  • A4.1 – Draft Code of Construction Practice

  • © Crown copyright and database rights 2014 Ordnance Survey 100035971

    Transport and Works Act 1992

    London Underground (Bank Station Capacity Upgrade) Order

    Draft Code of Construction Practice

    September 2014

  • Transport and Works Act 1992

    London Underground (Bank Station Capacity Upgrade) Order

    Draft Code of Construction Practice September 2014

    Bank Station Capacity Upgrade Project 5th Floor 10 King William Street London EC4N 7TW

    LUL Document Reference: LUL-8798-RPT-G-002206

  • Bank Station Capacity Upgrade Project Draft Code of Construction Practice

    London Underground Limited September 2014

    Table of Contents

    List of Abbreviations ..................................................................................... i

    1 Introduction ..................................................................................... 1

    2 Site and Works Overview ................................................................ 3

    2.1 Proposed Works ............................................................................................................. 3

    2.2 Site Contact Information ................................................................................................. 3

    2.3 Site Plans ....................................................................................................................... 4

    2.4 Indicative Programme of Proposed Works ...................................................................... 8

    3 General Principles of Construction Environmental Management .................................................................................... 9

    3.1 Environmental Management ........................................................................................... 9

    3.2 Considerate Contractor Scheme ..................................................................................... 9

    3.3 Site Management and Responsibilities ........................................................................... 9

    3.4 Training ........................................................................................................................ 11

    3.5 Emergency Preparedness and Response ..................................................................... 11

    4 Liaison and Consultation Strategy .............................................. 13

    4.1 Liaison with Neighbours ................................................................................................ 13

    4.2 Complaints Procedures ................................................................................................ 14

    5 Site Operations and Working Hours ............................................ 16

    5.1 Working Hours .............................................................................................................. 16

    5.2 Schedule of Plant and Equipment ................................................................................. 19

    6 Noise and Vibration ....................................................................... 21

    6.1 Introduction ................................................................................................................... 21

    6.2 Working Hours .............................................................................................................. 21

    6.3 Protective Works .......................................................................................................... 21

    6.4 Monitoring Regimes ...................................................................................................... 24

    6.5 Section 61 Consents ..................................................................................................... 26

    7 Air Quality ...................................................................................... 27

    7.1 Introduction ................................................................................................................... 27

    7.2 Specification and Use of Vehicles and Equipment to Minimise Emissions .................... 27

    7.3 Vehicle Procurement and Replacement ........................................................................ 29

    7.4 Additional Plant and Vehicle Controls ........................................................................... 29

    7.5 Protective Works – Dust ............................................................................................... 30

    7.6 Monitoring Regimes – Dust ........................................................................................... 33

    8 Land Contamination ...................................................................... 36

    8.1 Introduction ................................................................................................................... 36

  • Bank Station Capacity Upgrade Project Draft Code of Construction Practice

    London Underground Limited September 2014

    8.2 Protective Works .......................................................................................................... 36

    8.3 Unexploded Ordnance .................................................................................................. 36

    9 Waste and Materials Handling and Storage ................................ 38

    9.1 Introduction ................................................................................................................... 38

    9.2 Site Waste Management Plan ...................................................................................... 38

    9.3 Measures to Reduce Potential Impacts from Waste ...................................................... 38

    9.4 Duty of Care Requirements and Authorisations ............................................................ 40

    10 Water Resources and Flood Risk ................................................. 41

    10.1 Introduction ................................................................................................................... 41

    10.2 Protective Works .......................................................................................................... 41

    10.3 Monitoring Regimes ...................................................................................................... 44

    11 Sustainability and Preservation ................................................... 45

    11.1 Climate Change and Sustainability ............................................................................... 45

    11.2 Archaeology and Built Heritage..................................................................................... 47

    11.3 Trees and Wildlife ......................................................................................................... 47

    12 Townscape and Visual Amenity ................................................... 49

    12.1 Work Sites External Perimeters .................................................................................... 49

    12.2 Work Site Interiors ........................................................................................................ 50

    12.3 Lighting / Light Pollution ................................................................................................ 50

    13 Highways and Access ................................................................... 51

    13.1 Introduction ................................................................................................................... 51

    13.2 Traffic Management Plan .............................................................................................. 51

    13.3 Key Details ................................................................................................................... 52

    13.4 Strategic Routes ........................................................................................................... 52

    13.5 Site Access / Egress ..................................................................................................... 52

    13.6 Work Related Road Risk............................................................................................... 57

    13.7 Green Travel ................................................................................................................. 57

    13.8 Works Affecting Highways and Public Rights of Way .................................................... 57

    13.9 Road Cleanliness ......................................................................................................... 58

    13.10 Highway Reinstatement ................................................................................................ 59

    14 Settlement ...................................................................................... 60

    14.2 Assessment process ..................................................................................................... 60

    14.3 Mitigation measures ...................................................................................................... 61

    14.4 Provisions in relation to Listed buildings ....................................................................... 62

    14.5 Pre-construction defect surveys ....................