A96 Dualling East of Huntly to Aberdeen A96 Online Dualling at Inverurie Supplementary Study Page A1 Appendix A Drawings D2APc (GSJ) Layout, including drainage basins: A96PEA-AMAR-HGN-SWI-DR-CH-335062 Plan Sheet 1 of 3 A96PEA-AMAR-HGN-SWI-DR-CH-335070 Plan Sheet 2 of 3 A96PEA-AMAR-HGN-SWI-DR-CH-335064 Plan Sheet 3 of 3 A96PEA-AMAR-HGN-SWI-SK-CH-335038 Cross-section D2APb (At-Grade) Layout, including drainage basins: A96PEA-AMAR-HGN-SWI-DR-CH-335071 Plan Sheet 2 of 3 A96PEA-AMAR-HGN-SWI-SK-CH-335055 Cross-section Utility Drawings: A96PEA-AMAR-VUT-SWI-DR-CU-335001 West A96PEA-AMAR-VUT-SWI-DR-CU-335010 D2APc (GSJ) A96PEA-AMAR-VUT-SWI-DR-CU-335011 D2APb (At-Grade) A96PEA-AMAR-VUT-SWI-DR-CU-335003 East Indicative Phasing: A96PEA-AMAR-HGN-SWI-SK-CH-335049 W/B Cway A96PEA-AMAR-HGN-SWI-SK-CH-335051 D2APc (GSJ) A96PEA-AMAR-HGN-SWI-SK-CH-335050 & 335077 D2APb (At-Grade) A96PEA-AMAR-HGN-SWI-SK-CH-335069 D2AUP (GSJ) A96PEA-AMAR-HGN-SWI-SK-CH-335071 & 335072 D2AUP (At-Grade) Environmental Plans: A96PEA-AMAR-EGN-SWI-MP-LX-002001 Key Environmental Constraints A96PEA-AMAR-EAQ-SWI-MP-LA-002001 Air Quality Receptors A96PEA-AMAR-ENV-SWI-MP-LN-002001 Noise and Vibration Receptors D2UAP Layouts: A96PEA-AMAR-HGN-SWI-SK-CH-335056 D2UAP (GSJ) Layout A96PEA-AMAR-HGN-SWI-DR-CH-335074 D2UAP (At-Grade) Layout A96PEA-AMAR-HGN-SWI-SK-CH-335073 D2UAP (At-Grade) Cross-sections

Transcript of A96 Report Template - transport.gov.scot

Page 1: A96 Report Template - transport.gov.scot

A96 Dualling East of Huntly to Aberdeen A96 Online Dualling at Inverurie Supplementary Study

Page A1

Appendix A

Drawings D2APc (GSJ) Layout, including drainage basins:

• A96PEA-AMAR-HGN-SWI-DR-CH-335062 – Plan Sheet 1 of 3

• A96PEA-AMAR-HGN-SWI-DR-CH-335070 – Plan Sheet 2 of 3

• A96PEA-AMAR-HGN-SWI-DR-CH-335064 – Plan Sheet 3 of 3

• A96PEA-AMAR-HGN-SWI-SK-CH-335038 – Cross-section

D2APb (At-Grade) Layout, including drainage basins:

• A96PEA-AMAR-HGN-SWI-DR-CH-335071 – Plan Sheet 2 of 3

• A96PEA-AMAR-HGN-SWI-SK-CH-335055 – Cross-section

Utility Drawings:

• A96PEA-AMAR-VUT-SWI-DR-CU-335001 – West

• A96PEA-AMAR-VUT-SWI-DR-CU-335010 – D2APc (GSJ)

• A96PEA-AMAR-VUT-SWI-DR-CU-335011 – D2APb (At-Grade)

• A96PEA-AMAR-VUT-SWI-DR-CU-335003 – East

Indicative Phasing:

• A96PEA-AMAR-HGN-SWI-SK-CH-335049 – W/B Cway

• A96PEA-AMAR-HGN-SWI-SK-CH-335051 – D2APc (GSJ)

• A96PEA-AMAR-HGN-SWI-SK-CH-335050 & 335077 – D2APb (At-Grade)

• A96PEA-AMAR-HGN-SWI-SK-CH-335069 – D2AUP (GSJ)

• A96PEA-AMAR-HGN-SWI-SK-CH-335071 & 335072 – D2AUP (At-Grade)

Environmental Plans:

• A96PEA-AMAR-EGN-SWI-MP-LX-002001 – Key Environmental Constraints

• A96PEA-AMAR-EAQ-SWI-MP-LA-002001 – Air Quality Receptors

• A96PEA-AMAR-ENV-SWI-MP-LN-002001 – Noise and Vibration Receptors

D2UAP Layouts:

• A96PEA-AMAR-HGN-SWI-SK-CH-335056 – D2UAP (GSJ) Layout

• A96PEA-AMAR-HGN-SWI-DR-CH-335074 – D2UAP (At-Grade) Layout

• A96PEA-AMAR-HGN-SWI-SK-CH-335073 – D2UAP (At-Grade) Cross-sections

Page 2: A96 Report Template - transport.gov.scot

Cross Sections

Scale 1:200

Project Name

Revision

Scale :

Drawing Title

Dimensions :

Client

Suitability

@ A1Project Ref. No. Stage

Project Originator Volume

Location Type

|

Number

-

|

-

-

||

-

Role

-

|

Drawing Number

Suitability Description

ApprovedReviewed

Revision details

Checked AuthorisedCreated

dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy

Revision

|

-

Designer

Precision House

McNeil Drive

Motherwell

ML1 4UR

58 Port Dundas Road

Glasgow

G4 0HF

A96 Dualling East of Huntly to

Aberdeen

D2APb&c Carriageway Widening

Indicative Construction Phasing

Online Dualling at Inverurie

Supplementary Study

250002-92 STAGE 2

As Shown

M

A96PEA AMAR HGN

SWI SK CH 335049

S4 Fit for Stage Approval P01

P01

J.Marsh

01/05/20

S.Clifford

01/05/20

R.Oakley

01/05/20

G.MacDonald

01/05/20

G.Wilkie

01/05/20

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

Existing Cross Section Ch4750 Phase 1 - Excavation

Phase 2 - Roadworks

Phase 3 - Re-construct Existing A96

Final D2APb&c Cross Section

Plan

Scale 1:1000

LEGEND

New Road Construction

Embankment (1:2 Slope)

Cutting (1:2 Slope)

New Structures

New Attenuation Basin

Construction Area

Page 3: A96 Report Template - transport.gov.scot

Cross Sections

Scale 1:250

Project Name

Revision

Scale :

Drawing Title

Dimensions :

Client

Suitability

@ A1Project Ref. No. Stage

Project Originator Volume

Location Type

|

Number

-

|

-

-

||

-

Role

-

|

Drawing Number

Suitability Description

ApprovedReviewed

Revision details

Checked AuthorisedCreated

dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy

Revision

|

-

Designer

McNeil Drive

Motherwell

ML1 4UR

58 Port Dundas Road

Glasgow

G4 0HF

A96 Dualling East of Huntly to

Aberdeen

D2APc Grade Separated Junction

Indicative Construction Phasing

Online Dualling at Inverurie

Supplementary Study

250002-92 STAGE 2

As Shown

M

A96PEA AMAR HGN

SWI SK CH 335051

S4 Fit for Stage Approval P01

P01

J.Marsh

01/05/20

S.Clifford

01/05/20

R.Oakley

01/05/20

G.MacDonald

01/05/20

G.Wilkie

01/05/20

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

Plan

Scale 1:1250

Existing Cross Section Ch 3940

Phase 1 - Site clearance

Phase 2 - Eastbound slip road and retaining wall

earthworks and carriageway construction

Phase 3 - Westbound slip road retaining wall

earthworks and carriageway construction

Phase 4 - Construction of elevated section

Phase 5 - Completed Works

LEGEND

New Road Construction

Embankment (1:2 Slope)

Cutting (1:2 Slope)

New Structures

New Attenuation Basin

Construction Area

Affected Properties

Assumed Minimum Construction /

Maintenance Area

Page 4: A96 Report Template - transport.gov.scot

1.00 7.30

Eastbound

Lane

Westbound

Lane

1.00

Davah Wood

Verge

3.00 1.0 3.653.65 3.653.652.502.50 2.50

26.10

1.00 1.001.00 1.00

3.00

3.00 3.00

Westbound / Eastbound

Temporary Lanes

3.00 3.00

Westbound/ Eastbound

Temporary Lanes

Westbound/ Eastbound

Temporary Lanes

3.653.65 2.501.001.00

Highway Boundary Fence

Affected property

Aquhorthies Circle

Existing retaining wall to the

rear of Aquhorthies Circle

Highway Boundary

Fence

Existing

Carriageway

House demolished and

cleared for excavation

Construction

begins on EB

carriageway

Temporary traffic moved to

newly completed carriageway

Retaining wall assumed to be 1m

thick including facings

Structural form indicative only

Assumed minimum 3m wide area

around highway boundary required for

construction / maintenance access

Existing Fence

Assumed minimum 3m wide area

around highway boundary required

for construction / maintenance access

Construction

begins on WB

carriageway

Davah Wood

Davah Wood

Davah Wood

Davah Wood

Davah Wood

Aquhorthies

Circle

Davah Wood

Verge

Highway Boundary Fence

Davah Wood

Verge

Highway Boundary Fence

Davah Wood

Verge

Highway Boundary Fence

Davah Wood

Verge

Aquhorthies

Circle

Aquhorthies

Circle

Aquhorthies

Circle

Aquhorthies

Circle

B

a

l

a

n

c

i

n

g

P

o

n

d

D

r

a

i

n

B

9

1

7

0

U

n

d

e

r

p

a

s

s

DAVAH WOOD

A

Q

U

H

O

R

T

H

IE

S

C

IR

C

L

E

E

S

S

P

o

l

i

c

e

S

t

a

t

i

o

n

M

a

s

t

C

o

n

d

o

r

h

i

l

l

D

r

a

in

A

r

k

l

e

a

G

O

L

F

W

A

L

K

N

E

T

H

E

R

GOLF PARK

Lay-by

L

B

A

A

3+

750

4+

000

4+

250

Project Name

Revision

Scale :

Drawing Title

Dimensions :

Client

Suitability

@ A1Project Ref. No. Stage

Project Originator Volume

Location Type

|

Number

-

|

-

-

||

-

Role

-

|

Drawing Number

Suitability Description

ApprovedReviewed

Revision details

Checked AuthorisedCreated

dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy

Revision

|

-

Designer

Precision House

McNeil Drive

Motherwell

ML1 4UR

58 Port Dundas Road

Glasgow

G4 0HF

A96 Dualling East of Huntly to

Aberdeen

D2APb At Grade Roundabout

Indicative Construction Phasing (AQ)

Online Dualling at Inverurie

Supplementary Study

250002-92 STAGE 2

As Shown

M

A96PEA AMAR HGN

SWI SK CH 335050

S4 Fit For Stage Approval P01

P01

J.Marsh

01/05/20

S.Clifford

01/05/20

R.Oakley

01/05/20

G.MacDonald

01/05/20

G.Wilkie

01/05/20

---

---

---

---

---

---

---

---

---

---

---

---

Existing Cross Section Ch 3940

Phase 1 - Site clearance and temporary traffic management

Phase 2 - Eastbound carriageway filled and constructed

Phase 3 - Westbound carriageway construction

Phase 4 - Completed Works

Cross Sections

Scale 1:250

Plan

Scale 1:1000

LEGEND

New Road Construction

Embankment (1:2 Slope)

Cutting (1:2 Slope)

New Structures

New Attenuation Basin

Construction Area

Affected Properties

Assumed Minimum Construction /

Maintenance Area

Page 5: A96 Report Template - transport.gov.scot

B

a

l

a

n

c

i

n

g

P

o

n

d

D

r

a

i

n

B

9

1

7

0

U

n

d

e

r

p

a

s

s

DAVAH WOOD

A

Q

U

H

O

R

T

H

IE

S

C

IR

C

L

E

E

S

S

P

o

l

i

c

e

S

t

a

t

i

o

n

M

a

s

t

C

o

n

d

o

r

h

i

l

l

D

r

a

in

A

r

k

l

e

a

G

O

L

F

W

A

L

K

N

E

T

H

E

R

GOLF PARK

L

B

B

B

4+

000

4+

250

3+

750

A

A

1.00 7.30

Eastbound

Lane

Westbound

Lane

1.00

Davah Wood

Verge

3.00 3.00

Westbound / Eastbound

Temporary Lanes

Westbound / Eastbound

Temporary Lanes

Highway Boundary Fence

Affected property

Aquhorthies Circle

Existing retaining wall to the

rear of Aquhorthies Circle

Highway Boundary

Fence

Existing

Carriageway

Construction begins on

WB carriageway and

retaining wall

Temporary traffic moved to

newly completed carriageway

Construction begins

on WB carriageway

and retaining wall

Davah Wood

Davah Wood

Davah Wood

Davah Wood

Davah Wood

Aquhorthies

Circle

Davah Wood

Verge

Highway Boundary Fence

Aquhorthies

Circle

Aquhorthies

Circle

Aquhorthies

Circle

Aquhorthies

Circle

Westbound / Eastbound

Temporary Lanes

For detailed construction method of

retaining wall referer to

A96PEA-AMAR-HGN-SK-CH-335070

Traffic moved to extent of

existing eastbound lane

Retaining wall assumed to be

1m thick including facings

Structural form indicative only

3.00 1.0

Existing A96

Carriageway

Existing

Earthworks

Slope

Existing

Verge

19m

3.653.65 3.653.652.502.50 2.50

26.10

1.00 1.001.00 1.00

Retaining wall assumed to be

1m thick including facings

Structural form indicative only

Assumed minimum 3m wide area around

highway boundary required for

construction / maintenance access

3.00

Assumed minimum 3m wide area

around highway boundary required

for construction / maintenance access

Existing

Verge

1.0

Boundary encroaches in

to local service road for

Davah Wood properties

3.00 3.00

1.0 3.653.652.50 1.00 1.00

Project Name

Revision

Scale :

Drawing Title

Dimensions :

Client

Suitability

@ A1Project Ref. No. Stage

Project Originator Volume

Location Type

|

Number

-

|

-

-

||

-

Role

-

|

Drawing Number

Suitability Description

ApprovedReviewed

Revision details

Checked AuthorisedCreated

dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy

Revision

|

-

Designer

Precision House

McNeil Drive

Motherwell

ML1 4UR

58 Port Dundas Road

Glasgow

G4 0HF

A96 Dualling East of Huntly to

Aberdeen

D2APb At-Grade Roundabout

Indicative Construction Phasing (DW)

Online Dualling at Inverurie

Supplementary Study

250002-92 STAGE 2

As Shown

M

A96PEA AMAR HGN

SWI SK CH 335077

S0 Initial non-contractual code P01.1

P01.1

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

Cross Sections

Scale 1:250

Plan

Scale 1:1000

Existing Cross Section Ch 3940

Phase 1 - Site clearance and temporary traffic management

Phase 2 - Eastbound carriageway filled and constructed

Phase 3 - Westbound carriageway construction

Phase 4 - Completed Works

LEGEND

New Road Construction

Embankment (1:2 Slope)

Cutting (1:2 Slope)

New Structures

New Attenuation Basin

Assumed Minimum Construction /

Maintenance Area

Affected Properties

Construction Area

P01

J.Marsh

01/05/20

S.Clifford

01/05/20

R.Oakley

01/05/20

G.MacDonald

01/05/20

G.Wilkie

01/05/20

RevisionSuitability Suitability Description

S4 Fit For Stage Approval P01

Page 6: A96 Report Template - transport.gov.scot

B

a

l

a

n

c

i

n

g

P

o

n

d

D

r

a

i

n

B

L

A

C

K

H

A

L

L

R

O

A

D

B

9

1

7

0

U

n

d

e

r

p

a

s

s

S

t

a

E

lS

u

b

D

r

a

in

D

r

a

in

DAVAH WOOD

A

Q

U

H

O

R

T

H

IE

S

C

IR

C

L

E

E

S

S

P

o

l

i

c

e

S

t

a

t

i

o

n

M

a

s

t

C

o

n

d

o

r

h

i

l

l

D

r

a

in

A

r

k

l

e

a

OLD

CO

UR

SE

AV

EN

UE

G

O

L

F

W

A

L

K

N

E

T

H

E

R

GOLF PARK

Lay-by

L

B

A

A

1.00

Hardstrip

7.30

Eastbound

Lane

Westbound

Lane

1.00

Davah Wood

Verge

Highway Boundary Fence

Affected property

Davah Wood

Affected property

Aquhorthies

Circle

Existing retaining wall to the

rear of Aquhorthies Circle

Construct retaining retaining

wall and fill behind

Construct eastbound slip road

Demolish houses and

clear vegetation

Existing Carriageway

Excavate for slip road and

construct retaining wall

Construct westbound slip road

Westbound

Temporary Lane

3.00

Transfer traffic to west

side of existing A96

3.00

Existing

Carriageway

3.00

Westbound/ Eastbound

Temporary Lanes

Transfer traffic to east

and west slip roads

Transfer traffic to east

and west slip roads

Construct and retaining walls, infill

and mainline carriageway

Affected property

Davah Wood

Affected property

Aquhorthies Circle

Highway Boundary

Fence Demolish houses and

clear vegetation

Transfer traffic to newly

constructed slip road

7.30 1.001.00

Eastbound

Lane

Westbound

Lane

Eastbound

Temporary Lane

1.00

1.303.703.302.001.00

2.50 3.65 3.65

1.30

3.65 3.65

21.40

2.50 1.00

3.70 3.30 2.00 1.00

1.80Westbound

Temporary Lane

Eastbound

Temporary Lane

Eastbound

Temporary Lane

Cross Sections

Scale 1:250

Project Name

Revision

Scale :

Drawing Title

Dimensions :

Client

Suitability

@ A1Project Ref. No. Stage

Project Originator Volume

Location Type

|

Number

-

|

-

-

||

-

Role

-

|

Drawing Number

Suitability Description

ApprovedReviewed

Revision details

Checked AuthorisedCreated

dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy

Revision

|

-

Designer

McNeil Drive

Motherwell

ML1 4UR

58 Port Dundas Road

Glasgow

G4 0HF

A96 Dualling East of Huntly to

Aberdeen

D2UAP Grade Separated Junction

Indicative Construction Phasing

Online Dualling at Inverurie

Supplementary Study

250002-92 STAGE 2

As Shown

M

A96PEA AMAR HGN

SWI SK CH 335069

S4 Fit for Stage Approval P01

P01

J.Marsh

01/05/20

S.Clifford

01/05/20

R.Oakley

01/05/20

G.MacDonald

01/05/20

G.Wilkie

01/05/20

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

Plan

Scale 1:1250

Existing Cross Section Ch 3940

Phase 1 - Site clearance

Phase 2 - Eastbound slip road and retaining wall,

earthworks and carriageway construction

Phase 3 - Westbound slip road retaining wall,

earthworks and carriageway construction

Phase 4 - Construction of elevated section

Phase 5 - Completed Works

LEGEND

New Road Construction

Embankment (1:2 Slope)

Cutting (1:2 Slope)

New Structures

New Attenuation Basin

Assumed Minimum Construction /

Maintenance Area

Affected Properties

Construction Area

Page 7: A96 Report Template - transport.gov.scot

1.00 7.30

Eastbound

Lane

Westbound

Lane

1.00

3.00 3.00

Westbound / Eastbound

Temporary Lanes

Westbound / Eastbound

Temporary Lanes

Affected property

Aquhorthies Circle

Existing retaining wall to the

rear of Aquhorthies Circle

Highway Boundary

Fence

Existing

Carriageway

Construction begins on

WB carriageway and

retaining wall

Temporary traffic moved to

newly completed carriageway

Retaining wall assumed to be 1m

thick including facings

Structural form indicative only

Assumed minimum 3m wide area

around highway boundary required for

construction / maintenance access

Assumed minimum 3m wide area

around highway boundary required

for construction / maintenance access

Construction begins

on WB carriageway

and retaining wall

Aquhorthies

Circle

Westbound / Eastbound

Temporary Lanes

Traffic moved to extent of

existing westbound lane

3.00 3.00

3.00

1.8 3.65 2.50

1.0

3.65

3.00

3.65 3.652.501.0

29.4

Aquhorthies

Circle

Aquhorthies

Circle

Aquhorthies

Circle

Aquhorthies

Circle

Highway Boundary Fence

Highway Boundary FenceHighway Boundary Fence

Highway Boundary FenceHighway Boundary Fence

Davah Wood

Verge

Davah Wood

Davah Wood

Verge

Davah Wood

Davah Wood

Verge

Davah Wood

Davah Wood

Verge

Davah Wood

Davah Wood

Verge

Davah Wood

B

a

l

a

n

c

i

n

g

P

o

n

d

D

r

a

i

n

B

9

1

7

0

U

n

d

e

r

p

a

s

s

DAVAH WOOD

A

Q

U

H

O

R

T

H

IE

S

C

IR

C

L

E

E

S

S

P

o

l

i

c

e

S

t

a

t

i

o

n

M

a

s

t

C

o

n

d

o

r

h

i

l

l

D

r

a

in

A

r

k

l

e

a

G

O

L

F

W

A

L

K

N

E

T

H

E

R

GOLF PARK

Lay-by

L

B

A

A

3+

750

4+

000

4+

250

Project Name

Revision

Scale :

Drawing Title

Dimensions :

Client

Suitability

@ A1Project Ref. No. Stage

Project Originator Volume

Location Type

|

Number

-

|

-

-

||

-

Role

-

|

Drawing Number

Suitability Description

ApprovedReviewed

Revision details

Checked AuthorisedCreated

dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy

Revision

|

-

Designer

Precision House

McNeil Drive

Motherwell

ML1 4UR

58 Port Dundas Road

Glasgow

G4 0HF

A96 Dualling East of Huntly to

Aberdeen

D2UAP At-Grade Roundabout

Indicative Construction Phasing (AQ)

Online Dualling at Inverurie

Supplementary Study

250002-92 STAGE 2

As Shown

M

A96PEA AMAR HGN

SWI SK CH 335071

S4 Fit For Stage Approval P01

P01

J.Marsh

01/05/20

S.Clifford

01/05/20

R.Oakley

01/05/20

G.MacDonald

01/05/20

G.Wilkie

01/05/20

Cross Sections

Scale 1:250

Plan

Scale 1:1000

LEGEND

New Road Construction

Embankment (1:2 Slope)

Cutting (1:2 Slope)

New Structures

New Attenuation Basin

Assumed Minimum Construction /

Maintenance Area

Affected Properties

Construction Area

Existing Cross Section Ch 3920

Phase 1 - Site clearance and temporary traffic management

Phase 2 - Eastbound carriageway filled and constructed

Phase 3 - Westbound carriageway construction

Phase 4 - Completed Works

Page 8: A96 Report Template - transport.gov.scot

1.00 7.30

Eastbound

Lane

Westbound

Lane

1.00

Davah Wood

Verge

3.00 3.00

Westbound / Eastbound

Temporary Lanes

Westbound / Eastbound

Temporary Lanes

Highway Boundary Fence

Affected property

Aquhorthies Circle

Existing retaining wall to the

rear of Aquhorthies Circle

Highway Boundary

Fence

Existing

Carriageway

Construction begins on

WB carriageway and

retaining wall

Temporary traffic moved to

newly completed carriageway

Retaining wall assumed to be 1m

thick including facings

Structural form indicative only

Assumed minimum 3m wide area

around highway boundary required for

construction / maintenance access

Assumed minimum 3m wide area

around highway boundary required

for construction / maintenance access

Construction begins

on WB carriageway

and retaining wall

Davah Wood

Davah Wood

Davah Wood

Davah Wood

Davah Wood

Aquhorthies

Circle

Davah Wood

Verge

Highway Boundary Fence

Aquhorthies

Circle

Aquhorthies

Circle

Aquhorthies

Circle

Aquhorthies

Circle

3.00

3.653.65 1.80

2.501.00

3.00 3.00

Westbound / Eastbound

Temporary Lanes

For detailed construction method of

retaining wall referer to

A96PEA-AMAR-HGN-SK-CH-335070

Traffic moved to extent of

existing eastbound lane

1.8 3.65 2.50

1.0

3.65

3.00

3.65 3.652.501.0

29.4

B

a

l

a

n

c

i

n

g

P

o

n

d

D

r

a

i

n

B

9

1

7

0

U

n

d

e

r

p

a

s

s

DAVAH WOOD

A

Q

U

H

O

R

T

H

IE

S

C

IR

C

L

E

E

S

S

P

o

l

i

c

e

S

t

a

t

i

o

n

M

a

s

t

C

o

n

d

o

r

h

i

l

l

D

r

a

in

A

r

k

l

e

a

G

O

L

F

W

A

L

K

N

E

T

H

E

R

GOLF PARK

Lay-by

L

B

3+

750

4+

000

4+

250

A

A

Project Name

Revision

Scale :

Drawing Title

Dimensions :

Client

Suitability

@ A1Project Ref. No. Stage

Project Originator Volume

Location Type

|

Number

-

|

-

-

||

-

Role

-

|

Drawing Number

Suitability Description

ApprovedReviewed

Revision details

Checked AuthorisedCreated

dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy

Revision

|

-

Designer

Precision House

McNeil Drive

Motherwell

ML1 4UR

58 Port Dundas Road

Glasgow

G4 0HF

A96 Dualling East of Huntly to

Aberdeen

D2UAP At-Grade Roundabout

Indicative Construction Phasing (DW)

Online Dualling at Inverurie

Supplementary Study

250002-92 STAGE 2

As Shown

M

A96PEA AMAR HGN

SWI SK CH 335072

S4 Fit For Stage Approval P01

P01

J.Marsh

01/05/20

S.Clifford

01/05/20

R.Oakley

01/05/20

G.MacDonald

01/05/20

G.Wilkie

01/05/20

Cross Sections

Scale 1:250

Plan

Scale 1:1000

LEGEND

New Road Construction

Embankment (1:2 Slope)

Cutting (1:2 Slope)

New Structures

New Attenuation Basin

Assumed Minimum Construction /

Maintenance Area

Affected Properties

Construction Area

Existing Cross Section Ch 3940

Phase 1 - Site clearance and temporary traffic management

Phase 2 - Westbound carriageway excavated and constructed

Phase 3 - Eastbound carriageway construction

Phase 4 - Completed Works