A2 A8 - majorprojects.planningportal.nsw.gov.au

7
GENERAL NOTES ALL LEVELS RELATIVE TO 'AUSTRALIAN HEIGHT DATUM' DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY ALL DIMENSIONS AND EXISTING CONDITIONS SHALL BE CHECKED AND VERIFIED BY THE CONTRACTOR BEFORE PROCEEDING WITH THE WORK fjmt studio architecture interiors landscape urban community sydney melbourne uk Level 5, 70 King Street t +61 2 9251 7077 w fjmtstudio.com legend C FRANCIS-JONES MOREHEN THORP PTY LTD 2020 ABN 28 101 197 219 NOMINATED ARCHITECT: RICHARD FRANCIS-JONES (REG NO 5301) project code sheet no. revision scale first issued title project 85 Harrington Street & 68-72 Gloucester Street Lot 1 in DP 777033 The Rocks NSW 2000 Plans Level Basement 1 GA85H 29/03/2018 As Noted @ A2 S A2 DA-2011 rev date name by chk A8 A1 03/04/2018 S4.55(1A) Coordination Package DN AH INDICATES CHANGES FORMING THIS APPLICATION A2 04/04/2018 S4.55(1A) Coordination Package DN AH A3 04/04/2018 S4.55(1A) Submission DN AH A4 11/05/2018 S4.55(1A) Submission AH DN INDICATES BUILDING OUTLINE "AS APPROVED" U 05/11/2018 S4.55 Submission Draft DN SH A5 20/11/2018 S4.55 Submission DN SH A6 13/12/2018 S4.55 Revised Submission DN SH A7 25/02/2020 S4.55 Revised Submission DS SH A8 02/04/2020 S4.55 Revised Submission SH SH 1 BED 2 BED 2 BATH 3 BED COMMERCIAL Terracotta Cladding 1 TC1 Terracotta Cladding 2 TC2 Operable Terracotta Baguette Screen SC2 Paving 1 PAV1 Aluminium Panel ALP Sandstone Cladding ST1 RETAIL LOBBY TOWNHOUSE LIVE/ WORK Glazed Balustrade 2 BAL2 Glazed Balustrade 1 BAL1 High Level Louvre (Retail) LV1 Aluminium Framed Retail Glazing GL1 Precast Concrete 1 PC1 Aluminium Framed Performance Glazing GL2 Adaptable Apartment Cross Ventilated Apartment Solar Compliant Apartment Solar Compliant Balcony Livable Apartment (Silver Level) Terracotta Cladding 3 TC3 Palisade Balustrade BAL3 Terracotta Cladding 4 TC4 Cross Ventilated Apartment Rendered Finish 1 RF1 Operable Bronze Screen SC1 Operable Exterior Venetian Blinds SC3 UP 1 2 3 4 5 STOP SIGN GARBAGE CHUTE ABOVE 9 8 10 12 11 15 14 13 16 17 18 20 19 22 23 24 25 26 2 3 4 5 6 7 1 GARBAGE CHUTE ABOVE 21 BLOCK 1 ENTRY BASEMENT 1 UNSURE OF SOIL CONDITIONS UNSURE OF SOIL CONDITIONS 1:5 RAMP (20% GRADIENT) 1:8 (12.5% GRADIENT) 1:8 (12.5% GRADIENT) LOADING BAY (1) (6) 26 Car parking Spaces GRD 4 1:20 RAMP (5% GRADIENT) FACE OF BAKERS TERRACE ABOVE FACE OF BAKERS TERRACE ABOVE SITE BOUNDARY SITE BOUNDARY SITE BOUNDARY SETOUT POINT BLOCK 1 SITE BOUNDARY SETOUT POINT BLOCK 2 SITE BOUNDARY SITE BOUNDARY SITE BOUNDARY DP DP DP DP DP DP DP DP DP DP DP DP DP DP DP DP DP DP DP LINE OF EXISTING EXCAVATION LINE OF EXISTING EXCAVATION LINE OF EXISTING EXCAVATION HB1.FS2B FS-2 SSL 13.400 RS-1 CPE E6 COMMS CB1.05 COMMS SSL 13.050 C/E F6 CB1.07 GARBAGE 2 24 m2 SSL 13.050 HB1.06 WATER PUMP & GAS REGULATOR SSL 13.400 RS-3 CB1.06 SWITCHROOM SSL 13.050 H8a HB1.05 COMMERCIAL METERING HB1.04 GARBAGE 1 19 m2 RS-2 CP SUPPLY CB1.02 LIFT LOBBY FFL 13.050 HB1.02 LIFT LOBBY FFL 13.400 HB1.03 LIFT LOBBY FFL 13.400 CB1.04 GREASE ARRESTOR 1 SSL 13.050 CB1.08 CORRIDOR CB1.FS3B FS-3 FFL 13.050 RS 69 7 m2 Volume 14.8 m3 RS 68 10 m2 Volume 20.3 m3 RS 66 3 m2 Volume 6.5 m3 RS 67 3 m2 Volume 6.2 m3 RS 63 2 m2 Volume 5.1 m3 RS 35 Area 7 m2 Volume 14.9 m3 RS 37 Area 3 m2 Volume 6.5 m3 RS 47 Area 5 m2 Volume 9.6 m3 RS 49 Area 4 m2 Volume 7.7 m3 RS 40 Area 2 m2 Volume 4.5 m3 RS 36 Area 3 m2 Volume 5.8 m3 RS 55 Area 2 m2 Volume 4.2 m3 RS 44 Area 2 m2 Volume 4.5 m3 RS 73 Area 10 m2 Volume 20.3 m3 RS 48 Area 4 m2 Volume 8.9 m3 RS 70 7 m2 Volume 15.6 m3 RS 41 Area 2 m2 Volume 4.5 m3 RS 43 Area 2 m2 Volume 4.5 m3 RS 45 Area 2 m2 Volume 4.5 m3 RS 62 2 m2 Volume 5.1 m3 RS 59 7 m2 Volume 14.2 m3 RS 58 3 m2 Volume 7.3 m3 DRAIN 6 7 8 9 10 11 12 13 14 15 6 7 8 9 10 11 12 13 14 UP 1 2 3 4 5 CONVEX MIRROR CONVEX MIRROR CONVEX MIRROR BOLLARD BOLLARD BOLLARD BOLLARD BOLLARD ASSUMED ROCK CARPARK RAMP CARPARK RAMP ZONE FOR MAINTENANCE ZONE FOR MAINTENANCE (4) L1 L2 L3 L4 1:5 RAMP (20% GRADIENT) (4) ZONE FOR MAINTENANCE ZONE FOR MAINTENANCE (4) ZONE FOR MAINTENANCE (2) SECTION OF RAMP 200 THICK RS 72 Area 13 m2 Volume 27.5 m3 RS 71 Area 11 m2 Volume 23.9 m3 RS 57 Area 4 m2 Volume 7.6 m3 RS 46 Area 2 m2 Volume 4.6 m3 RS 53 Area 2 m2 Volume 4.8 m3 RS 52 Area 3 m2 Volume 6.3 m3 RS 56 Area 3 m2 Volume 6.4 m3 RS 54 Area 2 m2 Volume 4.3 m3 HB1.07 MAINTENANCE SSL 13.400 H10 H15 GAR-1 RS-1A DRY FIRE H10 DRY FIRE RS 61 2 m2 Volume 5.1 m3 RS 33 Area 12 m2 Volume 25.2 m3 RS 34 Area 5 m2 Volume 10.5 m3 RS 39 Area 2 m2 Volume 4.2 m3 RS 50 Area 2 m2 Volume 5.1 m3 RS 32 Area 3 m2 Volume 7.1 m3 RS 64 4 m2 Volume 8.6 m3 RS 38 Area 4 m2 Volume 8.1 m3 RS 65 5 m2 Volume 11.5 m3 RS 42 Area 2 m2 Volume 4.5 m3 RS 51 Area 1 m2 Volume 3.0 m3 RS 60 2 m2 Volume 5.1 m3 AMENDED CAR PARKING DISTRIBUTION REDISTRIBUTION OF ACCESSIBLE CAR SPACES GENERAL REDISTRIBUTION OF BASEMENT STORAGE TO IMPROVE ACCESS & EFFICIENCY B1 TOTAL CAR PARKING SPACES 32 INCLUDING 27 RESIDENTIAL SPACES 4 ACCESSIBLE SPACES 1 LOADING BAY 27 BICYCLE SPACES (IN RESIDENTIAL STORAGE CAGES) 35 BICYCLE SPACES FOR RETAIL/COMMERCIAL 30 BICYCLE SPACES FOR VISITORS OTHER B1 TOTAL CAR PARKING SPACES 26 INCLUDING 24 RESIDENTIAL SPACES 2 ACCESSIBLE RESIDENTIAL SPACES PLUS 1 LOADING BAY 34 BICYCLE SPACES (IN INDIVIDUAL RESIDENTIAL STORAGE CAGES) OTHER AMENDED CAR PARKING RATES APPROVED CAR PARKING RATES

Transcript of A2 A8 - majorprojects.planningportal.nsw.gov.au

DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY
ALL DIMENSIONS AND EXISTING CONDITIONS SHALL BE CHECKED AND VERIFIED BY THE CONTRACTOR BEFORE PROCEEDING WITH THE WORK
fjmt studio architecture interiors landscape urban community
sydney melbourne uk Level 5, 70 King Street t +61 2 9251 7077 w fjmtstudio.com
legend
C FRANCIS-JONES MOREHEN THORP PTY LTD 2020 ABN 28 101 197 219 NOMINATED ARCHITECT: RICHARD FRANCIS-JONES (REG NO 5301)
project code sheet no. revision
scale first issued
title
project
85 Harrington Street & 68-72 Gloucester Street Lot 1 in DP 777033 The Rocks NSW 2000
Plans Level Basement 1
A8
INDICATES CHANGES FORMING THIS APPLICATION
A2 04/04/2018 S4.55(1A) Coordination Package DN AH A3 04/04/2018 S4.55(1A) Submission DN AH A4 11/05/2018 S4.55(1A) Submission AHDN
INDICATES BUILDING OUTLINE "AS APPROVED"
U 05/11/2018 S4.55 Submission Draft DN SH A5 20/11/2018 S4.55 Submission DN SH A6 13/12/2018 S4.55 Revised Submission DN SH A7 25/02/2020 S4.55 Revised Submission DS SH A8 02/04/2020 S4.55 Revised Submission SH SH
1 BED
22
23
24
25
26
1
SITE BOUNDARY
SITE BOUNDARY
SITE BOUNDARY
SETOUT POINT BLOCK 2
RS-3
RS-2
CB1.04 GREASE ARRESTOR 1 SSL 13.050
CB1.08 CORRIDOR
RS 35 Area 7 m2 Volume 14.9 m3
RS 37 Area 3 m2 Volume 6.5 m3
RS 47 Area 5 m2 Volume 9.6 m3
RS 49 Area 4 m2 Volume 7.7 m3
RS 40 Area 2 m2 Volume 4.5 m3
RS 36 Area 3 m2 Volume 5.8 m3
RS 55 Area 2 m2 Volume 4.2 m3
RS 44 Area 2 m2 Volume 4.5 m3
RS 73 Area 10 m2 Volume 20.3 m3
RS 48 Area 4 m2 Volume 8.9 m3
RS 70 7 m2 Volume 15.6 m3
RS 41 Area 2 m2 Volume 4.5 m3
RS 43 Area 2 m2 Volume 4.5 m3
RS 45 Area 2 m2 Volume 4.5 m3
RS 62 2 m2 Volume 5.1 m3
RS 59 7 m2 Volume 14.2 m3
RS 58 3 m2 Volume 7.3 m3
DRAIN
67
67
8
RS 72 Area 13 m2 Volume 27.5 m3
RS 71 Area 11 m2 Volume 23.9 m3
RS 57 Area 4 m2 Volume 7.6 m3
RS 46 Area 2 m2 Volume 4.6 m3
RS 53 Area 2 m2 Volume 4.8 m3
RS 52 Area 3 m2 Volume 6.3 m3
RS 56 Area 3 m2 Volume 6.4 m3
RS 54 Area 2 m2 Volume 4.3 m3
HB1.07 MAINTENANCE SSL 13.400
RS 33 Area 12 m2 Volume 25.2 m3
RS 34 Area 5 m2 Volume 10.5 m3
RS 39 Area 2 m2 Volume 4.2 m3
RS 50 Area 2 m2 Volume 5.1 m3
RS 32 Area 3 m2 Volume 7.1 m3
RS 64 4 m2 Volume 8.6 m3
RS 38 Area 4 m2 Volume 8.1 m3
RS 65 5 m2 Volume 11.5 m3
RS 42 Area 2 m2 Volume 4.5 m3
RS 51 Area 1 m2 Volume 3.0 m3
RS 60 2 m2 Volume 5.1 m3
AMENDED CAR PARKING DISTRIBUTION
GENERAL REDISTRIBUTION OF BASEMENT STORAGE TO IMPROVE ACCESS & EFFICIENCY
B1 TOTAL CAR PARKING SPACES 32 INCLUDING 27 RESIDENTIAL SPACES 4 ACCESSIBLE SPACES 1 LOADING BAY
27 BICYCLE SPACES (IN RESIDENTIAL STORAGE CAGES) 35 BICYCLE SPACES FOR RETAIL/COMMERCIAL 30 BICYCLE SPACES FOR VISITORS
OTHER
B1 TOTAL CAR PARKING SPACES 26 INCLUDING 24 RESIDENTIAL SPACES 2 ACCESSIBLE RESIDENTIAL SPACES PLUS 1 LOADING BAY
34 BICYCLE SPACES (IN INDIVIDUAL RESIDENTIAL STORAGE CAGES)
OTHER
GENERAL NOTES
DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY
ALL DIMENSIONS AND EXISTING CONDITIONS SHALL BE CHECKED AND VERIFIED BY THE CONTRACTOR BEFORE PROCEEDING WITH THE WORK
fjmt studio architecture interiors landscape urban community
sydney melbourne uk Level 5, 70 King Street t +61 2 9251 7077 w fjmtstudio.com
legend
C FRANCIS-JONES MOREHEN THORP PTY LTD 2020 ABN 28 101 197 219 NOMINATED ARCHITECT: RICHARD FRANCIS-JONES (REG NO 5301)
project code sheet no. revision
scale first issued
title
project
85 Harrington Street & 68-72 Gloucester Street Lot 1 in DP 777033 The Rocks NSW 2000
Plans Level Basement 2
A8
INDICATES CHANGES FORMING THIS APPLICATION
A2 04/04/2018 S4.55(1A) Coordination Package DN AH A3 04/04/2018 S4.55(1A) Submission DN AH A4 11/05/2018 S4.55(1A) Submission AHDN
INDICATES BUILDING OUTLINE "AS APPROVED"
U 05/11/2018 S4.55 Submission Draft DN SH A5 20/11/2018 S4.55 Submission DN SH A6 13/12/2018 S4.55 Revised Submission DN SH A7 25/02/2020 S4.55 Revised Submission DS SH A8 06/04/2020 S4.55 Revised Submission SH SH
1 BED
3 x MOTORCYCLES
2 x MOTORCYCLES
SETOUT POINT BLOCK 2
CP SUPPLY
UNDERCROFT
HB2.02 LIFT LOBBY FFL 10.400 SSL 10.350
CB2.05 VESTIBULE
HB2.06 CAR PARK H8.01
RS-2
RS 2 Area 6 m2 Volume 12.0 m3RS 3
Area 3 m2 Volume 6.8 m3
AMENDED CAR PARKING DISTRIBUTION
FIRE SERVICES WATER TANK RELOCATED IN ACCORDANCE WITH BCA DtS FIRE SERVICES REQUIREMENTS
REDISTRIBUTION OF ACCESSIBLE CAR SPACES TO IMPROVE ACCESS
GENERAL REDISTRIBUTION OF BASEMENT STORAGE TO IMPROVE ACCESS & EFFICIENCY
B2 TOTAL CAR PARKING SPACES 32 INCLUDING 29 RESIDENTIAL SPACES 3 ACCESSIBLE SPACES
5 MOTORBIKE SPACES 29 BICYCLE SPACES (IN RESIDENTIAL STORAGE CAGES)
OTHER
B2 TOTAL CAR PARKING SPACES 28 INCLUDING 24 RESIDENTIAL SPACES 4 ACCESSIBLE RESIDENTIAL SPACES
OTHER
AMENDED CAR PARKING RATESAPPROVED CAR PARKING RATES
5 MOTORBIKE SPACES 24 BICYCLE SPACES (IN INDIVIDUAL RESIDENTIAL STORAGE CAGES)
GENERAL NOTES
DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY
ALL DIMENSIONS AND EXISTING CONDITIONS SHALL BE CHECKED AND VERIFIED BY THE CONTRACTOR BEFORE PROCEEDING WITH THE WORK
fjmt studio architecture interiors landscape urban community
sydney melbourne uk Level 5, 70 King Street t +61 2 9251 7077 w fjmtstudio.com
legend
C FRANCIS-JONES MOREHEN THORP PTY LTD 2020 ABN 28 101 197 219 NOMINATED ARCHITECT: RICHARD FRANCIS-JONES (REG NO 5301)
project code sheet no. revision
scale first issued
title
project
85 Harrington Street & 68-72 Gloucester Street Lot 1 in DP 777033 The Rocks NSW 2000
Plans Level H1 - C2 Floor Plan
GA85H
A7
INDICATES CHANGES FORMING THIS APPLICATION
A2 04/04/2018 S4.55(1A) Coordination Package DN AH A3 04/04/2018 S4.55(1A) Submission DN AH A4 11/05/2018 S4.55(1A) Submission AHDN
INDICATES BUILDING OUTLINE "AS APPROVED"
U 05/11/2018 S4.55 Submission Draft DN SH A5 20/11/2018 S4.55 Submission DN SH A6 13/12/2018 S4.55 Revised Submission DN SH A7 25/02/2020 S4.55 Revised Submission DS SH
1 BED
UP
12345
UP
12345
6,235
22.480
22.460
21.260
23.750
EXISTING STAIR
EXISTING STAIR
H A R R I N G T O N S T R E E T
LINE OF EXISTING EXCAVATION
LINE OF EXISTING EXCAVATION
LINE OF EXISTING EXCAVATION
LINE OF EXISTING EXCAVATION
RS-1
H8b
RETAIL STORE 8A RETAIL 85 m2 FFL 22.475 SSL 22.425
H15
H15
H1.08 IRRIGATION
RETAIL STORE 8B RETAIL 44 m2 FFL 23.275 SSL 23.225
C/E F6
6
7
UP
12345
be removed
SITE BOUNDARY
SITE BOUNDARY
SITE BOUNDARY
C205 B 10 m2
E4A
GAR-1
AMENDED FLOOR LEVELS BASED FROM EXISTING
FOUNDATION RL LEVELS
POSSIBLE FUTURE DIVISION WALL
INCREASED TREADS TO STEPS AND RL LEVELS TO ALIGN FFL LEVELS
TO PROPOSED BAKER TERRACE
GENERAL NOTES
DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY
ALL DIMENSIONS AND EXISTING CONDITIONS SHALL BE CHECKED AND VERIFIED BY THE CONTRACTOR BEFORE PROCEEDING WITH THE WORK
fjmt studio architecture interiors landscape urban community
sydney melbourne uk Level 5, 70 King Street t +61 2 9251 7077 w fjmtstudio.com
legend
C FRANCIS-JONES MOREHEN THORP PTY LTD 2020 ABN 28 101 197 219 NOMINATED ARCHITECT: RICHARD FRANCIS-JONES (REG NO 5301)
project code sheet no. revision
scale first issued
title
project
85 Harrington Street & 68-72 Gloucester Street Lot 1 in DP 777033 The Rocks NSW 2000
Plans Level H2 - C3 Floor Plan (Gloucester Street)
GA85H
A7
INDICATES CHANGES FORMING THIS APPLICATION
A2 04/04/2018 S4.55(1A) Coordination Package DN AH A3 04/04/2018 S4.55(1A) Submission DN AH A4 11/05/2018 S4.55(1A) Submission AHDN
INDICATES BUILDING OUTLINE "AS APPROVED"
U 05/11/2018 S4.55 Submission Draft DN SH A5 20/11/2018 S4.55 Submission DN SH A6 13/12/2018 S4.55 Revised Submission DN SH A7 25/02/2020 S4.55 Revised Submission DS SH
1 BED
5,425
6,235
10,760
6,440
10,760
9m
1.2m
9m
VERTICAL BARS TURNED 45 DEGREES TO PROMOTE VISUAL PRIVACY
NEW STEEL PALISADE FENCE
TO PROMOTE VISUAL TRANSPARENCY W HEN
UP RAMP FROM GLOUCESTER STREET
G L O U C E S T E R S T R E E T
INV 26.680
exRL 26.610
RL 26.680
RL 26.670
41 51
RS-1
AL
H2.XX PUBLIC LIFT ACCESS
HC
UP
UP
12345
3.3m
2m
INTERPRETIVE PANELS(S)
L4
EXISTING HYDRANT PIPE - TO BE RE-ROUTED AT BREAKTHROUGH POINT
EXISTING HYDRANT PIPE - TO BE RE-ROUTED AT BREAKTHROUGH POINT
1:14 GRADIENT
1:14 GRADIENT
SITE BOUNDARY
SITE BOUNDARY
SITE BOUNDARY
BT 72 94 m2
BT 68 68 m2
C306 B 17 m2
C307 B 11 m2
GT 86 B 6 m2
GT 84 B 6 m2
GT 88 B 4 m2
C306 3 BED 109 m2
H206 3 BED 120 m2
GT 86 TOWN HOME 56 m2
GT 84 TOWN HOME 57 m2
GT 82 TOWN HOME 52 m2
GT 80 TOWN HOME 52 m2
GT 78 TOWN HOME 67 m2
H205 B 10 m2
H203 B 10 m2
GT 76 B 4 m2
H203 2 BED 100 m2
H205 2 BED 100 m2
H206 B 11 m2
H202 B 8 m2
H201 B 10 m2
H2.FS2R STAIR
C3.FS3R STAIR
PROPOSAL TO REMOVE
GENERAL NOTES
DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY
ALL DIMENSIONS AND EXISTING CONDITIONS SHALL BE CHECKED AND VERIFIED BY THE CONTRACTOR BEFORE PROCEEDING WITH THE WORK
fjmt studio architecture interiors landscape urban community
sydney melbourne uk Level 5, 70 King Street t +61 2 9251 7077 w fjmtstudio.com
legend
C FRANCIS-JONES MOREHEN THORP PTY LTD 2020 ABN 28 101 197 219 NOMINATED ARCHITECT: RICHARD FRANCIS-JONES (REG NO 5301)
project code sheet no. revision
scale first issued
title
project
85 Harrington Street & 68-72 Gloucester Street Lot 1 in DP 777033 The Rocks NSW 2000
Plans Level H3 - C5 Floor Plan
GA85H
A7
INDICATES CHANGES FORMING THIS APPLICATION
A2 04/04/2018 S4.55(1A) Coordination Package DN AH A3 04/04/2018 S4.55(1A) Submission DN AH A4 11/05/2018 S4.55(1A) Submission AHDN
INDICATES BUILDING OUTLINE "AS APPROVED"
U 05/11/2018 S4.55 Submission Draft DN SH A5 20/11/2018 S4.55 Submission DN SH A6 13/12/2018 S4.55 Revised Submission DN SH A7 25/02/2020 S4.55 Revised Submission DS SH
1 BED
UP
12345
VOID OVER
WALKWAY BELOW
LIFT O/R
G L O U C E S T E R S T R E E T
C A H
I L L E X P R E S S W
A Y
H3.11 AL
H3.FS1R STAIR
C/E F6
678
UP
12345
26.760
28.580
L4
SETOUT POINT BLOCK 2
GT 86 TOWN HOME 51 m2
GT 82 TOWN HOME 47 m2
GT 76 TOWN HOME 66 m2
GT 88 TOWN HOME 69 m2
GT 84 B 12 m2
GT 86 B 13 m2GT 88 B
15 m2
H306 B 9 m2
H301 B 10 m2
GT 78 TOWN HOME 61 m2
GAR-1
H302 B 8 m2
RS-1
H3.FS2R STAIR
C5.FS3R STAIR
H
H
H
H
H
H
DRY FIRE
EXISTING WALL IDENTIFIED AS C.1990 BRICKWORK AND STUDWORK, TO BE DEMOLISHED & REPLACED WITH NEW WALL
REVERT BEDROOM RAISED FLOOR LEVEL TO PREVIOUSLY APPROVED FINISHED FLOOR LEVEL
GENERAL NOTES
DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY
ALL DIMENSIONS AND EXISTING CONDITIONS SHALL BE CHECKED AND VERIFIED BY THE CONTRACTOR BEFORE PROCEEDING WITH THE WORK
fjmt studio architecture interiors landscape urban community
sydney melbourne uk Level 5, 70 King Street t +61 2 9251 7077 w fjmtstudio.com
legend
C FRANCIS-JONES MOREHEN THORP PTY LTD 2020 ABN 28 101 197 219 NOMINATED ARCHITECT: RICHARD FRANCIS-JONES (REG NO 5301)
project code sheet no. revision
scale first issued
title
project
85 Harrington Street & 68-72 Gloucester Street Lot 1 in DP 777033 The Rocks NSW 2000
Sections Block 2 & Baker's Terrace Cross Section
GA85H
A7
INDICATES CHANGES FORMING THIS APPLICATION
A2 04/04/2018 S4.55(1A) Coordination Package DN AH A3 04/04/2018 S4.55(1A) Submission DN AH A4 11/05/2018 S4.55(1A) Submission AHDN
INDICATES BUILDING OUTLINE "AS APPROVED"
U 05/11/2018 S4.55 Submission Draft DN SH A5 20/11/2018 S4.55 Submission DN SH A6 13/12/2018 S4.55 Revised Submission DN SH A7 25/02/2020 S4.55 Revised Submission DS SH
1 BED
CAMBRIDGE PLACE
GLOUCESTER STREET
Si te
Bo un
da ry
Si te
Bo un
da ry
Level C1
Level C2
Level C3
Level C5
Level C6
Level C7
Ground Floor
Basement 1
Basement 2
G(ii) MINOR DESIGN CHANGES TO RETAIL FRONTAGE.
AMENDED FLOOR LEVELS BASED ON EXISTING HERITAGE FLOOR LEVELS
BEDROOM RAISED FLOOR LEVEL REVERTED TO PREVIOUSLY APPROVED FINISHED FLOOR LEVEL
GENERAL NOTES
DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY
ALL DIMENSIONS AND EXISTING CONDITIONS SHALL BE CHECKED AND VERIFIED BY THE CONTRACTOR BEFORE PROCEEDING WITH THE WORK
fjmt studio architecture interiors landscape urban community
sydney melbourne uk Level 5, 70 King Street t +61 2 9251 7077 w fjmtstudio.com
legend
C FRANCIS-JONES MOREHEN THORP PTY LTD 2020 ABN 28 101 197 219 NOMINATED ARCHITECT: RICHARD FRANCIS-JONES (REG NO 5301)
project code sheet no. revision
scale first issued
title
project
85 Harrington Street & 68-72 Gloucester Street Lot 1 in DP 777033 The Rocks NSW 2000
Section4.55 Additional Drawings Condition B2(b)
GA85H
A7
INDICATES CHANGES FORMING THIS APPLICATION
A2 04/04/2018 S4.55(1A) Coordination Package DN AH A3 04/04/2018 S4.55(1A) Submission DN AH A4 11/05/2018 S4.55(1A) Submission AHDN
INDICATES BUILDING OUTLINE "AS APPROVED"
U 05/11/2018 S4.55 Submission Draft DN SH A5 20/11/2018 S4.55 Submission DN SH A6 13/12/2018 S4.55 Revised Submission DN SH A7 25/02/2020 S4.55 Revised Submission DS SH
1
C.1990s INFILL - OKAY TO REMOVE IF STRUCTURALLY ACCEPTABLE
1, 2 & 3 - MODIFIED EXISTING WINDOW OPENINGS 'BRICKED UP'
WINDOW INSERTED C.1990s INTO PREVIOUS DOOR OPENING
MODIFIED DOOR OPENING C.1990s
1 99121
1 99121
2 99121
2 99121
2
3
Minor Works Legend Existing/Retained - N/A to s.57 application
General Note of Works: - Remove c1980 concrete slab from basement - Remove fill from basements - Remove all c1980 ceilings, bathrooms, kitchens, service risers and plant equipment
1 31004
RETAIL STORE 8A RETAIL 85 m2 FFL 22.475 SSL 22.425
RETAIL STORE 8B RETAIL 44 m2 FFL 23.275 SSL 23.225
1 31002
R SQ
ORIGINAL FABRIC TO RETAIN, ALSO STRUCTURAL LOAD BEARING WALL
PROPOSED FLOOR LEVEL - RESTORE TO 'EXISTING' FLOOR LEVELS SHOWN DOTTED IN ORIGINAL PLANS
PROPOSED FLOOR LEVEL - RESTORE TO 'EXISTING' FLOOR LEVELS SHOWN DOTTED IN ORIGINAL PLANS
PROPOSED FLOOR LEVEL - RESTORE TO 'EXISTING' FLOOR LEVELS SHOWN DOTTED IN ORIGINAL PLANS
POTENTIAL DIVISION WALL LOCATION.
INCREASE STAIR TREADS TO ALIGN PROPOSED LEVEL TO BAKER TERRACE FLOOR ALIGNMENT.
DA-2011 [A8] Level Basement 1_200402
DA-2011 [A8] Level Basement 1
DA-2012 [A8] Level Basement 2_200406
DA-2012 [A8] Level Basement 2
bakers terrace drawings.pdf
DA-2003 Level H2 - C3 Floor Plan (Gloucester Street)
DA-2003 Level H2 - C3 Floor Plan (Gloucester Street)
DA-2004 Level H3 - C5 Floor Plan
DA-2004 Level H3 - C5 Floor Plan
DA-4151 Block 2 & Baker's Terrace Cross Section
DA-4151 Block 2 & Baker's Terrace Cross Section
DA-9901 Condition B2(b)
DA-9901 Condition B2(b)