ABB GroupNovember 13, 2009 | Slide 1
Indoor SubstationsSuministro Elctrico SustentableCongreso Bienal Internacional
Alfredo Gallegos, FES Manager, 10 y 11 de Noviembre 2009
-
7/25/2019 ABB - Indoor Substations
2/41
ABB GroupNovember 13, 2009 | Slide 2
Agenda
Introduction
Utilities challenges and requirements
Example of Indoor substations
MALTE - Complete pre-fabricated AIS substation up to 72.5 kV
URBAN - Site built indoor AIS substation up to 170 kV Truly invisible GIS substations for all voltage levels
Summary
-
7/25/2019 ABB - Indoor Substations
3/41
ABB GroupNovember 13, 2009 | Slide 3
Reasons to migrate from Outdoor to Indoor Substation
Substations built years ago outskirt the city and today aresurrounded by residential and commercial areas
Consequences are:
Pressure to Minimize visual impact
Incidents of people entering the Substations
Important land cost
Increase pressure of availability
-
7/25/2019 ABB - Indoor Substations
4/41
ABB GroupNovember 13, 2009 | Slide 4
Requirements on Substations from neighbors
Open air substation not so nice aesthetic,want power without seeing it
Originally outskirt of city, now surroundedby residential buildings, offices, shoppingcenters, hotels etc.
Acoustic problem from humming of powertransformers
Third party safety, especially childrenplaying
Station modularized and as much aspossible pre-manufactured
No substation fence and yard, buildingitself give the shell protection
Underground-in and underground-out, i.e.cable to first line tower in case of OH-linebays
Site work as little and short as possible,saves cost, shorten overall delivery timeand minimize disturbance to neighborsduring site activities
-
7/25/2019 ABB - Indoor Substations
5/41
ABB GroupNovember 13, 2009 | Slide 5
Engineer problems facing an Indoor Substation
Transformer Noise
HV Over Head Lines Incoming
Easy Access to Power Transformers
Heat Dissipation
-
7/25/2019 ABB - Indoor Substations
6/41
ABB GroupNovember 13, 2009 | Slide 6
Agenda
Introduction
Utilities challenges and requirements
Example of Indoor substations
MALTE - Complete pre-fabricated AIS substation up to 72.5 kV
URBAN - Site built indoor AIS substation up to 170 kV Truly invisible GIS substations for all voltage levels
Summary
-
7/25/2019 ABB - Indoor Substations
7/41
ABB GroupNovember 13, 2009 | Slide 7
MALTE - up to 72.5 kVComplete pre-fabricated AIS substation
-
7/25/2019 ABB - Indoor Substations
8/41
ABB GroupNovember 13, 2009 | Slide 8
MALTE - up to 72.5 kVComplete pre-fabricated AIS substation
Transformer foundation and
oil pit
Only one precast foundationfor the whole substation,function also as oil pit
Power Transformer put in
place
-
7/25/2019 ABB - Indoor Substations
9/41
ABB GroupNovember 13, 2009 | Slide 9
MALTE - up to 72.5 kVComplete pre-fabricated AIS substation
Interior from HV-module
HV-cables connection toPower transformer.
-
7/25/2019 ABB - Indoor Substations
10/41
ABB GroupNovember 13, 2009 | Slide 10
MALTE - up to 72.5 kVComplete pre-fabricated AIS substation
Summary
High availability (equipment indoor)
Small footprint
~100 m2 (1/3 of traditional)
Land preparation minimized, all equipment pre-fabricated
Short time at site (~2 weeks)
connection to network
commissioning
Low maintenance cost
Can easily be moved
Personnel and third party safe
-
7/25/2019 ABB - Indoor Substations
11/41
ABB GroupNovember 13, 2009 | Slide 11
Agenda
Introduction
Utilities challenges and requirements
Example of Invisible substations
MALTE - Complete pre-fabricated AIS substation up to 72.5 kV
URBAN - Site built indoor AIS substation up to 170 kV Truly invisible GIS substations for all voltage levels
Summary
-
7/25/2019 ABB - Indoor Substations
12/41
ABB GroupNovember 13, 2009 | Slide 12
HV Module LTB Compact
-
7/25/2019 ABB - Indoor Substations
13/41
ABB GroupNovember 13, 2009 | Slide 13
URBAN up to 170 kVSite built indoor AIS substation
Before renewal
145 kV AIS
After renewal
145 kV AIS
-
7/25/2019 ABB - Indoor Substations
14/41
ABB GroupNovember 13, 2009 | Slide 14
URBAN up to 170 kVSite built indoor AIS substation
-
7/25/2019 ABB - Indoor Substations
15/41
ABB GroupNovember 13, 2009 | Slide 15
URBAN up to 170 kVSite built indoor AIS substation
Portable maintenancestand mounted on CB truck
CB truck can easily beexchanged using a fork lift
-
7/25/2019 ABB - Indoor Substations
16/41
ABB GroupNovember 13, 2009 | Slide 16
URBAN up to 170 kVSite built indoor AIS substation
Medium Voltage switchgear Yellow reflective stripe on floor
for emergency evacuation,instead of battery lighting.
Better and more nature friendlysolution
Control Room
Back-up relay and controlequipment in same physicalhardware.
-
7/25/2019 ABB - Indoor Substations
17/41
ABB GroupNovember 13, 2009 | Slide 17
Agenda
Introduction
Utilities challenges and requirements
Example of Invisible substations
MALTE - Complete pre-fabricated AIS substation up to 72.5 kV URBAN - Site built indoor AIS substation up to 170 kV
Truly invisible GIS substations for all voltage levels
Summary
-
7/25/2019 ABB - Indoor Substations
18/41
ABB GroupNovember 13, 2009 | Slide 18
HV Module - PASS
-
7/25/2019 ABB - Indoor Substations
19/41
ABB GroupNovember 13, 2009 | Slide 19
Mechanism
Polymeric Bushings
Breaker
TC
Line / EarthDisconnector
HV Module - PASS
-
7/25/2019 ABB - Indoor Substations
20/41
ABB GroupNovember 13, 2009 | Slide 20
Jockey Club
Shopping Iguatemi
Subestao Itaim
Indoor AIS 138kV Substation Eletropaulo/SP
138 kV Substation in Sao Paulo, Brazil.
3 x 40 MVA Transformers Available Footprint 35 x 35 mt2
-
7/25/2019 ABB - Indoor Substations
21/41
ABB GroupNovember 13, 2009 | Slide 21
Subestaoexistente
readisponibilizada
BCAP6
TR1
111
105
101
INTERL
DER
BCAP5
TR3
104
107
FUTURO
112
BCAP4
TR3
FUTURO
110
100
FUTURO
DER
INTERL
106
TR2
BCAP3
108
BCAP2
TR2
FUTURO
109
103
FUTURO
DER
INTERL
102
TR1
BCAP1
CONJUNTO
BLINDADO
3
CONJUNTO
BLINDADO
2
CONJUNTO
BLINDADO
1
TR2
TR1
TR3
S A1 S A2
NA+101,8m
NA+101,8m
NA+102,5m
S.BATERIAS
BANCODEBATERIAS1-125V
MANUTENODODISJUNTOR
BANCODEBATERIAS
2-125V
NA+101,8m
1 2 3 4
A
B
C
D
E
ACESSOESCADA
PORTA
PORTA
PORTA
PORTAPORTA
PORTA
NA+102,5m
NA+102,3m
CX
BL BL
GRAMA
BL
CXBL
102.30(pisozero)
101.52
101.436 101.0681 01 .3 02 1 01 .1 91
101.52
S
rampasobe(i=14,5%)
101.80
PARALELEPIPEDO
PISODRENANTE - UTILIZARPARALELIPPEDOSDOEXISTENTE
102.25esuas variveis
101.80 101.80
100.862
100.814
101.20
101.127101.127
S
VARIAVEL
MURO -H=3,00m
MURO
-H=3,00m
102.25
mdia
102.30
102.30
102.2
5
102.30
102.2
5
101,8
0
102.30
Itaim Substation Layout
-
7/25/2019 ABB - Indoor Substations
22/41
ABB GroupNovember 13, 2009 | Slide 22
Substation Layout
-
7/25/2019 ABB - Indoor Substations
23/41
ABB GroupNovember 13, 2009 | Slide 23
Itaim Substation Layout
-
7/25/2019 ABB - Indoor Substations
24/41
ABB GroupNovember 13, 2009 | Slide 24
Itaim Substation Layout
-
7/25/2019 ABB - Indoor Substations
25/41
ABB GroupNovember 13, 2009 | Slide 25
Itaim Substation
Indoor AIS 138kV Substation Eletropaulo/SP
-
7/25/2019 ABB - Indoor Substations
26/41
ABB GroupNovember 13, 2009 | Slide 26
Agenda
Introduction
Utilities challenges and requirements
Example of Invisible substations
MALTE - Complete pre-fabricated AIS substation up to 52.5 kV URBAN - Site built indoor AIS substation up to 170 kV Truly invisible GIS substations for all voltage levels
Summary
-
7/25/2019 ABB - Indoor Substations
27/41
ABB GroupNovember 13, 2009 | Slide 27
Underground GIS substation
Barbana GIS Substation Underground GIS substation
Waterfall for hiding
transformer humming
Waterfall enrich visual and
audible perception of park Water also used for
transformer cooling via heatexchanger
Complete bay modules fromfactory for fast and easy work
at site
Environmental friendly
Personnel and third party safe
-
7/25/2019 ABB - Indoor Substations
28/41
ABB GroupNovember 13, 2009 | Slide 28
Underground GIS substation
People have their say
People were involved in the design of the surrounding park
-
7/25/2019 ABB - Indoor Substations
29/41
ABB GroupNovember 13, 2009 | Slide 29
Underground GIS substation
Barbana GIS Substationlayout and configuration
-
7/25/2019 ABB - Indoor Substations
30/41
ABB GroupNovember 13, 2009 | Slide 30
GIS Substation
145 kV Substation in Rio de Janeiro - Leblon
3 x 40 MVA Transformers
Available Footprint 25 x 25 mt2
-
7/25/2019 ABB - Indoor Substations
31/41
ABB GroupNovember 13, 2009 | Slide 31
Substation Leblon: Plant Layout
-
7/25/2019 ABB - Indoor Substations
32/41
ABB GroupNovember 13, 2009 | Slide 32
Substation Leblon: Plant Layout
-
7/25/2019 ABB - Indoor Substations
33/41
ABB GroupNovember 13, 2009 | Slide 33
Substation Leblon: Plant Layout
-
7/25/2019 ABB - Indoor Substations
34/41
ABB GroupNovember 13, 2009 | Slide 34
Substation Leblon: Plant Layout
Fotomontagem
-
7/25/2019 ABB - Indoor Substations
35/41
ABB GroupNovember 13, 2009 | Slide 35
Substation : LIGHTDistribution Utility GIS SS Leblon
-
7/25/2019 ABB - Indoor Substations
36/41
ABB GroupNovember 13, 2009 | Slide 36
Substation : LIGHTDistribution Utility GIS SS Leblon
-
7/25/2019 ABB - Indoor Substations
37/41
ABB GroupNovember 13, 2009 | Slide 37
Substation : LIGHTDistribution Utility GIS SS Leblon
-
7/25/2019 ABB - Indoor Substations
38/41
ABB GroupNovember 13, 2009 | Slide 38
Summary
Cost Comparison
Erection time
AIS/GIS solution around 1.5 to 2 years
Equipos/Montaje/Ing Obras Civiles Total CostConventional S/E 70% 30% 100%Indoor S/E 60% 40% 130%
-
7/25/2019 ABB - Indoor Substations
39/41
ABB GroupNovember 13, 2009 | Slide 39
Main Benefits No visual Impact (Community)
Reduce Footprint
Potential surplus Land*
Reduced Outages Improve company image
Increase Reliability
Reduce Maintenance
Summary
-
7/25/2019 ABB - Indoor Substations
40/41
ABB GroupNovember 13, 2009 | Slide 40
ABB Experience in Brazil
In operation
Energia Sao Jos - Manaus
Light - Light Leblon
Copel - Uvaranas
Electropaulo - Itaim
Petrobras - Repar
In Construction
Light - Light Copacabana
Copel - Capim Siqueira
Copel - Pilarzinho Copel - Jardim Bandeirantes
-