पतासूच - Kar...पत स च / Address List 1. क य#क र "नद शक, प स...

50

Transcript of पतासूच - Kar...पत स च / Address List 1. क य#क र "नद शक, प स...

  • पतासू�च/ Address List

    1. काय#कार� "नदेशक, पोसोको, एसआरएलडीसी, ब�गलूर/ Executive Director, SRLDC, POSOCO, Bengaluru

    2. मुL य अ भयंता (एचपीसी व जल पMरयोजना) एपीजेनको, 4वी मंिजल, गुणदल, �वजयवाडा आं � 520004/ Chief Engineer (Generation), APGENCO, 4

    th Floor, VidyutSoudha, Eluru Road, Gunadala, Vijayawada, AP – 520 004

    3. मुख ् यअ भयंता (पMरयोजना), एपीजेनको, 4वी मंिजल, गुणदल, �वजयवाडा आं � 520004/Chief Engineer (Projects),

    APGENCO, 4th

    Floor, VidyutSoudha, Eluru Road, Gunadala, Vijayawada, AP – 520 004

    4. मुख ् यअ भयंता(आईपीसी व �व�युत�णाल�),एपीRान ् स ् को,3र� मंिजल, गुणदल, �वजयवाडा आं � 520004/ Chief

    Engineer (IPC & Power Systems), APTRANSCO, 3rd

    Floor, VidyutSoudha, Eluru Road, Gunadala,

    Vijayawada, AP – 520 004

    5. मुख ् यअ भयंता ( उत ् पादन), ट�एसजेनको, हैदराबाद/ Chief Engineer (Generation), TSGENCO, Hyderabad

    6. मुख ् यअ भयंता (पMरयोजना), ट�एसजेनको, हैदराबाद/ Chief Engineer (Projects), TSGENCO, Hyderabad

    7. मुख ् यअ भयंता (�व�युत�णाल�), ट�एसRान ् स ् को, हैदराबाद/ Chief Engineer (Power System), TSTRANSCO,

    Hyderabad

    8. मुख ् यअ भयंता (इले.Tडज़ाईन), केपीसीएल, ब�गलूर/ Chief Engineer (Ele. Designs), KPCL, Bangalore

    9. मुख ् यअ भयंता ( आरट�और आर & डी), केपीट�सीएल, ब�गलूर/ Chief Engineer (RT and R&D), KPTCL, Bangalore

    10. मुख ् यअ भयंता (एम.ट�.एस), टैनजोडको, चैन ् नै/ Chief Engineer (MTS), TANGEDCO, Chennai

    (Fax No: 044 – 28585804)

    11. मुख ् यअ भयंता (जल �व�युत), टैनजोडको, चैन ् नै/ Chief Engineer (Hydro),TANGEDCO, Chennai

    (Fax No: 044 – 28553356)

    12. मुख ् यअ भयंता (संर�णएवंसंचार), ट�एनईबी, चने ् नै/ Chief Engineer (Protection & Communication),

    TANTRANSCO, Chennai

    13. मुख ् यअ भयंता (पारेषण), �णाल��चालन, एचएमट�कालोनी, केएसईबी, कलमस ् सेर�-683503/ Chief Engineer

    (Transmission) System Operation, HMT Colony, KSEB, Kalamassery-683503

    14. अधी�क अ भयंता-।, �व�युत �वभाग, 137, एनएससी बोस साल,ै पुदचुरे�- 605001/ Superintending Engineer –I,

    Electricity Department, 137, NSC Bose Salai, Puducherry – 605001 (Fax No: 0413-2331556)

    15. जीएम ( �चावअनु) द�े-।, पावर�Yड, सकंदराबाद/ GM (O&M), SR-I, PGCIL, Secunderabad

    16. जीएम ( �चावअनु) द�े-।।, पावर�Yड, ब�गलूर/ GM (O&M), SR-II, PGCIL, Bengaluru

    17. महा�बंधक (ओएस), एनट�पीसी, द��ण�े�ीयमुख ् यालय, सकंदराबाद/ General Manager (OS), NTPC SRHQ,

    Secunderabad

    18. मुख ्य महा�बंधक ,ट�पीएस -।�वस ्तार ,एनएलसीआईएल ,नैवेल� - 607807 / Chief General Manager, TPS-I Expn. NLCIL,

    Neyveli-607807 (Fax No: 04142 – 265303)

    19. मुख ् यअ भयंता (पारेषण) एनपीसीआईएल, मुंबई/ Chief Engineer (Transmission), NPCIL, Mumbai.

    20. क� �"नदेशक, केजीएस, कैगा, कना#टक/ Station Director, KGS, Kaiga, Karnataka

    21. क� �"नदेशक, एमएपीएस, कल ् पक् कम/ Station Director, MAPS, Kalpakkam

    22. क� �"नदेशक, केकेएनपीपी, "त[नल ् वेल�िजला, त मलनाडु- 627106/ Station Director, KKNPP, Thirunelveli

    Dist,TamilNadu-627106

    23. \ीपीपीजेस ् ट�न, एजीएम (ईएम), एनट�ईसीएल, चने ् नै-103/ Shri P.P. Gestine, AGM (EM), NTECL, Chennai-103.

    24. \ी एम �भाकर, महा�बंधक (� व अ), एनट�पीएल, हाब#र ए� टेट, तूतुकुडी- 628004/ Sh. M. Prabhakar,

    GM (O&M), NTPL, Harbour Estate, Tuticorin – 628004 (Fax No: 0461 – 2352842)

    25. \ी सूय# �काश, उपा] य� (�चालन व अनुर�ण), जेएसड^ _ यू एनज` ल. तोरणग_ लु, ब_ लार� – 583275/

    Shri Surya Prakash, Vice President (Operations & Maintenance), M/s JSW Energy Ltd, Toranagallu,

    Bellary-583275

  • 26. \ी शांताराम प,ै सह उपा] य� (�व�युत एव ंपMरयोजना), जेएसड^ _ यू एनज` ल. तोरणग_ लु, ब_ लार� – 583275/

    ShriShantharamPai, Associate Vice President (Electrical & Projects), M/s JSW Energy Ltd, Toranagallu,

    Bellary-583275

    27. \ीआरवीभdए,उपाध ् य� ( �चालन) यूपीसीएल, ब�गलूर/ ShriR.V.Bhat, Vice President (Operations), UPCL,

    Bangalore

    28. सह उपा] य� ( संर�ण व मीटMरगं), अदानी पावर ल, 8-ए, 'संभव' जज भवन के सामने, बोदकदेव, अहमदाबाद-

    380015, गुजरात / Associate Vice President (Protection & Metering), Adani Power Ltd, 8-A, ‘Sambhav,’

    Opp. Judge’s Bungalow, Bodakdev, Ahmedabad 380 015, Gujarat, India

    29. \ी eब�युत च$बत` (�धान �व�युत एवं सी आई अनुर�ण) ट�पीसीआईएल, f यानपुरम / नेलg तू[ Yाम, मुतुकूर

    मंडल, एसपीएसआर ने_ लूर- 524344/ Sh. BidyutChakraborty (Head Electrical and C&I Maintenance), TPCIL,

    Pyanampuram/ Nelaturu Village, MuthukurMandal, SPSR Nellore – 524344 (Fax No: 0861 – 305 2304)

    30. \ी आर एस कुमार� वामी, सलाहार(�व�युत), सीईपीएल, मेलमरडूर Yाम, ओ+d�पदरम ता_ लूक, तूतुकुडी- 628105,

    त मलनाडु/ Sh. R.S. Kumaraswamy, Advisor (Electrical), CEPL, Melamarudur Village, OttipidaramTaluk,

    Tuticorin – 628 105, Tamil Nadu (Fax No: 0461 – 2614297)

    31. \ी ;कशोर आक# ट, वMर. उपा] य� (� व अ), आईएल व एफएस, ट�पीसीएल, सी पुदपेुdै डाक, परनगीपेdै, भुवन�गMर

    ता_ लूक, कुडलूर िजला, त मलनाडु- 608502/ Sh. Kishore Arcot, Sr. Vice President (O&M), IL&FS Tamilnadu

    Power Company Ltd., C.Pudhupettai (post), Parnagipettai, BhuvanagiriTaluk, CuddaloreDist, Tamilnadu –

    608502 (Fax No: 0414-4252991)

    32. \ी स^ यसाची मुखज`, वMर. उपा] य� ( � एव ं अ) +हदंजुा एनपीसीएल, पेटगंhयड मंडल, �वशाखपhनम, आ �-

    530031/ Sh. Sabyasachi Mukherjee, Sr. Vice President (O&M), Hinduja NPCL, PedagantyadaMandal,

    Visakhapatnam, AP – 530031.

    33. \ी एस सुंदरमू"त#, उपा] य� ( �चालन), लैनको कiडप_ ल� पावर ल मटेड, आईडीए कiडप_ ल�, इjा+हमपhनम मंडल,

    कृl ण िजल ्ला, आंm �देश- 521228/ Sh. S. Sundaramoorthy-Vice President (operations), LancoKondapalli

    Power Limited, IDA Kondapalli, IbrahimpatnamMandal, Krishna district, Andhra Pradesh-521228, (Fax

    No: 0866-2872801)

    34. "नदेशक (एनपीसी�भाग), के�व�ा, नई+दल ् ल� / Director (NPC Division), CEA, New Delhi

    *****

  • Agenda for the 82nd

    Meeting of PCSC scheduled to be held on 28th

    March, 2019 Page 1

    SOUTHERN REGIONAL POWER COMMITTEE BENGALURU

    Agenda for the 82nd Meeting of Protection Coordination Sub-Committee of SRPC to be held on 28th March, 2019

    1. Introduction

    2. Confirmation of Minutes of last PCSC meeting

    Confirmation of minutes of 81st Protection Coordination Sub-Committee meeting held on 28 January 2019.

    3. Grid Occurrences

    3.1 Grid Disturbances (GD), Grid Incidences (GI), and trippings due to failure of Auto-

    reclosing (A/R), and mal-operation of PLCC equipment that occurred during the period January, 2018 – March, 2019 given at Annexure-I would be discussed in the PCSC meeting.

    Constituents are requested to furnish the following information in respect of the above grid occurrences to have fruitful discussions.

    (a) Single line diagram of the station with switching devices, CT, PT and relay details. (b) Cause of the tripping & Remedial Action taken (c) Relay setting details

    Constituents are requested to bring/ furnish full particulars of the tripping events pertaining to their system.

    3.2 In compliance of Regulations 5.2 (r) of IEGC, the Constituents are required to furnish

    the following information in respect of Grid Occurrences within 24 hrs of occurrence of the same to SRLDC/ SRPC: (a) First Information Report (FIR) (b) Event Logger (EL) output (c) Disturbance Recorder (DR) output (d) Trip event analysis report (with pre and post fault system conditions) Non-furnishing of tripping details (FIR/DR/EL/TR) for the period 01.01.2019 – 28.02.2019 had been brought to Constituents’ notice vide letters (i) No. SRPC/ SE-III/ PCSC/ 2019/ 148-155 dated 08.01.2019, (ii) No. SRPC/ SE-III/ PCSC/ 2019/ 532-538 dated 18.01.2019, and (iii) No. SRPC/ SE-III/ PCSC/ 2019/ 780-90 dated 05.02.2019, (iv) No. SRPC/ SE-III/ PCSC/ 2019/ 1061-70 dated 19.02.2019, (v) No. SRPC/ SE-III/ PCSC/ 2019/ 1228-40 dated 06.03.2019. Non-compliance in this regard would be discussed in the meeting.

    4. Submission of Reports/ Compliance by Constituents

    4.1 Status of implementation of pending Protection Coordination

    Sub-Committee (PCSC) Recommendations

    The status of implementation of pending PCSC recommendations (up to 81st PCSC

  • Agenda for the 82nd

    Meeting of PCSC scheduled to be held on 28th

    March, 2019 Page 2

    meeting) is given at Annexure-II. The latest status on the same may please be sent latest by 20.03.2019.

    4.2 Remedial measures for "Transmission Elements under Forced Outage"

    The Constituents are requested to furnish the remedial measures/ action taken by them for the tripping events as circulated vide our emails. (Annexure-III)

    The tripping events are based on the daily reports at SRLDC website http://srldc.in/Reports.aspx under the menu: Reports->Daily-> "TL under Forced Outage")

    4.3 Certificate for Healthiness of Batteries

    As per the MoP direction given in pursuant to recommendations of the Enquiry Committee (NEW grid disturbance on 30th & 31st July, 2012), RPC’s are required to obtain from their respective Constituents the monthly certificate for healthiness of batteries, installed at 220 KV and above voltage level Substations (for power supply to Relays, RTUs and PLCC equipment) and furnish the same to CEA/ MoP.

    With reference to above, the Constituents have been requested to submit the certificate on healthiness of batteries on monthly basis (i.e. status for a month shall be sent by the 7th day of the following month) to SRPC Secretariat.

    The sought status for the month of February, 2019 is awaited from the following SR-Constituents:

    TSGENCO (Thermal & Hydro), KPTCL, TANGEDCO, TANTRANSCO, KSEBL, Puducherry ED, TPCIL

    5. Operationalization of Data Modification Notification System (DMNS) for the States

    of Southern Region

    On the above subject, SRPC vide (i) letter no: SRPC/ SE-III/ PMS/ 2018/ 5124 – 146 dated 03.08.2018 & subsequent reminder mails, and (ii) letter no: SRPC/ SE-III/ PMS/ 2018/ 7242-62 dated 16.11.2018 & subsequent reminder mails had requested the Utilities of Tamil Nadu & Puducherry & Kerala & Telangana and Andhra Pradesh & Karnataka respectively to furnish the details of their Users who are responsible for calculating relay settings and/ or intimating calculated relay settings to the field to SRPC Secretariat ([email protected]) so as to create their respective DMNS Accounts. However, it is noted with concern that details in this regard are still awaited from the following Utilities:

    KA-SLDC & Lanco KPL Since DMNS has already been operationalised w.e.f. 10.09.2018, it is requested from the above Utilities to kindly furnish the sought details without further delay. In this regard, it is also requested from all Utilities (including SLDC’s) of Tamil Nadu, Kerala, Telangana, Puducherry, Andhra Pradesh, Karnataka & SRLDC to regularly use DMNS application for intimating further changes that have taken place at the stations falling under their control.

    http://srldc.in/Reports.aspxmailto:[email protected]

  • Agenda for the 82nd

    Meeting of PCSC scheduled to be held on 28th

    March, 2019 Page 3

    6. Other Protection Issues, if any, with the permission of the Chair

    7. Sending Agenda items for the PCSC meetings

    As per the Guidelines of CEA/MOP, it has been decided to conduct the PCSC meetings on monthly basis. It is requested that Agenda Items for the PCSC meetings, if any, may please be sent latest by 5th working day of the month to SRPC Secretariat to compile and circulate the same so as to have fruitful discussions in the PCSC meetings.

    8. Date of next PCSC meeting

    It is informed that the 83rd meeting of PCSC will be held on 16th May, 2019 (Thursday) from 10:30 hrs onwards in the Conference Hall of SRPC Secretariat, Bengaluru.

    *****

  • Grid Occurrences to be discussed in the 82ndMeeting of PCSC scheduled to be held on 28th March , 2019 1/5

    Grid Occurrences - 81

    For all tripping events involving failure of substation equipment, Constituents are requested to kindly furnish the SLD or equivalent pictorial representation showing (i) Location of the fault, and (ii) Bus-bar arrangement/ Configuration of feeders and other connected equipment with proper CB positions (OPEN/ CLOSE) at the time of occurrence of the fault.

    I. Details of Grid Disturbances:

    Sl. No.

    Details of Event Date &Time Reason Remarks Category

    1

    Complete outage of 400kV Sriperumbudur station

    28-01-2019

    at 01:15 Hrs

    Failure of ‘R-phase’ HV side Current transformer (CT) of 315MVA 400/230kV ICT-3 at 400kV Sriperumbudur substation (400kV TANTRANSCO switchyard).

    GD-2

    2 Complete Outage of 220kV Hootagalli SS of KPTCL

    03-02-2019

    at 20:26 hrs

    B-ph fault due to failure of B-ph CT of Bus Coupler at 220kV Hootagalli Station. Since bus bar protection is not available at 220kV Hootagalli, fault was cleared by tripping of all connected lines at remote end on Zone 2 Distance Protection operation

    GD-1

    3

    Complete Outage of 220kV Kadra Power House of KPCL & 220kV Karwar SS of KPTCL

    04-02-2019

    at 20:19 hrs

    During de-synchronising of Kadra unit#2, R-pole didn’t open due to struck breaker condition. Pole Discrepancy operated. All the connected 220kV lines at Kadra end were hand tripped.

    GD-1

    4 Complete Outage of 220kV Ambewadi Station of KPTCL

    06-02-2019

    at 14:51hrs

    Fault occurred while test charging of 220kV Ambewadi – Nagjheri Line -2 from Ambewadi end. Suspected stuck breaker condition at Ambewadi end) led to clearing of fault by tripping of remote end breaker in Zone-2. LBB protection is not active at 220kV Ambewadi station.

    GD-1

    5

    Complete Outage of 220kV Bhramapuram substation of KSEB

    08-02-2019

    at 10:28 hrs

    Complete outage of 220kV Brahmapuram SS occurred due to suspected mal operation of Bus Bar protection.

    GD-1

    6

    Complete Outage of 220kV N’Sagar Main Power House of TSGENCO

    17-02-2019

    at 23:32 hrs

    During change over to Pump Condenser mode, bus fault occurred at 220kV N’Sagar Main Power House. Due to non-operation of BBP (Bus Bar Protection), fault was cleared by tripping of 220kV connected feeders on Zone 2 Distance Protection operation.

    GD-1

    7

    Complete Outage of 220kV Gooty Switching Station (SWS) of APTRANSCO

    19-02-2019

    at 04:15 hrs

    Failure of B-ph CT occurred in 220kV Gooty PG to Gooty SWS line-1. Bus-1 and Bus-2 Bus Bar Protection (BBP) operated resulting in the tripping of all the connected elements at 220kV Gooty SWS

    GD-1

    Annexure-I

  • Grid Occurrences to be discussed in the 82ndMeeting of PCSC scheduled to be held on 28th March , 2019 2/5

    8 Complete outage of 220kV Alipura substation

    20-02-2019

    at 12:45 hrs

    As informed by KPTCL, Suspected delayed clearance of fault in 220 kV BTPS-Lingapur line from BTPS end resulted in tripping of lines from Alipura S/s.

    GD-1

    9

    Complete Outage of 220kV NIMHANS and 220kV East DV Compound (EDC) SS of KPTCL

    22-02-2019

    at 11:35 hrs

    R-ph to Y-ph fault in 220kV Hoody to HSR line-1. 220kV HSR-EPIP line got overloaded and tripped at HSR end only on Overcurrent protection.220kV HSR-NIMHANS line was hand tripped at HSR end. 220kV EDC and 220kV NIMHANS were fed from HSR and Hoody SS.

    GD-1

    10

    Complete outage of 230kV Mywadi substation of TANTRANSCO

    04-03-2019 at 11:25 hrs

    As per the verbal information received,

    triggering incident was B-ph bus fault.

    Bus bar protection of Bus-1 and Bus-2

    operated at 230kV Mywadi substation

    GD-1

    II. Details of Grid Incidents:

    Sl. No. Details of Event Date &Time Reason Category

    1 Tripping of 400kV KTPS

    VI- KTPS VII 05-01-2019 at 10:17hrs

    Line tripped at KTPS VI end due to suspected mal-operation of over-voltage protection. Line was in service from KTPS VII., BUS CVT secondary R PHASE got grounded at KTPS VI

    2 Tripping of 400kV/220kV

    Talarichevu ICT-2

    09-01-2019 at 12:22hrs

    ICT#2 got tripped on differential protection operation during charging of 80MVA Potential Transformer at 220kV Talarichevu Pooling Station. Suspected Mal-operation of ICT#2 differential protection

    3 Tripping of 400 kV

    Kalpakka-Vemagiri line-1

    16-01-2019 at 01:54hrs

    Line tripped on operation of Overvoltage Stage-1 protection at Vemagiri end and DT received at Kalpakka end. DR of Vemagiri end not furnished.

    4 Tripping of 400/220kV

    Julurupadu ICT-1&2

    21-01-2019 at 05:02hrs

    ICT-1&2 tripped on LV Earth fault during fault in 220kV Julurupadu-Peddagopathy-1 feeder. Distance protection of line did not operate at Julurupadu end

    5 Tripping of 400 KV

    Mahbubnagar – Uravakonda line - 2

    22-01-2019 at 18:53hrs

    OV St-1 at Uravakonda end and DT was received at Mahaboobnagar end. From DR, voltages observed are: Vr-244kV, Vy-247kV and Vb-257kV. B-ph voltage is found to be higher than R and Y phases.

    6 Tripping of 400/220 kV ICT-1 at Khammam

    27-01-2019 at 14:33hrs

    ICT-1 at Khammam tripped on operation of IV side non directional Over-current high set during failure of L.A in 220kV Khammam (Budhidampadu)-Suryapet line-2.

    Annexure-I

  • Grid Occurrences to be discussed in the 82ndMeeting of PCSC scheduled to be held on 28th March , 2019 3/5

    7 Tripping of 400/220 kV ICT-1 at Khammam

    28-01-2019 at 1:15hrs

    ICT-3 at Khammam tripped on operation IV side over flux

    8 400 kV N'Sagar-Cuddappa line -1

    29-01-2019 at 06:14hrs

    Line tripped due to mal-operation of Buchholz relay at Cudappah and direct trip was received at N'Sagar end

    9 400kV Singareni-Sundilla line-2

    31-01-2019 at 18:38 hrs

    Tripped on operation of Overvoltage Stage-1 protection at Sundilla end and DT received at Singareni end. Considerable difference in the phase voltages observed from the DR of Sundilla end (Vr-261.7, Vy-238kV and Vb-214kV).

    02-02-2019 at 20:06 hrs

    Tripped on operation of Overvoltage Stage-1 protection at Sundilla end and DT received at Singareni end. Considerable difference in the phase voltages observed from the DR of Sundilla end (R-261kV, Y-237kV, B-214kV)

    18-02-2019 at 18:39 hrs

    Tripped on operation of Overvoltage Stage-1 protection at Sundilla end and DT received at Singareni end. Considerable difference in the phase voltages observed from the DR of Sundilla end (Vr-262.75kV, Vy-240kV & Vb-215kV)

    10 Tripping of 400 kV Kalpakka-Vemagiri line-1

    04-02-2019 at 02:03hrs

    Line tripped on operation of over voltage protection at Vemagiri and direct trip was received at Kalpakka . Voltages recorded in DR at Kalpakka (R-242kV, Y-243kV, B-241kV). DR of Vemagiri not furnished.

    11 Tripping of 400kV KTPS-7 Khammam line

    04-02-2019 at 06:15 hrs

    Line got tripped due automatic restarting of Main-1 distance relay at Khammam end. Suspected mal-operation of Main-1 Relay. Line holding from KTPS end

    12 Tripping of 400kV Kaiga-Guttur line-1&2

    07-02-2019 at 11:49 hrs

    Line-1 tripped due to insulator flashover. Line-2 tripped due to zone-3 operation at Kaiga and Direct trip receive at Guttur

    13 Tripping of 400kV Kaiga - Guttur Ckt-2 & 400/220kV ICT-2 at Kaiga

    11-02-2019 at 11:46 hrs

    Bus-2 at 400kV Kaiga got de-energized due to LBB operation.

    14 Tripping of 400 kV Simhadiri-Kalpakka line-3

    13-02-2019 at 21:46 hrs

    Breaker at Kalpaka end tripped without any alarm Simahdri end breaker is in close condition

    15 400 kV VIJAYAWADA - NELLORE 1

    17-Feb-2019 at 05:08 hrs

    Tripped on operation of overvoltage Stage-1 protection at Vijaywada (Nunna) end and DT received at Nellore end. As reported, Overvoltage relay at Vijaywada (Nunna) end had maloperated due to failure of relay resistor coil

    16 Complete outage of 230kV side of 400/220kV Karamadai station

    19-02-2019 at 14:15 hrs

    Triggering incident was failure of B-ph CT of 230kV Karamadai Ingur line at Karamadai end.

    Annexure-I

  • Grid Occurrences to be discussed in the 82ndMeeting of PCSC scheduled to be held on 28th March , 2019 4/5

    III. Details of Trippings due to Failure or Non-operation of Auto-Reclose:

    Sl. No. Element Date & Time Reason

    1 Tripping of 400kV Ramagundam-Hyderabad line-IV

    05-01-2019 at 03:37 hrs

    Y-N fault in line. At Hyderabad end Autoreclose operated and at Ramagundam end autoreclose not operated due to direct trip receive

    2 Tripping of 400KVHinduja-KV Kota-1

    14-01-2019 at 13:46 hrs

    Line tripped on B-phase to earth fault. Auto-reclose did not operated at both ends.

    3 Tripping of 220kV Kadakola Kaniyampet

    17-01-2019 at 16:44 hrs

    Line tripped on B-phase to earth fault. At Kadakola end A/r not operated. A/r was successful at Kaniyampet end

    4 Tripping of 400kV Dhoni-Munirabad line

    22-01-2019 at 15:44 hrs

    Y-ph to earth fault occurred in line. A/ r not attempted at munirabad end due to DT receipt from Dhoni end

    5 Tripping of 220kV Sedam Tandur

    25-01-2019 at 15:48 hrs

    R-ph fault in the line. At Sedam end, A/r not attempted. At Tandur end, A/r operated and line tripped due to subsequent fault during A/r reclaim time

    6 Tripping of 400 kV KHAMMAM - KALPAKKA line-1

    04-02-2019 at 13:15 hrs

    Line tripped on R-phase to earth fault. Auto reclose not attempted due to both PLCC channel failure

    7 Tripping of 220 kV GUMMUDIPUNDI - SULLURPET line

    08-Feb-2019 at 13:52hrs

    B-phase to earth fault occurred in line. Auto-reclose was successful at Sulurupetta. At Gummudipundi end Main 2 relay (RA ZOA) issued a 3 -phase trip

    8 Tripping of 400kV VTPS-SURYAPET-1

    10-02-2019 at 13:20 hrs

    B-phase to earth fault occurred in line. Auto-reclose was successful at Suryapet and breakers got tripped at VTPS end

    9 Tripping of 400kV VTPS-SURYAPET-1

    15-02-2019 at 14:36 hrs

    B-phase to earth fault occurred in line. Auto-reclose was successful at Suryapet and breakers got tripped at VTPS end

    10 Tripping of 220KV KTPS-NUNNA

    15-Feb-2019 at 12:40 hrs

    R-phase to earth fault occurred in line. Line did not attempt auto-reclose as A/R is not enabled.

    11 Tripping of 400 kV KAIGA - GUTTUR line- 1

    16-Feb-2019 04:27 hrs

    R-phase to earth fault occurred in line resulting in tripping of line. Auto-reclose not attempted at both ends

    Annexure-I

  • Grid Occurrences to be discussed in the 82ndMeeting of PCSC scheduled to be held on 28th March , 2019 5/5

    IV. Details of Trippings due to PLCC mal-operation:

    Sl. No. Element Date & Time Reason

    1 Tripping of 400 kV Kayathar - Karaikudi 2

    04-01-2019 at 18:31 hrs

    Line tripped on direct trip receive at Karaikudi end and was in service from Kayathar end. Suspected PLCC mal-operation at Kayathar end.

    Annexure-I

  • Meeting

    No /

    Index

    Details of Event Date & Time Reason PCSC Recommendations Utility responsible for

    Implementation

    Status of Implementation of PCSC Recommendations Remarks

    Status of Pending Implementation of PCSC Recommendations as on 11.03.2019 (up to 81th Meeting)

    KPTCL Mail dated 27-05-2015:

    1. KPTCL has taken action to provide bus bar protection to 220kV buses. --- Pending

    2. Over current relay Settings of ICTs to be reviewed by PGCIL.

    --- Pending

    3. --- Pending

    KPTCL Mail dated 29-07-2015:

    1. Initial Tendering stage. --- Pending

    2. --- Pending

    3. --- Pending

    KPTCL Mail dated on 23-01-2016:

    1. Detailed estimate prepared for taking up the work. CEE, Transmission Zone, Gulbarga will take

    up necessary procurement and further execution. --- Pending

    2. --- Pending with PGCIL (SR-I).

    3. --- Pending

    PGCIL (SR-I) Mail dated 14.07.2016:

    2. Relay settings of all the stations in SRTS-1 were derived as per Ramakrishna Commettee

    recomendations and implemented" --- Completed.

    KPTCL Mail dated 16.12.2017:

    1) & 3). DPR is approved. Tender is to be called by CEE,TZ Kalaburgi --- Pending

    Review Meeting dated 19.12.2017:

    1. KPTCL informed that Tenders for providing BBP would be called in Jan-Feb, 2018; Supply of

    the same is targeted by September, 2018; Erection & Commissioning is targeted by January,

    2019

    --- Pending

    3. PGCIL (SR-I) informed that time-synchronization of 220 kV side is in place. --- Completed.

    KPTCL mail dated 19.12.2018:

    1. DPR preapared for the work of providing Bus Bar Protection to 220kV buses at Guddadahally

    is approved. Tender is to be invited by CEE,TZ .

    Review Meeting dated 20.12.2018:

    1. Tender would be floated in January 2019. Works would be completed in 6 months after

    awarding PO.

    16-07-201434/I/6 400/220 kV ICT-1 & 2 at

    Munirabad

    As reported directional over current relay of ICT’s operated

    due to snapping of line jumper in 220kV Lingapur line.

    1. Bus bar protection shall be provided by asset owner ( i.e

    KPTCL).

    2. Settings for main distance protection & Overcurrent

    protection shall be examined and reviewed.

    3. Time synchronization of the Substation shall be ensured.

    KPTCL/

    PGCIL (SR-I)

    Pending

    (with KPTCL)

    Multi-Utilities

    Annexure-II

    Page 1 of 33

  • PGCIL (SR-I) mail dated 20.06.2018:

    PGCI(SR1) procuring LDP relays for retrofitting of Main-1&2 distance relays. Tenders are invited

    from bidders & tender floated. Technical bid opening in this week.

    PGCIL (SR-I) mail dated 10.12.2018:

    PO placed on M/s GE & TD India Ltd on 24.09.2018. Supply of relays is schdule for for January,

    2019 and commissioning is targed to be completed by March, 2019.

    PGCIL (SR-I) mail received on 27-04-2016:

    1. The firmware of REL670 is being upgraded. ------- Completed.

    2. The recording of events in msec interval is being taken up with OEM. Henceforth, for analysis

    purpose, we will provide larm list which has msec time stamp. -------- Completed.

    3. End to end testing of PLCC code transmision and tuning of channels carried out. -------

    Completed.

    4. Procurement of differential protection for 400kV NPS-NLR D/C and 400kV RCR-RTPS-D/C is

    under tendering. The legends modified in Event/alarm list. Provision of diff. relay for all short

    lines emanating from NPS is being taken up with our corporate.

    ----- Pending.

    PGCIL(SR-I) RVMD 14-07-2016:

    4. The proposal for procurement of Line differential Protections for 400kV Raichur - RTPS-1 & 2

    and 400kV Nellore - NPS - 1 & 2 lines has been approved and tender is under technical

    evaluation --- Pending

    Complete outage of TPCIL power

    station

    PendingRunning units at Thermal Powertech power Station tripped

    due to tripping of 400kV Nellore pooling station (NPS)-TPCIL

    line and 400kV Nellore pooling station (NPS)-NCC line

    47/I/2 Complete outage of

    Krishnapatnam TPS

    08-09-2015

    at 18:20 hrs

    APGENCO letter dated 18.03.2016:

    1.SOE and SLD are attached. The DR of 405 CB is not generated during the incident. Now the

    problem is identified and rectified.

    --------- Completed

    2.All the 3 lines i.e CHTR-2, MNBL-I & II tripped in zone

    protection. The fault was in Blind zone i.e P2 side of CT, where it was covered under Bus fault by

    the time fault moved on to P1 side when the fault comes under STUB/TEED zone after 330msec

    all the feeders expect CHTR-1 tripped in Zone-II and total fault persisted for 500msec before the

    405 TIE CB opens and clear the fault. As a remedial the STUB protection operation also checked

    and found OK.------- Completed

    3.The Time Sync was missed on the day and found there was problem with LAN Timer same was

    rectified. Now found OK.

    -----------Completed

    4.Now the DR Time scale changed to 1 sec for Pre fault and 3 sec for Post fault and STATE of

    events are corrected wherever found wrong/or misguiding during analysis.---------Completed.

    PGCIL-SR1 RVMD 27-04-2016:

    5. Procurement of differential protection for 400kV NPS-NLR D/C and 400kV RCR-RTPS-D/C is

    under tendering.

    PGCIL-SR1 RVMD 14-07-2016:

    5. The proposal for procurement of Line differential Protections for 400kV Raichur - RTPS-1 & 2

    and 400kV Nellore - NPS - 1 & 2 lines has been approved and tender is under technical

    evaluation

    PGCIL (SR-I) Mail dated 15.12.2017:

    PGCIL: On 23.11.2017 LDP relays commissioned in place of Main-1 distance relay in 400kV NPS-

    Nellore line-2 & In line-1 installation of LDP relay is planned in Dec-2017/Jan-2018.

    Review Meeting dated 19.12.2017:

    5. PGCIL (SR-I) informed that LDP commissioning on both lines would be completed by February,

    2018. In this regard, PCSC made it clear that the recommendation pertains to providing LDP as

    both Main-I & Main-II on both the lines, and asked PGCIL (SR-I) to ensure & comply with the

    same.

    PGCIL (SR-I),

    MEPL, SEL, TPCIL, NCC

    50/I/2 1.PGCIL (SR-I) to furnish Action Taken Report on the findings

    of OEM on relay mal-operation at NPS end on 400 kV NPS –

    NCC line to PCSC forum.

    2. PGCIL (SR-I) to appropriately configure Station Event Logger

    at NPS to record events at msec interval.

    3. PGCIL (SR-I) to carry out PLCC end-to-end testing in

    coordination with TPCIL for 400 kV NPS –TPCIL line.

    4.PGCIL (SR-I), MEPL, SEL, TPCIL & NCC to take steps to

    provide line differential protection at their respective ends on

    all 400 kV lines (except Gooty line) emanating from Nellore

    Pooling Station, and furnish an action plan to implement the

    same.

    30-12-2015 at

    06:02hrs

    As per FIR submitted, CT damage observed in Chitoor-Main

    bay (404). Main breakers connected to bus-1 (401, 404, 407,

    410) got tripped on operation of bus bar protection. Unit-1

    tripped on operation of MFT. Unit-2 was not in service

    1. APGENCO to furnish to PCSC forum (i) A3-size Single Line

    Diagram of SDSTPS, and (ii) the sequence of events with time

    stamp showing the protection that opened Tie-CB (405) at

    SDSTPS.

    2. APGENCO to review STUB/TEED protection in all dias at

    SDSTPS and ensure that they are configured for instantaneous

    operation.

    3. APGENCO to properly configure the STATE of the tripping

    events so that they get recorded appropriately like TRIP/

    OPERATED in their corresponding Event Loggers.

    4. APGENCO to ensure time sync of all DR’s and EL’s at

    SDSTPS.

    5. PGCIL (SR-I) to provide line differential protection for 400

    kV NPS –Nellore-PG lines 1 & 2.

    APGENCO/

    PGCIL (SR-I)

    Pending

    [with

    PGCIL (SR-I)]

    Annexure-II

    Page 2 of 33

  • PGCIL (SR-I) Mail dated 15.12.2017:

    4. LDP relays procurement is under process. Procurement will be completed by Feb-2018. TPCIL

    has to give written confirmation for LDP relay procurement. For want of written confirmation

    from TPCIL, PGCIL approving authority has withheld the LDP proposal.

    Review Meeting dated 19.12.2017:

    4. PGCIL (SR-I) informed that they are waiting for written confirmation from TPCIL to complete

    procurement of LDP relays. To this, PCSC forum asked TPCIL to submit written confirmation to

    PGCIL (SR-I) by 29.12.2017. PGCIL (SR-I) assured that with receipt of above confirmation from

    TPCIL by Dec, 2017, they would be able to complete the work by FEbruary, 2018.

    APTRANSCO informed that they would be able to implement LDP from their & APGENCO side by

    April, 2018.

    In this regard, PCSC forum made it clear that the recommendation is about providing LDP as

    both Main-I & Main-II relays on all stated lines in Nellore Complex, ans asked all stakeholders to

    ensure & comply with the same.

    PGCIL (SR-I) mail dated 20.06.2018:

    PGCI(SR1) procuring LDP relays for retrofitting of Main-1&2 distance relays. Tenders are invited

    from bidders & tender floated. Technical bid opening in this week.

    PGCIL (SR-I) mail dated 10.12.2018:

    PO placed on M/s GE & TD India Ltd on 24.09.2018. Supply of relays will be completed by

    Jan'2019 and commissioning by Mar'19

    APTRANSCO mail dated on 31-08-2016:

    To avoid the unwanted malopeartions due to the external LBB trip initiation from PGCIL, Vide

    letter Dt: 04-08-2016, APTRANSCO has requsted the PGCIL to arrange the Master trip relay and

    breaker contacts of ICT-1 &2 LV side to enable the internal LBB feature in the Busbar protection

    scheme at 220kV Gooty Switching station. Waiting for the PGCIL response.

    APTRANSCO mail dated on 15-11-2016:

    To avoid the unwanted maloperations due to the external LBB trip initiation from PGCIL, vide

    letter Dt: 04-08-2016, ARTRANSCO has requested the PGCIL to arrange the Master trip relay and

    breaker contacts of ICT-1&2 LV side to enable the internal LBB feature in the Busbar protection

    scheme at 220kV Gooty Switching station. Waiting for the PGCIL response.

    APTRANSCO mail dated on 20-12-2016:

    Waiting for the PGCIL response.

    APTRANSCO mail dated 04.03.2017 & 24.05.2017.

    SRPC is requested to coordinate with PGCIL in takind necessary action.

    APTRANSCO mail dated 20.09.2017 & 22.11.2017

    PGCIL may be requested to take necessary actionAPTRANSCO maild ated 15.12.2017:

    1. Cable healthiness checked and found ok. But it is proposed to replace the cable with armored

    cable. --Completed

    2. After replacing the cable contactors will be removed so as to avoid unwarrented delays in

    transmitting trigging signal to the central unit . ---Pending

    Review Meeting dated 19.12.2017:

    APTRANSCO informed that replacement of the existing cable with armoured cable and

    subsequent removal of cable contactors would be completed by 31.12.2017. In this regard,

    PGCIL (SR-I) also assured that they would render all required help from their side to complete

    the stated works in time.

    APTRANSCO Mail Dated 30.01.2018:

    New armoured cable is laid from 220 kv Gooty (AP) to 400/220 kv Gooty (PGCIL) for replacing

    the existing cable connected to ICT-2.PGCIL is requested to provide spare contacts from trip

    relays of 315 mva LV-1 and LV-2 for providing internal CB failure in busbar protection scheme.

    Complete outage of TPCIL power

    station

    PendingRunning units at Thermal Powertech power Station tripped

    due to tripping of 400kV Nellore pooling station (NPS)-TPCIL

    line and 400kV Nellore pooling station (NPS)-NCC line

    Tripping at 220 kV Gooty

    Substation of APTRANSCO

    56/II/13

    PGCIL (SR-I),

    MEPL, SEL, TPCIL, NCC

    50/I/2

    24-06-2016 at 16:04

    hrs

    Pending [ with PGCIL

    (SR-I) ]

    1.PGCIL (SR-I) to furnish Action Taken Report on the findings

    of OEM on relay mal-operation at NPS end on 400 kV NPS –

    NCC line to PCSC forum.

    2. PGCIL (SR-I) to appropriately configure Station Event Logger

    at NPS to record events at msec interval.

    3. PGCIL (SR-I) to carry out PLCC end-to-end testing in

    coordination with TPCIL for 400 kV NPS –TPCIL line.

    4.PGCIL (SR-I), MEPL, SEL, TPCIL & NCC to take steps to

    provide line differential protection at their respective ends on

    all 400 kV lines (except Gooty line) emanating from Nellore

    Pooling Station, and furnish an action plan to implement the

    same.

    30-12-2015 at

    06:02hrs

    APTRANSCO/

    PGCIL (SR-I)

    1.APTRANSCO to check the healthiness of the connecting

    cable between Gooty (PGCIL) and Gooty (APTRANSCO), and

    replace it, if required.

    2.APTRANSCO to ensure that the distributed architecture

    employed in implementing busbar protection at their Gooty

    220 kV SS does not introduce any unwarranted delays in

    transmitting the triggering signals to the Central Unit.

    LBB protection got operated for 400/220kV ICT-2 breaker

    which had resulted in tripping of 220kV Bus-2 at 220kV Gooty

    Substation

    Annexure-II

    Page 3 of 33

  • APTRANSCO Mail Dated 24.04.2018 & 24.05.2018:

    As requested by PGCIL the busbar drawings Were submitted for providing spare contacts from

    trip relays of 315 mva LV-1 and LV-2 for providing LBB in busbar protection scheme.

    PGCIL (SR-I) mail dated 20.06.2018:

    220kV CB LBB protection (Stand alone protection) available at PGCIL end is to protect ICT in case

    of non tripping of CB. It is opined that stand alone protection is better than new LBB logic

    proposed by APTRANSCO in Busbar schme. The reason for mal-operation of 220kV Bus on

    24.06.2016 is mainly due to cable issue. The problem shall be solved once we replace, this

    suspected cable betweem POWERGRID & APTRANSCO.

    APTRANSCO Mail Dated 18.12.2018:

    PGCIL was requested to arrange LC & coordinate for completeing the work.

    PGCIL (SR-I) mail dated 10.12.2018:

    220kV CB LBB protection (Stand alone protection) available at PGCIL end is to protect ICT in case

    of non tripping of CB. It is opined that stand alone protection is better than new LBB logic

    proposed by APTRANSCO in Busbar schme. The reason for mal-operation of 220kV Bus on

    24.06.2016 is mainly due to cable issue. The problem shall be solved once APTRANSCO replaces

    suspected cable, this suspected cable betweem POWERGRID & APTRANSCO.

    In this regard a letter dtd 22.09.2018 hasbeen sent to EE, MRT & T/F, Ananthapur, AP TRANSCO

    that the required relay contact will not provided by POWERGRID.

    Review Meeting held on 20.12.2018:

    Cable laying work was completed by PGCIL (SR-I). It was agreed that the work would be

    completed by PGCIL (SR-I), in cordination with APTRANSCO, within one month.

    APTRANSCO MAIL DATED 22.01.2019:

    Pending [ with PGCIL (SR-I) ]

    Tripping at 220 kV Gooty

    Substation of APTRANSCO

    56/II/13

    18-07-2016

    at 19:05 hrs

    PGCIL (SR-I), TPCIL, MEPL, SEL, SGPL, APTRANSCO, APGENCO

    and SDSTPS to implement line differential protection on all

    400 kV transmission lines (of length less than 50 km)

    emanating from Nellore PS, Nellore (PG) SS, and Nellore (AP)

    SS. [It may be noted here that the cut-off length of 50 km has

    been specified with a view to exclude only long transmission

    lines].

    APGENCO/

    PGCIL(SR-I)/

    TPCIL/MEPL/SEL/

    SGPL/ APTRANSCO

    57/II/9 Tripping of 400 kV Nellore (PG) -

    NPS line-1, 400 kV

    Krishnapatnam-Nellore (AP) lines

    -1&2 and 400kV NPS - MEPL line

    Pending

    24-06-2016 at 16:04

    hrs

    Pending [ with PGCIL

    (SR-I) ]

    APTRANSCO/

    PGCIL (SR-I)

    1.APTRANSCO to check the healthiness of the connecting

    cable between Gooty (PGCIL) and Gooty (APTRANSCO), and

    replace it, if required.

    2.APTRANSCO to ensure that the distributed architecture

    employed in implementing busbar protection at their Gooty

    220 kV SS does not introduce any unwarranted delays in

    transmitting the triggering signals to the Central Unit.

    LBB protection got operated for 400/220kV ICT-2 breaker

    which had resulted in tripping of 220kV Bus-2 at 220kV Gooty

    Substation

    APTRANSCO mail dated on 20-12-2016:

    Issue was addressed to the concerned for necessary action.

    APTRANSCO mail dated on 24-05-2017:

    Meeting was conducted and the relays procurement for all the loctions is under progress.

    APTRANSCO mail dated on 20-10-2017 & 22.11.2017:

    Relays procurement for all the locations is under progress.

    APTRANSCO Mail dated 15.12.2017:

    Technical bids opened. PQ evaluation under progress . Price bids expected to open in next

    week.

    PGCIL (SR-I) Mail dated 15.12.2017:

    LDP relays procurement is under process. Procurement will be completed by Feb-2018. TPCIL

    has to give written confirmation for LDP relay procurement. For want of written confirmation

    from TPCIL, PGCIL approving authority has withheld the LDP proposal.

    Review Meeting dated 19.12.2017:

    PGCIL (SR-I) informed that they are waiting for written confirmation from TPCIL to complete

    procurement of LDP relays. To this, PCSC forum asked TPCIL to submit written confirmation to

    PGCIL (SR-I) by 29.12.2017. PGCIL (SR-I) assured that with receipt of above confirmation from

    TPCIL by Dec, 2017, they would be able to complete the work by FEbruary, 2018.

    APTRANSCO informed that they would be able to implement LDP from their & APGENCO side by

    April, 2018.

    In this regard, PCSC forum made it clear that the recommendation is about providing LDP as

    both Main-I & Main-II relays on all stated lines in Nellore Complex, ans asked all stakeholders to

    ensure & comply with the same.

    APTRANSCO MAIL DATED 30.01.2018

    Technical & financial bids are opened. Tenders will be awarded shortly.

    Triggering incident was snapping of Y phase conductor in

    400kV Nellore (PG) - NPS line-1. Distance relay at

    Krishnapatnam end over-reached in Zone-1, and resulted in

    tripping of 400kV Krishnapatnam – Nellore (AP) lines - 1&2

    from Krishnapatnam end. Distance relay at MEPL over-

    reached and resulted in tripping of MEPL-NPS line from MEPL

    end.

    Annexure-II

    Page 4 of 33

  • APTRANSCO Mail Dated 24.04.2018:

    ABB make LDP relays inspection is completed. SNEIDER make LDP relays inspection yet to be

    completed. Delivery of relays expected in the 1st weak of May-2018.

    APTRANSCO Mail Dated 24.05.2018:

    SNEIDER make LDP relays inspection yet to be completed.Delivery of relays expected in the

    month of june 2018.

    PGCIL (SR-I) mail dated 20.06.2018:

    PGCI(SR1) procuring LDP relays for retrofitting of Main-1&2 distance relays. Tenders are invited

    from bidders & tender floated. Technical bid opening in this week.

    APTRANSCO Mail Dated 26.06.2018:

    ABB make LDP relays are delivered. Schneider make LDP relays inspection to be offered by the

    company.

    APTRANSCO Mail Dated 25.07.2018:

    schneider LDP relays inspection yet to be offered by the company.

    APTRANSCO Mail Dated 25.09.2018:

    ABB make LDP relays for Main-1 protection were delivered earlier and schneider make LDP

    relays for Main-2 protection are delivered in this week.

    APTRANSCO Mail Dated 18.12.2018:

    ABB & SCHNEIDER Relays are drawn and available at site. To be commissioned in coordination

    with the Alstom (Area) engineers who implemented SAS.

    PGCIL (SR-I) mail dated 10.12.2018:

    PGCIL(SR-1): PO placed on M/s GE & TD India Ltd on 24.09.2018. Supply of relays will be

    completed by Jan'2019 and commissioning by Mar'19

    APTRANSCO MAIL DATED 22.01.2019:

    The relays are yet to be commissioned.

    64/I/1 Complete outage of North

    Chennai TPS STG-2

    24-04-2017

    at 21:02hrs

    Tripping of evacuating lines due to fault led to tripping of

    Units

    64/I/2 Complete outage of North

    Chennai TPS STG-2

    25-04-2017

    at 18:27hrs

    Tripping of evacuating lines due to fault led to tripping of Unit

    64/I/3 Complete outage of North

    Chennai TPS STG-2

    26-03-2017

    at 21:09 hrs

    Tripping of evacuating lines due to fault led to tripping of

    running Unit at NCTPS Stg-2

    Status received vide TANTRANSCO mail dated 15-06-2017 & 04.08.2017 & 18.09.2017 & 12-12-

    2017:

    1. All the Porcelain insulators of 400kV NCTPS-II - Vallur feeders-1&2 were replaced with Polymer

    insulators by 20.05.2017. -----Completed

    2. Existing Porcelain insulators of all other 400kV feeders are being replaced with Polymer

    insulators in a phased manner.

    --- Pending

    PGCIL (SR-II) Mail dated 11-12-2017:

    Pertaining to POWERGRID all the porceleing insulators in the polluted streches has been

    completed. - Completed.

    Review Meeting dated 19.12.2017:

    TANTRANSCO informed that a total of 597 insulators ahd alreeady been replaced, and the total

    replacement would take another 9-month period.

    In this regard, TANTRANSCO was asked to furnish detailed plan of action regarding replacement

    of insulators on all 400 kV lines owned by them in Chennai area.

    TANTRANSCO MAIL DATED 25.01.2018:

    Existing Porcelain insulators of all other 400kV feeders are being replaced with Polymer

    insulators in a phased manner. Timeline: Sep-2018. Detailed plan of action will be submitted.

    TANTRANSCO MAIL DATED 29.08.2018:

    Existing Porcelain insulators of all other 400kV feeders are being replaced with Polymer

    insulators in a phased manner. Timeline: Sep-2018.

    18-07-2016

    at 19:05 hrs

    PGCIL (SR-I), TPCIL, MEPL, SEL, SGPL, APTRANSCO, APGENCO

    and SDSTPS to implement line differential protection on all

    400 kV transmission lines (of length less than 50 km)

    emanating from Nellore PS, Nellore (PG) SS, and Nellore (AP)

    SS. [It may be noted here that the cut-off length of 50 km has

    been specified with a view to exclude only long transmission

    lines].

    APGENCO/

    PGCIL(SR-I)/

    TPCIL/MEPL/SEL/

    SGPL/ APTRANSCO

    57/II/9 Tripping of 400 kV Nellore (PG) -

    NPS line-1, 400 kV

    Krishnapatnam-Nellore (AP) lines

    -1&2 and 400kV NPS - MEPL line

    Pending

    TANTRANSCO and PGCIL (SR-II) to take steps to complete

    insulator replacement works on the 400 kV lines owned by

    them in Chennai area within 3 months.

    TANTRANSCO/

    PGCIL(SR-II)

    Pending

    [with TANTRANSCO]

    Triggering incident was snapping of Y phase conductor in

    400kV Nellore (PG) - NPS line-1. Distance relay at

    Krishnapatnam end over-reached in Zone-1, and resulted in

    tripping of 400kV Krishnapatnam – Nellore (AP) lines - 1&2

    from Krishnapatnam end. Distance relay at MEPL over-

    reached and resulted in tripping of MEPL-NPS line from MEPL

    end.

    Annexure-II

    Page 5 of 33

  • TANTRANSCO MAIL DATED 22.05.2018:

    Existing Porcelain insulators of all other 400kV feeders are being replaced with Polymer

    insulators in a phased manner. Timeline: Sep-2018. Detailed plan of action will be submitted.

    TANTRANSCO MAIL DATED 08.06.2018:

    Existing Porcelain insulators of all other 400kV feeders are being replaced with Polymer

    insulators in a phased manner. Timeline: Sep-2018. Detailed plan of action will be submitted.

    TANTRANSCO MAIL DATED 23.07.2018:

    Existing Porcelain insulators of all other 400kV feeders are being replaced with Polymer

    insulators in a phased manner. Timeline: Sep-2018.

    TANTRANSCO MAIL DATED 11.09.2018:

    Existing Porcelain insulators of all other 400kV feeders are being replaced with Polymer

    insulators in a phased manner. Timeline: Dec-2018.

    TANTRANSCO MAIL DATED 11.12.2018:

    1.Replacement of porcelain insulators with Polymer insulator for 4 Km radius from NCTPS.2 in

    400kV SVCM & Alamathy feeders were completed.

    2. Further, Procurement under progress for replacement of 230kV and 110 kV porcelain

    insulators with Polymer insulator in coastel area.Time line . June 2019.

    TANTRANSCO MAIL DATED 23.01.2019:

    Time Line requested upto June 2019

    NTPC mail dated 07.12.2017:

    1. High set DEFR on 220 KV lines is disabled ----Completed

    2. ---- Pending

    Review Meeting dated 19.12.2017:

    TSTRANSCO informed that the works are under progress, and are targeted to be completed in 3

    months time.

    TSTRANSCO MAIL DATED 20.01.2018:

    Line Differential Protection will be provided within 3 months i.e., by end of March, 2018.

    TSTRANSCO MAIL DATED 20.04.2018:

    Line Differential Protection relays are under procurement and will be provided by end of May,

    2018.

    TSTRANSCO MAIL DATED 17.05.2018:

    Line Differential relays will be supplied to site by manufacturer by end of May, 2018 and

    erection will be completed by end of June, 2018.

    TSTRANSCO MAIL DATED 12.10.2018:

    Inspection of the relays is completed and the relays are received at stores. Relays are to be

    drawn and commissioned. Work is expected to be completed by end of December 2018.

    TSTRANSCO MAIL DATED 22.01.2019:

    Relays will be commissioned by end of February, 2019.

    TANTRANSCO and PGCIL (SR-II) to take steps to complete

    insulator replacement works on the 400 kV lines owned by

    them in Chennai area within 3 months.

    TANTRANSCO/

    PGCIL(SR-II)

    Pending

    [with TANTRANSCO]

    66/ II/ 10 Tripping of 400/ 220 kV ICT’s – 3

    & 4 at Ramagundam STPS

    NTPC-Ramagundam/

    TSTRANSCO

    PendingTriggering incident was failure of 220 kV

    B-phase LA in ICT-3 LV extension feeder (220KV line-2) at

    Malayalapalli substation

    1. NTPC to disable high-set of DEFR on the 220 kV lines

    emanating from their Ramagundam STPS.

    2. NTPC/ TSTRANSCO to provide Line Differential Protection

    (with or without pilot) on 220 kV Ramagundam –

    Malayalapalli lines – 1 & 2 & 3.

    11-06-2017

    at 19:46hrs

    Annexure-II

    Page 6 of 33

  • 69/I/2 Complete outage of 400kV TPCIL

    station

    30-10-2017 at 21:37

    hrs

    400kV TPCIL - Nellore line-1 got tripped at TPCIL end during

    failure of LA of Station Transformer-2 at TPCIL. Running Units

    at TPCIL got tripped due to loss of evacuating line. 400kV

    TPCIL - Nellore PS line-2 was under emergency shutdown

    1. TPCIL to configure DEF protection such that it remains in

    blocked condition as long as Distance Protection is active, and

    becomes active only when distance protection does not

    pickup.

    2.PGCIL (SR-I) to ensure healthiness of Carrier

    communication, and the set PUP mode of carrier aided

    scheme operates reliably on TPCIL lines 1 & 2.

    TPCIL/

    PGCIL (SR-I)

    Review Meeting dated 19.12.2017:

    PGCIL (SR-I) informed that they are waiting for written confirmation from TPCIL to complete

    procurement of LDP relays. To this, PCSC forum asked TPCIL to submit written confirmation to

    PGCIL (SR-I) by 29.12.2017. PGCIL (SR-I) assured that with receipt of above confirmation from

    TPCIL by Dec, 2017, they would be able to complete the work by February, 2018.

    APTRANSCO informed that they would be able to implement LDP from their & APGENCO side by

    April, 2018.

    In this regard, PCSC forum made it clear that the recommendation is about providing LDP as

    both Main-I & Main-II relays on all stated lines in Nellore Complex, ans asked all stakeholders to

    ensure & comply with the same.

    PGCIL (SR-I) mail dated 20.06.2018:

    2. PGCI(SR1) procuring LDP relays for retrofitting of Main-1&2 distance relays. Tenders are

    invited from bidders & tender floated. Technical bid opening in this week.

    PGCIL (SR-I) mail dated 10.12.2018:

    2. PO placed on M/s GE & TD India Ltd on 24.09.2018. Supply of relays will be completed by

    Jan'2019 and commissioning by Mar'19.

    Review Meeting on 20.12.2018:

    1. It was noted that TPCIL representatives have not attended the meting. TPCIL wasked to

    furnish implementation status of the given recommendation at the earliest.

    Pending

    APTRANSCO maild ated 30.01.2018:

    1. Pending...

    2.A/R scheme on 400kV Kurnool (PGCIL) feeder-2 will be checked after getting LC.

    APTRANSCO maild ated 24.04.2018 & 24.05.2018 & 26.06.2018:

    1. Pending...

    2. B Ph auxilary trip relay is found defective. The same is to be replaced by M/S PGCIL. Ii) PD

    relay event is configured in the EL as per the recommendation.

    PGCIL (SR-I) mail dated 20.06.2018:

    1. ---Pending

    2. PGCIl(SR-1): B-Ph auxiliary relay problem rectified at Narnoor end by replacing relay contact. ---

    Completed

    APTRANSCO Mail Dated 25.07.2018:

    Lines and Bays pertain to PGCILAPTRANSCO Mail Dated 18.12.2018:

    1) Bays and lines pertains to PGCIL .

    2) ---Completed.

    PGCIL (SR-I) mail dated 20.12.2018:

    1) PO placed on M/s GE & TD India Ltd on 24.09.2018. Supply of relays will be completed by

    Jan'2019.

    APTRANSCO MAIL DATED 22.01.2019:

    Pending [with PGCIL (SR-I)]

    APTRANSCO/

    PGCIL (SR-I)

    69/III/3 Tripping of 400 kV Kurnool(PG) –

    Kurnool(AP) line-2

    02-10-2017 at 02:03

    hrs

    1) PGCIL (SR-I) and APTRANSCO to provide for Line Differential

    Protection as both the Main protections on 400 kV Kurnool

    (AP) – Kurnool (PG) lines 1 & 2 lines.

    2) APTRANSCO to furnish an action taken report w.r.t.

    resolving A/R non-operation at Kurnool-AP end for the

    subject trippings and configure EL for capturing PDR

    operation at their 400 kV Kurnool-AP SS.

    Line tripped on B-ph to ground fault. A/R was unsuccessful at

    both Kurnool (AP) and Kurnool (PG) ends.

    Pending [with PGCIL

    (SR-I)]

    Annexure-II

    Page 7 of 33

  • APTRANSCO maild ated 15.12.2017:

    APTRANSCO would extend support and requirements if any ,for the rectification proposed by

    KPTCL.

    Review Meeting dated 19.12.2017:

    It was noted that the original Gooty - Lingapur line got LILOed at BTPS, Alipura, and Ragulapadu.

    It was also noted that Phase Discrepancy is being observed in Ragulapadu - Alipira section only.

    When enquired about the same, KPTCL informed that they would examine the issue in detail,

    and would inform the action lan proposed by next PCSC-71 meeting. On this, APTRANSCO was

    also asked to render all help required from their side to KPTCL.

    APTRANSCO maild dated 30.01.2018:

    APTransco world extend required support .

    APTRANSCO maild dated 24.04.2018 & 24.05.2018 & 26.06.2018:

    AP Transco would extend required support for attending, phase discrepancy issue in ragulapadu-

    Alipura line by KPTCL.

    APTRANSCO Mail Dated 25.07.2018:

    To be attended by KPTCL as discussed in 75th PCSC meeting.

    KPTCL mail dated 19.12.2018:

    Phase mis match issue is to be sorted out jointly by KPTCL/ APTRANSCO/ KPCL.

    Review Meeting on 20.12.2018:

    PCSC forum decided that concrete action in this respect to be initiated in 2 months by KPTCL

    alongwith APTRANSCO.

    APTRANSCO MAIL DATED 22.01.2019:

    Pending [with KPTCL ]

    76/II/9 Tripping of 230 kV Thiruvalam -

    Chittoor line

    13-06-2018 at

    18:55hrs

    Y-phase to earth fault occurred in line. At 230 kV Tiruvalam

    end, breaker was under lockout leading to operation of LBB

    protection.

    1) TANTRANSCO to provide double-bus operation at their 230

    kV Thiruvalam SS.

    2) APTRANSCO to replace the existing static relays with

    suitable numerical relays for various line protections at their

    220 kV Chittoor SS.

    TANTRANSCO/ APTRANSCO 1) TANTRANSCO Mail dated 29.08.2018 & 11.09.2018:

    Material supplied and work to be taken up ---Pending

    2) APTRANSCO Mail dated 24.09.2018:

    The static relays were replaced with Numerical relay on all 220 kV feeders at 220 kV SS chittoor.--

    -Completed

    TANTRANSCO Mail dated 11.12.2018:

    Due to space constraint, the equipments could not be erected.

    Review Meeting on 20.12.2018:

    In view of Tiruvalam being inter-state sustation, TANTRANSCO was asked to prvodie double-bus

    operation at their 230 kV Tiruvalam SS.

    APTRANSCO MAIL DATED 22.01.2019:

    Pending [with TANTRANSCO]

    TANTRANSCO MAIL DATED 23.01.2019:

    Feasibility for providing hybrid breaker / shifting of bays will be studied & action will be taken.

    Time upto Sep 2019

    Pending [with

    TANTRANSCO]

    69/III/7 Tripping of 220 kV Ragulapadu –

    Alipura line

    12-10-2017 at 01:30

    hrs

    Line tripped on B-Ph to earth fault. A/R was successful at

    Regulapadu and breakers at Alipura end got tripped.

    KPTCL and APTRANSCO to sort out issues relating to

    incongruence in denoting R, Y, B phases of the electric supply

    on their respective sides.

    APTRANSCO/ KPTCL Pending

    [with KPTCL ]

    Annexure-II

    Page 8 of 33

  • 78/I/2 Complete outage of 220 kV

    Nagjheri PH and 220/110 kV

    Ambewadi Substation.

    17-09-2018 at

    14:37hrs

    220kV lines connected to Nagjheri PH got tripped due to

    successive transient faults. Running Units #3 and #4 at

    Nagjheri got tripped on over frequency protection operation

    due to loss of evacuating lines resulting in complete outage of

    220 kV Nagjheri. 220 kV Nagjheri being the only source to

    220kV Ambewadi station, since 220kV Ambewadi Narendra

    line 1&2 were under shutdown during antecedent condition,

    tripping of Units at 220 kV Nagjheri resulted in the loss of

    supply to 220 kV Ambewadi SS.

    1. SLDC/KPTCL to be pro-active in issuing necessary directions

    that help in expeditious restoration of the tripped lines based

    on the prevailing conditions and grid security.

    2.KPCL to implement A/R enabled on all 220 kV lines

    emanating from their 220 kV Nagjheri PH, with the help of

    KPTCL, by December, 2018. In the event of non-amenability of

    the existing PZ1000 relays in providing A/R feature, KPCL shall

    take steps to retrofit them with suitable relays that support

    A/R.

    3. KPTCL to restore PLCC carrier communication on 220 kV

    Nagjheri – Bidnal line at the earliest

    KPCL/ KPTCL KPTCL mail dated 19.12.2018:

    3). Nagzari-Bidnal PLCC link is healthy --- Completed.

    1.--- Pending

    2. --- Pending

    Review Meeting on 20.12.2018:

    1. & 3. Completed

    2. Pending

    KPCL mail dated 24-12-2018:

    1) --- Completed

    2) Proposal will be taken up for replacement of existing PZ1000 relays with new version

    Numerical Line protection relays having IEC61850 shortly, after availing necessary admnistrative

    approval...Pending

    3) Completed

    KPCL mail dated 23.01.2019:

    1. Completed

    2. Letter addressed to site to take up the proposal for replacement of PZ1000 line distance

    relays.

    3. Completed

    Pending

    78/II/3 Multiple trippings at 400 kV

    Julurupadu

    01-08-2018

    at 19:33 hrs

    400kV Julurupadu-KTPSVII line-1 tripped at at Julurupadu end

    on SOTF due to 3-phase to ground fault while charging the

    line. 400kV Julurupadu-KTPSVII line-2 tripped at KTPSVII end

    due to Over Current protection and 400kV Julurupadu-

    Suryapet-2 feeder tripped at Suryapet end on STUB(I>4)

    indications.

    1) TSGENCO to ensure that the mandate operations

    procedures are duly followed by their station personnel at

    KTPS end whenever any LC is taken or returned.

    2) TSGENCO to ensure the following on all 400 kV lines

    emanating from their KTPS-VII station:

    • O/C protection is kept disabled.

    • High-set operation of line’s DEF protection is kept disabled;

    IDMT settings of DEF protection are suitably kept.

    3)TSTRANSCO to resolve issues w.r.t. Stub protection

    operation at Suryapet end relays for the 400 kV Suryapet -

    Julurupadu line-2, and intimate the corrective action taken to

    PCSC forum.

    TSGENCO/ TSTRANSCO TSTRANSCO mail dated 14-11-2018:

    1) Pending.

    2) Pending.

    3) The stub operation in P444 relay at Suryapet end is due to logic problem and is rectified on

    28-10-2018.---Completed.

    TSTRANSCO mail dated 27-11-2018:

    1) TSGENCO ( AT KTPS - VII stage ) Strictly adhering the operations procedures and following the

    standard procedures while taking and returning LC . -

    Completed

    2) TSGENCO ( at KTPS - VII Stage ) is adopted the settings from TSTRANSCO for the 400 kv

    feederes. The settings will be modified accordingly in coordination with TSTRANSCO. --

    Pending

    3) Completed

    Review Meeting on 20.12.2018:

    2. TSGENCO informed that the modification of settings will be completed in 1 month.

    -----Pending

    Pending

    78/II/16 Multiple trippings at 220kV

    Nagjheri PH

    31-08-2018

    at 11:49 hrs

    Triggering incident was B-E fault in 220 kV Nagjheri -

    Ambewadi line-1. As per the information received, after

    tripping of 220 kV Naghjeri - Ambewadi line-1, 220 kV

    Naghjeri Ambewadi line#2 got overloaded. This resulted in

    the tripping of Nagjheri Generating Units #3 and 6 on SPS

    operation. At the same time, Unit #2 got tripped on REF

    operation.

    1)KPTCL to examine the reasons for tripping of more than one

    Unit (Units – 3 & 6) on SPS operation at Nagjheri PH during

    subject trippings, and furnish a report on the same along with

    remedial action taken to PCSC forum.

    2)KPCL to employ a suitable time delay of 50 – 60 msec in

    operation of REF protection for the GT of Unit-2 at their

    Nagjheri PH.

    KPTCL/ KPCL Review Meeting on 20.12.2018:

    1. KPTCL I formed that SPS scheme finalisation shall be completed in one month time --- Pending

    KPCL mail dated 24-12-2018:

    2) Time delay of operation is not changed. However, the external NCT is used for REF protection

    against earlier internal NCT for REF, to avoid tripping due to malopration --- Completed.

    KPCL mail dated 23.01.2019:

    1) It shall be reviewd and Implemented by KPCL in coordination with KPTCL.

    2)....Completed.

    Pending

    Annexure-II

    Page 9 of 33

  • 79/I/2 Complete outage of 230/ 110 kV

    Gummidipoondi Substation

    05-10-2018 at 00:42

    hrs

    Triggering incident was B-phase fault at 230kV

    Gummidipoondi Substation due to which 230kV Bus-1 Bus-bar

    protection operated. 230kV Gummidipoondi Station was

    under single bus operation, hence operation of Bus-bar

    protection resulted in tripping of all connected elements.

    1) TANTRANSCO to take steps to implement multi-bus, multi-

    zone operation (Double-bus operation) at their 230 kV

    Gummidipooindi SS by December, 22018.

    2) TANTRANSCO to check if the Gummidipoondi substation is

    adequately protected from lightning-strokes by providing

    requisite no. of lightning masts and/ or earth-wire caging.

    3) APTRANSCO was asked to verify & correct the settings

    employed for distance protection at Sullurpeta and configure

    DR’s & EL’s of all Protection Relays at their Supllurpet SS

    properly for recording only the mandated protections &

    digital signals.

    TANTRANSCO/ APTRANSCO TANTRANSCO Mail dated 11.12.2018:

    1. TANTRANSCO: Estimate sanctioned for replacement of defective isolator status feedback.

    Work under progress. ......Pending

    2.Earth value of 110kV earthmat has been improved & 230kV side earthmat work under

    progress. Lightning mask earthing renovation under execution............Pending

    3.......Pending

    APTRANSCO Mail Dated 18.12.2018:

    Relays settings reviewed and need to be revised due to change of line length DR & EL's of Main-

    1 (P444) relay configured properly. Main-2 (D60) relay to be configured.

    Review Meeting on 20.12.2018:

    1 & 2). TANTRANSCO informed that Work will be completed by March 2019.

    3. APTRANSCO informed that work will be completed by February 2019.

    APTRANSCO MAIL DATED 22.01.2019:

    Collecting the details of adjacent feeders connected to Gummadipudi for computing revised

    relay settings.

    TANTRANSCO MAIL DATED 23.01.2019:

    Isolator status will be ensured by March 2019

    Pending

    81/IV/3 Tripping of 400 kV Warangal -

    Bhoopalapalli line-2

    15-12-2018 at 20:42

    hrs

    Line tripped at Bhoopalapalli end only and was holding from

    warangal s/s. FIR, DR and EL of Bhoopalapally were not

    furnished.

    For the line under consideration, the following shall be

    carried out by TSGENCO in coordination with PGCIL (SR-I):

    (i) End-to-end communication for DT/ permissive & other

    signals may be ensured by testing at both the ends.

    (ii) Healthiness of PLCC system components (hardware and

    software) at both ends shall be checked and faulty

    components shall be repaired/ replaced.

    TSGENCO/ PGCIL (SR-I) Yet to be informed Pending

    Annexure-II

    Page 10 of 33

  • 57/II/9 Tripping of 400 kV Nellore (PG) -

    NPS line-1, 400 kV

    Krishnapatnam-Nellore (AP) lines

    -1&2 and 400kV NPS - MEPL line

    18-07-2016

    at 19:05 hrs

    Triggering incident was snapping of Y phase conductor in

    400kV Nellore (PG) - NPS line-1. Distance relay at

    Krishnapatnam end over-reached in Zone-1, and resulted in

    tripping of 400kV Krishnapatnam – Nellore (AP) lines - 1&2

    from Krishnapatnam end. Distance relay at MEPL over-

    reached and resulted in tripping of MEPL-NPS line from MEPL

    end.

    APGENCO to furnish a report on the remedial action

    implemented w.r.t. overreaching of Krishnapatnam end

    distance relays during the tripping of 400 kV Nellore (PG) -

    NPS line-1

    APGENCO Review Meeting dated 19.12.2017:

    It was noted that no APGENCO representative had come to attend the meeting.

    APGENCO Mail dated 19.12.2017:

    Procurement of relays is under progress

    Review Meeting dated 20.12.2018:

    APGENCO representatives had not come to attend the meeting.

    Pending

    74/II/21 Tripping of 400 KV Kalikiri –

    RYTPP line-2

    29-04-2018 at 19:29

    hrs

    Line tripped on operation of over-voltage protection at RYTPP

    and Direct Trip receipt at Kalikiri. The correct operation of

    over-voltage tripping could not be validated as FIR, DR and EL

    of RYTPP and DR and EL of Kalikiri were not furnished.

    1). APGENCO to furnish detailed report on the reasons for the

    tripping of the line including remedial measures taken.

    2). APGENCO to ensure that the OVR-settings implemented at

    Rayalaseema TPP are as per the SRPC provided settings issued

    vide letter dated 01.05.2018, and confirm the same.

    APGENCO Status received vide mail dated 25.09.2018:

    2). OVR settinss incorporated as per the Lr.No. CE/IPC&PS/SP/13/

    400KV -OVR -SRPC/VOL.OI/ D.No,2001333/ 18: Dt: 04.05.18 --- Completed

    Review Meeting dated 20.12.2018:

    1). It was noted that no APGENCO representative had come to attend the meeting --- Pending

    Pending

    75/I/2 Complete outage of 400 kV

    Kalikiri and 400 kV RyTPP, Stage-

    V station

    16:08 hrs on

    11-05-2018

    Triggering incident was R-E fault in 400kV RyTPP- Kalikiri Ckt-

    1. Auto reclose (A/ R) was successful at Kalikiri end but didn’t

    operate at RyTPP end. This led to tripping of running unit at

    RyTPP due to tripping of evacuating line and complete outage

    of RYTPP. At the same time 400kV Chittoor-Kalikiri lines - 1&2

    got tripped from Chittoor end on operation of Z3 (mal-

    operation) resulting in loss of supply to Kalikiri station.

    APGENCO to ensure that A/R functionality implemented on

    400 kV RyTPP (Stage-V) – Kalikiri lines – 1 & 2 at RyTPP (Stage-

    V) end is healthy and in kept service.

    APGENCO Status received vide mail dated 25.09.2018:

    RTPP,(9taqe-lU end,iis healthy and kept in service. Hence it is requested to drop all the ahove

    points.

    Review Meeting dated 20.12.2018:

    It was noted that no APGENCO representative had come to attend the meeting

    --- Pending

    Pending

    79/III/8 Tripping of 400 kV RYTPP-Kalikiri

    line-2

    26-09-2018 at 21:13

    hrs

    Line tripped on B-N fault. Auto-reclose was successful at

    Kalikiri and three phase trip at RYTPP due to A/R lock-out.

    APGENCO to furnish a detailed report on tripping event

    bringing out reasons for A/R non-operation at yTPP end on

    400 kV RyTPP – Kalikiri line along with remedial action taken

    to PCSC forum.

    APGENCO Review Meeting dated 20.12.2018:

    It was noted that no APGENCO representative had come to attend the meeting.

    Pending

    73/I/7 Complete outage of 220 kV Vizag

    (Gazuwaka) switching station

    27-03-2018 at 16:14

    hrs

    Triggering incident was R-ph CT failure Bus-Coupler. This

    resulted in tripping of all the connected elements due to

    operation of bus bar protection.

    1) APTRANSCO to furnish equipment failure report of the

    current incident (CT blast) to PSE&TD Division of CEA with a

    copy marked to SRPC.

    2) APTRANSCO to take steps to provide one more thermo-

    vision camera to Vizag division for use exclusively on 400 kV &

    220 & 132 kV transmission lines emanating from Kalpaka,

    Gajuwaka, VSS, Pendurti and other adjoining substations of

    APTRANSCO.

    APTRANSCO APTRANSCO Mail Dated 26.06.2018 & 25.07.2018:

    1. Vide Lr.No.CE/Tr/SE/Tr/DE/SS/ADE-4/F.No.1/D.No.138/18Dt:20.06.18. Equipment & failure

    report communicated to CE(STED),CE/(IC),CEA.

    ---Complied.

    2. Indent is being processed.---Pending.

    APTRANSCO Mail dated 24.09.2018:

    2. Tendering process has been initiated. ---Pending

    APTRANSCO Mail Dated 18.12.2018:

    2. Purchase order placed on 20.09.2018.

    Review Meeting on 20.12.2018:

    2. APTRANSCO informed that Timeline for completion of work is March 2019.

    APTRANSCO MAIL DATED 22.01.2019:

    Test reports received. Dispatch instructions to be given.

    Pending

    Andhra Pradesh

    Annexure-II

    Page 11 of 33

  • 80/II/18 Tripping of 400 kV Uravakonda -

    Veltoor line-2

    19-11-2018 at 12:00

    Hrs

    As per FIR, 400 kV Uravakonda - Veltoor Line-2 tripped on

    operation of overvoltage Stage-1 at Uravakonda end and DT

    received at veltoor end. From the DR furnished, voltages at

    Uravakonda end are: Vr- 243kV, Vy-245kV and Vb-242kV.

    From the DR operation of Overvoltage Stage-1 protection

    could not be established. Over voltage grading of the line at

    Uravakonda end is 109%, 6secs, tripping is not as per grading.

    APTRANSCO to adopt recommended OVR, Stage-I and OVR,

    Stage-II protections at their 400 kV Uravakonda SS, and to

    ensure that OVR-I_START signal is configured for triggering

    corresponding Event Logger (EL), and OVR-I_TRIP is

    configured for triggering corresponding Event Logger (EL) and

    Disturbance Recorder (DR).

    APTRANSCO APTRANSCO MAIL DATED 22.01.2019:

    Informed to M/s siemens to configure the OVR signals.

    Pending

    Annexure-II

    Page 12 of 33

  • 07-11-2017 at 23:02

    hrs

    09-11-2017 at 21:57

    hrs

    12-11-2017 at 20:54

    hrs

    17-11-2017 at 21:19

    hrs

    11-11-2017 at 22:02

    hrs

    12-11-2017 at 23:09

    hrs

    24-11-2017 at 18:46

    hrs

    11-12-2017 at 18:49

    hrs

    18-12-2017 at 19:10

    hrs

    74/II/2 Tripping of 400 kV Kurnool-

    Srisailam line

    01-04-2018 at 18:03

    hrs

    Line tripped on operation of Over Voltage Stg-1 protection at

    Srisailam and Direct Trip was received at Kurnool.

    Considerable difference between Phase voltages was

    observed in Srisailam end DR. (Vr-257kV, Vy-246kV, Vb-239kV)

    1). TSGENCO was asked to double—check the faulty CVT’s

    and replace them at the earliest.

    2). TSGENCO was also asked to implement new OVR gradings

    issued vide SRPC letter dated 01.05.2018.

    TSGENCO TSGENCO mail dated 31.07.2018:

    1. TSGENCO: Purchase order was placed on 08.03.2018 for procurement of CVT’s & after receipt

    of new CVT’s faulty CVT’s will be replaced with new CVT’s. Replacement of faulty CVT's will be

    completed by the end of September 2018.

    --- Pending

    2.TSGENCO: TSGENCO was implemented new OVR gradings issued by SRPC

    --- Completed.

    Review Meeting dated 19.12.2018:

    1. TSGENCO informed that CVT replacemen will be completed by January 2019

    Pending

    Tripping of 400kV Kurnool-

    Srisailam line

    TSGENCO to adopt stipulated OVR, Stage-I gradings for the

    400 kV lines emanating from their 400 kV Srisailam LB RH, and

    furnish an action taken report w.r.t. mitigating observed

    voltage difference among R & Y & B phases.

    PendingTripping of 400 kV Satenapalli-

    Srisailam line-1

    70/II/2

    Tripping of 400 kV Narnoor –

    Srisailam LB line

    Line tripped due to operation of over voltage protection at

    Srisailam LB end. Considerable phase difference was observed

    between phases at Srisailam end

    Pending

    Pending

    1. TSGENCO to take steps to replace the existing faulty CVT’s

    at Srisalam end on 400 kV Srisailam – Narnoor line at the

    earliest.

    2. TSGENCO to adopt stipulated OVR, Stage-I gradings on all

    400 kV transmission lines emanating from Srisaliam LB.

    TSGENCO TSGENCO mail dated 31.07.2018:

    1.TSGENCO: Purchase order was placed on 08.03.2018 for procurement of CVT’s & after receipt

    of new CVT’s faulty CVT’s will be replaced with new CVT’s. Replacement of faulty CVT's will be

    completed by the end of September 2018.

    ---Pending

    2.TSGENCO: TSGENCO was adopted new OVR stage-1 gradings on all feeders issued by SRPC. ---

    Complied

    Review Meeting dated 19.12.2018:

    1. TSGENCO informed that CVT replacemen would be completed by January 2019

    ------- Pending

    Line tripped on operation of over-voltage protection at

    Srisailam and Direct Trip was received at Sattenapalli.

    Considerable voltage difference was observed between R, Y &

    B phases at Srisailam end.

    71/II/7

    70/II/3

    Telangana

    TSGENCO mail dated 31.07.2018:

    TSGENCO: Purchase order was placed on 08.03.2018 for procurement of CVT’s & after receipt of

    new CVT’s faulty CVT’s will be replaced with new CVT’s. Replacement of faulty CVT's will be

    completed by the end of September 2018.

    TSGENCO: TSGENCO was adopted new OVR stage-1 gradings on all feeders issued by SRPC.

    Review Meeting dated 19.12.2018:

    TSGENCO informed that CVT replacement would be completed by January 2019.

    TSGENCO to adopt stipulated OVR, Stage-I gradings for the

    400 kV lines emanating from their 400 kV Srisailam LB RH, and

    furnish an action taken report w.r.t. mitigating observed

    voltage difference among R & Y & B phases

    Line tripped on operation of Over-Voltage protection at

    Srisailam and Direct Trip was received at Kurnool.

    Considerable voltage difference was observed between R, Y &

    B phases.

    TSGENCO TSGENCO mail dated 31.07.2018:

    TSGENCO: Purchase order was placed on 08.03.2018 for procurement of CVT’s & after receipt of

    new CVT’s faulty CVT’s will be replaced with new CVT’s. Replacement of faulty CVT's will be

    completed by the end of September 2018.

    TSGENCO: TSGENCO was adopted new OVR stage-1 gradings on all feeders issued by SRPC.

    Review Meeting dated 19.12.2018:

    TSGENCO informed that CVT replacemen would be completed by January 2019

    TSGENCO

    Annexure-II

    Page 13 of 33

  • 74/II/8 Tripping of 400/220 kV ICT-2 at

    Gajwel

    11-04-2018 at 5:50

    hrs

    400/220 kV ICT-2 at Gajwel tripped on mal-operation of

    Buchholtz relay.

    1). TSTRANSCO was asked to keep the ICT and its mechanical

    protections under observation for detecting any slippages.

    2). TSTRANSCO was also asked to configure capturing of

    mechanical protections of ICT’s in the respective relay’s/

    station’s event logger.

    TSTRANSCO TSTRANSCO mail dated 20.06.2018:

    1. Mechanical protections of ICTs is under observation. --- Completed

    2.New relays are available at site and will be commissioned by 2nd week of August-2018. The

    mechanical protection of ICTs will be configured in the new relays ----Pending

    TSTRANSCO MAIL DATED 20.10.2018:

    2. New relays will be commissioned by end of November-2018 and the Over Voltage settings will

    be implemented after commissioning in new relays ----Pending

    TSTRANSCO MAIL DATED 06.12.2018:

    2. New relays will be commissioned by end of January-2019 and the mechanical protections of

    ICTs will be configured in the new relays ----Pending

    TSTRANSCO MAIL DATED 22.01.2019:

    Relays will be commissioned by end of February, 2019.

    Pending

    PAR/

    PCSC-58

    TSGENCO/ TSTRANSCO The issue was discussed in PCSC-58 meeting held on 18.10.2016, when PCSC forum agreed to de-

    link the implementation of the Item from the scope of Protection Audit Recommendations

    (PAR), and pursue it as part of PCSC Recommendations.

    TSGENCO mail dated 30-05-2017

    Procurement of Differential Protection relays is under process and the work will be completed

    by the end of November 2017.

    TSGENCO mail dated 18-09-2017

    Procurement of Line Differential Protection Relays is under process and the work will be

    completed by the end of January 2018.

    Review Meeting dated 19.12.2017:

    TSGENCO informed that they are in constant touch with TSTRANSCO in this regard, and hope to

    implement LDP by February, 2018.

    TSTRANSCO informed that procurement of LDP relays is under progress, and assured that LDP

    would be implemented in 3-months time.

    TSTRANSCO MAIL DATED ON 20-01-2018:

    The matter is being coordinated with TSGENCO.

    TSTRANSCO MAIL DATED ON 05-03-2018:

    As a part of implementation of line differential relays for short distance (Jurala PH to Jurala SS)

    feeders, procurement of Line Differential Protection Relays are in process and the work will be

    completed by the end of June 2018.

    TSGENCO mail dated 31.07.2018:

    TSGENCO: Purchase Order was placed on 05.06.2018 for Procurement of Line Differential

    Protection (LDP) relays and the work will be completed by the end of October 2018

    TSTRANSCO MAIL DATED 20.10.2018:

    Inspection of the relays is completed and the relays are received at stores. Relays are to be

    drawn and commissioned. Work is expected to be completed by end of December 2018.

    TSTRANSCO MAIL DATED 22.01.2019:

    Relays will be commissioned by end of February, 2019.

    PendingProvision of line differential protection for Jurala line 1 & 2 (line length-1.45 KM) feeders at 220 kV Jurala HPS

    [Carry-Over from Protection Audit Recommendations]

    Karnataka

    Annexure-II

    Page 14 of 33

  • Mail received on 21-10-2015:

    1) Anti-pumping contactors of all the nine 220KV Lines are in circuit and tested periodically

    during AOH works of lines along with other protections.

    2) Completed.

    3) Possibility to use both the 220kV buses as main bus under normal operation is under review.

    Mail recieved on 23-11-2015:

    1) Completed

    3) Two bus operation for 220kV buses : In place of existing CT switching relays, High speed

    manual heavy duty change over switch of sufficient current capacity will be retrofitted to all

    feeders at 220kV station and same will be operated manually during changeover of feeder by

    one bus to the other and this arrangement may facilitate to put both buses in service. Time

    required for this retrofit is around 90days . However, this work will be taken up only after

    retrofitting of electromagnetic relays with numerical relays for Main-2 protection of all 220kV

    lines, for which work is in progress.

    Status received vide mail dated 10-07-2017:

    1) --- Completed.

    2) --- Completed. Status received vide KPCL mail dated 14.12.2017:

    3) DPR for implementation of Two Bus operation for 220kV bus system has been prepared and

    proposal is placed for funds from PSDF. After the approval of the DPR, the work is proposed to

    be taken up.

    Review Meeting dated 19.12.2017:

    3) KPCL informed that DPR for implementation of Two Bus operation for 220kV bus system has

    been prepared and proposal is placed for funds from PSDF. After the approval of the DPR, the

    work is proposed to be taken up. Time frame requested for is 2 yrs.

    KPCL mail dated 19.12.2018:

    3) Work proposed to be taken up under PSDF. Approval from Nodal agency is awaited. However,

    arrangements have been made to issue NIT.

    Review Meeting on 21.12.2018:

    KPCL informed that Tender would be floated in 1 month and work would be completed in 2

    years.

    KPCL mail dated 23.01.2019:

    Tender would be floated in 1 month and work would be completed in 2 years.

    54/II/4 Tripping of 400 kV Raichur TPS-

    Mahboobnagar line

    05-04-2016 at 10:23

    hrs

    Line tripped on operation of Backup impedance protection of

    line reactor. Direct trip was received at Mahboobnagar end.

    KPCL to keep the functioning of the concerned electro-

    mechanical back-up impedance protection relay under

    observation, and replace it with a spare at the earliest.

    KPCL Status received vide KPCL mail dated 10.07.2017:

    The electro-mechanical back-up impedance protection relay is in service. However, Budgetary

    offer obtained for the retrofitting of Line reactor protection with Numerical relay and is under

    process

    Status received vide KPCL mail dated 14.12.2017:

    Tendering under process

    Review Meeting dated 19.12.2017:

    KPCL informed that the new numerical relay for backup impedance protection of Line Reactor

    would be provided by June, 2018.

    KPCL Mail dated 19.01.2018:

    E-tender for the retrofitting work of Line Reactor protections will be invited shortly.

    KPCL mail dated 19.12.2018:

    Materials are received at site and works would be completed by availing the Line Shutdown in

    the month of January 2019.

    KPCL mail dated 23.01.2019:

    Materials are received at site and works would be completed by availing the Line Shutdown

    approved by OCC in the month of January-February 2019

    Pending

    07-06-2015 at 01:35

    hrs

    KPCLTrippings at 220kV Raichur TPS46/II/21 Pending1. KPCL to check the operation of anti-pumping relay on 220

    kV side and keep it in healthy condition.

    2. KPCL to provide manual reset to the 220 kV side master trip

    relay.

    3. KPCL to use both the 220 kV buses as main buses under

    normal operation, and should go for single bus operation onl