Assessment has been submitted and considers airborne pollutants in the atmosphere and sets out mitigation measures. The report concludes that there is likely to be a low risk for significant effects of dust soiling and human health from the dust-generating activities on site. It also highlights that air quality impacts from traffic has already been assessed within the Masterplan application and as the total number of car parking spaces at the University, after proposed car parking is implemented, is within the allowable threshold of that application, traffic associated with the development is considered to be acceptable in terms of air quality impact. The report also concludes that other emission sources from the processes used within the building are not expected to have a significant impact on local air quality. Various mitigation measures are set out in Section 9 of the report relating to construction works. It also recommends that a central extraction system is

Page 24: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

24

applied throughout the building in order to remove emissions from the testing facilities and highlights that the stack should be located at least 1m above the roof level of the building. CCC Environmental Protection have confirmed that the report is acceptable and recommend that the mitigation techniques to minimise dust emissions from the construction phase are adopted into a construction management plan. Therefore, subject to this condition and a further condition relating to extraction equipment, the proposal is considered acceptable in terms of air quality and thus accords with Policy EM2 and paragraph 124 of the NPPF. Health implications The NPPF indicates that health is a material planning consideration. Education can improve the life chances and opportunities of people in terms of access to employment and to improve people’s sense of self-worth. Education can also help to reduce poverty as a result of increased skills level and employability. Therefore, enhanced education provision is supported in principle. The commitment of the University to embracing sustainable and active travel through their Travel Plan is welcome and has a positive impact upon health. It is considered that the provision of cycle parking and associated facilities (including showers, changing facilities and lockers) within the building will encourage the use of sustainable transport as does the location of the development within an established campus at the heart of a network of cycle routes. Whilst car parking is provided within the University campus a lack of dedicated car parking for this development will further encourage alternative travel methods including walking and cycling. These modes of travel have clear health benefits and therefore the development can be considered to have a neutral or potentially a positive impact upon health. CCC Public Health team has raised no objections to the proposed development on health grounds. Other considerations The Utilities Planning Statement highlights that a number of below ground services will need to be diverted and a series of new utility connections will be required for the construction of the new building. These include electricity, telecommunications, gas, water, district heating and surface and foul water drainage connections. A separate application reference FUL/2014/1320 has been submitted to deal with these matters. However, it should be noted that laying of or altering most of the services do not ordinarily require planning permission and only do in this instance because UoW intend to carry out the works themselves rather than the relevant Statutory Undertakers. West Midlands Police have raised no objections to the application and the Crime Prevention Design Advisor (CPDA) met with the applicant prior to the submission of the application to consider ways of designing out crime. It is likely that the two parties will meet again to look at detailed proposals.

Page 25: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

25

CONCLUSION / REASON FOR APPROVAL The application is considered acceptable in principle and the significant employment generated by the development is welcomed. The design of the building is visually interesting and is complemented by good quality landscape design. The development is acceptable in terms of highway considerations subject to a condition linking the development to the construction of a proposed multi-storey car park. The proposal is acceptable in all other respects as appraised in detail above. The reason for Coventry City Council granting planning permission is because the development is in accordance with: Policies OS4, OS6, OS9, EM2, EM4, EM5, EM6, EM8, EM9, E1, E2, E3, E5, E6, E8, BE2, BE15, BE20, BE21, GE8, GE14, GE15, S10, AM1, AM9, AM12, AM22 and SCL9 of the Coventry Development Plan 2001 together with the aims of SPD ‘Delivering a more sustainable city’ and the NPPF. SCHEDULE OF CONDITIONS Condition(s) A full list of conditions will be circulated to Committee prior to the meeting. LIST OF BACKGROUND PAPERS PROPER OFFICER: Group Manager Planning and Building Control Author: Andrew Cornfoot ALL BACKGROUND PAPERS OPEN TO PUBLIC INSPECTION at City Services & Development Directorate, Civic Centre 4, Much Park Street and www.coventry.gov.uk Planning Application File: FUL/2014/1098 Coventry Development Plan 2001

Page 26: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)
Page 27: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

CHECKEDSTATUS

REVISION

DRAWN

SCALE

DRAWING TITLE

DRAWING NUMBER

PROJECT TITLE

DATE DETAIL CHKDRNREV

DATE

NOTES:

@A1

@A3

SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION:

NOTE THE FOLLOWING:OF WORK DETAILED ON THIS DRAWING, NORMALLY ASSOCIATED WITH THE TYPES IN ADDITION TO THE HAZARDS / RISKS

Significant Residual Risks:

Action to be Taken:

Refer to Health and Safety Plan

5 BALDWIN TERRACE LONDON N1 7RU TEL: 020 7704 1975

PROJECT EMAIL:

© EDWARD CULLINAN ARCHITECTS LTD 2012

KIR

BY C

OR

NE

R R

OA

D

80.6

3

LM PI

20/03/2014

National Automotive Innovation CentreWarwick Manufacturing Group

P1 20/03/2014 LM PI

PLANNING

CAR PARK 15

CAR PARK 16 CAR PARK 11

CAR PARK 9

IMC

IDL

IIPSI

BUILDING

ZEEMAN

SCIENCES

PHYSICALENGINEERING

HUMANITIES

LIBRARY

UNIVERSITY ROAD

LIB

RA

RY R

OA

D

HOUSE

UNIVERSITY

HOUSEMILBURN

SCIENCE PARK

IARC

P1

LOCATION PLAN

NAIC_P_001

Issued for planning

redline: 25,035m2area within

NAICfor the

Proposed Site

IINM

1:1250

SCIENCE

COMPUTER

1:2500

SQUARE

ACADEMIC

CAR PARK 8 CAR PARK 8a

BP ARCHIVE

CENTRE &

MODERN RECORDS

CHAPLAINCY

SCIENCES

WBS SOCIAL

SCIENCES

SOCIAL

CHEMISTRY

BUILDING

RAMPHAL

PHYSICSCAR PARK 10

CAR PARK 10a

CAR PARK 10b

RECEPTION

WBS MAIN

SCARMAN

HALL

GAMES

ARDEN

BUILDINGMANAGEMENT ENGINEERING

& DAROCOUNSELLING

CLAYCROFT

CAR PARK 17

CAR PARK 12

STOP

BUSS

CA

RM

AN R

OA

D

GIBBET HILL

KIR

BY C

OR

NE

R R

OA

D

AC

AD

EMIC

RO

AD

MIL

LB

UR

N HIL

L R

OA

D

NO

RTH

Page 28: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

MIL

BU

RN HIL

L R

OA

D

CHECKEDSTATUS

REVISION

DRAWN

SCALE

DRAWING TITLE

DRAWING NUMBER

PROJECT TITLE

DATE DETAIL CHKDRNREV

DATE

NOTES:

@A0

SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION:

NOTE THE FOLLOWING:OF WORK DETAILED ON THIS DRAWING, NORMALLY ASSOCIATED WITH THE TYPES IN ADDITION TO THE HAZARDS / RISKS

Significant Residual Risks:

Action to be Taken:

Refer to Health and Safety Plan

5 BALDWIN TERRACE LONDON N1 7RU TEL: 020 7704 1975

PROJECT EMAIL:

© EDWARD CULLINAN ARCHITECTS LTD 2013

@A3

80.6

3

79.89

DU

CTS

4X E

MP

TY

27,000L bulk store (6298mm x ø2500) 10,000L interceptor(Approx. 2333mm x ø2500)

10,000L water tank(Approx. 2333mm x ø2500)

Vent pipe

http://www.argos.co.uk/static/Product/partNumb

er/9077027.htm

1 2

1 2 3 4 5 6 7 8 9 10

11

12

3

12345678910

1 2 3 4 5 6 7 8 9 10

11

12

3

12345678910

1 2 3 4 5 6 7

123456

12

34

12

34

1 2 3 4 5 6 7

123456

123

12

34

56

78

910

12

34

56

78

12

12345678910

11

12

3

1 2 3 4 5 6 7 8 9 10

Ammendments to original drawing

Drive-In Sim Control

32.21 sq m

00-HB-023

JLR VR

415.16 sq m

00-HB-032

Drive-In Sim

95.49 Sq m

00-HB-022

TMETC VR

161.70 sq m

00-HB-031

Milling

252.03 sq m

00-ES-026 Wood Mill

114.74 sq m

00-ES-027a

Paintshop

326.00 sq m

00-ES-027

JLR Clay Store

72.96 sq m

00-HB-030

JLR 3D Print Room

15.05 sq m

00-OF-001a

Teapoint

29.17 sq m

00-OF-006

JLR Research Office

479.06 sq m

00-OF-009

Store

76.76 sq m

00-HB-024

Loading/Goods Receiving

54.24 sq m

00-ES-007

TMETC Electrical Lab

82.01 sq m

00-HB-027

Breakout

31.36 sq m

00-ES-002

Engineering Hall

1555.69 sq m

00-ES-001

Store

56.06 sq m

00-HB-033

TMETC VIL Control

63.32 sq m

00-ES-017

TMETC Vehicle Integration Lab

106.08 sq m

00-ES-012

TMETC Battery Module Lab

51.17 sq m

00-HB-028

TMETC Infotainment

57.38 sq m

00-ES-011

JLR Quiet Room

72.07 sq m

00-ES-010 JLR Charging Lab

57.38 sq m

00-ES-014

JLR Thermo Fluids Lab

116.63 sq m

00-ES-013

JLR Electrical Development Lab

108.38 sq m

00-HB-026

Store

22.69 sq m

00-ES-003

Store

137.28 sq m

00-ES-004

Local Storage

7.23 sq m

00-ES-016

Store

56.52 sq m

00-ES-005

Goods Movement Zone

428.43 sq m

00-ES-006

Goods Check-in

12.91 sq m

00-ES-022

Reception

300.02 sq m

00-HB-002

Café

367.49 sq m

00-HB-005

Café WC

2.42 sq m

00-HB-009

Café back of House

88.35 sq m

00-HB-006

Café store

5.29 sq m

00-HB-007

Café WC lobby

1.03 sq m

00-HB-008 Café Refuse

9.79 sq m

00-HB-007a

Facility manager

55.33 Sq m

00-HB-020

Col. Meeting Room 1

31.26 Sq m

00-HB-021

Collaborative Hub

380.12 sq m

00-HB-034

JLR Research Office

283.56 sq m

00-OF-001

Stair 4

25.08 sq m

00-ES-021

Corridor

26.67 sq m

00-ES-020

Stair 4 Lobby

11.32 sq m

00-ES-020a

Stair 3

40.76 sq m

00-ES-029

Corridor

13.00 sq m

00-HB-019

Stair 1

21.13 sq m

00-HB-004

Corridor

18.39 sq m

00-HB-025

Stair 2 Lobby

14.63 sq m

00-OF-004

Stair 3 Lobby

14.62 sq m

00-ES-028

Corridor

43.27 sq m

00-ES-008

VR Movement Zone

60.47 sq m

00-HB-032a

Stair 1 Lobby

7.62 sq m

00-HB-003

Stair 2

40.33 sq m

00-OF-005

Corridor

6.17 sq m

00-ES-024

Corridor

33.66 sq m

00-HB-011

Corridor

15.30 sq m

00-OF-007

Corridor

16.45 sq m

00-HB-029

Disabled WC

3.75 sq m

00-HB-018

Female Showers

12.10 sq m

00-ES-009c

Recycling Store

26.49 sq m

00-OF-008

Cleaners Store

5.64 sq m

00_ES_028a

Showers Lobby

8.86 sq m

00-ES-009a

Cleaners Store

3.87 sq m

00-HB-015

WC

3.50 sq m

00-HB-016

Cleaners Store

4.74 sq m

00-HB-014 Male WCs

9.27 sq m

00-HB-012

Female WCs

11.08 sq m

00-HB-013

Diasabled Shower

7.59 sq m

00-ES-009b

WC

2.77 sq m

00-ES-009d

Sub Equipment Room 1

16.15 sq m

00-HB-010

Disabled WC

3.12 sq m

00-HB-012a

WCs

32.16 sq m

00-OF-002 Cleaners Store

5.15 sq m

00-OF-003

Male Showers

32.96 sq m

00-ES-009

Refuse Store

10.59 sq m

00-OF-010

Sub Equipment Room 2

18.37 sq m

00-ES-025

Lift Motor Room

15.78 sq m

00-ES-023

WC

3.50 sq m

00-HB-017

HV/LV Switchroom 1

116.33 sq m

00-ES-018

Service Yard

2562.94 sq m

00-XS-001

External Terrace

164.34 sq m

00-XS-002

Cold Water Storage Plant

48.81 sq m

00-DW-023

HV Intake

31.91 sq m

00-DW-027

Gas Intake

15.20 Sq m

00-DW-026

Stair 5

20.64 sq m

00-DW-031

Corridor

11.34 sq m

00-DW-030

Cleaners Store

2.57 sq m

00-DW-012a

WCs

30.69 sq m

00-DW-012

WMG Student Projects

277.23 sq m

00-DW-028

WMG Project Tools

23.53 sq m

00-DW-029

JLR Dyno 2

48.00 sq m

00-DW-011

JLR Brake Dyno

40.00 sq m

00-DW-017

JLR Low Emission 1

27.26 sq m

00-DW-033a

JLR Dyno 3 Barrel Store

5.80 sq m

00-DW-033b

JLR Low Emission 2

23.20 sq m

00-DW-033c

JLR Barrel Store 2

11.60 sq m

00-DW-033d

JLR Barrel Store 1

11.60 sq m

00-DW-036

JLR Fuelling Area

42.17 sq m

00-DW-022

JLR E-Dyno 1

34.72 sq m

00-DW-004

JLR Dyno 3

40.00 sq m

00-DW-018

JLR E-Dyno 2

34.72 sq m

00-DW-005 JLR Soak

247.76 sq m

00-DW-021

JLR Chassis Dyno

81.65 sq m

00-DW-020 JLR Dyno 1

48.00 sq m

00-DW-009

TMETC Gas Bottle Store

13.05 sq m

00-DW-035

TMETC Dyno 2

44.00 sq m

00-DW-008

TMETC Vehicle Bay

33.00 sq m

00-DW-007

TMETC Dyno 1

44.00 sq m

00-DW-006

TMETC Engine PSB

98.70 sq m

00-DW-001

TMETC Barrel Store

5.80 sq m

00-DW-034

Paint Store

15.21 sq m

00-DW-033

Breakout

36.25 sq m

00-DW-013

Control Corridor 2

20.97 sq m

00-DW-003a

Control Corridor 1

183.48 sq m

00-DW-003

Dyno access corridor

44.63 sq m

00-DW-001a

Dyno Local Store

16.61 sq m

00-DW-015

Emergency Shower

3.37 sq m

00-DW-014

Workshop 1

47.56 sq m

00-DW-002

Workshop 2

124.69 sq m

00-DW-002 a

Instrument Room

48.00 sq m

00-DW-019

Instrument Room

48.00 sq m

00-DW-010

E-Machines Lab

48.12 sq m

00-DW-016

Forklift Accessway

277.32 sq m

00-DW-032

Stair 6

17.60 sq m

00-DW-024

Exhibtion Store

9523279.13 Sq mm

00-HB-001a

Exhibition

708.06 sq m

00-HB-001

1:500

PI

20/03/2014

National Automotive Innovation CentreWarwick Manufacturing Group

P1 20/03/2014 PI

PLANNING

NAIC

CAR PARK 15

CAR PARK 16

CAR PARK 11

CAR PARK 9

IMC

IDL

IIPSI

BUILDINGZEEMAN

SquareAcademic

SCIENCECOMPUTER

SCIENCESPHYSICAL

ENGINEERING

HUMANITIES

LIBRARY

UNIVERSITY ROAD

LIB

RA

RY R

OA

D

HOUSEUNIVERSITY

HOUSEMILBURN

SCIENCE PARK

IARC

P3

Bulk Fuel Store

YardService

StoreTyre

Service Entrance & Exit

Tanker Exit Only

EntranceMain

LM

NAIC_P_002

SITE PLAN

Planning Issue LM

of separate planning applicationNew entrance to car park subject

IINM

NO

RTH

MIL

LB

UR

N HIL

L R

OA

D

ACADEMIC R

OAD

Bicycle Shelter

mobile catering outletLocation for future

NTS

spacesparking 3 disabled

P2 09/04/2014 PIAAalabeledPlanning Issue - Disabled parking

P3 24/04/2014 PIPlanning Issue - Dimensions labeled MA

12.478m

16701

23.88m77.4m118.4

m

163.7m

7.73m

35.3

m

approx 43.89m

appro

x 8.99m

3.48m

Page 29: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

CHECKEDSTATUS

REVISION

DRAWN

SCALE

DRAWING TITLE

DRAWING NUMBER

PROJECT TITLE

DATE DETAIL CHKDRNREV

DATE

NOTES:

@A0

SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION:

NOTE THE FOLLOWING:OF WORK DETAILED ON THIS DRAWING, NORMALLY ASSOCIATED WITH THE TYPES IN ADDITION TO THE HAZARDS / RISKS

Significant Residual Risks:

Action to be Taken:

Refer to Health and Safety Plan

5 BALDWIN TERRACE LONDON N1 7RU TEL: 020 7704 1975

PROJECT EMAIL:

© EDWARD CULLINAN ARCHITECTS LTD 2013

@A3

GHJKLMNOPQR

ABCDEFGHJKLM

SERVICE YARD ENTRANCE PAINTSHOP/MILLING REAR ENTRANCE OFFICE

OFFICE OFFICE CAFE

TERRACE

CAFE

1:100

1:200

MA LM

National Automotive Innovation CentreWarwick Manufacturing Group

NAIC_P_013

Planning

P1

KEY

P1 MA LM

20/03/2014

North West Elevation

20/03/2014 Planning Issue

Glazing

U-Channel Glazing

Glazed bricks

Grey Brick

Louvred Panels

Mesh Solar CladdingLarge Format Curved

Curved metal cladding panels

PlantPlant

Process Extracts

Process Extracts Plant

Plant

Process extract

Roof terrace

Viewing Garden

+95.100 AOD

+82.500 AOD

+86.700 AOD

+90.900 AOD

+95.100 AOD

+82.500 AOD

+86.700 AOD

+90.900 AOD

Page 30: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

CHECKEDSTATUS

REVISION

DRAWN

SCALE

DRAWING TITLE

DRAWING NUMBER

PROJECT TITLE

DATE DETAIL CHKDRNREV

DATE

NOTES:

@A0

SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION:

NOTE THE FOLLOWING:OF WORK DETAILED ON THIS DRAWING, NORMALLY ASSOCIATED WITH THE TYPES IN ADDITION TO THE HAZARDS / RISKS

Significant Residual Risks:

Action to be Taken:

Refer to Health and Safety Plan

5 BALDWIN TERRACE LONDON N1 7RU TEL: 020 7704 1975

PROJECT EMAIL:

© EDWARD CULLINAN ARCHITECTS LTD 2013

@A3

1213141516171819202122

101112

123456789101112

1213141516171819202122

EMERGENCY EXIT FROM SERVICE YARD

FUEL/BOTTLE STORES

PAINTSHOP/MILLINGENGINEERING LABS FIRE ESCAPE

ACADEMIC ROAD

MILBURN HILL ROAD

1:100

1:200

MA LM

National Automotive Innovation CentreWarwick Manufacturing Group

NAIC_P_012

Planning

P1

KEY

P1 MA LM

20/03/2014

North East Elevation

20/03/2014 Planning Issue

Glazing

U-Channel Glazing

Glazed bricks

Grey Brick

Louvred Panels

Mesh Solar CladdingLarge Format Curved

Curved metal cladding panels

Carpark 15 shown dashed

Screening to plant terraceProcess extracts

Process extracts

Process extracts Plant

Plant

Process extracts

Plant

+95.100 AOD

+82.500 AOD

+86.700 AOD

+90.900 AOD

+95.100 AOD

+82.500 AOD

+86.700 AOD

+90.900 AOD

Page 31: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

CHECKEDSTATUS

REVISION

DRAWN

SCALE

DRAWING TITLE

DRAWING NUMBER

PROJECT TITLE

DATE DETAIL CHKDRNREV

DATE

NOTES:

@A0

SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION:

NOTE THE FOLLOWING:OF WORK DETAILED ON THIS DRAWING, NORMALLY ASSOCIATED WITH THE TYPES IN ADDITION TO THE HAZARDS / RISKS

Significant Residual Risks:

Action to be Taken:

Refer to Health and Safety Plan

5 BALDWIN TERRACE LONDON N1 7RU TEL: 020 7704 1975

PROJECT EMAIL:

© EDWARD CULLINAN ARCHITECTS LTD 2013

@A3

H J K L M N O P Q R

A B C D E F G

H J K LUNIVERSITY ROAD SOAKSERVICE YARDEMERGENCY EXIT

ENGINEERING HALL ENGINEERING ENTRANCE TYRE STORE

SERVICE ENTRANCE ROAD

1:100

1:200

MA LM

National Automotive Innovation CentreWarwick Manufacturing Group

NAIC_P_011

Planning

P1

KEY

P1 MA LM

20/03/2014

South East Elevation

20/03/2014 Planning Issue

Glazing

U-Channel Glazing

Glazed bricks

Grey Brick

Louvred Panels

Mesh Solar CladdingLarge Format Curved

Curved metal cladding panels

CARPARK 15 SHOWN DASHED

CARPARK 15 SHOWN DASHED

Process equipment extracts

Process equipment extracts Plant

Plant

Plant

Process equipment extract

+95.100 AOD

+82.500 AOD

+86.700 AOD

+90.900 AOD

+95.100 AOD

+82.500 AOD

+86.700 AOD

+90.900 AOD

Page 32: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

CHECKEDSTATUS

REVISION

DRAWN

SCALE

DRAWING TITLE

DRAWING NUMBER

PROJECT TITLE

DATE DETAIL CHKDRNREV

DATE

NOTES:

@A0

SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION:

NOTE THE FOLLOWING:OF WORK DETAILED ON THIS DRAWING, NORMALLY ASSOCIATED WITH THE TYPES IN ADDITION TO THE HAZARDS / RISKS

Significant Residual Risks:

Action to be Taken:

Refer to Health and Safety Plan

5 BALDWIN TERRACE LONDON N1 7RU TEL: 020 7704 1975

PROJECT EMAIL:

© EDWARD CULLINAN ARCHITECTS LTD 2013

@A3

1 2 3 4 5 6 7 8 9 10 11 12

12 13 14 15 16 17 18 19 20 21 22

CAFEMILBURN HILL ROAD MAIN ENTRANCE EXHIBITION

STUDENT PROJECTS SOAKEXHIBITION ACADEMIC ROAD

1:100

1:200

MA LM

National Automotive Innovation CentreWarwick Manufacturing Group

NAIC_P_010

Planning

P1

KEY

P1 MA LM

Glazing

U-Channel Glazing

Glazed bricks

20/03/2014

South West Elevation

20/03/2014 Planning Issue

Grey Brick

Louvred Panels

Mesh Solar CladdingLarge Format Curved

Curved metal cladding panels

main entrance door

Roof Terrace

Roof Terrace

+95.100 AOD

+82.500 AOD

+86.700 AOD

+90.900 AOD

+95.100 AOD

+82.500 AOD

+86.700 AOD

+90.900 AOD

Page 33: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

CHECKEDSTATUS

REVISION

DRAWN

SCALE

DRAWING TITLE

DRAWING NUMBER

PROJECT TITLE

DATE DETAIL CHKDRNREV

DATE

NOTES:

@A0

SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION:

NOTE THE FOLLOWING:OF WORK DETAILED ON THIS DRAWING, NORMALLY ASSOCIATED WITH THE TYPES IN ADDITION TO THE HAZARDS / RISKS

Significant Residual Risks:

Action to be Taken:

Refer to Health and Safety Plan

5 BALDWIN TERRACE LONDON N1 7RU TEL: 020 7704 1975

PROJECT EMAIL:

© EDWARD CULLINAN ARCHITECTS LTD 2013

@A3

DU

CTS

4X E

MP

TY

22,500L bulk store (5348mm x ø2500)

27,000L bulk store (6298mm x ø2500)Approx. 28,960L or 34,750L interceptor(Approx. 6000mm x ø2500 or 7000mm x ø2500 )

Instrument Room

48.00 Sq m

00-DW-019

JLR Dyno 3

40.00 Sq m

00-DW-018

JLR Brake Dyno

40.00 Sq m

00-DW-017

JLR Dyno 2

48.00 Sq m

00-DW-011

Instrument Room

48.00 Sq m

00-DW-010

JLR Dyno 1

48.00 Sq m

00-DW-009

Corridor

11.34 Sq m

00-DW-030

TMETC Dyno 2

44.00 Sq m

00-DW-008

TMETC Dyno 1

44.00 Sq m

00-DW-006

TMETC Vehicle Bay

33.00 Sq m

00-DW-007

Breakout

36.25 Sq m

00-DW-013

Dyno Local Store

16.61 Sq m

00-DW-015

E-Machines Lab

48.12 Sq m

00-DW-016

JLR E-Dyno 1

34.72 Sq m

00-DW-004

Control Corridor 2

20.97 Sq m

00-DW-003a

JLR E-Dyno 2

34.72 Sq m

00-DW-005

Cold Water Storage Plant

48.81 Sq m

00-DW-023WMG Project Tools

23.53 Sq m

00-DW-029

Workshop 2

124.69 sq m

00-DW-002 a

TMETC Engine PSB

98.70 Sq m

00-DW-001

TMETC Barrel Store

5.80 Sq m

00-DW-034

TMETC Gas Bottle Store

13.05 Sq m

00-DW-035

JLR Low Emission 1

27.26 Sq m

00-DW-033a

JLR Dyno 3 Barrel Store

5.80 Sq m

00-DW-033b

JLR Low Emission 2

23.20 Sq m

00-DW-033c

JLR Barrel Store 2

11.60 Sq m

00-DW-033d

Workshop 1

47.56 Sq m

00-DW-002 Stair 6

17.34 Sq m

00-DW-024

Stair 6 Lobby

5.23 Sq m

00-DW-025

WMG Student Projects

277.23 Sq m

00-DW-028

JLR Soak

247.76 Sq m

00-DW-021

Control Corridor 1

183.48 Sq m

00-DW-003

JLR Chassis Dyno

81.65 Sq m

00-DW-020

JLR Fuelling Area

42.17 Sq m

00-DW-022

Paint Store

15.21 Sq m

00-DW-033

JLR Barrel Store 1

11.60 Sq m

00-DW-036

Emergency Shower

3.37 Sq m

00-DW-014

WCs

30.69 Sq m

00-DW-012

Cleaners Store

2.57 Sq m

00-DW-012a

Dyno access corridor

44.63 Sq m

00-DW-001a

Forklift Accessway

277.32 Sq m

00-DW-032

Stair 5

20.64 Sq m

00-DW-031

HV Intake

31.91 Sq m

00-DW-027

Gas Intake

9.82 Sq m

00-DW-026

Cleaners Store

3.87 Sq m

00-HB-015

WC

3.50 Sq m

00-HB-016

WC

3.50 Sq m

00-HB-017

Disabled WC

3.75 Sq m

00-HB-018

Store

56.06 Sq m

00-HB-033

Goods Check-in

12.91 Sq m

00-ES-022

TMETC VR

161.70 Sq m

00-HB-031

JLR Electrical Development Lab

108.38 Sq m

00-HB-026

JLR Clay Store

72.96 Sq m

00-HB-030

Store

76.76 Sq m

00-HB-024

Drive-In Sim Control

32.21 Sq m

00-HB-023

Facility manager

54.08 Sq m

00-HB-020

Reception

307.67 Sq m

00-HB-002

Breakout

31.36 Sq m

00-ES-002

Corridor

6.17 Sq m

00-ES-024

Stair 1

21.13 Sq m

00-HB-004

Corridor

18.39 Sq m

00-HB-025

Corridor

16.45 Sq m

00-HB-029

Corridor

13.00 Sq m

00-HB-019

JLR VR

415.16 Sq m

00-HB-032

Sub Equipment Room 1

16.15 Sq m

00-HB-010

TMETC Electrical Lab

82.01 Sq m

00-HB-027

TMETC Battery Module Lab

51.17 Sq m

00-HB-028

Exhibtion Store

47.75 Sq m

00-HB-001a

Stair 4

25.08 Sq m

00-ES-021

JLR Thermo Fluids Lab

116.63 Sq m

00-ES-013

Loading/Goods Receiving

54.24 Sq m

00-ES-007

Engineering Hall

1555.69 Sq m

00-ES-001

Stair 3 Lobby

14.62 Sq m

00-ES-028

Corridor

43.27 Sq m

00-ES-008

Stair 2 Lobby

14.63 Sq m

00-OF-004

Store

22.69 Sq m

00-ES-003

VR Movement Zone

60.47 Sq m

00-HB-032a

Showers Lobby

8.86 Sq m

00-ES-009a

Diasabled Shower

7.59 Sq m

00-ES-009b

WC

2.77 Sq m

00-ES-009d

Male Showers

32.96 Sq m

00-ES-009

JLR Charging Lab

57.38 Sq m

00-ES-014

Store

56.52 Sq m

00-ES-005

Store

137.28 Sq m

00-ES-004

Collaborative Hub

380.04 Sq m

00-HB-034

Teapoint

29.17 Sq m

00-OF-006

JLR Research Office

479.06 Sq m

00-OF-009

JLR Quiet Room

72.07 Sq m

00-ES-010

Stair 4 Lobby

11.73 Sq m

00-ES-020a

HV/LV Switchroom 1

116.33 Sq m

00-ES-018

TMETC Infotainment

57.38 Sq m

00-ES-011

Corridor

26.67 Sq m

00-ES-020

Drive-In Sim

94.82 Sq m

00-HB-022

Col. Meeting Room 1

27.52 Sq m

00-HB-021

TMETC Vehicle Integration Lab

106.08 Sq m

00-ES-012

TMETC VIL Control

63.32 Sq m

00-ES-017

Local Storage

7.23 Sq m

00-ES-016

Café store

5.29 Sq m

00-HB-007

Café WC

2.42 Sq m

00-HB-009

Corridor

33.66 Sq m

00-HB-011

Café WC lobby

1.03 Sq m

00-HB-008

Cleaners Store

4.74 Sq m

00-HB-014 Male WCs

9.27 Sq m

00-HB-012

Female WCs

11.08 Sq m

00-HB-013

Disabled WC

3.12 Sq m

00-HB-012a

JLR Research Office

283.58 Sq m

00-OF-001

WCs

32.16 Sq m

00-OF-002 Cleaners Store

5.15 Sq m

00-OF-003

Service Yard

2562.94 Sq m

00-XS-001

Paintshop

326.00 Sq m

00-ES-027

Wood Mill

114.74 Sq m

00-ES-027a

Sub Equipment Room 2

18.37 Sq m

00-ES-025

Lift Motor Room

15.78 Sq m

00-ES-023

Goods Movement Zone

428.43 Sq m

00-ES-006

Cleaners Store

5.64 Sq m

00_ES_028a

Milling

252.03 Sq m

00-ES-026

Stair 3

40.76 Sq m

00-ES-029

Female Showers

12.10 Sq m

00-ES-009c

Recycling Store

26.49 Sq m

00-OF-008

Corridor

15.30 Sq m

00-OF-007

Refuse Store

10.59 Sq m

00-OF-010

Stair 2

40.33 Sq m

00-OF-005

JLR 3D Print Room

15.05 Sq m

00-OF-001a

Café Refuse

9.79 Sq m

00-HB-007a

Café back of House

88.35 Sq m

00-HB-006

External Terrace

164.34 Sq m

00-XS-002

Café

367.49 Sq m

00-HB-005

Stair 1 Lobby

8.18 Sq m

00-HB-003

Exhibition

719.00 Sq m

00-HB-001

Mobile Rig 5000x2000

LED LightingMix Lab

with LED LightingConfigurable Paint Booth

with LED LightingConfigurable Paint Booth

Kolb Studioline M Milling Machine Arms

Hydraulic Set Up Ram Hydraulic Set Up Ram

Kolb Studioline M Milling Machine Arms

within dashed red lineModel Movement Zone

Thermal Chamber 8000x4000Refrigeration Plinthfor Thermal Chamber 3000x1500

DrillPillar

Mill

SawBand

machineBending

HacksawPower

guillotineSmall

cutterPlasmaPortable

Lathe Hotw

ash

Material Store

cabinetEmissions

RackCooling

Therm

al Chamber 8000x4000

Refrigeration Plinthfor Thermal Chamber

3000x1500

Dust Extract Dust Extract

Dust Extract

dust motor

dust motor

BenchNew

BenchNew

Shelves

CupboardsTall

Racking

CutterLazer 50W

CNC4 axis

Printer3D

ChestsTool

40 inch wall monitor

Shelving

printerPhotocopier/

Table with 14 chairs

Fold out bed

TeapointFixed

Roller pallet / stillage

Brake disks

Drive shafts

Drive shafts

Brake disks

Tools

Test Equipment

Oil storage

Extract hoses

Test Equipment

Roller pallet / stillage

Drive shafts

Driving sim

BuckSim

RigProjection

Kardax Machines - 4

(collapsible)Lab Cars

BenchWork

BenchWork

BenchWork

BenchWork

BucksPackage

25 L Fuel Drums

Printer3D

Racking

Fireproof Cabinets

Benches

Station 1Weld Work

Station 2Weld Work

pressFly

pressHydraulic

ablationLazer

SystemTensioningBand

Cabinets

ShelvingDuty Heavy

palletsClay on

Car Stacker

room?Not enough

Clay Model

Car Stacker

Clay Model

unitextractor Fume

fire alarm buttonemergency buttonEmergency phone

BenchesWork

Lab CarStandard

BenchesWork

Racking

Cabinets

CHANGELAYOUT

TVmounted Wall

ScalesWeighingVehicle Portable

viceincludingBenches

viceincludingBenches

viceincludingBenches

ArmFaro

craneA-frameMobile

Racking.equip: Hand tools andHarness Development

Vehicle RampFlush Fitting

elevated test rig4 wheel hybrid

lampinspection Retractable

trolleysStorage kit/

trolleysStorage kit/

equipmentLab car

protection ?Oil spill

LiftVehiclePlatform

vehicle liftSwing arm

Workbench

Workbench

cabinetTool

cabinetTool

cabinetTool

cabinetTool

cabinetTool

cabinetTool

cabinetTool

bedplateIn ground

bedplateIn ground

padweighing corner Vehicle

padweighing corner Vehicle

padweighing corner Vehicle

padweighing corner Vehicle

readoutwall-mounted with digital Scales

Tools

Workbench

test rigEBHS Airflow

UnitStorageTool

Wastebin

Equipment cupboards

cupboardsEquipment

DeskDesk

ISOKELL

SimulatorDesktopAcousticVehicle

unitStorage

Desks

trolleyMobile test

bedtest Elevated

trolleyMobile test

Parts Racking

Vehicle RampFlush Fitting

trolleyequipmentParts/

TrolleyCharging

UnitStorageTool

test rigAirflow

fancoolingPortable

Wastebin

Laptop hotdesks

Buck control desk

holdersSpeaker

PrinterColour

lightsFlood

Workbench

Racking

Store Local

Large Display Wall (LCD/LED)

Small display screens

PC station

Display Modules

stacksSpeaker

Projectors for exhibition

for exhibitionMicrophones

Reception deskDisplay screens

Sofas x2tableCoffee

Seating x8

podmeeting Informal

Jetwash

Small display screens

12 monitors 4 chairs3 desks with

Bin DWcounterLowered

Pallet truck

ForkliftStringo

monitorsLarge

monitorsLarge

Flowrig

cupboardCOSHH

Racking

Workbenches

TableSurface

Lockers

for 20 peopleTables and chairs

MachineVending FridgeM K

Lockers

areaSoldering

area

welding

TIG

area

welding

MIG

Cleaner

Parts

Pallet truck

Pallet truck

Racking

stationsSoldering

Workbench

Racking

Climatic chamber

rack19 inch

Lab sink

Benches

benchworkElectrical

cupboardFume

WasherParts

StorageBattery

StorageComponent Electric

unitcharging Battery Electric

drillPedestal

TableIron

BenchesRobotics

CraneSand

cupboardStorage

cupboardStorage

cupboardStorage

cupboardStorage

cupboardStorage

cupboardStorage

tool kitElectrical tool kit

Mechanical

pressHydraulic

Welder

drill / millBench top

Submarine Project

ProjectDisplay

Benches

Rolling road

2 Post lift

BenchWorkLinedMetal

BenchWorkLinedMetal

areaWelding

Extra storage / work bench Extra storage / work bench

areaoilWaste

areastoreFuel

charging Battery

Racking

4 monitorsPc with

Racking

Racking

Student formula car 2930x1430

Screen

Guillotine

Workbenches

build

er

metal

Sheet

Bay 1

Bay 2Bay 3

1:200

MA LM

National Automotive Innovation CentreWarwick Manufacturing Group

P1 20/03/2014 MA LM

NAIC_P_003

Ground Floor Plan

Planning

P1

Planning Issue

CARPARK 15

NTS

UNIVERSIT

Y ROAD

Bicycle Shelter

20/03/2014

of separate planning applicationNew entrance to car park subject

Tanker Exit Only

Service Entrance & Exit

StoreTyre

NO

RTH

TankWater Attenuation Below Ground

mobile catering outletLocation for future

MIL

LB

UR

N HIL

L R

OA

D

InterceptorOil/Water Below Ground

Bulk Fuel StoreBelow Ground

Page 34: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

CHECKEDSTATUS

REVISION

DRAWN

SCALE

DRAWING TITLE

DRAWING NUMBER

PROJECT TITLE

DATE DETAIL CHKDRNREV

DATE

NOTES:

@A0

SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION:

NOTE THE FOLLOWING:OF WORK DETAILED ON THIS DRAWING, NORMALLY ASSOCIATED WITH THE TYPES IN ADDITION TO THE HAZARDS / RISKS

Significant Residual Risks:

Action to be Taken:

Refer to Health and Safety Plan

5 BALDWIN TERRACE LONDON N1 7RU TEL: 020 7704 1975

PROJECT EMAIL:

© EDWARD CULLINAN ARCHITECTS LTD 2013

@A3

A

B

C

D

E

F

G

H

J

K

L

M

N

O

P

Q

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

R

Breakout

17.05 Sq m

01-DW-101

Stair 5

13.96 Sq m

01-DW-103

Heating Plant

171.48 Sq m

01-DW-111

Corridor

21.63 Sq m

01-DW-104 Sub Equipment Room 5

16.20 Sq m

01-DW-105 Female WCs

7.72 Sq m

01-DW-108

Male WCs

6.76 Sq m

01-DW-107

Compressed Air Plant

125.03 Sq m

01-DW-112

Stair 6 Lobby

5.23 Sq m

01-DW-116

Stair 6

17.34 Sq m

01-DW-117

Disabled WC

3.90 Sq m

01-DW-109

Cleaners Store

2.60 Sq m

01-DW-106

Soak Process Plant

136.04 Sq m

01-DW-115

Dyno Process Plant

1210.69 Sq m

01-DW-113

HV/LV Switchroom 2

122.88 Sq m

01-DW-114

Mezzanine

76.10 Sq m

01-DW-102

WCs

31.04 Sq m

01-OF-116

Store

61.50 Sq m

01-ES-103

Col. Meeting Room 4

14.20 Sq m

01-HB-105

Col. Meeting Room 5

28.84 Sq m

01-HB-106

Col. Meeting Room 6

14.02 Sq m

01-HB-107

JLR Project Strategy Room

50.36 Sq m

01-HB-108

Col. Meeting Room 7

14.02 Sq m

01-HB-109

Sub Equipment Room 3

16.15 Sq m

01-OF-102

Col. Meeting Room 3

19.67 Sq m

01-HB-104

TMETC Clay Store

184.34 Sq m

01-ES-113

Kitchen

24.05 Sq m

01-OF-112

Corridor

41.89 Sq m

01-ES-108

Corridor

5.98 Sq m

01-ES-111

Model Movement Zone

120.34 Sq m

01-ES-106

Corridor

10.60 Sq m

01-ES-104

Stair 1

21.13 Sq m

01-OF-105

Library

84.03 Sq m

01-HB-103

JLR VR

54.83 Sq m

01-HB-103b

Corridor

8.91 Sq m

01-HB-103a

JLR Innovation room

42.86 Sq m

01-HB-110

TMETC HR Interview Room

13.23 Sq m

01-OF-114b

Col. Stair Breakout

33.59 Sq m

01-HB-101a

Mezzanine

72.22 Sq m

01-ES-101

Store

96.17 Sq m

01-ES-102

Col. Meeting Room 2

34.15 Sq m

01-HB-102

Store

20.40 Sq m

01-ES-105

External Terrace

25.94 Sq m

01-XS-101

Stair 4

25.08 Sq m

01-ES-110

Core Lobby

40.07 Sq m

01-OF-115

Cleaners Store

5.12 Sq m

01-OF-117

Core Lobby

6.84 Sq m

01-OF-106 Stair 2

41.74 Sq m

01-OF-110

Stair 3 Lobby

14.62 Sq m

01-OF-118

Stair 2 Lobby

14.64 Sq m

01-OF-109

WCs

32.15 Sq m

01-OF-107 Cleaners Store

5.15 Sq m

01-OF-108

JLR Office Meeting

32.30 Sq m

01-OF-113b

JLR Office Meeting

32.40 Sq m

01-OF-113

Teapoint

27.26 Sq m

01-OF-111

JLR Corridor

9.75 Sq m

01-OF-113c

Confidential Waste

29.59 Sq m

01-ES-107

Sub Equipment Room 4

18.41 Sq m

01-ES-112

Paintshop Mezzanine

114.77 Sq m

01-ES-107a

TMETC HR Office

45.45 Sq m

01-OF-114c

JLR Research Office

341.50 Sq m

01-OF-101

TMETC IT Prep

29.75 Sq m

01-OF-114a

JLR Office Meeting

54.02 Sq m

01-OF-113a

External Terrace

25.94 Sq m

01-XS-102

Stair 3

41.74 Sq m

01-OF-119

Stair 4 Lobby

15.18 Sq m

01-ES-109

Stair 1 Lobby

8.06 Sq m

01-OF-104

JLR Research Office

525.33 Sq m

01-OF-103

Collaborative Hub

568.81 Sq m

01-HB-101

Void Over

Void Over

Void OverVoid Over

Void Over

Void Over

Void Over

Void Over

Void Over

Void Over

Void Over

Void Over

1:200

MA LM

20/03/2014

National Automotive Innovation CentreWarwick Manufacturing Group

P1 20/03/2014 MA LM

NAIC_P_004

Planning

P1

Planning Issue

CARPARK 15

First Floor Plan

NTSNO

RTH

Page 35: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

CHECKEDSTATUS

REVISION

DRAWN

SCALE

DRAWING TITLE

DRAWING NUMBER

PROJECT TITLE

DATE DETAIL CHKDRNREV

DATE

NOTES:

@A0

SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION:

NOTE THE FOLLOWING:OF WORK DETAILED ON THIS DRAWING, NORMALLY ASSOCIATED WITH THE TYPES IN ADDITION TO THE HAZARDS / RISKS

Significant Residual Risks:

Action to be Taken:

Refer to Health and Safety Plan

5 BALDWIN TERRACE LONDON N1 7RU TEL: 020 7704 1975

PROJECT EMAIL:

© EDWARD CULLINAN ARCHITECTS LTD 2013

@A3

A

B

C

D

E

F

G

H

J

K

L

M

N

O

P

Q

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

R

Cleaners Store

4.49 Sq m

02-ES-204a

Mezzanine

232.14 Sq m

02-HB-210

JLR Design Hall

921.92 Sq m

02-DS-201

Design Stair Lobby

33.66 Sq m

02-DS-206

TMETC Design Hall

1042.26 Sq m

02-DS-208

JLR Clay Modelers

22.89 Sq m

02-DS-205a

JLR Clay Modelers

41.24 Sq m

02-DS-205

Stair

37.52 Sq m

02-DS-203a

JLR Future Showroom and Review

405.50 Sq m

02-DS-204

Disabled WC/Shower

8.45 Sq m

02-ES-205

TMETC Studio Store

35.04 Sq m

02-ES-208

WCs

31.05 Sq m

02-OF-217

Sub Equipment Room 6

16.15 Sq m

02-OF-202

Corridor

6.17 Sq m

02-ES-210

Col. Meeting Room 8

17.68 Sq m

02-HB-202

Hard Modelling

207.90 Sq m

02-ES-206

TMETC Clean Store

29.20 Sq m

02-ES-209

JLR Office Meeting Room 2

15.45 Sq m

02-HB-205

Cleaners Store

5.04 Sq m

02-OF-218

JLR Office Meeting Room 1

15.45 Sq m

02-HB-204

Col. Stair Breakout

14.39 Sq m

02-HB-201a

Kitchen

24.02 Sq m

02-OF-212

VR Stair

24.77 Sq m

02-DS-202

Stair 4

25.08 Sq m

02-ES-214

Stair 4 lobby

12.19 Sq m

02-XS-201

Core Lobby

6.84 Sq m

02-OF-206

Stair 2 Lobby

14.64 Sq m

02-OF-209

Core Lobby

10.13 Sq m

02-OF-219

Stair 3 Lobby

14.58 Sq m

02-OF-220a

Stair 1

21.12 Sq m

02-OF-205

Stair 1 Lobby

8.51 Sq m

02-OF-204

TMETC MD OFFICE

20.91 Sq m

02-HB-209

TMETC Office Meeting Room 2

13.14 Sq m

02-HB-207

TMETC Office Meeting Room 3

13.14 Sq m

02-HB-208

TMETC Research Office

271.12 Sq m

02-OF-215

TMETC Meeting Room 4

13.08 Sq m

02-HB-208a

TMETC Meeting Room 5

13.32 Sq m

02-HB-208b

TMETC Office Meeting Room 1

13.32 Sq m

02-HB-206

TMETC Meeting Room 7

25.84 Sq m

02-OF-213b

JLR Clean Stores

31.95 Sq m

02-ES-203

JLR Studio Stores

31.95 Sq m

02-ES-202

Changing Cleanup

52.20 Sq m

02-ES-201

JLR Office Meeting

30.94 Sq m

02-OF-203a

WCs

32.16 Sq m

02-OF-207 Cleaners Store

5.15 Sq m

02-OF-208

Teapoint

27.34 Sq m

02-OF-211

Collaborative Hub

246.73 Sq m

02-HB-201

WCs

21.53 Sq m

02-ES-204

TMETC Meeting Room

41.23 Sq m

02-OF-221

Sub Equipment Room 7

18.36 Sq m

02-ES-211

TMETC Design Breakout

53.27 Sq m

02-DS-207

TMETC DMU Room 1

66.23 Sq m

02-OF-224

Model Movement Zone

272.17 Sq m

02-ES-207

Corridor

14.84 Sq m

02-ES-212

TMETC Digital Review Room

115.92 Sq m

02-DS-209

TMETC Colour + Trim

112.59 Sq m

02-DS-210

JLR Research Office

339.38 Sq m

02-OF-201

JLR Research Office

721.48 Sq m

02-OF-203

JLR Office Meeting

15.60 Sq m

02-OF-201a

Stair 2

41.74 Sq m

02-OF-210

External Terrace

27.79 Sq m

02-XS-201

TMETC Research Office

509.09 Sq m

02-OF-213

External Terrace

27.79 Sq m

02-XS-202

Stair 3

41.74 sq m

02-OF-220

TMETC Research Office

487.11 Sq m

02-OF-223

TMETC Meeting Room 6

25.17 Sq m

02-OF-213a

JLR Meeting Room

25.76 Sq m

02-DS-203 Store

30.19 Sq m

02-DS-211Stair 5

13.96 Sq m

02-DW-203a

Cleaners Store

4.06 Sq m

02-DW-211 Sub Equipment Room 8

19.91 Sq m

02-DW-213 WCs

59.92 Sq m

02-DW-210

BCP +Absorbtion Chiller

175.30 Sq m

02-DW-216

Battery Room

51.88 Sq m

02-DW-218

UPS Room

27.35 Sq m

02-DW-219

Corridor

24.64 Sq m

02-DW-212

Process Cooling Pump

134.85 Sq m

02-DW-214

Stair 6 Lobby

5.23 Sq m

02-DW-207

Stair 6

17.34 Sq m

02-DW-208

WMG Lecture Room 2

105.42 Sq m

02-DW-205

WMG Lecture Room 1

116.12 Sq m

02-DW-204

JLR Main Equipment Room

77.72 Sq m

02-DW-217 WMG CAD stations

65.13 Sq m

02-DW-203

Lecture Breakout

180.30 Sq m

02-DW-206

Corridor

98.01 Sq m

02-DW-202

TMETC WMG Main Equipment Room

37.34 Sq m

02-DW-209

WMG Project Space

457.94 Sq m

02-DW-201

Vertical Panel Saw

LatheWood turning

Bandsaw

Bandsaw

Wood Thickening Planer

Spindle Sander

Racking

Racking

PlanerOver & Under

Dimension Saw

Bobbing

Milling Machine

Racking

Bench Pillar Drill

D.Disc Sander

Table Saw

BenchCarpenters Work

Extraction (size TBC)

Cross Cutter

Di-Noc Tank

Di-Noc Tank

Shredder

Spray Booth

Spra

y B

ooth

Shredder

Kardex. A

ppro

x Size

Kardex. A

ppro

x Size

Void Over

Void Over

Lift

Void Over

1:200

MA LM

20/03/2014

National Automotive Innovation CentreWarwick Manufacturing Group

P1 20/03/2014 MA LM

NAIC_P_005

Planning

P1

Planning Issue

CARPARK 15

Second Floor Plan

NTSNO

RTH

Page 36: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

CHECKEDSTATUS

REVISION

DRAWN

SCALE

DRAWING TITLE

DRAWING NUMBER

PROJECT TITLE

DATE DETAIL CHKDRNREV

DATE

NOTES:

@A0

SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION:

NOTE THE FOLLOWING:OF WORK DETAILED ON THIS DRAWING, NORMALLY ASSOCIATED WITH THE TYPES IN ADDITION TO THE HAZARDS / RISKS

Significant Residual Risks:

Action to be Taken:

Refer to Health and Safety Plan

5 BALDWIN TERRACE LONDON N1 7RU TEL: 020 7704 1975

PROJECT EMAIL:

© EDWARD CULLINAN ARCHITECTS LTD 2013

@A3

A

B

C

D

E

F

G

H

J

K

L

M

N

O

P

Q

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

R

Design Reception

92.42 Sq m

03-DS-301

TMETC Printroom

15.08 Sq m

03-DS-320

WCs

30.66 Sq m

03-OF-314 Cleaners Store

4.91 Sq m

03-OF-315

Stair 1

21.13 Sq m

03-OF-305

Corridor

5.90 Sq m

03-HB-307

Collaborative Hub

305.50 Sq m

03-HB-301

Catering Kitchen

26.71 Sq m

03-HB-309

Col. Stair Breakout

4.28 Sq m

03-HB-301a

TMETC Studio Meeting

26.28 Sq m

03-DS-316

Corridor

104.89 Sq m

03-DS-302

TMETC Studio Office

81.40 Sq m

03-DS-319

Collaborative Hub

83.26 Sq m

03-HB-312

Viewing Garden

581.72 Sq m

03-XS-302

Stair 1 Lobby

8.64 Sq m

03-OF-304

TMETC Designers Mezzanine

383.26 Sq m

03-DS-318

Stair 4

25.08 Sq m

03-OF-321

Stair 4 Lobby

6.28 Sq m

03-OF-320

Core Lobby

6.84 Sq m

03-OF-306 Stair 2 Lobby

14.64 Sq m

03-OF-309

Stair 2

41.74 Sq m

03-OF-310

Stair 3 Lobby

14.64 Sq m

03-OF-316 Stair 3

41.66 Sq m

03-OF-317

Showroom Control Stair

6.10 Sq m

03-HB-305

Sub Equipment Room 10

16.15 Sq m

03-OF-302

Cleaners Store

5.15 Sq m

03-OF-308

WCs

32.16 Sq m

03-OF-307

JLR Office Meeting

15.60 Sq m

03-OF-301a

JLR Research Office

360.07 Sq m

03-OF-301

Teapoint

29.36 Sq m

03-OF-311

JLR Office Meeting

42.16 Sq m

03-OF-303a

External Terrace

172.61 Sq m

03-XS-301

TMETC Office Meeting

19.01 Sq m

03-OF-312

Sub Equipment Room 9

18.36 Sq m

03-HB-308

Core Lobby

6.85 Sq m

03-OF-313

TMETC Research Office

497.18 Sq m

03-OF-318

Store

15.86 Sq m

03-HB-310

Showroom Back of House

102.53 Sq m

03-HB-306

Shared Studio Meeting

40.31 Sq m

03-DS-313

JLR Research Office

522.05 Sq m

03-OF-303

Airlock

6.18 Sq m

03-OF-319

Showroom Store

26.76 Sq m

03-HB-304

Showroom Store

26.76 Sq m

03-HB-303

WCs

21.46 Sq m

03-DS-303

WCs

16.43 Sq m

03-DS-304

Showroom

517.10 Sq m

03-HB-302

JLR Research Office

199.81 Sq m

03-OF-322

JLR Studio Office

16.59 Sq m

03-DS-311

JLR Studio Meeting

42.45 Sq m

03-DS-312

Design Stair Lobby

22.52 Sq m

03-DS-314

JLR Studio Office

16.59 Sq m

03-DS-310a

JLR Studio Meeting

20.62 Sq m

03-DS-307

Store

3.97 Sq m

03-DS-312a

JLR Mezzanine

69.64 Sq m

03-DS-305a

JLR Designers Mezzanine

58.97 Sq m

03-DS-305

Staircase

32.63 Sq m

03-DS-305b

TMETC Studio Office

27.97 Sq m

03-DS-315

TMETC Mezzanine

19.84 Sq m

03-DS-315a

Mezzanine

151.60 Sq m

03-HB-311

JLR Mezzanine

176.66 Sq m

03-DS-306 Store

3.03 Sq m

03-DS-308a

JLR Design Studio

203.84 Sq m

03-DS-308

Store

3.03 Sq m

03-DS-308b

JLR Mezzanine Podium

69.59 Sq m

03-DS-309

JLR Kitchen

5.61 Sq m

03-DS-310

Stair 5

13.96 Sq m

03-DW-303a

Sub Equipment Room 11

17.29 Sq m

03-DW-304

Board Room

99.89 Sq m

03-DW-301

Preparation Kitchen

18.40 Sq m

03-DW-302 Corridor

152.07 Sq m

03-DW-303

Corridor

7.37 Sq m

03-DW-303b

WCs

35.99 Sq m

03-DW-305

Male WC

3.08 Sq m

03-DW-305a

Disabled WC

3.25 Sq m

03-DW-305c

Female WC

3.45 Sq m

03-DW-305b

Cleaners Store

2.92 Sq m

03-DW-306

Stair 6 Lobby

5.23 Sq m

03-DW-308

Stair 6

17.34 Sq m

03-DW-309

JLR Project Space

907.36 Sq m

03-DW-307

Roof Plant

773.79 Sq m

03-XS-305

WC Lobby

11.12 Sq m

03-DW-303c

External Terrace

325.11 Sq m

03-XS-303

Void Over

Void Over

1:200

MA LM

20/03/2014

National Automotive Innovation CentreWarwick Manufacturing Group

P1 20/03/2014 MA LM

NAIC_P_006

Planning

P1

Planning Issue

CARPARK 15

Third Floor Plan

63 Sq m04 - HB - 401Control Room

NTSNO

RTH

Showroom Control Room at Mezzanine level

Screen to plant

Access to Control Room Mezzanine

A

L_003

A

L_003

Page 37: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

SECTION 2.0 Page | 53NATIONAL AUTOMOTIVE INNOVATION CENTRE, UNIVERSITY OF WARWICKDESIGN & ACCESS STATEMENT

DETAIL OF CAFE

Page 38: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

CHECKEDSTATUS

REVISION

DRAWN

SCALE

DRAWING TITLE

DRAWING NUMBER

PROJECT TITLE

DATE DETAIL CHKDRNREV

DATE

NOTES:

@A0

SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION:

NOTE THE FOLLOWING:OF WORK DETAILED ON THIS DRAWING, NORMALLY ASSOCIATED WITH THE TYPES IN ADDITION TO THE HAZARDS / RISKS

Significant Residual Risks:

Action to be Taken:

Refer to Health and Safety Plan

5 BALDWIN TERRACE LONDON N1 7RU TEL: 020 7704 1975

PROJECT EMAIL:

© EDWARD CULLINAN ARCHITECTS LTD 2013

@A3

A

B

C

D

E

F

G

H

J

K

L

M

N

O

P

Q

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

R

Stair to roof level

Stair to roof level

Carlift to roof

1:200

MA LM

20/03/2014

National Automotive Innovation CentreWarwick Manufacturing Group

P1 20/03/2014 MA LM

NAIC_P_007

Planning

P1

Planning Issue

CARPARK 15

NTS

Roof Plan

NO

RTH

Northlight rooflight with PVs

PVs on frame

Mesh plant enclosure ETFE Rooflight

ETFE Rooflight

ETFE Rooflight ETFE Rooflight

Mesh plant enclosure

Mesh plant enclosure

Mesh plant enclosure

Mesh plant enclosure

Mesh plant enclosureMesh plant enclosure

Page 39: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

SECTION 2.0 Page | 39NATIONAL AUTOMOTIVE INNOVATION CENTRE, UNIVERSITY OF WARWICKDESIGN & ACCESS STATEMENT

EXTERNAL TERRACES

PVS

PV ON NORTH LIGHT

MECHANICAL PLANT

RISER

EDGE PROTECTION

ROOF LIGHTS

STAIR ACCESS TO ROOF

CAR LIFT

FLUES

Page 40: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

SECTION 2.0 Page | 38NATIONAL AUTOMOTIVE INNOVATION CENTRE, UNIVERSITY OF WARWICK

DESIGN & ACCESS STATEMENT

2.3 ROOF

2.3.1 Design Principles:

Main Roof:

The main roof, from the underside, is a light, gently undulating blanket of precision engineered timber. It is a consistent and instantly recognisable element which projects the ideal of unity of purpose, inherent in the NAIC project. It gives a strong consistent horizontal top-line to the eleva-tions and projects above a continuous ribbon of windows to appear to float above the building.

The roof has a consistent expression from outside to inside with a dramatic soaring atrium from the reception. The Design studios and mezzanines, offices and collaborative hub and atrium are unified by the visually constant timber ceiling.

The roof aims to create the feeling of one large, well lit, open shared space to promote collaboration.

The roof grid is set at 45 degrees to the main body of the building for two reasons:

• to align it North-South, allowing it to work naturally with a north-light profile.

• to avoid long parallel lines in the atrium which would have the effect of distancing one edge from the other.

From above the main roof is a hard-working simple ‘table’ for the energy management equipment the building needs. We get as much plant on the roof as possible to keep more premium space available inside the building.

External Terraces:

• Our visits to exemplar buildings during earlier design stages pointed out the benefits of well thought-out external areas as useful extensions for working.

• Provide spill out areas for users of the building while also collecting rainwater run-off. While not useful every day of the year, the idea of outside space for thought, air and a change of scene was well liked by building users. Terrace areas of varying sizes are provided at all four levels of the building

ROOF STRUCTURAL SYSTEM INTERFACE

Page 41: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)

SECTION 2.0 Page | 37NATIONAL AUTOMOTIVE INNOVATION CENTRE, UNIVERSITY OF WARWICKDESIGN & ACCESS STATEMENT

VIEW ALONG UNIVERSITY ROAD; THE SOUTH-EAST APPROACH

Page 42: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)
Page 43: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)
Page 44: ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014 1098... · PUBLIC COMMITTEE REPORT ... Tata Motors European Technical Centre (TMETC)