ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014...
Transcript of ABC PUBLIC COMMITTEE REPORT - Coventrydemocraticservices.coventry.gov.uk/documents/s17917/FUL 2014...
1
PUBLIC
COMMITTEE REPORT
Planning Committee 26/06/2014 APPLICATION No. - FUL/2014/1098 Description of Development - Erection of a National Automotive Innovation Centre for academic and business use, including café and showroom, landscaping including water features, parking, access, boundary treatment, external lighting, roof top solar PV panels, below ground water attenuation tank, fuel storage tank and fuel interceptor and tyre storage building Site Address - Warwick University Land off University Road Applicant - University Of Warwick Ward - Westwood RECOMMENDATION: Planning Committee are recommended to grant planning permission subject to conditions. INTRODUCTION: Site Description The irregular shaped application site covers an area of 2.5 hectares in area within the University of Warwick (UoW) campus to the south-west of the City and is located close to the administrative boundary with Warwick District Council. The site is located between Millburn Hill Road to the north, University Road to the south and to the south-east of University House, Kirby Corner Road. The site bounds Academic Road to the south east of the site with the International Manufacturing Centre (IMC) located on the opposite side of that road. Abutting the site to the east is the multi-storey element of UoW Car Park 15. Other surrounding land is within the ownership of the University and includes car parks, landscaping/woodland, Science Park buildings and the University’s Boiler House.
ABC
2
Much of the site is greenfield land and dominated by maintained grass with scattered trees, hedgerows and scrub. It includes part of the introduced landscaped Oval Plaza with live Willow fencing to the northern side of University Road and also a shared pedestrian-cycle way linking University House to University Road. Whilst much of the site is ‘green’ it does also include the surface car park element of Car Park 15 comprising 97 car parking spaces (91 standard; 6 disabled). This car park has one vehicular access point, off Academic Road. The site is relatively flat but there is a slight fall from north to south of approximately 3m (ranging from 83.5 to 80.5 AOD). Two watercourses are present within the site in two separate ditches along the south-western/southern site boundary. The watercourse to the south-western boundary is a tributary to the Westwood Brook and this joins the brook/culvert to the south of the site further along University Road. This brook ultimately discharges into the Canley Brook upstream of the Tocil Lakes approximately 500m southeast of the site. The application site is on land included within the UoW Masterplan (covering the period between 2008-2018) which was granted outline planning permission in October 2009. Although the site is identified within the approved Masterplan as a development site, the building exceeds the residual capacity for academic uses on this part of the campus and therefore a full application, rather than reserved matters application, has been submitted. Proposed Development Planning permission is sought for the erection of a high quality designed National Automotive Innovation Centre for academic and business use. The proposed building, designed to BREEAM excellent rating, will have a floorspace of 33,964 m² spread over four levels with a ground floor level of 82.5 AOD. The new building will have a sizeable footprint covering much of the existing grassland and also the site of the existing Car Park 15 surface car park. The development is a joint venture between UoW, Jaguar Land Rover (JLR), Tata Motors European Technical Centre (TMETC) and Warwick Manufacturing Group (WMG). These partners together with the UK Government’s Higher Education Funding Council England (HEFCE) have committed the significant figure of approximately £100 million to the creation and operation of a National Automotive Innovation Centre at the UoW. It is anticipated that approximately 1,060 people will be employed at the site and there will be provision for apprentice training and other youth initiatives including an academy for young engineers. A break-down of the expected employee numbers is below:
3
Organisation/Area Staff numbers JLR 600 TMETC 395 WMG 60 Café 5 TOTAL permanent staff 1060 The Planning Statement indicates that the vision for the NAIC is “to link people, research and world-leading infrastructure to create and develop novel technologies for the automotive industry” and it will facilitate longstanding research and development collaboration between the partners within a state of the art environment. It further states that “NAIC is designed to create a collaborative space, bringing together a range of different activities into one building to create a national centre for innovation in automotive engineering, and a meeting and teaching place for academia and industry”. The siting of the development on the University campus is seen as important to enable collaboration between academics and key players in the automotive industry. The site has also been chosen as it is already within the University’s Masterplan for development of up to four and five storeys, has outline planning permission, and is also partially within an employment allocation defined within the Coventry Development Plan. A range of activities are proposed within the building including bespoke research and development facilities, engineering hall, virtual reality lab, design workshops, teaching facilities, offices, a collaborative hub/atrium (including meeting rooms, library and break out space, innovation room), reception area, outdoor car viewing garden, a publicly accessible showroom and café (providing 150 covers and external seating areas). The building will be mixed use, with elements of the building being within B1 (Business), D1 (Non-residential institutions) and A3 (restaurants and cafes) and the table below sets out the floorspace of each use. Activity Use Gross Internal Area
(GIA) m² Café A3 582.36 Research office and collaborative hub
B1a 12,369.9
Design (studios, milling, paint-shop, showroom and VR), front of house (reception, exhibition)
B1b 10,278.58
Engineering (Engineering hall, dyno labs and labs)
B1c 8,285.5
WMG Teaching and Research Facilities
D1 1,532.95
A glazed façade will characterise public facing elements of the building to the southwest of the building including the café (with outdoor seating), entrance
4
and reception area and student project space, whilst there will also be upper floor external terraces for further visual interest. Materials proposed include anodised aluminium, glass, brickwork and engineered timber and the building is to have a horizontal emphasis reflecting surrounding buildings. A precision engineered timber roof is a key element of the design and the building will benefit from large roof lights and north lights, the latter adjoining south facing solar PV panels on the roof. A detailed hard and soft landscaping scheme is proposed for the outside of the building envelope. This includes tree and shrub planting, a realigned pedestrian/cycle route linking the IMC and University House, seating and lighting. Several water features are also proposed to the north-west and south-west of the building to provide visual interest, ecological benefits and to allow for elements of sustainable drainage to be incorporated into the landscape design. They include a shallow pond to the building frontage, development of an existing shallow channel to the south-west boundary and incorporation of several shallow swales and reflection pools to the building north-west and south-west of the building. The development proposed will result in the felling of around 80 trees comprising varying tree categories, approximately 72 metres of hedgerow and 100 metres of live Willow fence. Only 17 car parking spaces are to be provided within the site, including 3 disabled spaces. These car parking spaces will be located to the north-western side of the building and will be accessed off the cul-de-sac, Millburn Hill Road. Additional car parking to replace the loss of the surface car park and to serve the development is to be provided elsewhere within the campus, including a proposed new multi-storey car park accessed off Lynchgate Road. However, other than the 17 spaces there will be no car parking dedicated solely to the NAIC development. An entrance track to the north-east of the site will lead to a service yard to the rear of the building. Within the service area a tyre store building and underground fuel storage tank and interceptor and water storage tanks are proposed. The existing vehicular access into Car Park 15 will be retained solely as a vehicular exit for fuel tankers. A secure cycle parking facility is proposed for 101 cycles to the west of the site within a covered bespoke shelter. The local planning authority have provided an Environmental Impact Assessment Screening Opinion and confirmed on 1st April 2014 that as the impacts of the development are localised an Environmental Statement is not required. Supporting Information In addition to a number of plans, a plethora of documents have been submitted to support the application and these are listed below:
5
Design and Access Statement Planning Statement Statement of Community Involvement Landscape Design and Access Statement Transport Assessment and Travel Plan Ecological Assessment Arboricultural Impact Assessment Historic Environment Desk-Based Assessment Flood Risk Assessment Noise Assessment Ground Conditions Preliminary Risk Assessment External Lighting Planning Statement Air Quality Assessment Ventilation and Extraction Statement Sustainability Statement Site Waste Management Plan Foul Sewage and Utilities Statement.
RELEVANT PLANNING HISTORY: The main application of relevance to the assessment of this application is the 2009 outline planning permission for a University Masterplan: 54044 Development for University purposes including construction of buildings for academic teaching, research, social and administrative uses, sports and cultural facilities, residential accommodation for staff, students and visitors, other ancillary facilities including for the purposes of energy generation, access improvements for pedestrians, cyclists and vehicular traffic including public transport services, car parking, site infrastructure including drainage and main services, hard and soft landscaping including structural planting (Outline application), Approved, 9th October 2009 The Masterplan was also approved by Warwick District Council under application reference W/07/1120. Zone 2 of the Masterplan (Central Campus East), in which the application site is located, allows 74,000 m² of development up to a maximum of 5 storeys in height, of which 36,300 m² can be utilised for ‘academic uses’. To date approximately 16,100 m² is either completed, under construction or at planning stage thus leaving approximately 20,000 m² of remaining capacity for academic uses, thus less than that currently proposed. As highlighted above, the site is an identified development site within the Masterplan. Other applications of particular relevance to this application and have been submitted concurrently/or at a similar time are listed below. The significance of the applications is that they provide car parking which will partly serve the NAIC development and also one of the applications is for altered access arrangements into Car Park 15 which is necessary as this development will
6
remove the surface park element of that development and thus remove access into the existing multi-storey car park. FUL/2014/1161 Erection of a multi-storey car park and surface car parking spaces, new roundabout on Lynchgate Road including improved pedestrian crossings, alterations to Lynchgate link road, new barrier controls, culvert, car park access, drainage, balancing pond, extension to existing shared footway/cycle path, lighting, landscaping and services, Pending (to be considered at the same Planning Committee as this application) FUL/2014/1162 Extension to Car park 1A including erection of additional car park decks, lowering of existing decks, access ramps, access alterations, reconfiguration of existing spaces, boundary treatment, landscaping and drainage, Pending RM/2014/1163 Submission of reserved matters (access, appearance, landscaping, layout, scale) for the extension of Car Park 2, alteration of fire access, relocation of access barrier and drainage pursuant to outline planning permission 54044 (Warwick University Masterplan) approved on 9th October 2009, Approved 9th June 2014 FUL/2014/1142 Car park 15 access alterations comprising new vehicular access and barrier controls, pedestrian footways, associated alterations to car park elevations, drainage and landscaping, Pending (to be considered at the same Planning Committee as this application) FUL/2014/1230 New and diverted underground services and related infrastructure, Pending RELEVANT PLANNING POLICIES: Coventry Development Plan 2001 (CDP) OS4 – Creating a more sustainable city OS6 – Change of land use OS9 – Access by disabled people EM2 – Air quality EM4 – Flood risk and development EM5 – Pollution protection strategy EM6 – Contaminated land EM8 – Light pollution EM9 – Waste strategy E1 – Overall economy and employment strategy E2 – Consolidating and strengthening the City’s employment base E3 – Diversification of the local economy E5 – Office development E6 – Principal employment sites BE2 – The principles of Urban Design BE15 – Archaeological sites BE20 – Landscape design and development BE21 – Safety and security
7
GE8 – Control over development in urban green space GE14 – Protection of landscape features GE15 – Designing new development to accommodate wildlife S10 – Catering outlets AM1 – An integrated, accessible and sustainable transport strategy AM9 – Pedestrians in new developments AM12 – Cycling in new developments AM22 – Road safety in new developments SCL9 – University of Warwick SPD ‘Delivering a more sustainable city’ National Planning Policy Framework (NPPF) and National Planning Policy Guidance The NPPF published in March 2012 replaced all previous national planning policy and sets out the Government’s planning policies for England and how these are expected to be applied. It sets out the Government’s requirements for the planning system only to the extent that is relevant, proportionate and necessary to do so. The NPPF promotes sustainable development and amongst other matters good design is recognised as a key aspect of this. CONSULTATION RESPONSES: No objections from:
West Midlands Fire Service CCC Urban Design CCC Public Health Health and Safety Executive
No objections subject to conditions/informatives from: Environment Agency – subject to a condition requiring conformity with
the Flood Risk Assessment and that floor levels shall be set 82.2m above Ordnance Datum (AOD). Comments also made relating to water quality and Sustainable Drainage
WCC Ecology – recommend conditions requiring a Combined Ecological and Landscaping Scheme with mitigation to ensure that there is no net loss to biodiversity and tree protection for mature trees. Informatives relating to lighting, invasive species, nesting birds and reptiles and amphibians
Severn Trent Water - subject to a standard drainage condition requiring detailed drainage plans for the disposal of surface water and foul water sewage
West Midlands Police – no objections although have provided detailed advice about designing out crime
CCC Local Highway Authority – no objections subject to conditions including a condition preventing occupation of the building until the proposed multi-storey car park (FUL/2014/1161) has been constructed and is available for use
8
CCC Environmental Protection – recommend conditions relating to external plant/extraction systems and gas protection measures. The applicant has satisfactorily responded to comments made by the officer.
CCC Conservation and Archaeology – recommend a condition to secure a programme of archaeological work to be carried out ahead of the development
CCC Landscape Design – The applicant has responded to comments largely to the satisfaction of the officer. Whilst generally praising the scheme criticism of the lack of planting around the lake
CCC Sustainability Services – recommend a condition requiring the applicant to provide evidence to verify the achievement of the BREEAM rating. Also requested an assessment of the predicted energy demand for the building with the method and source of the data used clearly stated; and details of the installed capacity and estimated output of renewable/low carbon energy options installed as part of the proposal
CCC Tree Preservation Officer – Does not directly object although does recommend retention of the category B trees in group G8 which should remain in their entirety. Recommend further details relating to replacement planting and tree protection.
Comments are awaited from:
CENTRO CCC Flood risk and drainage
Any comments received will be reported as a late item. No comments received from Warwick District Council although they were notified out of courtesy as the development does not directly affect or adjoin their administrative area. Prior to the submission of the application the applicants have engaged with the Local Planning Authority and Local Highway Authority together with community consultation with residents and Ward Councillors. The following engagement events have been held:
A Development Forum meeting on 16th September 2013, chaired by Cllr Blundell and attended by residents and local Councillors (approximately 50 attendees). The meeting provided an opportunity for the development proposals to be explained and the views of those attending to be discussed with the project team
A public exhibition held at Cannon Park Shopping Centre on 8th October 2013 where invitations were sent to around 1,000 residents, businesses and organisations within the surrounding area. Approximately 70 people attended and 21 feedback forms were received.
Consultation relating to new and extended car parks within the University campus which are required, in part, to support the NAIC development. This included a public exhibition on 26th March 2014 at Cannon Park Shopping Centre which also provided an update on NAIC. A further
9
Development Forum took place on 3rd April, again chaired by Cllr Blundell and attended by residents and local Councillors to present an update on NAIC and the proposed car park proposals.
Statements of Community Involvement submitted with this application and the car park applications provide full details of the results of the consultations. The Statement of Community Involvement submitted as part of this application highlights that feedback was generally supportive relating to the benefits of the development associated with increased access to highly skilled jobs, investment in the engineering and automotive industry and the sustainability of the building. The report identifies the main cause for concern being the perceived increase in levels of traffic generated by the proposals and issues over parking on local roads. The document suggests that ‘Pinchpoint’ improvements (more in the ‘Highways Considerations’ section) will provide advance mitigation for the traffic impacts that may arise as a result of the additional car parking. 25 neighbouring properties and the Cannon Park Community Association (CPCA) were sent letters notifying them of the proposed development on 10th April 2014 and local Ward Councillors were sent e-mails informing them of the application on the same date. 4 site notices were erected on street furniture around the perimeter of the site on 15th April 2014 and the application was advertised in the Coventry Telegraph on 1st May 2014. There have been 12 representations in opposition to the application and 1 representation in support. Included within the representations in opposition to the application are comments from CPCA. Comments in support:
Inspirational architecture which should be welcome in Coventry The CPCA endorses the NAIC project in principle and welcome the
prospect of a research centre employing 1,000 personnel (although owing to traffic/inadequate transport infrastructure request the application is refused)
Comments in opposition:
Loss of open/green space – eroding the open character of the campus and removing land suitable for recreational use
Impact on sunlight and daylight on adjoining properties within Viscount Centre 2
Concern over cars associated with NAIC will park within Viscount Centre 2 car park
Noise and disturbance to properties on adjoining land Access / egress to multi-storey car park via Lynchgate Link resulting in
increased traffic levels on an already busy road affecting access into Cannon Park housing estate
Cannon Park residents feel trapped in their housing estate and the roundabout will exacerbate issues as inbound vehicles will have priority; will cause gridlock within the Science Park
10
Inadequate infrastructure. Lack of capacity of nearby junctions and roundabouts particularly given the traffic from the Science Park and Tesco (with JLR using 270 spaces at Tesco car park as a Park and Ride)
Emergency service vehicles will struggle to reach an incident Additional traffic could adversely affect pedestrian and highway safety Concern Lynchgate Link will ultimately become a through route into the
University Concern that this application and the application for a multi-storey car
park off Lynchgate Road will not be considered at the same time The date of the traffic survey was not representative of usual traffic The barrier leading into the multi-storey car park will cause further
impacts upon local traffic flow Concern that consultations have been undertaken during the Easter
holidays CPCA recommend a satellite campus and that an immediate moratorium
be imposed on all further development in the locality until the infrastructure issue has been resolved
The development is contrary to the NPPF and development plan policies as over 90% of staff are expected to travel by car
Overly large, over-development of the site, out of scale with adjacent buildings, no scope for expansion
An industrial building is incompatible with neighbouring University House and the materials are out of character
Vehicular access is ill-considered, deficient and tortuous Any improvement in traffic flow from ‘Pinchpoint’ schemes is probably
only marginal Failure to look at traffic impacts in area comprehensively UoW has failed its obligation to provide Park & Ride facilities remove
from the campus Question the value to Coventry of the additional jobs when 2007
statistics indicate that only 20% of University staff lived in Coventry/Kenilworth.
A further objection has been received from Cllrs Blundell, Sawdon and Crookes specifically objecting “on the basis that it is outside of the master plan, overdevelopment and unacceptable to residents”. They have also criticised the timing of the application consultation period during the Easter break and also that they believe the development and car park applications should have been submitted as one comprehensive application. It has been agreed with local Ward Councillors that applications FUL/2014/1098, FUL/2014/1161 and FUL/2014/1142 will all be presented to and considered at the same Planning Committee.
11
APPRAISAL: The main issues in determining this application are: the Principle of Development including economic benefits; Design; Highway Considerations; Ecology and Impact on trees; and Sustainability. There are a number of other important considerations which will also be fully appraised. Principle of development Policy E1 of the CDP seeks to consolidate and strengthen the economic base of the City and maximise employment and skill levels within the City. Policy E2 also supports the modernisation and expansion of existing employers in Coventry. CDP policy E3 states that favourable consideration will be given to proposals which foster or reinforce clusters of expertise and production in which new technologies are developed and exploited. UoW and JLR are major employers in the City and this development will strengthen their impact on the City’s economy whilst providing significant employment opportunities. The NAIC will provide a collaborative approach to research and development and will have a focus on developing new technologies. The proposal can therefore be considered to be supported by these overarching employment policies. The application site partly lies within the University of Warwick Development Plan area (primarily the existing surface car park) as defined by the CDP. The remainder of the site is an allocated Principal Employment site referred to in CDP Policy E6 as an International/National Sector site known as ‘University of Warwick Science Park’. Such sites are reserved for employment uses and therefore the development, which will support approximately 1,060 jobs (of which 535 are existing staff located at UoW and University of Warwick Science Park), is supported by the policy. CDP policy SCL9 states that proposals directly associated with the growth of the University will be considered in relation to the University Development Plan as well as other relevant Plan policies. Although the site does not lie wholly within the University area, as defined by the CDP, it is considered that the University Masterplan, granted approval more recently in 2009, essentially supersedes that boundary. The applicant has stated that the on-going implementation of their Masterplan is required to support the UoW’s Vision 2015 which is to make the University a universally acknowledged world centre of higher education by 2015, firmly within the top 50 world universities. Even though it is inevitable that not every job will be taken by a Coventry resident, Officers consider that the significant additional job creation including a number of high skilled employment opportunities will have substantial economic benefits to the City whilst the state
12
of the art building with world leading processes will enhance the profile of UoW and the City of Coventry and therefore the development is welcomed. As indicated earlier in this report, full planning permission is required as the development exceeds the total permitted floorspace for ‘academic uses’ within this part of the University Campus. The site is however identified as a development site within the Masterplan and the development proposed accords with various principles of the Masterplan including building heights, landscaping and car parking limits. Therefore, subject to the detailed considerations elsewhere in this report, the proposal is acceptable in principle. Policy E5 states that proposals for the development or expansion of business offices will be subject to:
Compatibility with nearby uses; Accessibility by a choice of means of transport; and Compatibility with other Plan policies.
The policy also highlights that proposals will be encouraged within or immediately adjacent to the City Centre, the Major District Centres or sites which are or can be made highly accessible by public transport. Whilst the policy is not applicable for the part of the site which benefits from a Principal Employment Site allocation, this policy is relevant to the remainder of the site as the development includes offices. The site is surrounded by other University buildings and Science Park buildings and it is considered that a building to be used for research and development, engineering and academic purposes will be compatible with neighbouring uses. UoW campus is highly accessible by public transport with a number of regular services. The campus is also accessible by bicycle with an expanding cycle network around the area. The remainder of the report will demonstrate that the proposal is compatible with other Plan policies and for these reasons the proposal accords with CDP Policy E5. As the development includes a café, policy S10 of the CDP is relevant. This states that catering outlets should be located within defined Centres and employment areas and will generally be discouraged outside those locations. Proposals within defined centres and employment areas will be permitted provided that they would:
Be compatible with nearby uses; Not cause harmful cumulative impact due to the existence of any
existing or proposed outlet; and Be compatible with other Plan policies.
The site is within an employment area and a café use is compatible with nearby uses. There does not appear to be any other large cafes in the vicinity and therefore there will be no harmful cumulative impact. This report will demonstrate that the proposal accords with relevant development plan policies. Design / Landscaping Policy BE2 of the CDP requires development to be of good design, Policy BE20 promotes a good standard of landscape design and boundary treatment whilst
13
Policy AM9 encourages convenient and well-designed pedestrian routes. The NPPF further emphasises the importance of good design with paragraph 56 highlighting that good design is a key aspect of sustainable development and is indivisible from good planning. To support the application a detailed Design and Access Statement and a Landscape Design and Access Statement have been produced which set out the design rationale behind the development. The applicant has indicated that the building materials, including anodised aluminium, glass, brickwork and engineered timber, have been chosen to create a modern, high quality development and are also required to meet specific technical demands including the requirement to achieve BREEAM ‘Excellent’, to meeting required performance criteria (including maintenance, acoustic performance and fire performance) and to provide a flexible working environment. The proposed building design is visually interesting and will provide an attractive landmark building in a prominent location on University Road on the approach to the campus from Scarman Roundabout. The design of a three storey glazed façade to the front is attractive and will offer an active frontage. It relates well to neighbouring buildings in terms of scale, building line and its unique design whilst integrates into and enhances existing landscape features, such as the water course to the south of the site, as well as maintaining and improving existing pedestrian and cycle routes. Design features such as the precision engineered timber roof are visually attractive whilst the building will benefit from large roof lights to allow natural light, solar PV panels and solar control systems all of which are considered to be positive aspects of the design. Significant thought has been put into the hard and soft landscaping scheme and the incorporation of a number of water features will add visual interest as well as being beneficial for drainage and biodiversity. The café with outdoor seating area located in an attractive landscaped setting will bring vibrancy to the area. A new landscaped public meeting area is also proposed to the front of the site with outdoor seating, high quality hard and soft landscaping and water features all of which are welcomed and will create an attractive environment. The location of the service yard and access in areas less visible from busy pedestrian and vehicle routes is supported. External lighting is proposed to help create a welcoming and safe atmosphere during hours of darkness and the strategy aims to minimise light pollution. Subject to a condition relating to external lighting, the development is considered to accord with Policy EM8. Overall, the proposed design of the development is of high quality and relates well to existing buildings and landscaping and does not conflict with the Masterplan. Therefore, the proposal accords with Policies BE2, BE20 and AM9
14
of the CDP and the NPPF. The Council’s Urban Design and Landscape Design officers raise no objections. Conditions are recommended relating to detailed matters such as landscaping and sample materials. Highway considerations CDP policy AM1, in harmony with Policy OS4, recommends that developments are planned in accessible locations and it promotes the use of alternative modes of transport to the private car. Policy AM22 is concerned with highway safety. The NPPF supports the locating of developments where the need to travel will be minimised and supports development that facilitates the use of sustainable modes of transport. The application site is located within a sustainable location within the University campus. Over 265 buses arrive at the University on a daily basis via a number of services and a new bus interchange at the University is to be delivered in 2014/15. There is also a network of cycle routes around the campus, linking Coventry and Kenilworth via the University and there are generally good pedestrian routes from the site thus further encouraging the use of alternative modes of transport. The car parking spaces to be lost on Millburn Hill Road as a result of the development will be replaced with 11 standard car parking spaces and 3 publicly available disabled spaces. Regular deliveries to the site will be via a secure service yard to the rear of the building which is accessed off Millburn Hill Road with an exit for fuel tankers only onto Academic Road via an existing retained access (the existing access to Car Park 15). It is anticipated that there would be up to 10 HGV and 30 LGV arrivals per day. Refuse will be stored in dedicated rooms next to Millburn Hill Road and collection will be from Millburn Hill Road where vehicles can utilise the existing retained turning head. There will be two designated car parking spaces on Milburn Hill Road for couriers delivering to the building and two vehicle drop-off bays will be provided (one on University Road and one on Academic Road) providing 5 spaces. The proposal also includes an exceptional drop-off route from University Road to the front door of the development and there is no provision for parking or waiting in this area. 91 car parking spaces and 6 disabled spaces will be lost in Car Park 15 to accommodate the new building. Whilst no significant new car parking is provided within this application, additional car parking will be brought forward primarily under a separate application (FUL/2014/1161), although two further car park applications have also been submitted, and the detailed assessment of the highway impacts associated with the additional car parking is considered under the Transport Assessment for the car park application. All NAIC users will have the same parking availability and conditions of use as other users of the University and they will be able to use all car parks including nearby CP9, CP15 and CP16.
15
A further application (FUL/2014/1142) will be submitted for the relocation of the entrance to the existing Car Park 15 as the current surface car park and access will be lost owing to the NAIC proposal. All three applications will be considered at the same Planning Committee. The Transport Assessment (TA) and Travel Plan highlight the highways measures agreed within the Masterplan and the associated S106 Agreement which the University is working with CCC to deliver. It also provides detail on the ‘Pinchpoint’ funding bid success for a scheme known as the ‘University of Warwick and Westwood Business Park Congestion Relief Scheme’, which was approved for funding by Central Government in late 2013. The scheme is a partnership between CCC and UoW to undertake measures with the aim of reducing traffic congestion in this part of Coventry. The full details of which junctions are to be improved through the scheme is set out in the Transport Assessment and it is envisaged that these will be delivered by CCC in the financial year 2014/2015 with some works already underway. In an assessment of existing traffic conditions, the TA acknowledges that there are some issues of congestion on nearby roads although proposed improvement works as part of the Pinchpoint funding should improve this situation. It also notes that traffic flows during the peak period are lower now than they were in 2004. The TA indicates that there have been 11 recorded personal injury accidents within the area between 1st December 2008 and 30th November 2013, one of which being classed as serious. However, since the data was collected a fatal accident occurred in Lynchgate Road involving a pedestrian and a lorry and this is still under a Police investigation. The TA has assessed the Traffic Impacts of the NAIC development and this demonstrates that even with a robust assessment of additional traffic arising from the NAIC, the overall University traffic flows will be 5% and 10% below the 2007 levels of the AM and PM peaks respectively and will thus be below the targets set in the Masterplan S106 Agreement. The assessment indicates that whilst the trips generated by this development are not expected to breach the requirements of the S106 Agreement, it will be necessary to carry out junction assessments as part of the applications for additional car parking. In an assessment of car parking demand the TA indicates that car parking demand arising from the development will be significant because of the high level of single occupancy car drivers. However, it highlights that 535 members of the JLR/TMETC staff are already located at the University and its Science Park and therefore are already using the existing car parks. This leaves 460 new staff from JLR/TMETC to arrive at the University along with 65 UoW staff. After taking into consideration some backfilling of existing office space and Travel Plan targets together with JLR/TMETC improving the sustainable travel mode share of their staff, the TA arrives at a future parking demand of around 580 spaces. The Assessment further suggests that if JLR/TMETC staff begin to reflect the travel characteristic of the UoW staff (and evidence suggests that
16
they are committed to sustainable travel) then the car parking demand is likely to fall to around 480 spaces. It is envisaged that construction for the development will span a period of between 20-24 months and the applicant has indicated that this can be managed through a Construction Phase Traffic Management Plan. However, the report concludes that the level of vehicles to and from the site will not have a significant impact on the operation of the local road network. The TA highlights that the proposed additional car parking proposed under the application for a multi-storey car park (629 spaces) along with applications FUL/2014/1162 (131 spaces) and FUL/2014/1163 (32 spaces) will provide a total of 792 spaces. 430 spaces will have been lost since 2009 by the time this development will be constructed thus giving a net increase in parking spaces of +363, which is within the 442 allowed by the Masterplan permission and S106 Agreement. The Local Highway Authority have raised no objections to the proposal. The development will reduce vehicular traffic around the application site given the loss of the 97 spaces and additional traffic impacts as a result of other proposed car parks will be considered under those applications. As the NAIC development with the potential for over 1,000 employees has no dedicated car parking and will result in the loss of 97 existing car parking spaces it is imperative that additional car parking is provided and the TA has demonstrated that there is a need for a significant level of car parking to serve this development. Therefore, a condition is required to ensure that the multi-storey car park, under application FUL/2014/1161, is constructed and available for use by University staff prior to the first use of the NAIC. Overall, subject to relevant conditions including the provision of further off-site car parking prior to the opening of the NAIC, the proposed development is considered to be sustainable and would have an acceptable impact upon the highway network. Other conditions proposed include: no occupation of the building until car parking/servicing delivery areas shown on the plans have been provided; cycling parking; submission of a Parking Management Plan; submission of a Construction Management plan; and a condition relating to minor highway works. The development therefore accords with Policies AM1 and AM22 of the CDP together with the NPPF. CDP policy AM12 indicates that cycle parking must be provided in accordance with standards set out in SPD. The applicant has proposed 101 cycle parking spaces which is below the amount that SPD ‘Delivering a more sustainable City’ recommends. However, the cycle parking is to be of high quality where both wheels of bicycles can be locked and it is to be housed in a bespoke shelter and therefore in this instance the quality of the cycle parking means that officers are happy to relax the requirement. Notwithstanding this, officers have requested that the applicant seeks to provide some additional cycle parking and Committee will be updated on this matter verbally or through the late representations document.
17
Ecology and Impact on Green space and Trees Whilst the loss of a large area of green space with scattered trees and hedges is unfortunate, outline planning permission has already been granted for this site to be developed and the site has also been identified as a Principal Employment site in the CDP. Therefore, policy GE8 is not considered to be relevant in this instance and the loss of the green space is acceptable in principle. Policies GE14 seeks to protect important landscape features of value to the amenity or history of a locality including trees and hedgerows whilst Policy GE15 indicates that new development should design new development to accommodate wildlife. Chapter 11 of the NPPF is also concerned with conserving and enhancing the natural environment. An Ecological Assessment has been submitted which highlights that the amenity grassland covering much of the site is well maintained and therefore is limited in ecological value. The report finds that whilst there is green space and trees on the site, there is limited connectivity to the surrounding environment as the site is surrounded by University buildings. No evidence of Badger, Water Vole and amphibians including Great Crested Newts were found and it is unlikely that the existing site has the potential to support these species. However, scattered trees may provide limited foraging and commuting habitat and to ensure conditions on the site remain unsuitable for amphibians it is recommended that Reasonable Avoidance Measure (RAMs) are put in place throughout construction works. The scattered trees, scrub, and hedgerows also provide foraging and nesting opportunities for a range of relatively common bird species. Whilst a Local Nature Reserve (LNR), a Local Wildlife Site (LWS) and Ecosites are found within the desktop search area, these are considered to be of sufficient distance from the site not to be impacted by the development.
The Ecological Assessment also recommends that works to trees are undertaken outside of the nesting bird season and if that is not possible a qualified ecologist should carry out checks a maximum of 24 hours in advance of clearance works to ensure no nesting birds are present. WCC Ecologists have welcomed the broad intentions to create habitats and increase biodiversity. They have recommend that a Biodiversity Impact Assessment (BIA) is carried out to determine how much biodiversity loss or gain there will be from the proposed development. This will form part of a Combined Ecological and Landscaping Scheme and a condition is recommended to ensure that there is no net loss to biodiversity in accordance with NPPF and GE15. A condition is also recommended relating to tree protection measures for mature trees that will be retained whilst a number of
18
informatives are proposed relating to lighting, nesting birds, reptiles and amphibians and invasive species. In addition to the Ecological Assessment an Arboricultural Impact Assessment has been submitted. This highlights that there are no trees on site that are the subject of a Tree Preservation Order and that there are no ancient woodlands or veteran trees on site, as defined by the NPPF. None of the trees were noted as having features suitable to support roosting bats and due to the suitability of trees for nesting birds the same recommendation is made relating to birds as in the Ecological Assessment.
The majority of on-site trees are considered to be low to moderate value. A total of 2 individual trees, 5 tree groups and part of 4 further groups (totalling 80 trees) are proposed to be removed and these comprise a mixture of values. Of these trees, part of Group G8 (adjacent to Academic Road), a Category A group are proposed to be lost whilst T3, G4, G6 and Part of G14, all of which are Category B trees will also be felled. In addition to the loss of trees, approximately 72 metres of hedgerow and 100 metres of live Willow fence will also be removed. The Assessment highlights that the majority of trees require removal as they fall directly within the footprint of the new building whilst the removal of others is to provide adequate operational land around the building. It concludes that the greatest impact of the tree removal will be on visual amenity. Whilst the development proposes the partial loss of Group G8 (13 Field Maples and 1 Claret Ash) the report suggests that this group has a high value (‘A’ category) owing to good condition and amenity value, rather than maturity and as such it may be possible to mitigate for their loss with new planting. 9 young Red Oak trees (G13) are proposed to be transplanted elsewhere to the northern boundary of the site and the report considers that these are of an age and size that this option is possible. As with the Ecological Assessment the report proposes tree protection measures for retained trees and the details of the type and position of the fencing have been provided. The report concludes that whilst the development will result in a reduction in trees within the survey area, this can adequately be offset by new planting across the University campus.
The Council’s Tree Preservation Officer has recommended retention of Group G8 in their entirety and have indicated that they have no objections to the proposed hedgerow removals as these are young, non-established or decorative. Further details relating to tree protection and replacement planting are recommended. Whilst retention of valuable trees is important this must be
19
weighed against the significant economic benefits that the development brings. The concerns have been raised with the applicant and Committee will be updated on this matter and the recommendation of officers. Sustainability Sustainability is a key aspect of the NPPF whilst CDP Policy OS4 and SPD ‘Delivering a more sustainable city’ seek to encourage sustainable development. The ‘highways considerations’ section of the report also highlights how the development is located in a highly accessible location for a range of travel modes. The Sustainability Statement highlights a number of key sustainable design elements including:
Provision for waste and recycling storage onsite during both construction and operation
The harvesting of rainwater to reduce the building’s water consumption (for WC flushing)
The use of SUDS drainage principles to drain surface water and reduce the building’s surface water drainage output
The use of Combined Cooling Heat & Power (CCHP) to generate electricity (connection to UoW district heating scheme)
A target to achieve a BREEAM ‘Excellent’ rating High thermal performance insulation and windows High efficiency lighting including advanced lighting control including
daylight sensing and automatic dimming High efficiency boiler plant, cooling plant and other engineering services Monitoring of building energy usage through an Energy Management
System (EMS) In addition to these measures the development will house a significant amount of solar photovoltaics on the roof thus providing on site renewable energy. The Council’s Sustainability Services team have been consulted and whilst raising no objections have requested further information including a pre-assessment estimator for the BREEAM rating and also an assessment of the predicted annual energy demand for the building and details of the installed capacity and estimated output of renewable/low carbon energy options to be installed. They have also recommended a condition, in accordance with the SPD, requiring the applicant to provide evidence to verify the achievement of the BREEAM rating. A draft Site Waste Management Plan has been prepared to improve the environmental performance of the development and is to be used for ‘designing out waste’. The template sets out good practice but does not provide specific details relating to the project. Therefore, a condition is recommended requiring a detailed Site Waste Management Plan to be submitted to and approved by the Local Planning Authority to ensure conformity with Policy EM9 which relates to waste handling.
20
For the reasons above, sustainability appears to have been given adequate consideration as part of the development of the plans and therefore the proposal accords with the NPPF and relevant development plan policies. Flood Risk / Drainage CDP policy EM4 states that development should be designed and located to minimise the risk of flooding to maximise the absorption of surface run-off by the ground. The NPPF also provides detailed guidance on flood risk and drainage. The Westwood Brook, a tributary of the Canley Brook flows through the site as both an open channel and within culverts. The site is currently served by existing surface and foul water sewerage infrastructure which is privately owned, operated and maintained by UoW. The Flood Risk Assessment (FRA) submitted as part of the application correctly identifies the site as being entirely within Flood Zone 1 and therefore the site is at low risk of fluvial flooding. Given this location, development on the site is in accordance with the principles laid out in the NPPF and as such the Sequential Test is satisfied and the Exception Test is not required. Although the site is within Flood Zone 1, fluvial analysis has been undertaken of the Westwood Brook to determine the potential extent of flooding from the 100 year flood event. The data has confirmed that the NAIC site is at low risk of fluvial flooding and that the impact of a 50% blockage of the Westwood Brook culvert would not pose a significant risk to the NAIC site owing to local topography and overland flow paths of the area encouraging water to flow to the south-east, away from the site. The report confirms that the bedrock underlying the site is a Principal Aquifer, meaning that the bedrock has the potential of containing large quantities of water. Ground investigation data has been collected and this generally encountered ground water levels between 3m to 4m below ground level. However, an artesian aquifer was encountered approximately 10m below ground level. The report finds that although groundwater is present in underlying strata (particularly the bedrock), the material nearer the surface has poorer water bearing potential, as indicated by the low rates of infiltration measures on site. Consequently groundwater will not be flood risk consideration to the majority of the site. However, the FRA indicates that excavations should mitigate against encounters from 3m and the artesian aquifer approximately 10m below existing ground level. The applicant has considered de-culverting and this has been discounted for a variety of reasons. However, the development proposes to introduce new surface water infrastructure and the FRA indicates that a surface water management strategy has been developed based on contemporary sustainable drainage principles.
21
The Environment Agency have confirmed that they have had extensive pre-application discussions with the applicant in relation to the development and the associated modelling of the local watercourse. They have approved the modelling and the appropriate finished floor level as part of that process. A condition is therefore recommended requiring the development to be carried out in accordance with the details contained within the Flood Risk Assessment submitted as part of the application and that the finished floor levels shall be set no lower than 82.2m above Ordnance Datum (AOD). Further advice has been requested from the Environment Agency surrounding the issue of below ground excavations to see if any further conditions are required relating to these. No comments have been made by CCC Flood Risk and Drainage team. Severn Trent Water have recommended a standard drainage condition requiring detailed drainage plans for the disposal of surface water and foul water sewage. Overall, the development appears to be at low risk of flooding and the surface water infrastructure proposed including sustainable drainage principles are welcomed and will assist in minimising the potential for flooding. The application therefore is consistent with the aims of the NPPF and CDP policy EM4. Impact on neighbouring amenity / Noise Paragraph 17 of the NPPF seeks to protect the amenities of all existing and future occupants of land and buildings. Policy EM5 of the CDP seeks to minimise pollution including pollution through noise. The nearest residential property is located around 240m away from the application site and therefore it is considered, given the size and scale of the building, that there would be no harm to the amenities of residents through a loss of privacy, overshadowing or overbearing effects. Whilst the development will be located near to Viscount Centre (to the north of the site), given the separation between the buildings is around 23m and both are commercial premises in the ownership of UoW, this is considered acceptable. The Noise Assessment found that the dominant noise source during daytime hours was road traffic from University Road whilst the dominant noise source during night-time was found to be predominantly from the plant located at the nearby University Boiler House. The assessment identifies internal ambient noise requirements whilst also stating that all facades will require a minimum glazing (glazing and frame) performance of Rw+Ctr 30dB and the building is to be mechanically ventilated throughout. Plant noise limits for the nearest noise receptors are set out in the report and further recommendations are made about hours of work, noise and vibration best practice during construction works.
22
CCC Environmental Protection have confirmed that the noise report is acceptable and that they agree with the glazing specifications set out in the report and the design levels for external plant. They also do not consider noise emanating from the building to be significant enough to impact upon any residential properties. Subject to these conditions the proposal is acceptable in terms of its impact upon neighbouring amenity and therefore it accords with Policy EM5 and the NPPF. Heritage Assets CDP policy BE15 relates to archaeological remains and Section 12 of the NPPF is also concerned with protecting heritage assets. An Historic Environment Desk-Based Assessment accompanies the application indicating that the site is within an area of multi-period archaeological activity and that there are no listed buildings on or adjacent to the site. The report highlights that with the exception of the surface car park, the site remains undeveloped within the limits of a previously enclosed post-medieval field boundary. Therefore, the potential for below-ground archaeological deposits is high and as such the report recommends that further archaeological investigations should be undertaken with trial trenching of 4% of the undeveloped areas of the site. The Council’s Conservation & Archaeology officer agrees with the conclusions of the report and recommends a condition to secure a programme of archaeological work to be carried out ahead of construction works. Subject to this condition, the development will have an acceptable impact upon heritage assets and potential archaeology and therefore the development accords with CDP policy BE15 together with the NPPF. Contaminated Land In harmony with guidance contained within the NPPF, CDP Policy EM6 states that development on or adjacent to contaminated land will be permitted only if any measures for remediation and protection required to ensure the health and protection required to ensure the health and safety of the development proposed and its users are identified and implemented. Policy EM5 also is concerned with pollution. A Ground Conditions Preliminary Risk Assessment has been undertaken including historic mapping dating back to 1885 which indicates very little development within the area until mid-1950s when the City expanded and the Teacher Training College was constructed to the north of the site. The main University campus began development on previously greenfield land with further expansion taking place during the late 20th century and into the 21st century. The report identifies the application site as greenfield land except for the surface car park.
23
Results from soil and water samples found no evidence of ground contamination, with all determinants being significantly below the commercial Generic Acceptance Criteria (GACs). It highlights that the risk of contamination from the existing car park would be very minimal as interceptors and drainage capture design features are likely to be present. Whilst the assessment identifies potential contamination from leaks and spills from storage of paint spraying materials and handling and operational activities of the NAIC, it suggests that mitigation measures to reduce the impact of any pollution incident such as accidental spills and leaks would be included within the building design. Gas monitoring was undertaken as part of the assessment and whilst this was found to be of low risk, high levels of methane were found. Given that there is no clear source for the gas, the report recommends that the gas risk is mitigated by providing a sealed and taped gas membrane beneath the reinforced ground slab for the development. The report concludes that there is very little evidence to suggest the presence of significant soil or groundwater contamination beneath the site. The Council’s Environmental Protection team concur with the results of the contaminated land survey and agree that no further investigation is required. They also agree that standard gas protection measures should be incorporated into the building design given the elevated and unusual levels of methane recorded. Therefore, a condition is recommended relating to this matter and the proposal is considered to accord with Policies EM5 and EM6 of the CDP and the NPPF. Air Quality CDP policy EM5 relates to the control of pollution whilst policy EM2 specifically states that where likely damage to air quality cannot be satisfactorily mitigated, development will not be permitted. Paragraph 124 of the NPPF also seeks to protect air quality. An Air Quality Assessment has been submitted and considers airborne pollutants in the atmosphere and sets out mitigation measures. The report concludes that there is likely to be a low risk for significant effects of dust soiling and human health from the dust-generating activities on site. It also highlights that air quality impacts from traffic has already been assessed within the Masterplan application and as the total number of car parking spaces at the University, after proposed car parking is implemented, is within the allowable threshold of that application, traffic associated with the development is considered to be acceptable in terms of air quality impact. The report also concludes that other emission sources from the processes used within the building are not expected to have a significant impact on local air quality. Various mitigation measures are set out in Section 9 of the report relating to construction works. It also recommends that a central extraction system is
24
applied throughout the building in order to remove emissions from the testing facilities and highlights that the stack should be located at least 1m above the roof level of the building. CCC Environmental Protection have confirmed that the report is acceptable and recommend that the mitigation techniques to minimise dust emissions from the construction phase are adopted into a construction management plan. Therefore, subject to this condition and a further condition relating to extraction equipment, the proposal is considered acceptable in terms of air quality and thus accords with Policy EM2 and paragraph 124 of the NPPF. Health implications The NPPF indicates that health is a material planning consideration. Education can improve the life chances and opportunities of people in terms of access to employment and to improve people’s sense of self-worth. Education can also help to reduce poverty as a result of increased skills level and employability. Therefore, enhanced education provision is supported in principle. The commitment of the University to embracing sustainable and active travel through their Travel Plan is welcome and has a positive impact upon health. It is considered that the provision of cycle parking and associated facilities (including showers, changing facilities and lockers) within the building will encourage the use of sustainable transport as does the location of the development within an established campus at the heart of a network of cycle routes. Whilst car parking is provided within the University campus a lack of dedicated car parking for this development will further encourage alternative travel methods including walking and cycling. These modes of travel have clear health benefits and therefore the development can be considered to have a neutral or potentially a positive impact upon health. CCC Public Health team has raised no objections to the proposed development on health grounds. Other considerations The Utilities Planning Statement highlights that a number of below ground services will need to be diverted and a series of new utility connections will be required for the construction of the new building. These include electricity, telecommunications, gas, water, district heating and surface and foul water drainage connections. A separate application reference FUL/2014/1320 has been submitted to deal with these matters. However, it should be noted that laying of or altering most of the services do not ordinarily require planning permission and only do in this instance because UoW intend to carry out the works themselves rather than the relevant Statutory Undertakers. West Midlands Police have raised no objections to the application and the Crime Prevention Design Advisor (CPDA) met with the applicant prior to the submission of the application to consider ways of designing out crime. It is likely that the two parties will meet again to look at detailed proposals.
25
CONCLUSION / REASON FOR APPROVAL The application is considered acceptable in principle and the significant employment generated by the development is welcomed. The design of the building is visually interesting and is complemented by good quality landscape design. The development is acceptable in terms of highway considerations subject to a condition linking the development to the construction of a proposed multi-storey car park. The proposal is acceptable in all other respects as appraised in detail above. The reason for Coventry City Council granting planning permission is because the development is in accordance with: Policies OS4, OS6, OS9, EM2, EM4, EM5, EM6, EM8, EM9, E1, E2, E3, E5, E6, E8, BE2, BE15, BE20, BE21, GE8, GE14, GE15, S10, AM1, AM9, AM12, AM22 and SCL9 of the Coventry Development Plan 2001 together with the aims of SPD ‘Delivering a more sustainable city’ and the NPPF. SCHEDULE OF CONDITIONS Condition(s) A full list of conditions will be circulated to Committee prior to the meeting. LIST OF BACKGROUND PAPERS PROPER OFFICER: Group Manager Planning and Building Control Author: Andrew Cornfoot ALL BACKGROUND PAPERS OPEN TO PUBLIC INSPECTION at City Services & Development Directorate, Civic Centre 4, Much Park Street and www.coventry.gov.uk Planning Application File: FUL/2014/1098 Coventry Development Plan 2001
CHECKEDSTATUS
REVISION
DRAWN
SCALE
DRAWING TITLE
DRAWING NUMBER
PROJECT TITLE
DATE DETAIL CHKDRNREV
DATE
NOTES:
@A1
@A3
SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION:
NOTE THE FOLLOWING:OF WORK DETAILED ON THIS DRAWING, NORMALLY ASSOCIATED WITH THE TYPES IN ADDITION TO THE HAZARDS / RISKS
Significant Residual Risks:
Action to be Taken:
Refer to Health and Safety Plan
5 BALDWIN TERRACE LONDON N1 7RU TEL: 020 7704 1975
PROJECT EMAIL:
© EDWARD CULLINAN ARCHITECTS LTD 2012
KIR
BY C
OR
NE
R R
OA
D
80.6
3
LM PI
20/03/2014
National Automotive Innovation CentreWarwick Manufacturing Group
P1 20/03/2014 LM PI
PLANNING
CAR PARK 15
CAR PARK 16 CAR PARK 11
CAR PARK 9
IMC
IDL
IIPSI
BUILDING
ZEEMAN
SCIENCES
PHYSICALENGINEERING
HUMANITIES
LIBRARY
UNIVERSITY ROAD
LIB
RA
RY R
OA
D
HOUSE
UNIVERSITY
HOUSEMILBURN
SCIENCE PARK
IARC
P1
LOCATION PLAN
NAIC_P_001
Issued for planning
redline: 25,035m2area within
NAICfor the
Proposed Site
IINM
1:1250
SCIENCE
COMPUTER
1:2500
SQUARE
ACADEMIC
CAR PARK 8 CAR PARK 8a
BP ARCHIVE
CENTRE &
MODERN RECORDS
CHAPLAINCY
SCIENCES
WBS SOCIAL
SCIENCES
SOCIAL
CHEMISTRY
BUILDING
RAMPHAL
PHYSICSCAR PARK 10
CAR PARK 10a
CAR PARK 10b
RECEPTION
WBS MAIN
SCARMAN
HALL
GAMES
ARDEN
BUILDINGMANAGEMENT ENGINEERING
& DAROCOUNSELLING
CLAYCROFT
CAR PARK 17
CAR PARK 12
STOP
BUSS
CA
RM
AN R
OA
D
GIBBET HILL
KIR
BY C
OR
NE
R R
OA
D
AC
AD
EMIC
RO
AD
MIL
LB
UR
N HIL
L R
OA
D
NO
RTH
MIL
BU
RN HIL
L R
OA
D
CHECKEDSTATUS
REVISION
DRAWN
SCALE
DRAWING TITLE
DRAWING NUMBER
PROJECT TITLE
DATE DETAIL CHKDRNREV
DATE
NOTES:
@A0
SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION:
NOTE THE FOLLOWING:OF WORK DETAILED ON THIS DRAWING, NORMALLY ASSOCIATED WITH THE TYPES IN ADDITION TO THE HAZARDS / RISKS
Significant Residual Risks:
Action to be Taken:
Refer to Health and Safety Plan
5 BALDWIN TERRACE LONDON N1 7RU TEL: 020 7704 1975
PROJECT EMAIL:
© EDWARD CULLINAN ARCHITECTS LTD 2013
@A3
80.6
3
79.89
DU
CTS
4X E
MP
TY
27,000L bulk store (6298mm x ø2500) 10,000L interceptor(Approx. 2333mm x ø2500)
10,000L water tank(Approx. 2333mm x ø2500)
Vent pipe
http://www.argos.co.uk/static/Product/partNumb
er/9077027.htm
1 2
1 2 3 4 5 6 7 8 9 10
11
12
3
12345678910
1 2 3 4 5 6 7 8 9 10
11
12
3
12345678910
1 2 3 4 5 6 7
123456
12
34
12
34
1 2 3 4 5 6 7
123456
123
12
34
56
78
910
12
34
56
78
12
12345678910
11
12
3
1 2 3 4 5 6 7 8 9 10
Ammendments to original drawing
Drive-In Sim Control
32.21 sq m
00-HB-023
JLR VR
415.16 sq m
00-HB-032
Drive-In Sim
95.49 Sq m
00-HB-022
TMETC VR
161.70 sq m
00-HB-031
Milling
252.03 sq m
00-ES-026 Wood Mill
114.74 sq m
00-ES-027a
Paintshop
326.00 sq m
00-ES-027
JLR Clay Store
72.96 sq m
00-HB-030
JLR 3D Print Room
15.05 sq m
00-OF-001a
Teapoint
29.17 sq m
00-OF-006
JLR Research Office
479.06 sq m
00-OF-009
Store
76.76 sq m
00-HB-024
Loading/Goods Receiving
54.24 sq m
00-ES-007
TMETC Electrical Lab
82.01 sq m
00-HB-027
Breakout
31.36 sq m
00-ES-002
Engineering Hall
1555.69 sq m
00-ES-001
Store
56.06 sq m
00-HB-033
TMETC VIL Control
63.32 sq m
00-ES-017
TMETC Vehicle Integration Lab
106.08 sq m
00-ES-012
TMETC Battery Module Lab
51.17 sq m
00-HB-028
TMETC Infotainment
57.38 sq m
00-ES-011
JLR Quiet Room
72.07 sq m
00-ES-010 JLR Charging Lab
57.38 sq m
00-ES-014
JLR Thermo Fluids Lab
116.63 sq m
00-ES-013
JLR Electrical Development Lab
108.38 sq m
00-HB-026
Store
22.69 sq m
00-ES-003
Store
137.28 sq m
00-ES-004
Local Storage
7.23 sq m
00-ES-016
Store
56.52 sq m
00-ES-005
Goods Movement Zone
428.43 sq m
00-ES-006
Goods Check-in
12.91 sq m
00-ES-022
Reception
300.02 sq m
00-HB-002
Café
367.49 sq m
00-HB-005
Café WC
2.42 sq m
00-HB-009
Café back of House
88.35 sq m
00-HB-006
Café store
5.29 sq m
00-HB-007
Café WC lobby
1.03 sq m
00-HB-008 Café Refuse
9.79 sq m
00-HB-007a
Facility manager
55.33 Sq m
00-HB-020
Col. Meeting Room 1
31.26 Sq m
00-HB-021
Collaborative Hub
380.12 sq m
00-HB-034
JLR Research Office
283.56 sq m
00-OF-001
Stair 4
25.08 sq m
00-ES-021
Corridor
26.67 sq m
00-ES-020
Stair 4 Lobby
11.32 sq m
00-ES-020a
Stair 3
40.76 sq m
00-ES-029
Corridor
13.00 sq m
00-HB-019
Stair 1
21.13 sq m
00-HB-004
Corridor
18.39 sq m
00-HB-025
Stair 2 Lobby
14.63 sq m
00-OF-004
Stair 3 Lobby
14.62 sq m
00-ES-028
Corridor
43.27 sq m
00-ES-008
VR Movement Zone
60.47 sq m
00-HB-032a
Stair 1 Lobby
7.62 sq m
00-HB-003
Stair 2
40.33 sq m
00-OF-005
Corridor
6.17 sq m
00-ES-024
Corridor
33.66 sq m
00-HB-011
Corridor
15.30 sq m
00-OF-007
Corridor
16.45 sq m
00-HB-029
Disabled WC
3.75 sq m
00-HB-018
Female Showers
12.10 sq m
00-ES-009c
Recycling Store
26.49 sq m
00-OF-008
Cleaners Store
5.64 sq m
00_ES_028a
Showers Lobby
8.86 sq m
00-ES-009a
Cleaners Store
3.87 sq m
00-HB-015
WC
3.50 sq m
00-HB-016
Cleaners Store
4.74 sq m
00-HB-014 Male WCs
9.27 sq m
00-HB-012
Female WCs
11.08 sq m
00-HB-013
Diasabled Shower
7.59 sq m
00-ES-009b
WC
2.77 sq m
00-ES-009d
Sub Equipment Room 1
16.15 sq m
00-HB-010
Disabled WC
3.12 sq m
00-HB-012a
WCs
32.16 sq m
00-OF-002 Cleaners Store
5.15 sq m
00-OF-003
Male Showers
32.96 sq m
00-ES-009
Refuse Store
10.59 sq m
00-OF-010
Sub Equipment Room 2
18.37 sq m
00-ES-025
Lift Motor Room
15.78 sq m
00-ES-023
WC
3.50 sq m
00-HB-017
HV/LV Switchroom 1
116.33 sq m
00-ES-018
Service Yard
2562.94 sq m
00-XS-001
External Terrace
164.34 sq m
00-XS-002
Cold Water Storage Plant
48.81 sq m
00-DW-023
HV Intake
31.91 sq m
00-DW-027
Gas Intake
15.20 Sq m
00-DW-026
Stair 5
20.64 sq m
00-DW-031
Corridor
11.34 sq m
00-DW-030
Cleaners Store
2.57 sq m
00-DW-012a
WCs
30.69 sq m
00-DW-012
WMG Student Projects
277.23 sq m
00-DW-028
WMG Project Tools
23.53 sq m
00-DW-029
JLR Dyno 2
48.00 sq m
00-DW-011
JLR Brake Dyno
40.00 sq m
00-DW-017
JLR Low Emission 1
27.26 sq m
00-DW-033a
JLR Dyno 3 Barrel Store
5.80 sq m
00-DW-033b
JLR Low Emission 2
23.20 sq m
00-DW-033c
JLR Barrel Store 2
11.60 sq m
00-DW-033d
JLR Barrel Store 1
11.60 sq m
00-DW-036
JLR Fuelling Area
42.17 sq m
00-DW-022
JLR E-Dyno 1
34.72 sq m
00-DW-004
JLR Dyno 3
40.00 sq m
00-DW-018
JLR E-Dyno 2
34.72 sq m
00-DW-005 JLR Soak
247.76 sq m
00-DW-021
JLR Chassis Dyno
81.65 sq m
00-DW-020 JLR Dyno 1
48.00 sq m
00-DW-009
TMETC Gas Bottle Store
13.05 sq m
00-DW-035
TMETC Dyno 2
44.00 sq m
00-DW-008
TMETC Vehicle Bay
33.00 sq m
00-DW-007
TMETC Dyno 1
44.00 sq m
00-DW-006
TMETC Engine PSB
98.70 sq m
00-DW-001
TMETC Barrel Store
5.80 sq m
00-DW-034
Paint Store
15.21 sq m
00-DW-033
Breakout
36.25 sq m
00-DW-013
Control Corridor 2
20.97 sq m
00-DW-003a
Control Corridor 1
183.48 sq m
00-DW-003
Dyno access corridor
44.63 sq m
00-DW-001a
Dyno Local Store
16.61 sq m
00-DW-015
Emergency Shower
3.37 sq m
00-DW-014
Workshop 1
47.56 sq m
00-DW-002
Workshop 2
124.69 sq m
00-DW-002 a
Instrument Room
48.00 sq m
00-DW-019
Instrument Room
48.00 sq m
00-DW-010
E-Machines Lab
48.12 sq m
00-DW-016
Forklift Accessway
277.32 sq m
00-DW-032
Stair 6
17.60 sq m
00-DW-024
Exhibtion Store
9523279.13 Sq mm
00-HB-001a
Exhibition
708.06 sq m
00-HB-001
1:500
PI
20/03/2014
National Automotive Innovation CentreWarwick Manufacturing Group
P1 20/03/2014 PI
PLANNING
NAIC
CAR PARK 15
CAR PARK 16
CAR PARK 11
CAR PARK 9
IMC
IDL
IIPSI
BUILDINGZEEMAN
SquareAcademic
SCIENCECOMPUTER
SCIENCESPHYSICAL
ENGINEERING
HUMANITIES
LIBRARY
UNIVERSITY ROAD
LIB
RA
RY R
OA
D
HOUSEUNIVERSITY
HOUSEMILBURN
SCIENCE PARK
IARC
P3
Bulk Fuel Store
YardService
StoreTyre
Service Entrance & Exit
Tanker Exit Only
EntranceMain
LM
NAIC_P_002
SITE PLAN
Planning Issue LM
of separate planning applicationNew entrance to car park subject
IINM
NO
RTH
MIL
LB
UR
N HIL
L R
OA
D
ACADEMIC R
OAD
Bicycle Shelter
mobile catering outletLocation for future
NTS
spacesparking 3 disabled
P2 09/04/2014 PIAAalabeledPlanning Issue - Disabled parking
P3 24/04/2014 PIPlanning Issue - Dimensions labeled MA
12.478m
16701
23.88m77.4m118.4
m
163.7m
7.73m
35.3
m
approx 43.89m
appro
x 8.99m
3.48m
CHECKEDSTATUS
REVISION
DRAWN
SCALE
DRAWING TITLE
DRAWING NUMBER
PROJECT TITLE
DATE DETAIL CHKDRNREV
DATE
NOTES:
@A0
SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION:
NOTE THE FOLLOWING:OF WORK DETAILED ON THIS DRAWING, NORMALLY ASSOCIATED WITH THE TYPES IN ADDITION TO THE HAZARDS / RISKS
Significant Residual Risks:
Action to be Taken:
Refer to Health and Safety Plan
5 BALDWIN TERRACE LONDON N1 7RU TEL: 020 7704 1975
PROJECT EMAIL:
© EDWARD CULLINAN ARCHITECTS LTD 2013
@A3
GHJKLMNOPQR
ABCDEFGHJKLM
SERVICE YARD ENTRANCE PAINTSHOP/MILLING REAR ENTRANCE OFFICE
OFFICE OFFICE CAFE
TERRACE
CAFE
1:100
1:200
MA LM
National Automotive Innovation CentreWarwick Manufacturing Group
NAIC_P_013
Planning
P1
KEY
P1 MA LM
20/03/2014
North West Elevation
20/03/2014 Planning Issue
Glazing
U-Channel Glazing
Glazed bricks
Grey Brick
Louvred Panels
Mesh Solar CladdingLarge Format Curved
Curved metal cladding panels
PlantPlant
Process Extracts
Process Extracts Plant
Plant
Process extract
Roof terrace
Viewing Garden
+95.100 AOD
+82.500 AOD
+86.700 AOD
+90.900 AOD
+95.100 AOD
+82.500 AOD
+86.700 AOD
+90.900 AOD
CHECKEDSTATUS
REVISION
DRAWN
SCALE
DRAWING TITLE
DRAWING NUMBER
PROJECT TITLE
DATE DETAIL CHKDRNREV
DATE
NOTES:
@A0
SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION:
NOTE THE FOLLOWING:OF WORK DETAILED ON THIS DRAWING, NORMALLY ASSOCIATED WITH THE TYPES IN ADDITION TO THE HAZARDS / RISKS
Significant Residual Risks:
Action to be Taken:
Refer to Health and Safety Plan
5 BALDWIN TERRACE LONDON N1 7RU TEL: 020 7704 1975
PROJECT EMAIL:
© EDWARD CULLINAN ARCHITECTS LTD 2013
@A3
1213141516171819202122
101112
123456789101112
1213141516171819202122
EMERGENCY EXIT FROM SERVICE YARD
FUEL/BOTTLE STORES
PAINTSHOP/MILLINGENGINEERING LABS FIRE ESCAPE
ACADEMIC ROAD
MILBURN HILL ROAD
1:100
1:200
MA LM
National Automotive Innovation CentreWarwick Manufacturing Group
NAIC_P_012
Planning
P1
KEY
P1 MA LM
20/03/2014
North East Elevation
20/03/2014 Planning Issue
Glazing
U-Channel Glazing
Glazed bricks
Grey Brick
Louvred Panels
Mesh Solar CladdingLarge Format Curved
Curved metal cladding panels
Carpark 15 shown dashed
Screening to plant terraceProcess extracts
Process extracts
Process extracts Plant
Plant
Process extracts
Plant
+95.100 AOD
+82.500 AOD
+86.700 AOD
+90.900 AOD
+95.100 AOD
+82.500 AOD
+86.700 AOD
+90.900 AOD
CHECKEDSTATUS
REVISION
DRAWN
SCALE
DRAWING TITLE
DRAWING NUMBER
PROJECT TITLE
DATE DETAIL CHKDRNREV
DATE
NOTES:
@A0
SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION:
NOTE THE FOLLOWING:OF WORK DETAILED ON THIS DRAWING, NORMALLY ASSOCIATED WITH THE TYPES IN ADDITION TO THE HAZARDS / RISKS
Significant Residual Risks:
Action to be Taken:
Refer to Health and Safety Plan
5 BALDWIN TERRACE LONDON N1 7RU TEL: 020 7704 1975
PROJECT EMAIL:
© EDWARD CULLINAN ARCHITECTS LTD 2013
@A3
H J K L M N O P Q R
A B C D E F G
H J K LUNIVERSITY ROAD SOAKSERVICE YARDEMERGENCY EXIT
ENGINEERING HALL ENGINEERING ENTRANCE TYRE STORE
SERVICE ENTRANCE ROAD
1:100
1:200
MA LM
National Automotive Innovation CentreWarwick Manufacturing Group
NAIC_P_011
Planning
P1
KEY
P1 MA LM
20/03/2014
South East Elevation
20/03/2014 Planning Issue
Glazing
U-Channel Glazing
Glazed bricks
Grey Brick
Louvred Panels
Mesh Solar CladdingLarge Format Curved
Curved metal cladding panels
CARPARK 15 SHOWN DASHED
CARPARK 15 SHOWN DASHED
Process equipment extracts
Process equipment extracts Plant
Plant
Plant
Process equipment extract
+95.100 AOD
+82.500 AOD
+86.700 AOD
+90.900 AOD
+95.100 AOD
+82.500 AOD
+86.700 AOD
+90.900 AOD
CHECKEDSTATUS
REVISION
DRAWN
SCALE
DRAWING TITLE
DRAWING NUMBER
PROJECT TITLE
DATE DETAIL CHKDRNREV
DATE
NOTES:
@A0
SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION:
NOTE THE FOLLOWING:OF WORK DETAILED ON THIS DRAWING, NORMALLY ASSOCIATED WITH THE TYPES IN ADDITION TO THE HAZARDS / RISKS
Significant Residual Risks:
Action to be Taken:
Refer to Health and Safety Plan
5 BALDWIN TERRACE LONDON N1 7RU TEL: 020 7704 1975
PROJECT EMAIL:
© EDWARD CULLINAN ARCHITECTS LTD 2013
@A3
1 2 3 4 5 6 7 8 9 10 11 12
12 13 14 15 16 17 18 19 20 21 22
CAFEMILBURN HILL ROAD MAIN ENTRANCE EXHIBITION
STUDENT PROJECTS SOAKEXHIBITION ACADEMIC ROAD
1:100
1:200
MA LM
National Automotive Innovation CentreWarwick Manufacturing Group
NAIC_P_010
Planning
P1
KEY
P1 MA LM
Glazing
U-Channel Glazing
Glazed bricks
20/03/2014
South West Elevation
20/03/2014 Planning Issue
Grey Brick
Louvred Panels
Mesh Solar CladdingLarge Format Curved
Curved metal cladding panels
main entrance door
Roof Terrace
Roof Terrace
+95.100 AOD
+82.500 AOD
+86.700 AOD
+90.900 AOD
+95.100 AOD
+82.500 AOD
+86.700 AOD
+90.900 AOD
CHECKEDSTATUS
REVISION
DRAWN
SCALE
DRAWING TITLE
DRAWING NUMBER
PROJECT TITLE
DATE DETAIL CHKDRNREV
DATE
NOTES:
@A0
SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION:
NOTE THE FOLLOWING:OF WORK DETAILED ON THIS DRAWING, NORMALLY ASSOCIATED WITH THE TYPES IN ADDITION TO THE HAZARDS / RISKS
Significant Residual Risks:
Action to be Taken:
Refer to Health and Safety Plan
5 BALDWIN TERRACE LONDON N1 7RU TEL: 020 7704 1975
PROJECT EMAIL:
© EDWARD CULLINAN ARCHITECTS LTD 2013
@A3
DU
CTS
4X E
MP
TY
22,500L bulk store (5348mm x ø2500)
27,000L bulk store (6298mm x ø2500)Approx. 28,960L or 34,750L interceptor(Approx. 6000mm x ø2500 or 7000mm x ø2500 )
Instrument Room
48.00 Sq m
00-DW-019
JLR Dyno 3
40.00 Sq m
00-DW-018
JLR Brake Dyno
40.00 Sq m
00-DW-017
JLR Dyno 2
48.00 Sq m
00-DW-011
Instrument Room
48.00 Sq m
00-DW-010
JLR Dyno 1
48.00 Sq m
00-DW-009
Corridor
11.34 Sq m
00-DW-030
TMETC Dyno 2
44.00 Sq m
00-DW-008
TMETC Dyno 1
44.00 Sq m
00-DW-006
TMETC Vehicle Bay
33.00 Sq m
00-DW-007
Breakout
36.25 Sq m
00-DW-013
Dyno Local Store
16.61 Sq m
00-DW-015
E-Machines Lab
48.12 Sq m
00-DW-016
JLR E-Dyno 1
34.72 Sq m
00-DW-004
Control Corridor 2
20.97 Sq m
00-DW-003a
JLR E-Dyno 2
34.72 Sq m
00-DW-005
Cold Water Storage Plant
48.81 Sq m
00-DW-023WMG Project Tools
23.53 Sq m
00-DW-029
Workshop 2
124.69 sq m
00-DW-002 a
TMETC Engine PSB
98.70 Sq m
00-DW-001
TMETC Barrel Store
5.80 Sq m
00-DW-034
TMETC Gas Bottle Store
13.05 Sq m
00-DW-035
JLR Low Emission 1
27.26 Sq m
00-DW-033a
JLR Dyno 3 Barrel Store
5.80 Sq m
00-DW-033b
JLR Low Emission 2
23.20 Sq m
00-DW-033c
JLR Barrel Store 2
11.60 Sq m
00-DW-033d
Workshop 1
47.56 Sq m
00-DW-002 Stair 6
17.34 Sq m
00-DW-024
Stair 6 Lobby
5.23 Sq m
00-DW-025
WMG Student Projects
277.23 Sq m
00-DW-028
JLR Soak
247.76 Sq m
00-DW-021
Control Corridor 1
183.48 Sq m
00-DW-003
JLR Chassis Dyno
81.65 Sq m
00-DW-020
JLR Fuelling Area
42.17 Sq m
00-DW-022
Paint Store
15.21 Sq m
00-DW-033
JLR Barrel Store 1
11.60 Sq m
00-DW-036
Emergency Shower
3.37 Sq m
00-DW-014
WCs
30.69 Sq m
00-DW-012
Cleaners Store
2.57 Sq m
00-DW-012a
Dyno access corridor
44.63 Sq m
00-DW-001a
Forklift Accessway
277.32 Sq m
00-DW-032
Stair 5
20.64 Sq m
00-DW-031
HV Intake
31.91 Sq m
00-DW-027
Gas Intake
9.82 Sq m
00-DW-026
Cleaners Store
3.87 Sq m
00-HB-015
WC
3.50 Sq m
00-HB-016
WC
3.50 Sq m
00-HB-017
Disabled WC
3.75 Sq m
00-HB-018
Store
56.06 Sq m
00-HB-033
Goods Check-in
12.91 Sq m
00-ES-022
TMETC VR
161.70 Sq m
00-HB-031
JLR Electrical Development Lab
108.38 Sq m
00-HB-026
JLR Clay Store
72.96 Sq m
00-HB-030
Store
76.76 Sq m
00-HB-024
Drive-In Sim Control
32.21 Sq m
00-HB-023
Facility manager
54.08 Sq m
00-HB-020
Reception
307.67 Sq m
00-HB-002
Breakout
31.36 Sq m
00-ES-002
Corridor
6.17 Sq m
00-ES-024
Stair 1
21.13 Sq m
00-HB-004
Corridor
18.39 Sq m
00-HB-025
Corridor
16.45 Sq m
00-HB-029
Corridor
13.00 Sq m
00-HB-019
JLR VR
415.16 Sq m
00-HB-032
Sub Equipment Room 1
16.15 Sq m
00-HB-010
TMETC Electrical Lab
82.01 Sq m
00-HB-027
TMETC Battery Module Lab
51.17 Sq m
00-HB-028
Exhibtion Store
47.75 Sq m
00-HB-001a
Stair 4
25.08 Sq m
00-ES-021
JLR Thermo Fluids Lab
116.63 Sq m
00-ES-013
Loading/Goods Receiving
54.24 Sq m
00-ES-007
Engineering Hall
1555.69 Sq m
00-ES-001
Stair 3 Lobby
14.62 Sq m
00-ES-028
Corridor
43.27 Sq m
00-ES-008
Stair 2 Lobby
14.63 Sq m
00-OF-004
Store
22.69 Sq m
00-ES-003
VR Movement Zone
60.47 Sq m
00-HB-032a
Showers Lobby
8.86 Sq m
00-ES-009a
Diasabled Shower
7.59 Sq m
00-ES-009b
WC
2.77 Sq m
00-ES-009d
Male Showers
32.96 Sq m
00-ES-009
JLR Charging Lab
57.38 Sq m
00-ES-014
Store
56.52 Sq m
00-ES-005
Store
137.28 Sq m
00-ES-004
Collaborative Hub
380.04 Sq m
00-HB-034
Teapoint
29.17 Sq m
00-OF-006
JLR Research Office
479.06 Sq m
00-OF-009
JLR Quiet Room
72.07 Sq m
00-ES-010
Stair 4 Lobby
11.73 Sq m
00-ES-020a
HV/LV Switchroom 1
116.33 Sq m
00-ES-018
TMETC Infotainment
57.38 Sq m
00-ES-011
Corridor
26.67 Sq m
00-ES-020
Drive-In Sim
94.82 Sq m
00-HB-022
Col. Meeting Room 1
27.52 Sq m
00-HB-021
TMETC Vehicle Integration Lab
106.08 Sq m
00-ES-012
TMETC VIL Control
63.32 Sq m
00-ES-017
Local Storage
7.23 Sq m
00-ES-016
Café store
5.29 Sq m
00-HB-007
Café WC
2.42 Sq m
00-HB-009
Corridor
33.66 Sq m
00-HB-011
Café WC lobby
1.03 Sq m
00-HB-008
Cleaners Store
4.74 Sq m
00-HB-014 Male WCs
9.27 Sq m
00-HB-012
Female WCs
11.08 Sq m
00-HB-013
Disabled WC
3.12 Sq m
00-HB-012a
JLR Research Office
283.58 Sq m
00-OF-001
WCs
32.16 Sq m
00-OF-002 Cleaners Store
5.15 Sq m
00-OF-003
Service Yard
2562.94 Sq m
00-XS-001
Paintshop
326.00 Sq m
00-ES-027
Wood Mill
114.74 Sq m
00-ES-027a
Sub Equipment Room 2
18.37 Sq m
00-ES-025
Lift Motor Room
15.78 Sq m
00-ES-023
Goods Movement Zone
428.43 Sq m
00-ES-006
Cleaners Store
5.64 Sq m
00_ES_028a
Milling
252.03 Sq m
00-ES-026
Stair 3
40.76 Sq m
00-ES-029
Female Showers
12.10 Sq m
00-ES-009c
Recycling Store
26.49 Sq m
00-OF-008
Corridor
15.30 Sq m
00-OF-007
Refuse Store
10.59 Sq m
00-OF-010
Stair 2
40.33 Sq m
00-OF-005
JLR 3D Print Room
15.05 Sq m
00-OF-001a
Café Refuse
9.79 Sq m
00-HB-007a
Café back of House
88.35 Sq m
00-HB-006
External Terrace
164.34 Sq m
00-XS-002
Café
367.49 Sq m
00-HB-005
Stair 1 Lobby
8.18 Sq m
00-HB-003
Exhibition
719.00 Sq m
00-HB-001
Mobile Rig 5000x2000
LED LightingMix Lab
with LED LightingConfigurable Paint Booth
with LED LightingConfigurable Paint Booth
Kolb Studioline M Milling Machine Arms
Hydraulic Set Up Ram Hydraulic Set Up Ram
Kolb Studioline M Milling Machine Arms
within dashed red lineModel Movement Zone
Thermal Chamber 8000x4000Refrigeration Plinthfor Thermal Chamber 3000x1500
DrillPillar
Mill
SawBand
machineBending
HacksawPower
guillotineSmall
cutterPlasmaPortable
Lathe Hotw
ash
Material Store
cabinetEmissions
RackCooling
Therm
al Chamber 8000x4000
Refrigeration Plinthfor Thermal Chamber
3000x1500
Dust Extract Dust Extract
Dust Extract
dust motor
dust motor
BenchNew
BenchNew
Shelves
CupboardsTall
Racking
CutterLazer 50W
CNC4 axis
Printer3D
ChestsTool
40 inch wall monitor
Shelving
printerPhotocopier/
Table with 14 chairs
Fold out bed
TeapointFixed
Roller pallet / stillage
Brake disks
Drive shafts
Drive shafts
Brake disks
Tools
Test Equipment
Oil storage
Extract hoses
Test Equipment
Roller pallet / stillage
Drive shafts
Driving sim
BuckSim
RigProjection
Kardax Machines - 4
(collapsible)Lab Cars
BenchWork
BenchWork
BenchWork
BenchWork
BucksPackage
25 L Fuel Drums
Printer3D
Racking
Fireproof Cabinets
Benches
Station 1Weld Work
Station 2Weld Work
pressFly
pressHydraulic
ablationLazer
SystemTensioningBand
Cabinets
ShelvingDuty Heavy
palletsClay on
Car Stacker
room?Not enough
Clay Model
Car Stacker
Clay Model
unitextractor Fume
fire alarm buttonemergency buttonEmergency phone
BenchesWork
Lab CarStandard
BenchesWork
Racking
Cabinets
CHANGELAYOUT
TVmounted Wall
ScalesWeighingVehicle Portable
viceincludingBenches
viceincludingBenches
viceincludingBenches
ArmFaro
craneA-frameMobile
Racking.equip: Hand tools andHarness Development
Vehicle RampFlush Fitting
elevated test rig4 wheel hybrid
lampinspection Retractable
trolleysStorage kit/
trolleysStorage kit/
equipmentLab car
protection ?Oil spill
LiftVehiclePlatform
vehicle liftSwing arm
Workbench
Workbench
cabinetTool
cabinetTool
cabinetTool
cabinetTool
cabinetTool
cabinetTool
cabinetTool
bedplateIn ground
bedplateIn ground
padweighing corner Vehicle
padweighing corner Vehicle
padweighing corner Vehicle
padweighing corner Vehicle
readoutwall-mounted with digital Scales
Tools
Workbench
test rigEBHS Airflow
UnitStorageTool
Wastebin
Equipment cupboards
cupboardsEquipment
DeskDesk
ISOKELL
SimulatorDesktopAcousticVehicle
unitStorage
Desks
trolleyMobile test
bedtest Elevated
trolleyMobile test
Parts Racking
Vehicle RampFlush Fitting
trolleyequipmentParts/
TrolleyCharging
UnitStorageTool
test rigAirflow
fancoolingPortable
Wastebin
Laptop hotdesks
Buck control desk
holdersSpeaker
PrinterColour
lightsFlood
Workbench
Racking
Store Local
Large Display Wall (LCD/LED)
Small display screens
PC station
Display Modules
stacksSpeaker
Projectors for exhibition
for exhibitionMicrophones
Reception deskDisplay screens
Sofas x2tableCoffee
Seating x8
podmeeting Informal
Jetwash
Small display screens
12 monitors 4 chairs3 desks with
Bin DWcounterLowered
Pallet truck
ForkliftStringo
monitorsLarge
monitorsLarge
Flowrig
cupboardCOSHH
Racking
Workbenches
TableSurface
Lockers
for 20 peopleTables and chairs
MachineVending FridgeM K
Lockers
areaSoldering
area
welding
TIG
area
welding
MIG
Cleaner
Parts
Pallet truck
Pallet truck
Racking
stationsSoldering
Workbench
Racking
Climatic chamber
rack19 inch
Lab sink
Benches
benchworkElectrical
cupboardFume
WasherParts
StorageBattery
StorageComponent Electric
unitcharging Battery Electric
drillPedestal
TableIron
BenchesRobotics
CraneSand
cupboardStorage
cupboardStorage
cupboardStorage
cupboardStorage
cupboardStorage
cupboardStorage
tool kitElectrical tool kit
Mechanical
pressHydraulic
Welder
drill / millBench top
Submarine Project
ProjectDisplay
Benches
Rolling road
2 Post lift
BenchWorkLinedMetal
BenchWorkLinedMetal
areaWelding
Extra storage / work bench Extra storage / work bench
areaoilWaste
areastoreFuel
charging Battery
Racking
4 monitorsPc with
Racking
Racking
Student formula car 2930x1430
Screen
Guillotine
Workbenches
build
er
metal
Sheet
Bay 1
Bay 2Bay 3
1:200
MA LM
National Automotive Innovation CentreWarwick Manufacturing Group
P1 20/03/2014 MA LM
NAIC_P_003
Ground Floor Plan
Planning
P1
Planning Issue
CARPARK 15
NTS
UNIVERSIT
Y ROAD
Bicycle Shelter
20/03/2014
of separate planning applicationNew entrance to car park subject
Tanker Exit Only
Service Entrance & Exit
StoreTyre
NO
RTH
TankWater Attenuation Below Ground
mobile catering outletLocation for future
MIL
LB
UR
N HIL
L R
OA
D
InterceptorOil/Water Below Ground
Bulk Fuel StoreBelow Ground
CHECKEDSTATUS
REVISION
DRAWN
SCALE
DRAWING TITLE
DRAWING NUMBER
PROJECT TITLE
DATE DETAIL CHKDRNREV
DATE
NOTES:
@A0
SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION:
NOTE THE FOLLOWING:OF WORK DETAILED ON THIS DRAWING, NORMALLY ASSOCIATED WITH THE TYPES IN ADDITION TO THE HAZARDS / RISKS
Significant Residual Risks:
Action to be Taken:
Refer to Health and Safety Plan
5 BALDWIN TERRACE LONDON N1 7RU TEL: 020 7704 1975
PROJECT EMAIL:
© EDWARD CULLINAN ARCHITECTS LTD 2013
@A3
A
B
C
D
E
F
G
H
J
K
L
M
N
O
P
Q
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
R
Breakout
17.05 Sq m
01-DW-101
Stair 5
13.96 Sq m
01-DW-103
Heating Plant
171.48 Sq m
01-DW-111
Corridor
21.63 Sq m
01-DW-104 Sub Equipment Room 5
16.20 Sq m
01-DW-105 Female WCs
7.72 Sq m
01-DW-108
Male WCs
6.76 Sq m
01-DW-107
Compressed Air Plant
125.03 Sq m
01-DW-112
Stair 6 Lobby
5.23 Sq m
01-DW-116
Stair 6
17.34 Sq m
01-DW-117
Disabled WC
3.90 Sq m
01-DW-109
Cleaners Store
2.60 Sq m
01-DW-106
Soak Process Plant
136.04 Sq m
01-DW-115
Dyno Process Plant
1210.69 Sq m
01-DW-113
HV/LV Switchroom 2
122.88 Sq m
01-DW-114
Mezzanine
76.10 Sq m
01-DW-102
WCs
31.04 Sq m
01-OF-116
Store
61.50 Sq m
01-ES-103
Col. Meeting Room 4
14.20 Sq m
01-HB-105
Col. Meeting Room 5
28.84 Sq m
01-HB-106
Col. Meeting Room 6
14.02 Sq m
01-HB-107
JLR Project Strategy Room
50.36 Sq m
01-HB-108
Col. Meeting Room 7
14.02 Sq m
01-HB-109
Sub Equipment Room 3
16.15 Sq m
01-OF-102
Col. Meeting Room 3
19.67 Sq m
01-HB-104
TMETC Clay Store
184.34 Sq m
01-ES-113
Kitchen
24.05 Sq m
01-OF-112
Corridor
41.89 Sq m
01-ES-108
Corridor
5.98 Sq m
01-ES-111
Model Movement Zone
120.34 Sq m
01-ES-106
Corridor
10.60 Sq m
01-ES-104
Stair 1
21.13 Sq m
01-OF-105
Library
84.03 Sq m
01-HB-103
JLR VR
54.83 Sq m
01-HB-103b
Corridor
8.91 Sq m
01-HB-103a
JLR Innovation room
42.86 Sq m
01-HB-110
TMETC HR Interview Room
13.23 Sq m
01-OF-114b
Col. Stair Breakout
33.59 Sq m
01-HB-101a
Mezzanine
72.22 Sq m
01-ES-101
Store
96.17 Sq m
01-ES-102
Col. Meeting Room 2
34.15 Sq m
01-HB-102
Store
20.40 Sq m
01-ES-105
External Terrace
25.94 Sq m
01-XS-101
Stair 4
25.08 Sq m
01-ES-110
Core Lobby
40.07 Sq m
01-OF-115
Cleaners Store
5.12 Sq m
01-OF-117
Core Lobby
6.84 Sq m
01-OF-106 Stair 2
41.74 Sq m
01-OF-110
Stair 3 Lobby
14.62 Sq m
01-OF-118
Stair 2 Lobby
14.64 Sq m
01-OF-109
WCs
32.15 Sq m
01-OF-107 Cleaners Store
5.15 Sq m
01-OF-108
JLR Office Meeting
32.30 Sq m
01-OF-113b
JLR Office Meeting
32.40 Sq m
01-OF-113
Teapoint
27.26 Sq m
01-OF-111
JLR Corridor
9.75 Sq m
01-OF-113c
Confidential Waste
29.59 Sq m
01-ES-107
Sub Equipment Room 4
18.41 Sq m
01-ES-112
Paintshop Mezzanine
114.77 Sq m
01-ES-107a
TMETC HR Office
45.45 Sq m
01-OF-114c
JLR Research Office
341.50 Sq m
01-OF-101
TMETC IT Prep
29.75 Sq m
01-OF-114a
JLR Office Meeting
54.02 Sq m
01-OF-113a
External Terrace
25.94 Sq m
01-XS-102
Stair 3
41.74 Sq m
01-OF-119
Stair 4 Lobby
15.18 Sq m
01-ES-109
Stair 1 Lobby
8.06 Sq m
01-OF-104
JLR Research Office
525.33 Sq m
01-OF-103
Collaborative Hub
568.81 Sq m
01-HB-101
Void Over
Void Over
Void OverVoid Over
Void Over
Void Over
Void Over
Void Over
Void Over
Void Over
Void Over
Void Over
1:200
MA LM
20/03/2014
National Automotive Innovation CentreWarwick Manufacturing Group
P1 20/03/2014 MA LM
NAIC_P_004
Planning
P1
Planning Issue
CARPARK 15
First Floor Plan
NTSNO
RTH
CHECKEDSTATUS
REVISION
DRAWN
SCALE
DRAWING TITLE
DRAWING NUMBER
PROJECT TITLE
DATE DETAIL CHKDRNREV
DATE
NOTES:
@A0
SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION:
NOTE THE FOLLOWING:OF WORK DETAILED ON THIS DRAWING, NORMALLY ASSOCIATED WITH THE TYPES IN ADDITION TO THE HAZARDS / RISKS
Significant Residual Risks:
Action to be Taken:
Refer to Health and Safety Plan
5 BALDWIN TERRACE LONDON N1 7RU TEL: 020 7704 1975
PROJECT EMAIL:
© EDWARD CULLINAN ARCHITECTS LTD 2013
@A3
A
B
C
D
E
F
G
H
J
K
L
M
N
O
P
Q
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
R
Cleaners Store
4.49 Sq m
02-ES-204a
Mezzanine
232.14 Sq m
02-HB-210
JLR Design Hall
921.92 Sq m
02-DS-201
Design Stair Lobby
33.66 Sq m
02-DS-206
TMETC Design Hall
1042.26 Sq m
02-DS-208
JLR Clay Modelers
22.89 Sq m
02-DS-205a
JLR Clay Modelers
41.24 Sq m
02-DS-205
Stair
37.52 Sq m
02-DS-203a
JLR Future Showroom and Review
405.50 Sq m
02-DS-204
Disabled WC/Shower
8.45 Sq m
02-ES-205
TMETC Studio Store
35.04 Sq m
02-ES-208
WCs
31.05 Sq m
02-OF-217
Sub Equipment Room 6
16.15 Sq m
02-OF-202
Corridor
6.17 Sq m
02-ES-210
Col. Meeting Room 8
17.68 Sq m
02-HB-202
Hard Modelling
207.90 Sq m
02-ES-206
TMETC Clean Store
29.20 Sq m
02-ES-209
JLR Office Meeting Room 2
15.45 Sq m
02-HB-205
Cleaners Store
5.04 Sq m
02-OF-218
JLR Office Meeting Room 1
15.45 Sq m
02-HB-204
Col. Stair Breakout
14.39 Sq m
02-HB-201a
Kitchen
24.02 Sq m
02-OF-212
VR Stair
24.77 Sq m
02-DS-202
Stair 4
25.08 Sq m
02-ES-214
Stair 4 lobby
12.19 Sq m
02-XS-201
Core Lobby
6.84 Sq m
02-OF-206
Stair 2 Lobby
14.64 Sq m
02-OF-209
Core Lobby
10.13 Sq m
02-OF-219
Stair 3 Lobby
14.58 Sq m
02-OF-220a
Stair 1
21.12 Sq m
02-OF-205
Stair 1 Lobby
8.51 Sq m
02-OF-204
TMETC MD OFFICE
20.91 Sq m
02-HB-209
TMETC Office Meeting Room 2
13.14 Sq m
02-HB-207
TMETC Office Meeting Room 3
13.14 Sq m
02-HB-208
TMETC Research Office
271.12 Sq m
02-OF-215
TMETC Meeting Room 4
13.08 Sq m
02-HB-208a
TMETC Meeting Room 5
13.32 Sq m
02-HB-208b
TMETC Office Meeting Room 1
13.32 Sq m
02-HB-206
TMETC Meeting Room 7
25.84 Sq m
02-OF-213b
JLR Clean Stores
31.95 Sq m
02-ES-203
JLR Studio Stores
31.95 Sq m
02-ES-202
Changing Cleanup
52.20 Sq m
02-ES-201
JLR Office Meeting
30.94 Sq m
02-OF-203a
WCs
32.16 Sq m
02-OF-207 Cleaners Store
5.15 Sq m
02-OF-208
Teapoint
27.34 Sq m
02-OF-211
Collaborative Hub
246.73 Sq m
02-HB-201
WCs
21.53 Sq m
02-ES-204
TMETC Meeting Room
41.23 Sq m
02-OF-221
Sub Equipment Room 7
18.36 Sq m
02-ES-211
TMETC Design Breakout
53.27 Sq m
02-DS-207
TMETC DMU Room 1
66.23 Sq m
02-OF-224
Model Movement Zone
272.17 Sq m
02-ES-207
Corridor
14.84 Sq m
02-ES-212
TMETC Digital Review Room
115.92 Sq m
02-DS-209
TMETC Colour + Trim
112.59 Sq m
02-DS-210
JLR Research Office
339.38 Sq m
02-OF-201
JLR Research Office
721.48 Sq m
02-OF-203
JLR Office Meeting
15.60 Sq m
02-OF-201a
Stair 2
41.74 Sq m
02-OF-210
External Terrace
27.79 Sq m
02-XS-201
TMETC Research Office
509.09 Sq m
02-OF-213
External Terrace
27.79 Sq m
02-XS-202
Stair 3
41.74 sq m
02-OF-220
TMETC Research Office
487.11 Sq m
02-OF-223
TMETC Meeting Room 6
25.17 Sq m
02-OF-213a
JLR Meeting Room
25.76 Sq m
02-DS-203 Store
30.19 Sq m
02-DS-211Stair 5
13.96 Sq m
02-DW-203a
Cleaners Store
4.06 Sq m
02-DW-211 Sub Equipment Room 8
19.91 Sq m
02-DW-213 WCs
59.92 Sq m
02-DW-210
BCP +Absorbtion Chiller
175.30 Sq m
02-DW-216
Battery Room
51.88 Sq m
02-DW-218
UPS Room
27.35 Sq m
02-DW-219
Corridor
24.64 Sq m
02-DW-212
Process Cooling Pump
134.85 Sq m
02-DW-214
Stair 6 Lobby
5.23 Sq m
02-DW-207
Stair 6
17.34 Sq m
02-DW-208
WMG Lecture Room 2
105.42 Sq m
02-DW-205
WMG Lecture Room 1
116.12 Sq m
02-DW-204
JLR Main Equipment Room
77.72 Sq m
02-DW-217 WMG CAD stations
65.13 Sq m
02-DW-203
Lecture Breakout
180.30 Sq m
02-DW-206
Corridor
98.01 Sq m
02-DW-202
TMETC WMG Main Equipment Room
37.34 Sq m
02-DW-209
WMG Project Space
457.94 Sq m
02-DW-201
Vertical Panel Saw
LatheWood turning
Bandsaw
Bandsaw
Wood Thickening Planer
Spindle Sander
Racking
Racking
PlanerOver & Under
Dimension Saw
Bobbing
Milling Machine
Racking
Bench Pillar Drill
D.Disc Sander
Table Saw
BenchCarpenters Work
Extraction (size TBC)
Cross Cutter
Di-Noc Tank
Di-Noc Tank
Shredder
Spray Booth
Spra
y B
ooth
Shredder
Kardex. A
ppro
x Size
Kardex. A
ppro
x Size
Void Over
Void Over
Lift
Void Over
1:200
MA LM
20/03/2014
National Automotive Innovation CentreWarwick Manufacturing Group
P1 20/03/2014 MA LM
NAIC_P_005
Planning
P1
Planning Issue
CARPARK 15
Second Floor Plan
NTSNO
RTH
CHECKEDSTATUS
REVISION
DRAWN
SCALE
DRAWING TITLE
DRAWING NUMBER
PROJECT TITLE
DATE DETAIL CHKDRNREV
DATE
NOTES:
@A0
SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION:
NOTE THE FOLLOWING:OF WORK DETAILED ON THIS DRAWING, NORMALLY ASSOCIATED WITH THE TYPES IN ADDITION TO THE HAZARDS / RISKS
Significant Residual Risks:
Action to be Taken:
Refer to Health and Safety Plan
5 BALDWIN TERRACE LONDON N1 7RU TEL: 020 7704 1975
PROJECT EMAIL:
© EDWARD CULLINAN ARCHITECTS LTD 2013
@A3
A
B
C
D
E
F
G
H
J
K
L
M
N
O
P
Q
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
R
Design Reception
92.42 Sq m
03-DS-301
TMETC Printroom
15.08 Sq m
03-DS-320
WCs
30.66 Sq m
03-OF-314 Cleaners Store
4.91 Sq m
03-OF-315
Stair 1
21.13 Sq m
03-OF-305
Corridor
5.90 Sq m
03-HB-307
Collaborative Hub
305.50 Sq m
03-HB-301
Catering Kitchen
26.71 Sq m
03-HB-309
Col. Stair Breakout
4.28 Sq m
03-HB-301a
TMETC Studio Meeting
26.28 Sq m
03-DS-316
Corridor
104.89 Sq m
03-DS-302
TMETC Studio Office
81.40 Sq m
03-DS-319
Collaborative Hub
83.26 Sq m
03-HB-312
Viewing Garden
581.72 Sq m
03-XS-302
Stair 1 Lobby
8.64 Sq m
03-OF-304
TMETC Designers Mezzanine
383.26 Sq m
03-DS-318
Stair 4
25.08 Sq m
03-OF-321
Stair 4 Lobby
6.28 Sq m
03-OF-320
Core Lobby
6.84 Sq m
03-OF-306 Stair 2 Lobby
14.64 Sq m
03-OF-309
Stair 2
41.74 Sq m
03-OF-310
Stair 3 Lobby
14.64 Sq m
03-OF-316 Stair 3
41.66 Sq m
03-OF-317
Showroom Control Stair
6.10 Sq m
03-HB-305
Sub Equipment Room 10
16.15 Sq m
03-OF-302
Cleaners Store
5.15 Sq m
03-OF-308
WCs
32.16 Sq m
03-OF-307
JLR Office Meeting
15.60 Sq m
03-OF-301a
JLR Research Office
360.07 Sq m
03-OF-301
Teapoint
29.36 Sq m
03-OF-311
JLR Office Meeting
42.16 Sq m
03-OF-303a
External Terrace
172.61 Sq m
03-XS-301
TMETC Office Meeting
19.01 Sq m
03-OF-312
Sub Equipment Room 9
18.36 Sq m
03-HB-308
Core Lobby
6.85 Sq m
03-OF-313
TMETC Research Office
497.18 Sq m
03-OF-318
Store
15.86 Sq m
03-HB-310
Showroom Back of House
102.53 Sq m
03-HB-306
Shared Studio Meeting
40.31 Sq m
03-DS-313
JLR Research Office
522.05 Sq m
03-OF-303
Airlock
6.18 Sq m
03-OF-319
Showroom Store
26.76 Sq m
03-HB-304
Showroom Store
26.76 Sq m
03-HB-303
WCs
21.46 Sq m
03-DS-303
WCs
16.43 Sq m
03-DS-304
Showroom
517.10 Sq m
03-HB-302
JLR Research Office
199.81 Sq m
03-OF-322
JLR Studio Office
16.59 Sq m
03-DS-311
JLR Studio Meeting
42.45 Sq m
03-DS-312
Design Stair Lobby
22.52 Sq m
03-DS-314
JLR Studio Office
16.59 Sq m
03-DS-310a
JLR Studio Meeting
20.62 Sq m
03-DS-307
Store
3.97 Sq m
03-DS-312a
JLR Mezzanine
69.64 Sq m
03-DS-305a
JLR Designers Mezzanine
58.97 Sq m
03-DS-305
Staircase
32.63 Sq m
03-DS-305b
TMETC Studio Office
27.97 Sq m
03-DS-315
TMETC Mezzanine
19.84 Sq m
03-DS-315a
Mezzanine
151.60 Sq m
03-HB-311
JLR Mezzanine
176.66 Sq m
03-DS-306 Store
3.03 Sq m
03-DS-308a
JLR Design Studio
203.84 Sq m
03-DS-308
Store
3.03 Sq m
03-DS-308b
JLR Mezzanine Podium
69.59 Sq m
03-DS-309
JLR Kitchen
5.61 Sq m
03-DS-310
Stair 5
13.96 Sq m
03-DW-303a
Sub Equipment Room 11
17.29 Sq m
03-DW-304
Board Room
99.89 Sq m
03-DW-301
Preparation Kitchen
18.40 Sq m
03-DW-302 Corridor
152.07 Sq m
03-DW-303
Corridor
7.37 Sq m
03-DW-303b
WCs
35.99 Sq m
03-DW-305
Male WC
3.08 Sq m
03-DW-305a
Disabled WC
3.25 Sq m
03-DW-305c
Female WC
3.45 Sq m
03-DW-305b
Cleaners Store
2.92 Sq m
03-DW-306
Stair 6 Lobby
5.23 Sq m
03-DW-308
Stair 6
17.34 Sq m
03-DW-309
JLR Project Space
907.36 Sq m
03-DW-307
Roof Plant
773.79 Sq m
03-XS-305
WC Lobby
11.12 Sq m
03-DW-303c
External Terrace
325.11 Sq m
03-XS-303
Void Over
Void Over
1:200
MA LM
20/03/2014
National Automotive Innovation CentreWarwick Manufacturing Group
P1 20/03/2014 MA LM
NAIC_P_006
Planning
P1
Planning Issue
CARPARK 15
Third Floor Plan
63 Sq m04 - HB - 401Control Room
NTSNO
RTH
Showroom Control Room at Mezzanine level
Screen to plant
Access to Control Room Mezzanine
A
L_003
A
L_003
SECTION 2.0 Page | 53NATIONAL AUTOMOTIVE INNOVATION CENTRE, UNIVERSITY OF WARWICKDESIGN & ACCESS STATEMENT
DETAIL OF CAFE
CHECKEDSTATUS
REVISION
DRAWN
SCALE
DRAWING TITLE
DRAWING NUMBER
PROJECT TITLE
DATE DETAIL CHKDRNREV
DATE
NOTES:
@A0
SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION:
NOTE THE FOLLOWING:OF WORK DETAILED ON THIS DRAWING, NORMALLY ASSOCIATED WITH THE TYPES IN ADDITION TO THE HAZARDS / RISKS
Significant Residual Risks:
Action to be Taken:
Refer to Health and Safety Plan
5 BALDWIN TERRACE LONDON N1 7RU TEL: 020 7704 1975
PROJECT EMAIL:
© EDWARD CULLINAN ARCHITECTS LTD 2013
@A3
A
B
C
D
E
F
G
H
J
K
L
M
N
O
P
Q
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
R
Stair to roof level
Stair to roof level
Carlift to roof
1:200
MA LM
20/03/2014
National Automotive Innovation CentreWarwick Manufacturing Group
P1 20/03/2014 MA LM
NAIC_P_007
Planning
P1
Planning Issue
CARPARK 15
NTS
Roof Plan
NO
RTH
Northlight rooflight with PVs
PVs on frame
Mesh plant enclosure ETFE Rooflight
ETFE Rooflight
ETFE Rooflight ETFE Rooflight
Mesh plant enclosure
Mesh plant enclosure
Mesh plant enclosure
Mesh plant enclosure
Mesh plant enclosureMesh plant enclosure
SECTION 2.0 Page | 39NATIONAL AUTOMOTIVE INNOVATION CENTRE, UNIVERSITY OF WARWICKDESIGN & ACCESS STATEMENT
EXTERNAL TERRACES
PVS
PV ON NORTH LIGHT
MECHANICAL PLANT
RISER
EDGE PROTECTION
ROOF LIGHTS
STAIR ACCESS TO ROOF
CAR LIFT
FLUES
SECTION 2.0 Page | 38NATIONAL AUTOMOTIVE INNOVATION CENTRE, UNIVERSITY OF WARWICK
DESIGN & ACCESS STATEMENT
2.3 ROOF
2.3.1 Design Principles:
Main Roof:
The main roof, from the underside, is a light, gently undulating blanket of precision engineered timber. It is a consistent and instantly recognisable element which projects the ideal of unity of purpose, inherent in the NAIC project. It gives a strong consistent horizontal top-line to the eleva-tions and projects above a continuous ribbon of windows to appear to float above the building.
The roof has a consistent expression from outside to inside with a dramatic soaring atrium from the reception. The Design studios and mezzanines, offices and collaborative hub and atrium are unified by the visually constant timber ceiling.
The roof aims to create the feeling of one large, well lit, open shared space to promote collaboration.
The roof grid is set at 45 degrees to the main body of the building for two reasons:
• to align it North-South, allowing it to work naturally with a north-light profile.
• to avoid long parallel lines in the atrium which would have the effect of distancing one edge from the other.
From above the main roof is a hard-working simple ‘table’ for the energy management equipment the building needs. We get as much plant on the roof as possible to keep more premium space available inside the building.
External Terraces:
• Our visits to exemplar buildings during earlier design stages pointed out the benefits of well thought-out external areas as useful extensions for working.
• Provide spill out areas for users of the building while also collecting rainwater run-off. While not useful every day of the year, the idea of outside space for thought, air and a change of scene was well liked by building users. Terrace areas of varying sizes are provided at all four levels of the building
ROOF STRUCTURAL SYSTEM INTERFACE
SECTION 2.0 Page | 37NATIONAL AUTOMOTIVE INNOVATION CENTRE, UNIVERSITY OF WARWICKDESIGN & ACCESS STATEMENT
VIEW ALONG UNIVERSITY ROAD; THE SOUTH-EAST APPROACH