SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
STUDY COMMITTEE B3SUBSTATIONS
Design, construction, maintenance and ongoing
management of substations and electrical installations in power stations (excluding generators)
Prep
ared
by
Slaw
omir
SAM
EK in
Feb
ruar
y 20
14
STUDY COMMITTEE B3A3-14(AG01)028-IWD
![Page 2: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/2.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
STUDY COMMITTEE24 Regular Members, 14 Observer Members, 2 Special Reporters, all WB
Convenors
Advisory Area AA1
CONCEPTS & DEVELOPMENTS
Advisory Area AA2
GAS INSULATED SWITCHGEAR/GAS
INSULATED LINES/SF6
Advisory Area AA3
AIR INSULATED SUBSTATIONS
Advisory Area AA4
SUBSTATION MANAGEMENT
STUDY COMMITTEE B3
![Page 3: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/3.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Study Committee ChairmanTerry KRIEG
AA1Mark OSBORNE
AA2Peter GLAUBITZ
AA3Akira OKADA
AA4Johan SMIT
SAGTerry KRIEG
CAGMichael MACKEY
SC SecretaryClaude COUNAN
(Romain MIGNE)
TAGPiet KNOL
STUDY COMMITTEE B3
![Page 4: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/4.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3SC B3 MEETINGS
49th SC B3 meeting on 30th August 2012 in Paris
50th SC B3 meeting on 12th September 2013 in Brisbane,together with SC B3/D1 colloquium
51st SC B3 meeting on 28th August 2014 in Paris
![Page 5: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/5.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3Overview of SC B3 running WBs
Strategic Advisory GroupSAG
KEY TASKS: Update of the Strategic Plan and of the Action Plan Discussing and preparing proposals for future
activities Propose new Working Groups Screening and reporting of the activities of Working
Groups and SC members Selection and preparation of future meetings or events Issuing proposals to the Technical Committee Cooperation with other international bodies such as
IEE, IEEE, CIRED, VDE
![Page 6: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/6.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Customer Advisory GroupCAG
ACTIVITIES: Identify opportunities to increase customer satisfaction Collect relevant feedback from CIGRE customers Prioritize new work and suggest preferential subjects Develop and implement concepts for active
communication with customers Report on the above for discussion during the
meetings of the Study Committee
Overview of SC B3 running WBs
![Page 7: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/7.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Customer Advisory GroupCAG
TARGET GROUPS: Engineers and managers in the electrical power
industry Consultants/Contractors Utilities Investors/Owners
Non-engineer personnel of utilities, power plants Governmental or non-government agencies
Regulators Universities
Young engineers and students
Overview of SC B3 running WBs
![Page 8: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/8.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Tutorial Advisory GroupTAG
ACTIVITIES: ELECRAMA 2012 (India, 20/21 January):
Responsible use of SF6 (P. Glaubitz) Standardization vs. Innovation in substation design
(T. Krieg) Joint D1/B3 Colloquium 2013 (Australia, 11 September):
SF6 - What are the Issues? (T. Krieg) International Situation - Regional Issues
(P. Glaubitz) SF6 Analysis and GIS Residual Life Management
(E. Duggan, K. Pohlink)
Overview of SC B3 running WBs
![Page 9: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/9.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Tutorial Advisory GroupTAG
ACTIVITIES: Discussion tutorial subjects for the SCB3 meeting in
2015 and possible other events Stimulate WG’s to provide tutorials as an delivery
Overview of SC B3 running WBs
![Page 10: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/10.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
ACTIVITIES: SAG/CAG/TAG Meeting,
7 ÷ 9 May, 2014, The Netherlands
Overview of SC B3 running WBs
SAG, CAG, TAG
![Page 11: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/11.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Advisory Area AA1CONCEPTS & DEVELOPMENTS
WG B3.13 „ Reducing replacement time of HV equipment” (Francois Gallon) - struggling with membershipTechnical Brochure due 2013.
Overview of SC B3 running WBs
![Page 12: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/12.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Advisory Area AA1CONCEPTS & DEVELOPMENTS
JWG B3/C1/C2.14 „Circuit configuration optimisation” (Gerd Lingner)
No C2 membership. One Corresponding member from C1.
Technical Brochure was sent for approval in August 2013.
Overview of SC B3 running WBs
![Page 13: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/13.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Advisory Area AA1CONCEPTS & DEVELOPMENTS
WG B3.35 „Substation Earthing System design optimisation through the application of quantified risk analysis” (Bill Carman)
Final Report 2016.
Overview of SC B3 running WBs
![Page 14: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/14.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Advisory Area AA1CONCEPTS & DEVELOPMENTS
WG B3.36 „Special considerations for AC collector systems and substations associated with HVDC connected wind power plants” (Peter Sanderberg)
Technical Brochure due 2013.
Overview of SC B3 running WBs
![Page 15: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/15.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Advisory Area AA1CONCEPTS & DEVELOPMENTS
FUTURE WORK TOPICSNEW TERMS OF REFERENCE (TOR) IN DEVELOPMENT
DC Substation requirements, Impact of cables on substation design, Recommendations for design and operation of rural
substations, Impact of NCIT on substation design - adapting design
for IEC 61850, location of Control and Protection, Lightning protection for substations.
Overview of SC B3 running WBs
![Page 16: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/16.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Advisory Area AA2GAS INSULATED SWITCHGEAR/GAS INSULATED LINES/SF6 WG B3.24 „Benefit of Partial Discharge
diagnosis on Gas Insulated Switchgear condition assessment” (Mark Reuter)Technical Brochure 2015.
Overview of SC B3 running WBs
![Page 17: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/17.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Advisory Area AA2GAS INSULATED SWITCHGEAR/GAS INSULATED LINES/SF6 WG B3.25 „SF6-analysis for AIS, GIS and MTS
Condition Assessment” (Eamonn Duggan)
TB No 567 SF6 Analysis for AIS, GIS and MTS Condition Assessment was published in February 2014.Report with the some title was published in ELECTRA, No 272, February 2014.
Overview of SC B3 running WBs
![Page 18: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/18.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Advisory Area AA2GAS INSULATED SWITCHGEAR/GAS INSULATED LINES/SF6 JWG B3/B1.27 „Factors for investment decision
GIL vs. Cables for AC Transmission”(Hermann Koch)
Publication scheduled for 2014.
Overview of SC B3 running WBs
![Page 19: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/19.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Advisory Area AA2GAS INSULATED SWITCHGEAR/GAS INSULATED LINES/SF6 WG B3.29 „Field Tests Technology on UHV
Substation during construction and operation” (Guangfan Li)
TB No 562 Field Tests Technology for UHV Substations was published in December 2013.
Overview of SC B3 running WBs
![Page 20: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/20.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Advisory Area AA2GAS INSULATED SWITCHGEAR/GAS INSULATED LINES/SF6 WG B3.30 „Guide to minimize the use of SF6
during routine testing of electrical equipment”(Silvio Stangherlin)
A draft of the Technical Brochure was sent to SC B3 members in February 2014 - internal approval in SC B3 by February 28, 2014.
Overview of SC B3 running WBs
![Page 21: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/21.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Advisory Area AA2GAS INSULATED SWITCHGEAR/GAS INSULATED LINES/SF6 JWG B1/B3.33 „Common dry type interfaces for
GIS connections above 52 kV for Extruded AC cables” (Pierre Mirebeau)
Publication scheduled for 2013/2014.
Overview of SC B3 running WBs
![Page 22: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/22.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Advisory Area AA2GAS INSULATED SWITCHGEAR/GAS INSULATED LINES/SF6 WG B3.37 „Internal arc effects in medium
voltage switchgear (1÷52 kV) - mitigation techniques” (Didier Fulchiron)
ToR approved 07/2013. Target: fault current limitation in MV GIS/AIS
review methods, mapping of existing technical solutions, review of standards and specifications, benefits, guidance for the user on relevant selection parameters.
Overview of SC B3 running WBs
![Page 23: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/23.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Advisory Area AA2GAS INSULATED SWITCHGEAR/GAS INSULATED LINES/SF6 WG B3.37 „Internal arc effects in medium
voltage switchgear (1÷52 kV) - mitigation techniques” (Didier Fulchiron)
22 experts currently proposed from 10 National Committees.
Web page and collaboration area set-up. Final report scheduled in 2017.
Overview of SC B3 running WBs
![Page 24: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/24.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Advisory Area AA2GAS INSULATED SWITCHGEAR/GAS INSULATED LINES/SF6 JWG D1/B3.57 „Dielectric Testing of gas-
insulated HVDC Systems” (Claus Neumann)
Report in ELECTRA or Technical Brochure with summary in ELECTRA - 2016.
Overview of SC B3 running WBs
![Page 25: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/25.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Advisory Area AA2GAS INSULATED SWITCHGEAR/GAS INSULATED LINES/SF6
FUTURE WORK TOPICSNEW TERMS OF REFERENCE (TOR) IN DEVELOPMENT
Measuring the parameters of SF6 Gas, HV DC GIS Switchgear, The impact on GIS based on the implementation of
NCIT technology.
Overview of SC B3 running WBs
![Page 26: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/26.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Advisory Area AA2GAS INSULATED SWITCHGEAR/GAS INSULATED LINES/SF6
FUTURE WORK TOPICSNEW TERMS OF REFERENCE (TOR) IN DEVELOPMENT
Overview of SC B3 running WBs
WG B3.39 „Impact of NCIT applications on HV Gas Insulated Switchgear” (Karsten Pohlink)
Start: 2014Final report: 2017
![Page 27: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/27.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Advisory Area AA2GAS INSULATED SWITCHGEAR/GAS INSULATED LINES/SF6
FUTURE WORK TOPICS Mobile substations, Influence of HV testing (GIS cable) on GIS, GIS-single line diagram layout - Gas compartment
optimization and service continuity, GIS interfaces, extension, maintenance concepts.
Overview of SC B3 running WBs
![Page 28: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/28.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Advisory Area AA3AIR INSULATED SUBSTATIONS
WG B3.23 „Guidelines for Uprating & Upgrading of Substations” (Hiroshi Imagawa)
TB No 532 Substation Uprating and Upgrading was published in April 2013.Report with the some title was published in ELECTRA, No 267, April 2013.
Overview of SC B3 running WBs
![Page 29: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/29.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Advisory Area AA3AIR INSULATED SUBSTATIONS
WG B3.31 „Air Insulated Substations Design for Severe Climate Condition” (Mark McVey)
Publication in ELECTRA June 2014 / Technical Brochure August 2014.
Overview of SC B3 running WBs
![Page 30: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/30.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Advisory Area AA3AIR INSULATED SUBSTATIONS
WG B3.32 „Saving through Optimized Maintenance of Air Insulated Substations” (Hugh Cunningham)
Publication in ELECTRA September 2014 / Technical Brochure December 2014.
Overview of SC B3 running WBs
![Page 31: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/31.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Advisory Area AA3AIR INSULATED SUBSTATIONS
Overview of SC B3 running WBs
WG B3.38 „Management of risk in Substations” (Gerald Buchs)
Start: March 2014Summary in ELECTRA: October 2017Technical Brochure: December 2017Tutorial: 2017
![Page 32: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/32.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Advisory Area AA3AIR INSULATED SUBSTATIONS
FUTURE WORK TOPICSNEW TERMS OF REFERENCE (TOR) IN DEVELOPMENT
Substation earthing system design optimisation -deterministic and probabilistic approach
Overview of SC B3 running WBs
![Page 33: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/33.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Advisory Area AA4SUBSTATIONS MANAGEMENT
WG B3.06 „Substation Management”(Johan Smit)TF01: Revision of a document on contracting of maintenance outsourcing. / Publication at the Doble Conference in Boston, March 25÷30, 2012.Practical Guide for the Outsourcing of Asset Management Services is finalized
Overview of SC B3 running WBs
![Page 34: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/34.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Advisory Area AA4SUBSTATIONS MANAGEMENT
WG B3.06 „Substation Management”(Johan Smit)
TF05: Practical Application of asset management information strategies.TB No 576 IT Strategies for Asset Management of Substations – General Principles was published in April 2014.
The majority of active members of WG B3.06 transfer their activities to WG B3.34.
Overview of SC B3 running WBs
![Page 35: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/35.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Advisory Area AA4SUBSTATIONS MANAGEMENT
Overview of SC B3 running WBs
![Page 36: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/36.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Advisory Area AA4SUBSTATIONS MANAGEMENT
WG B3.34 „Expected Impact of Future Grids on Substation Management” (Johan Smit)
The WG expects to issue a final Technical Brochure in 2014.
Overview of SC B3 running WBs
![Page 37: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/37.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3SC B3 GREEN BOOK
Green Book Schedule
Still early days on the SC B3 Green Book. SC B3 agreed to proceed at the Paris 2012
session. Discussion at Brisbane 2013. Duration will be approximately 2÷3 years.
![Page 38: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/38.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Organisation for Substation Reference Book
Chapter Title Chapter Manager
Introduction John Finn
Planning and Concepts John Finn
Air Insulated Substations Vacant
Gas Insulated Substations Vacant
Mixed Technology Substations and Gas Insulated Lines Tokio Yamagiwa
UHV and Offshore Substations Takeshi Yokota
Secondary Installations John Ainsworth
Environmental Effect of and on Substations Jarmo Elovaara
Substation Management Issues Johan Smit
Future Trends Mark Osborne
SC B3 GREEN BOOK
![Page 39: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/39.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Organisation for Substation Reference Book
SC B3 GREEN BOOK
CHAPTER 1INTRODUCTION
•Explain purpose of the book and how to use it
![Page 40: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/40.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Organisation for Substation Reference Book
SC B3 GREEN BOOK
CHAPTER 2PLANNING AND CONCEPT
•Turnkey substations•Combining innovation and standardization•Functional specs and evaluation•Philosophy of substation reliability•Use of computers in design and building of stations•Substation design process•Effect of safety regulations on design of substations•Evaluation of different switchgear technologies•Substations bus-switching arrangements - requirements and reliability •New functionalities on Substation design
![Page 41: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/41.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Organisation for Substation Reference Book
SC B3 GREEN BOOK
CHAPTER 3AIR-INSULATED SUBSTATIONS
• Cost reduction AIS• Renewal AIS• Mechanical aspects AIS: various brochures and papers available• Design of AIS, mechanical effects of short-circuit currents, stiff busbars, aeolian vibration
tubular busbars, dynamic short-circuit stress of busbar structures, paper-oil measurement transformer
• Influence of clearance distances on price of 420 kV outdoor substations• Measurement of short-circuit stresses on rigid conductor busbar systems• Thermal and dynamics effects of heavy short-circuit currents in HV ss• Phase to ground and phase to phase air clearances in substations• Uprating and upgrading• Seismic performance existing stations• Foundations of steel and prefab concrete
![Page 42: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/42.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Organisation for Substation Reference Book
SC B3 GREEN BOOK
CHAPTER 4GAS-INSULATED SUBSTATIONS
• GIS: economical and environmentally optimized design, installation and maintenance experience, database, earthing, condition monitoring,uprating and upgrading, various brochures and Electra papers, transient ground potential rise in GIS, pressure rise in GIS (single phase type), disconnect switches, grounding switches, work conditions for maintenance,
• Arrangement metal enclosed substations• Enclosures for gas filled electrical equipment• Effect of current rating on cost of metal-clad HV switchgear• Testing of metal enclosed HV stations
![Page 43: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/43.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Organisation for Substation Reference Book
SC B3 GREEN BOOK
CHAPTER 5MIXED TECHNOLOGY SUBSTATIONS
• Explain the relevance and use of mixed technology equipment within substations
![Page 44: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/44.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Organisation for Substation Reference Book
SC B3 GREEN BOOK
CHAPTER 6UHV AND OFFSHORE SUBSTATIONS
• Off-shore substations• Requirements UHV substations, reliability in design, repair and maintenance
tines, integrated mechanical design open type UHV substations• Insulation characteristics of SS up to 765 kV• Planning, design and operation of future substations
![Page 45: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/45.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Organisation for Substation Reference Book
SC B3 GREEN BOOK
CHAPTER 7SECONDARY INSTALLATIONS
• Secondary installations, application policy, design and maintenance practice, design and installation of equipment, secondary systems interface modeling, change management, acceptance tests digital systems, control system selection, design and operating experience computer based systems, reliability of substations with regard to secondary equipment., EMI in secondary systems
• Instrument transformer technology and service behaviour; several papers, new principles in GIS
![Page 46: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/46.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Organisation for Substation Reference Book
SC B3 GREEN BOOK
CHAPTER 8ENVIRONMENTAL IMPACT OF AND ON
SUBSTATIONS• Handling, recycling, disposal, status, reuse• SF6 mixtures• Substation environmental impact
![Page 47: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/47.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Organisation for Substation Reference Book
SC B3 GREEN BOOK
CHAPTER 9SUBSTATION MANAGEMENT ISSUES
• Replacement management• Condition monitoring management• Substation security• Asset management electric infrastructure• Substation reliability. Comparison of two methods• Maintenance of SS in technical, economical and organisational respect• Dynamic loading of transmission equipment
![Page 48: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/48.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Organisation for Substation Reference Book
SC B3 GREEN BOOK
CHAPTER 10FUTURE TRENDS
• Much of this chapter will need to be written as new because the previous work on future trends is well over ten years old and we should be up to date at least at first publication
![Page 49: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/49.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3
Organisation for Substation Reference Book
SC B3 GREEN BOOK
The idea to prepare a chapter covers maintenance issues, and particularly live working maintenance in substations is under consideration.
![Page 50: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/50.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3SC B3 GREEN BOOK
Guide Book for SF6
CIGRE Green bank on SF6 - using the available and upcoming SF6 brochures
![Page 51: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/51.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3CIGRE SC B3 AND D1 JOINT COLLOQUIUM
B3/D1 International Colloquium and Study Committee MeetingBrisbane, Queensland Australia - September 8th ÷ 13th, 2013
MANAGING SUBSTATIONS IN THE POWER SYSTEM OF THE FUTURE
Trends in Technology, Design, Materials and DiagnosticsPREFERRENTIAL SUBJECTS:
1. Latest Developments in Substation Design.
2. Impact of Modern Materials and Emerging Test. Techniques on Substation Equipment
3. Life Cycle Management and Maintenance.
![Page 52: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/52.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3PARIS SESSION 2014
STUDY COMMITTEE B3PREFERRENTIAL SUBJECTS
PS1 SUBSTATION DEVELOPMENTS TO ADDRESS FUTURE NEEDS• Integration of new approaches to grid automation in transmission
and distribution substations,• Impact of new grid developments on substation design. • Off shore substations,• Low cost and fast deployment distribution substations.
PS2 LIFE-CYCLE MANAGEMENT OF SUBSTATIONS• Renovation, refurbishment, extension and up-rating of substations,• Asset management, maintenance, monitoring, reliability and
sustainability issues,• Managing risk in design, installation and operation of substations.
![Page 53: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/53.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3NAGOYA MEETING 2015
CIGRE SC A3 & B3 Joint Colloquium / Tutorial
Challenges for Further Reliable HV/MV Substation and Equipment in the Future
(tentative)
![Page 54: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/54.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3NAGOYA MEETING 2015
CIGRE SC A3 & B3 Joint Colloquium / Tutorial
Underground Substation
Nagoya Castle
![Page 55: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/55.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3PROPOSALS FOR SC A3 FUTURE ACTIVITY
PROPOSALS WITH RELATION TO SC B3
1. Solutions for severe climate conditions.2. Development of solutions for power evacuation
from off shore wind farms.3. DC solutions for power evacuation from wind
farms.4. Green book.5. The evolution of substations for 2050.6. The environmental footprint of substations.
![Page 56: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/56.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3PROPOSALS FOR SC A3 FUTURE ACTIVITY
PROPOSALS WITH RELATION TO SC B3after discussion during Brisbane meeting
1. Secondary and monitoring systems of HV Equipment.
![Page 57: A3-14(AG01)028-IWD_SCB3_for_SCA3_2014_02](https://reader036.fdocuments.net/reader036/viewer/2022062520/5695d0141a28ab9b0290df2c/html5/thumbnails/57.jpg)
SC B3 for SC A3, Delft, 12th March, 2014
Study Committee B3SEE YOU IN PARIS
Thank you very much for your attention
See you in Paris
please send your questions and comments to