ABB GroupSeptember 24, 2009 | Slide 1
ABB Solutions for the FPSO marketElectrical, Instrument, AutomationTelecom and EPC turnkey packages
-
8/9/2019 ABB FPSO Solutions Ref
2/22
ABB GroupSeptember 24, 2009 | Slide 2
ABB References
ABB has deliveries to 35 FPSOs since1989
-
8/9/2019 ABB FPSO Solutions Ref
3/22
ABB GroupSeptember 24, 2009 | Slide 4 ABBMonth DD, YYYY | Slide 4
BP Angola MODEC
The FPSO will have production capacity of157,000 barrels per day and first oil from thedevelopment is scheduled in 2011.
Deliveries - FPSO
MV Switchgear
LV Switchgear
Power Managemt System
Transformers
FPSO - Latest Project
-
8/9/2019 ABB FPSO Solutions Ref
4/22
ABB GroupSeptember 24, 2009 | Slide 5 ABBMonth DD, YYYY | Slide 5
Tupi FPSO MODEC/Petrobras
Tupi pilot FPSO Cidade De Angara dos Reis MV22 MODEC convert the VLCC "M/V Sunrise IV
The FPSO will be capable of processing:
100,000 barrels of oil per day or150,000 barrels oftotal fluids per day, 150 million cubic feet per day ofgas. storage capacity of approximately 1,600,000
barrels. The FPSO will also be able to inject 100,000barrels of water per day.
The FPSO will initially gather production from 5subsea wells with the capability to handle 4additional production wells in the future.
Deliveries - FPSODesign, Engineering fabrication and construction of completeE-House
A-60 Fire Rated , ABS Certified
Architectural design
Redundant HVAC with pressurization
Fire & Gas Detection system
CO2 fire suppression system
Complete E&I installation, termination &commisisoning
Total weight of 700 tonn
MV Switchgear
LV Switchgear
Integration of the above into the e-house
FPSO - Latest Project
-
8/9/2019 ABB FPSO Solutions Ref
5/22
ABB GroupSeptember 24, 2009 | Slide 6
FPSO Project in development
Deliveries - FPSO
FEED Studies for Electro and Automation
Engineering services marine conversion Hullside Process and Safety Systems
Topside Process and Safety Systems
Power Management System
Ex Remote I/O cabinets for PCS, PSD, ESD and F&G
3x24MVA Generators
13.8kV Switchgear 6,6kV Switchgear
440V / 220V Process Switchboard
UPS w/batteries
Transformers (dry immersed)
VSD for LV
IS LimitersDeliveries - Wellhead Platforms
Integrated Process and Safety Systems
Power Management System
13.8kV Switchgar
4.16kV Switchgear
380V LV VSD MV
Transformers (oil immersed)
Peregrino FPSO & Wellhead Platforms
The FPSO and the two wellhead platforms will be installed on the Peregrino Fieldlocated offshore 85 km south-east of Rio de Janeiro, Brazil. The recoverableresources are estimated at between 300 million and 600 million barrels of heavy oil(API 14). There will be 30 horizontal production wells and 7 water injection wells.Production will commence in the first quarter of 2010.
-
8/9/2019 ABB FPSO Solutions Ref
6/22
ABB GroupSeptember 24, 2009 | Slide 7
FPSO Project in development Pioneer FPSO Cascade & Chinook - BW
Offshore (BWO) The FPSO will be installed on the Chinook
Cascade fields, located in the Walker Ridgeblock, situated over 300 km south of theLouisiana coast in the beginning of 2010.Production will commence in the first quarter of
2010. The FPSO will have a storage capacityof about 600,000 barrels of oil, a processcapacity of 80,000 bopd and gas exportfacilities of 16 mmscfd. The FPSO will beinstalled on the field with a water depth of2,600 meters, probably the deepest waterdepth an FPSO ever has been installed on.
Deliveries:
EPC services for Automation
Topside Process Control
Topside Process Shutdown
Topside Emergency Shutdown Vessel Emergency Shutdown
Power Management System
MV/LV Switchgears
VSD system for Cargo pump
Compressor Soft Starters
-
8/9/2019 ABB FPSO Solutions Ref
7/22
ABB GroupSeptember 24, 2009 | Slide 8
Low Cost Fast track FPSO projects (sample) Olowi Fred Olsen Production
The 145,000 dwt tanker Knock Allen to be convertedat Dubai Dry Dock to a FPSO for operation for CNRInternational (Olowi) Limited offshore Gabon, VestAfrica.
When completed in October 2008, the FPSO will havea production capacity of 35,000 barrels of oil, 85 mmdcf
gas per day and a power gen capacity of 2x27MW. Thestorage facilities of the vessel will hold 1.04 millionbarrels of oil equivalent.
Deliveries:
EPC services for Electro and Automation
E-house module
Topside Process Control
Topside Process Shutdown
Topside Emergency Shutdown
Vessel Emergency Shutdown
Power Management System
6,6kV main Switchgear
440V Process Switchboard
20kVA UPS w/batteries
Soft starters for 5MW compressors
Transformers (dry and oil immersed)
-
8/9/2019 ABB FPSO Solutions Ref
8/22
ABB GroupSeptember 24, 2009 | Slide 9
FPSO Project in operation Maersk Woodside Vincent/Nganhurra
The 380,000 dwt tanker Ellen Maersk to be converted to a
FPSO at Keppel Shipyard in Singapore in 2007 andrenamed Vincent.
When completed in 2008, the FPSO will have a productioncapacity of 120,000 barrels of oil and 100 million standardcubic feet of gas per day. The storage facilities of the vesselwill hold 1.9 million barrels of oil equivalent.
Deliveries:
Topside Process Control
Topside Process Shutdown
Topside Local Equipment room
Emergency Shut Down Systems
F&G systems
Ex Remote I/O cabinets for PCS, PSD, ESD and F&G
Power Management
Topside LV distribution boards and motor control centre
HV Switchgear
Generators Interface
MV Soft starter.
UPS
Trafo
Ex. Distribution Boards
-
8/9/2019 ABB FPSO Solutions Ref
9/22
ABB GroupSeptember 24, 2009 | Slide 10
FPSO Project in operation
Cidade de Vitoria (Golfinho II)
Vitoria, is a FPSO vessel with a storage capacity of1,600,000 barrels and an oil production capacity of 100,000barrels of oil per day. The FPSO is used on the Petrobrasfield called Golfinho.
ABB Scope of Supply:
Topside Process Control
Topside Process Shutdown
Topside Instrumentation
Topside Local Equipment room
Ship Automation System (refurbishment)
Emergency Shut Down Systems
F&G systems
Topside LV distribution boards and motor control centre HV Switchgear
Power Management.
Telecom
-
8/9/2019 ABB FPSO Solutions Ref
10/22
ABB GroupSeptember 24, 2009 | Slide 11
Low Cost Fast track FPSO projects (sample)
Sendje Ceiba
The 275,000 dwt tanker Berge Hus was converted into anFPSO at Jurong shipyard in Singapore and renamed SendjeCeiba.
FPSO Sendje Ceiba was delivered with a productioncapacity of 160,000 barrels of liquids per day (bpd) andwater injection capacity of 135,000 bpd. The storagecapacity is two million barrels of oil. ABB (Vetco Aibel) hasprovided the process plant. The design life is 15 years withten years on the field without dry docking.
Deliveries:
Topside Process Control
Topside Process Shutdown
Topside Instrumentation
Topside Local Equipment room
Ship Automation System (refurbishment)
Emergency Shut Down Systems F&G systems
Topside LV distribution boards and motor control centre
HV Switchgear
New Generator
Power Management.
MV Soft starter.
-
8/9/2019 ABB FPSO Solutions Ref
11/22
ABB GroupSeptember 24, 2009 | Slide 12
Low Cost Fast track FPSO projects (sample)
Sendje Berge Upgrade
Sendje Berge was upgraded in 2004 at JurongShipyard in Singapore after been awarded a contractwith ADDAX.
Deliveries upgrade scope:
Extension of topside Process Control
Extension of topside Process Shutdown
Extension of topside Instrumentation
Extension of topside Local Equipment Room
Extension of Ship Automation System (refurbishment)
Extension of Emergency Shut Down Systems
Extension of F&G systems
Extension of Topside LV distribution boards and motorcontrol centre
Extension of HV Switchgear. New panels in existingswitchboard.
New Generator
Extension of Power Management
Delivery of Medium Voltage soft starters for GasInjection pumps. 4,7MW.
-
8/9/2019 ABB FPSO Solutions Ref
12/22
ABB GroupSeptember 24, 2009 | Slide 13
Low Cost Fast track FPSO projects (sample)
Berge Helene Generic
The conversion of the 275,000 dwt tanker BergeHelene was completed 2003 at Jurong shipyard in
Singapore. Berge Helene is a generic FPSO with aproduction capacity of 60,000 barrels of liquids per day(bpd) and a storage capacity of two million barrels ofcrude oil. The vessel is designed for extended at-seaservice and to support incremental, on-locationexpansion of up to 240,000 bpd.
Deliveries generic:
Topside Process Control
Topside Process Shutdown
Topside Instrumentation
Ship Automation System (refurbishment) Emergency Shut Down Systems
Topside F&G systems
HV Switchgear
Power Management
-
8/9/2019 ABB FPSO Solutions Ref
13/22
ABB GroupSeptember 24, 2009 | Slide 14
Low Cost Fast track FPSO projects
Berge Helene Upgrade
The upgrade of Berge Helene in production at Chinguettifield outside Mauritania, West Africa.
Deliveries for upgrade:
Extension of Topside Process Control
Extension of Topside Process Shutdown
Extension of Topside Instrumentation
Extension of Ship Automation System (refurbishment)
Extension of Emergency Shut Down Systems
Extension of Topside F&G systems Extension of existing HV Switchgear.
Delivery of 2 pc. 30MVA turbine generators.
Delivery of new 11kV switchboard.
Delivery of 6,6 kV emergency switchboard.
Extension of Power Management.
Delivery of transformers with bus-duct connection.
Delivery of 11 kV soft starters for Water Injection andGas Injection pumps.
Delivery of 6,6kV Soft Starters for emergencyswitchboard.
-
8/9/2019 ABB FPSO Solutions Ref
14/22
ABB GroupSeptember 24, 2009 | Slide 15
Fire & Gas
Emergency Shutdown
Process Shutdown
Process Control System
PIMS
Subsea Control
Compressor / Turbine Control
Training Simulator
Varg (Pertra)
-
8/9/2019 ABB FPSO Solutions Ref
15/22
ABB GroupSeptember 24, 2009 | Slide 16
Balder - ExxonMobil
Process Control System
Subsea Control
Well Control System
-
8/9/2019 ABB FPSO Solutions Ref
16/22
ABB GroupSeptember 24, 2009 | Slide 17
Terra Nova
Fire & Gas
Emergency Shut Down
Process Shutdown
Process Control
Subsea Control
PIMS
-
8/9/2019 ABB FPSO Solutions Ref
17/22
ABB GroupSeptember 24, 2009 | Slide 18
Island Wellserver
ABB Supplies Well Services:
Integrated Operation / Remote Services
Data Acquisition
Fire & Gas
Emergency Shutdown System
-
8/9/2019 ABB FPSO Solutions Ref
18/22
ABB GroupSeptember 24, 2009 | Slide 19
-
8/9/2019 ABB FPSO Solutions Ref
19/22
ABB GroupSeptember 24, 2009 | Slide 20
Tupi I
-
8/9/2019 ABB FPSO Solutions Ref
20/22
ABB GroupSeptember 24, 2009 | Slide 21
Tupi I
-
8/9/2019 ABB FPSO Solutions Ref
21/22
ABB GroupSeptember 24, 2009 | Slide 22
Tupi I
-
8/9/2019 ABB FPSO Solutions Ref
22/22
ABB GroupSeptember 24, 2009 | Slide 24
Fred Olsen Production Knock Allan FPSO