Overview
• Introduction
• The Chinese Labor Rate Model (CLRM)
• ResultsResults
• Conclusions
5
7/6/2010
6
The Case Study
Steel Fabrication Costs in Chinay
• A Suspension Bridge• Two Spans 10 000 Meters Long• Two Spans, 10,000 Meters Long• Orthotropic Box Girders
6
7/6/2010
7
The Case Study
Steel Fabrication Costs in Chinay
• 45,000 Metric Tons of Steel • 97% to be Fabricated in• 97% to be Fabricated in
Shanghai, China
What is a reasonable cost of Chinese laborWhat is a reasonable cost of Chinese labor for steel fabrication?
7
7/6/2010
8
Steel Fabrication Costs in ChinaThe Myth: Chinese Labor is Cheap and Abundanty p
Average Hourly Compensation Costs of Manufacturing Workers 2002
Source: “Manufacturing Earnings and Compensation in China,” Judith Banister, Aug. 2005 (BLS)
8
7/6/2010
9
The Myth: Chinese Labor is Cheap and Abundant
Steel Fabrication Costs in China
That is 5.8% of an American worker’s pay
9
Source: “Manufacturing Earnings and Compensation in China,” Judith Banister, Aug. 2005 (BLS)
7/6/2010
13
Steel Fabrication Costs in China
Earnings versus Total Compensationg p
Company Benefits
Total CompensationTotal cost to h l
Government Benefits
the employer
Additional Earnings
TotalBasic
Earnings
TotalEarnings
Paid to the worker
13
7/6/2010
14
Exchange Rates
Steel Fabrication Costs in China
14
Source: “Manufacturing Earnings and Compensation in China,” Judith Banister, Aug. 2005 (BLS)
7/6/2010
15
Exchange Rates
Steel Fabrication Costs in China
15
Source: “China: Country Commerce Report” Economist Intelligence Unit, Feb. 2009
7/6/2010
16
Steel Fabrication Costs in China
The Chinese Labor Rate Model (CLRM)
• Hypothesis: The 2/3 Rule
• Methodology
• The Model
• An Independent Assessment of Chinese Labor RatesChinese Labor Rates
16
7/6/2010
17
Steel Fabrication Costs in China
Hypothesis: The 2/3 Ruleyp
Source of Fabricated Steel Price Per Metric TonChina $1500China $1500U.S. $2500
17
7/6/2010
19
Steel Fabrication Costs in China
Hypothesis: The 2/3 Ruleyp
Country Hourly Shop RateU S $55 $75U.S. $55-$75China (theoretical) $36-$50
19
7/6/2010
20
Steel Fabrication Costs in China
Methodologygy
• Uses the Welder as the representative tradep
• Monte Carlo Simulation
• Results in the Expected T t l C ti H l R tTotal Compensation Hourly Rate
20
7/6/2010
21
The Chinese Labor Rate Model (CLRM)
Steel Fabrication Costs in China
( )
Inputs OutputSimulation
Basic Earnings
Total Compensation Components
The Expected Total
Compensation Hourly Rate
Weekly Work Schedule
Hourly Rate
21
7/6/2010
22
Steel Fabrication Costs in China
Model Inputs: Basic Earningsp g
Company Benefits
Government Benefits
Additional Earnings
BasicEarnings
22
x (Basic Hourly Rate x Shift Multiplier x Overtime Rate)Hours Worked
7/6/2010
23
Basic Earnings: Hourly Rate
Steel Fabrication Costs in China
g y
• Basic Hourly Rate for a Chinese Welder (Shanghai): $6
• Minimum wage in 2008: $1.14
23
7/6/2010
24
Basic Earnings: Work Shifts
Steel Fabrication Costs in China
g
• Regular Shift: 100% of Basic Rate
• Swing/Evening Shift: 115% of Basic Rate
• Expected Shift: Regular or Swing• Expected Shift: Regular or Swing» Discrete distribution function
24
7/6/2010
25
Steel Fabrication Costs in China
Basic Earnings: Overtime Rates
Sat SunMon Tue Wed Thu FriHours
1
g
2
3
4
Sun & Holiday300%
Weekday100% of Expected Shift Rate
Sat200%
5
7
6
$18.00$20.70
$12.00$13.80
Base $6.00Swing $6.90
89 Overtime 150% ($9.00 / $10.35)
25
7/6/2010
26
CLRM Inputs
Steel Fabrication Costs in China
p
Inputs OutputSimulation
• Basic Hourly Rate• Shift Multiplier• Overtime Rates
Basic Earnings
Total Compensation Components
The Expected Total
Compensation Hourly Rate
Weekly Work Schedule
Hourly Rate
26
7/6/2010
27
Steel Fabrication Costs in China
Model Inputs: Total Compensation Componentsp p p
Company Benefits
Government Benefits
Additional Earnings
BasicEarnings
27
7/6/2010
28
Additional (Taxable) Earnings
Steel Fabrication Costs in China
( ) g
Year End Bonus
50%
Paid Vacation & Holidays
Technical Capability Subsidy
Paid Vacation & Holidays
Technical Capability Subsidy
Year End Bonus
47.4%88.4%
8.4% 8.4%
14% 30%
50%25%
Basic Earnings
Basic Earnings gg
Low High
• Expected Rate: Uniform distribution function
28
7/6/2010
29
Steel Fabrication Costs in China
Model Inputs: Total Compensation Componentsp p p
Company Benefits
Government Benefits
Additional Earnings
BasicEarnings
29
7/6/2010
30
Government Social Welfare Benefits
Steel Fabrication Costs in China
Maternity 1%Housing Fund
H i F d5%
7%
Medical Insurance
Pension
Unemployment Insurance
Medical Insurance
Pension
Unemployment Insurance33%45%
6% 12%19%
22%
2%2%
Worker’s Comp
Worker’s Comp
0.5%1%
Maternity
Maternity
0.5%1%Housing Fund5%
Additional Taxable Earnings
B i
Additional Taxable Earnings
B i
Total Earnings
Total Earnings
Basic Earnings
Low High
Basic Earnings
g g
• Expected Rate: Uniform distribution function
30
7/6/2010
31
Steel Fabrication Costs in China
Model Inputs: Total Compensation Componentsp p p
Company Benefits
Government Benefits
Additional Earnings
BasicEarnings
31
7/6/2010
32
Company Benefits
Steel Fabrication Costs in China
p y
Ed ti
Small Tools,Consumables,
Safety EquipmentSmall Tools,
Consumables, 60%10%
10%
5%
Camp & Travel
Camp & Travel10%
20%
Accessorial Pension
Education
Government
Accessorial Pension
Education
,Safety Equipment31%
10% 20%
6%
10%5%
GovernmentGovernment Benefits
Total
Government Benefits
Total
Low High
Earnings Earnings
• Expected Rate: Uniform distribution function
32
7/6/2010
33
Steel Fabrication Costs in China
Model Inputs: Total Compensation Componentsp p p
Company Benefits 64%-105%
Government Benefits
64% 105%
Additional Earnings
BasicEarnings
33
7/6/2010
34
CLRM Inputs
Steel Fabrication Costs in China
p
Inputs OutputSimulation
• Basic Hourly Rate• Shift Multiplier• Overtime Rates
Basic Earnings
• Additional Taxable Earnings• Government Benefits• Company Benefits
Total Compensation Components
The Expected Total
Compensation Hourly Rate
Weekly Work Schedule
Hourly Rate
34
7/6/2010
35
Model Inputs: The Weekly Work Schedule
Steel Fabrication Costs in China
p y
• Realistic work week
S t i bl th lif f th j t• Sustainable over the life of the project
• Takes into account statutory limits
35
7/6/2010
36
Model Inputs: The Weekly Work Schedule
Steel Fabrication Costs in China
p y
Description Weekly Schedule Expected Value
Minimum MaximumMinimum Hours
Maximum Hours
Regular Weekday Hours 40 40 Uniform Distribution
Overtime Weekday Hours 0 5 Uniform Distributiony
Saturday Hours 0 8 Discrete Distribution0 hours: 50% probability8 hours: 50% probabilityIf overtime weekday > 4 hrs
Sunday Hours 0 8 Discrete Distribution0 hours: 60% probability8 hours: 40% probabilityOnly if worked Saturday
Total Hours Per Week 40 61 Sum of the aboveTotal Hours Per Week 40 61 Sum of the aboveExpected Values
36
7/6/2010
42
CLRM Inputs
Steel Fabrication Costs in China
p
Inputs OutputSimulation
• Basic Hourly Rate• Shift Multiplier• Overtime Rates
Basic Earnings
• Additional Taxable Earnings• Government Benefits• Company Benefits
Total Compensation Components
The Expected Total
Compensation Hourly Rate
• Weekday Hours• Weekday Overtime• Weekend Work
Weekly Work Schedule
Hourly Rate
42
Weekend Work
7/6/2010
43
Monte Carlo Simulation
Steel Fabrication Costs in China
Basic Earnings
Inputs OutputTotal Compensation Components
Weekly Work Schedule
• Numerous iterations• Randomly selected values
Probability distributions embedded in the input tables• Probability distributions embedded in the input tables
43
7/6/2010
44
Output: The Total Compensation Hourly Rate
Steel Fabrication Costs in China
p p y
Description Sample Output(one iteration)
CalculationWeekly
RateHourly Rate
Regular Weekday Pay $240.00 $6.00
Overtime Weekday Pay $22.50 $9.00Saturday Pay $0.00 $0.00S d P $0 00 $0 00Sunday Pay $0.00 $0.00
Basic Earnings $262.50 $6.18Additional Taxable Earnings $178.24 $4.19
Total Taxable Earnings $440.74 $10.37Total Taxable Earnings $440.74 $10.37Government Welfare Benefits $171.89 $4.04Company Benefits $200.54 $4.72
Total Compensation H l R t
$813.16 $19.13
44
Hourly Rate(before markups)
7/6/2010
45
Output: The Total Compensation Hourly Rate
Steel Fabrication Costs in China
p p y
Description Sample Output(one iteration)
CalculationWeekly
RateHourly Rate
Regular Weekday Pay $240.00 $6.00$6/hr x 100% regular shift x100% weekday rate x40 hrs
Overtime Weekday Pay $22.50 $9.00Saturday Pay $0.00 $0.00Sunday Pay $0.00 $0.00
Basic Earnings $262.50 $6.18Additional Taxable Earnings $178 24 $4 19Additional Taxable Earnings $178.24 $4.19
Total Taxable Earnings $440.74 $10.37Government Welfare Benefits $171.89 $4.04Company Benefits $200.54 $4.72
45
Total Compensation Hourly Rate(before markups)
$813.16 $19.13
7/6/2010
46
Steel Fabrication Costs in China
Model Inputs: Basic Earningsp g
Company Benefits
Government Benefits
Additional Earnings
BasicEarnings
46
x (Basic Hourly Rate x Shift Multiplier x Overtime Rate)Hours Worked
7/6/2010
47
Output: The Total Compensation Hourly Rate
Steel Fabrication Costs in China
p p y
Description Sample Output(one iteration)
CalculationWeekly
RateHourly Rate
Regular Weekday Pay $240.00 $6.00$6/hr x 100% regular shift x100% weekday rate x40 hrs
Overtime Weekday Pay $22.50 $9.00Saturday Pay $0.00 $0.00Sunday Pay $0.00 $0.00
Basic Earnings $262.50 $6.18Additional Taxable Earnings $178 24 $4 19Additional Taxable Earnings $178.24 $4.19
Total Taxable Earnings $440.74 $10.37Government Welfare Benefits $171.89 $4.04Company Benefits $200.54 $4.72
47
Total Compensation Hourly Rate(before markups)
$813.16 $19.13
7/6/2010
48
Output: The Total Compensation Hourly Rate
Steel Fabrication Costs in China
p p y
Description Sample Output(one iteration)
CalculationWeekly
RateHourly Rate
Regular Weekday Pay $240.00 $6.00
Overtime Weekday Pay $22.50 $9.00$6/hr x 100% regular shift x150% overtime rate x2.5 hrs
Saturday Pay $0.00 $0.00Sunday Pay $0.00 $0.00
Basic Earnings $262.50 $6.18Additional Taxable Earnings $178 24 $4 19Additional Taxable Earnings $178.24 $4.19
Total Taxable Earnings $440.74 $10.37Government Welfare Benefits $171.89 $4.04Company Benefits $200.54 $4.72
48
Total Compensation Hourly Rate(before markups)
$813.16 $19.13
7/6/2010
49
Output: The Total Compensation Hourly Rate
Steel Fabrication Costs in China
p p y
Description Sample Output(one iteration)
CalculationWeekly
RateHourly Rate
Regular Weekday Pay $240.00 $6.00
Overtime Weekday Pay $22.50 $9.00Saturday Pay $0.00 $0.00 $6/hr x
100% regular shift x200% S t d t200% Saturday rate x0 hrs
Sunday Pay $0.00 $0.00Basic Earnings $262.50 $6.18Additional Taxable Earnings $178 24 $4 19Additional Taxable Earnings $178.24 $4.19
Total Taxable Earnings $440.74 $10.37Government Welfare Benefits $171.89 $4.04Company Benefits $200.54 $4.72
49
Total Compensation Hourly Rate(before markups)
$813.16 $19.13
7/6/2010
50
Output: The Total Compensation Hourly Rate
Steel Fabrication Costs in China
p p y
Description Sample Output(one iteration)
CalculationWeekly
RateHourly Rate
Regular Weekday Pay $240.00 $6.00
Overtime Weekday Pay $22.50 $9.00Saturday Pay $0.00 $0.00S d P $0 00 $0 00 $6/hSunday Pay $0.00 $0.00 $6/hr x
100% regular shift x300% Sunday rate x0 hrs
Basic Earnings $262.50 $6.18Additional Taxable Earnings $178 24 $4 19Additional Taxable Earnings $178.24 $4.19
Total Taxable Earnings $440.74 $10.37Government Welfare Benefits $171.89 $4.04Company Benefits $200.54 $4.72
50
Total Compensation Hourly Rate(before markups)
$813.16 $19.13
7/6/2010
51
Output: The Total Compensation Hourly Rate
Steel Fabrication Costs in China
p p y
Description Sample Output(one iteration)
CalculationWeekly
RateHourly Rate
Regular Weekday Pay $240.00 $6.00
Overtime Weekday Pay $22.50 $9.00Saturday Pay $0.00 $0.00S d P $0 00 $0 00Sunday Pay $0.00 $0.00
Basic Earnings $262.50 $6.18Additional Taxable Earnings $178.24 $4.19
Total Taxable Earnings $440.74 $10.37Total Taxable Earnings $440.74 $10.37Government Welfare Benefits $171.89 $4.04Company Benefits $200.54 $4.72
Total Compensation H l R t
$813.16 $19.13
51
Hourly Rate(before markups)
7/6/2010
52
Output: The Total Compensation Hourly Rate
Steel Fabrication Costs in China
p p y
Description Sample Output(one iteration)
CalculationWeekly
RateHourly Rate
Regular Weekday Pay $240.00 $6.00
Overtime Weekday Pay $22.50 $9.00Saturday Pay $0.00 $0.00S d P $0 00 $0 00Sunday Pay $0.00 $0.00
Basic Earnings $262.50 $6.18Additional Taxable Earnings $178.24 $4.19 Basic Earnings x
Additional Taxable Earnings Rate
Total Taxable Earnings $440.74 $10.37Government Welfare Benefits $171.89 $4.04Company Benefits $200.54 $4.72
T t l C ti $813 16 $19 13
52
Total Compensation Hourly Rate(before markups)
$813.16 $19.13
7/6/2010
53
Output: The Total Compensation Hourly Rate
Steel Fabrication Costs in China
p p y
Description Sample Output(one iteration)
CalculationWeekly
RateHourly Rate
Regular Weekday Pay $240.00 $6.00
Overtime Weekday Pay $22.50 $9.00Saturday Pay $0.00 $0.00S d P $0 00 $0 00Sunday Pay $0.00 $0.00
Basic Earnings $262.50 $6.18Additional Taxable Earnings $178.24 $4.19
Total Taxable Earnings $440.74 $10.37Total Taxable Earnings $440.74 $10.37Government Welfare Benefits $171.89 $4.04Company Benefits $200.54 $4.72
Total Compensation H l R t
$813.16 $19.13
53
Hourly Rate(before markups)
7/6/2010
54
Output: The Total Compensation Hourly Rate
Steel Fabrication Costs in China
p p y
Description Sample Output(one iteration)
CalculationWeekly
RateHourly Rate
Regular Weekday Pay $240.00 $6.00
Overtime Weekday Pay $22.50 $9.00Saturday Pay $0.00 $0.00S d P $0 00 $0 00Sunday Pay $0.00 $0.00
Basic Earnings $262.50 $6.18Additional Taxable Earnings $178.24 $4.19
Total Taxable Earnings $440.74 $10.37Total Taxable Earnings $440.74 $10.37Government Welfare Benefits $171.89 $4.04 Total Taxable
Earnings xGovernment Benefits Rate
Company Benefits $200.54 $4.72
54
Total Compensation Hourly Rate(before markups)
$813.16 $19.13
7/6/2010
55
Output: The Total Compensation Hourly Rate
Steel Fabrication Costs in China
p p y
Description Sample Output(one iteration)
CalculationWeekly
RateHourly Rate
Regular Weekday Pay $240.00 $6.00
Overtime Weekday Pay $22.50 $9.00Saturday Pay $0.00 $0.00S d P $0 00 $0 00Sunday Pay $0.00 $0.00
Basic Earnings $262.50 $6.18Additional Taxable Earnings $178.24 $4.19
Total Taxable Earnings $440.74 $10.37Total Taxable Earnings $440.74 $10.37Government Welfare Benefits $171.89 $4.04Company Benefits $200.54 $4.72 Total Taxable
Earnings xCompany Benefits Rate
55
Total Compensation Hourly Rate(before markups)
$813.16 $19.13
7/6/2010
56
Output: The Total Compensation Hourly Rate
Steel Fabrication Costs in China
p p y
Description Sample Output(one iteration)
CalculationWeekly
RateHourly Rate
Regular Weekday Pay $240.00 $6.00
Overtime Weekday Pay $22.50 $9.00Saturday Pay $0.00 $0.00S d P $0 00 $0 00Sunday Pay $0.00 $0.00
Basic Earnings $262.50 $6.18Additional Taxable Earnings $178.24 $4.19
Total Taxable Earnings $440.74 $10.37Total Taxable Earnings $440.74 $10.37Government Welfare Benefits $171.89 $4.04Company Benefits $200.54 $4.72
Total Compensation H l R t
$813.16 $19.13
56
Hourly Rate(before markups)
7/6/2010
57
Steel Fabrication Costs in China
Results
Distribution of Welder Total Compensation Rate before Markup
90%
10%
57
7/6/2010
58
Steel Fabrication Costs in China
Conclusions
• The 2/3 Rule Works
• Additional International Support Costs
58
7/6/2010
62
Steel Fabrication Costs in China
The 2/3 Rule Works
Description U.S. China RatioBasic Hourly Rate $24 $6 25%yTotal Compensation Hourly Rate $33 $21 64%Overhead & Profit $41 $27 66%Total Shop Rate $74 $48 65%
62
7/6/2010
63
Steel Fabrication Costs in ChinaThe Myth: Chinese Labor is Cheap and Abundanty p
Average Hourly Compensation Costs of Manufacturing Workers2002
63
Source: “Manufacturing Earnings and Compensation in China,” Judith Banister, Aug. 2005 (BLS)
7/6/2010
64
Additional International Support Costs
Steel Fabrication Costs in China
pp
• Additional Quality Control
– Not familiar with U.S. standards
– Higher level of manual work
Additi l i t i d– Additional inspectors required
64
7/6/2010
65
Additional International Support Costs
Steel Fabrication Costs in China
pp
• Added Shipping Costs
– $0.50 to $1 per KG
– 21 - 45 days shipping time
S i l b i & dditi l i ti– Special bracings & additional inspections
65
7/6/2010
66
Additional International Support Costs
Steel Fabrication Costs in China
pp
• Logistics and Communications Difficulties
– Time zone differences
– Translations• Shop drawings
F b i ti• Fabrication sequence• Tolerances• Word connotation• Take time
66
7/6/2010
67
Additional International Support Costs
Steel Fabrication Costs in China
pp
• Limited Supply of Qualified Workers
– Expats needed
– Base cost equivalent or higher than U.S.
– Additional incentives required
67
7/6/2010
68
Steel Fabrication Costs in China
68
Source: “U.S. Apparel Retailers Turn Their Gaze Beyond China,” Wall Street Journal, June 16, 2010
7/6/2010
69
Coming Up
Steel Fabrication Costs in China
g p
• Quantification of Additional International Support Costs
• Welder Productivity Rates
69