A2-3.2 Hall/Planning-and-Development/Proposed... · 2 north elevation a2-3.2.1 1 : 100 3 south...

2
This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction. The contractor working from drawings not specifically marked 'For Construction' must assume full responsibility and bear costs for any corrections or damages resulting from his work. T TURNER FLEISCHER URNER FLEISCHER ARCHITECTS INC. 6 Lesmill on m3b 416 425-2222 Road oronto Canada turnerfleischer.com T elephone T ( ) 7 2t8 PROJECT PROJECT NO. DRAWING DRAWN BY SCALE DRAWING NO. PROJECT DATE CHECKED BY CUNDLES ROAD EAST "SITE A3" BARRIE, ON 07.347R BUILDING A3.2 PERSPECTIVE MB A2-3.2.0 JK 2017-04-21 # DATE DESCRIPTION BY 1 2017-04-27 ISSUED FOR REVIEW DP 2 2017-06-29 ISSUED FOR REVIEW MB 3 2017-10-30 ISSUED FOR REVIEW MB

Transcript of A2-3.2 Hall/Planning-and-Development/Proposed... · 2 north elevation a2-3.2.1 1 : 100 3 south...

Page 1: A2-3.2 Hall/Planning-and-Development/Proposed... · 2 north elevation a2-3.2.1 1 : 100 3 south elevation a2-3.2.1 1 : 100 1 west elevation a2-3.2.1 1 : 100 4 east elevation a2-3.2.1

This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc.

The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify

Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be

scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc.,

information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the

work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction.

The contractor working from drawings not specifically marked 'For Construction' must assume full

responsibility and bear costs for any corrections or damages resulting from his work.

T

TURNER FLEISCHER

URNERFLEISCHERARCHITECTS INC.

6 Lesmill on m3b416 425-2222

Road oronto Canada

turnerfleischer.com

TelephoneT ( )

7 2t8

PROJECT

PROJECT NO.

DRAWING

DRAWN BY

SCALE

DRAWING NO.

PROJECT DATE

CHECKED BY

CUNDLES ROAD EAST "SITE A3"

BARRIE, ON

07.347R

BUILDING A3.2 PERSPECTIVE

MB

A2-3.2.0

JK

2017-04-21

# DATE DESCRIPTION BY

1 2017-04-27 ISSUED FOR REVIEW DP

2 2017-06-29 ISSUED FOR REVIEW MB

3 2017-10-30 ISSUED FOR REVIEW MB

Page 2: A2-3.2 Hall/Planning-and-Development/Proposed... · 2 north elevation a2-3.2.1 1 : 100 3 south elevation a2-3.2.1 1 : 100 1 west elevation a2-3.2.1 1 : 100 4 east elevation a2-3.2.1

FFE

0'-0"

T/O STEEL

18'-0"

T/O HIGH PARAPET

23'-6"

T/O LOW PARAPET

20'-0"

T/O MID PARAPET

21'-0"

(2'

- 6

")

76

2

(1'

- 0

")

30

5

(2'

- 0

")

61

0

(18

' -

0")

54

867

16

3 (

23

' -

6")

FL1 PNL3 PNL2

BL3 BL1

PNL2 FL1PNL3

GL1 EC5 BL1EC4

FFE

0'-0"

T/O STEEL

18'-0"

T/O HIGH PARAPET

23'-6"

T/O LOW PARAPET

20'-0"

T/O MID PARAPET

21'-0"

71

63

(2

3'

- 6

")

(2'

- 6

")

76

2

(1'

- 0

")

30

5

(2'

- 0

")

61

0

(18

' -

0")

54

86

FL1 PNL3 PNL2

EC4 BL3 BL1

BL2

EC3 EC3 EC4

FL1 PNL3 PNL2

BL1

PNL2FL1

FFE

0'-0"

T/O STEEL

18'-0"

T/O HIGH PARAPET

23'-6"

T/O LOW PARAPET

20'-0"

T/O MID PARAPET

21'-0"

(2'

- 6

")

76

2

(1'

- 0

")

30

5

(2'

- 0

")

61

0

(18

' -

0")

54

867

16

3 (

23

' -

6")

FL1 PNL3 PNL2

GL1EC5BL1 BL1 BL1GL1GL1EC5EC1

FL2 PNL2 BR1 PNL3

EC4 GL1EC5 BL1

FL1 PNL3 PNL2

FFE

0'-0"

T/O STEEL

18'-0"

T/O HIGH PARAPET

23'-6"

T/O LOW PARAPET

20'-0"

T/O MID PARAPET

21'-0"

71

63

(2

3'

- 6

")

(2'

- 6

")

76

2

(1'

- 0

")

30

5

(2'

- 0

")

61

0

(18

' -

0")

54

86

FL1 PNL3 PNL2 FL1PNL3PNL2

BL3 BL1 PNL2 EC4

A2-3.2.1

2

A2-3.2.11

A2-3.2.14

A2-3.2.1

3N

BUILDING A3.2(±4,905 S.F.)

EN

TRA

NC

E

EXIT

EXIT

M/E ROOM(±150 S.F.)

Project Description

Item

1

Ontario Building Code Data Matrix OBC Reference

2 Major Occupancy(s)

3 Building Area (sq. m)

4

5

6

7

Gross Area (sq. m)

Number of Storeys

Number of Streets/Access Routes

Building Classification

8 Sprinkler System Proposed

10

11

12

13

14

15

16

17

18

19

20

Standpipe required

Fire Alarm Required

Water Service/Supply is Adequate

High Building

Permitted Construction

Actual Construction

Mezzanine(s) Area (sq.m)

Occupant load based on

Unit A3.2

Barrier-free Design

Hazardous Substances

Entire Building

Basement only

In lieu of roof rating

Not required

Yes

Yes

Yes

Yes

Non-combustibleCombustible

Combustible Non-combustible

sq.m/Person Design of Building

No

No

No

No

Both

Both

Occupancy: Load Persons

Yes No (Explain)

Yes No

Addition

Alteration

Part 3 Part 9New

Existing

Existing

Above grade

New

New

Total

Total

Below grade

Required Fire

Resistance

Rating (FRR)

Horizontal Assemblies FRR

(Hours)

FRR of Supporting

Members

Floors

Roof

Hours

Hours

N/A

N/A

Floors

Roof

Hours

Hours

N/A

N/A

--

3.1.2.1.(1) --

1.1.3.2 --

--

1.4.1.2[A] & 3.2.1.1 --

3.2.2.10 & 3.2.5 --

3.2.2.61 --

3.2.2.57 --

3.2.9.1 --

3.2.4. --

3.2.5.7. --

3.2.6 --

3.2.2.57 --

3.2.1.1.(3)-(8) --

3.1.17 --

3.8 --

3.3.1.2 & 3.3.1.20 --

3.2.2.57 & 3.2.1.4 --

Spatial Separation - Construction of Exterior Walls

Wall Area of

EBF

(sq.m)

L.D.

(m)

L/H

or

H/L

Permitted

Max % of

Openings

Proposed %

of

Openings

FRR

(hours)

Listed Design or

Description

Comb.

Constr.

Comb. Constr

Non. Cladding

Non-

Comb

Const

Group E - "Mercantile"

396 396

1 0

4

Group E, up to 2 Storeys

107E

North

Part 11

--

--

--

--

--

--

--

--

--

--

--

--

--

--

3.2.3

--

--

--

0

0

N/A

1%60%3:112.3105

Listed Design No. or

Description (SG-2)

Mezzanine HoursN/A

Mezzanine Hours

Listed Design No. or

Description (SG-2)

--

East

--

--

4.65

+16

3:1

3:1

117

105 1%

9%

100%

BOTH

0

Table 3.2.3.1.C1

2

Change of Use

- Proposed Commercial Unit.

South

West 9.2 3:1117 37%100% 1

0%

1.1.3.2396 396

--

N/A --

Table 3.2.3.1.C

Table 3.2.3.1.C

Table 3.2.3.1.C

BOTH

BOTH

BOTH

This drawing, as an instrument of service, is provided by and is the property of Turner Fleischer Architects Inc.

The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify

Turner Fleischer Architects Inc. of any variations from the supplied information. This drawing is not to be

scaled. The architect is not responsible for the accuracy of survey, structural, mechanical, electrical, etc.,

information shown on this drawing. Refer to the appropriate consultant's drawings before proceeding with the

work. Construction must conform to all applicable codes and requirements of authorities having jurisdiction.

The contractor working from drawings not specifically marked 'For Construction' must assume full

responsibility and bear costs for any corrections or damages resulting from his work.

T

TURNER FLEISCHER

URNERFLEISCHERARCHITECTS INC.

6 Lesmill on m3b416 425-2222

Road oronto Canada

turnerfleischer.com

TelephoneT ( )

7 2t8

PROJECT

PROJECT NO.

DRAWING

DRAWN BY

SCALE

DRAWING NO.

PROJECT DATE

CHECKED BY

As indicated

CUNDLES ROAD EAST "SITE A3"

BARRIE, ON

07.347R

BUILDING A3.2

FLOOR PLAN & ELEVATIONS

MB

A2-3.2.1

JK

2017-04-21

# DATE DESCRIPTION BY

1 2017-04-27 ISSUED FOR REVIEW DP

2 2017-06-29 ISSUED FOR REVIEW MB

3 2017-10-30 ISSUED FOR REVIEW MB

EXTERIOR FINISH & COMPONENT SCHEDULE

MATERIAL DESCRIPTION AREA

BL1 SHOULDICE CONCRETE BLOCK

COLOUR: COLBY TAPESTRY

MORTAR: SOLOMON 94X IRON BLACK

52 m²

BL2 SHOULDICE CONCRETE BLOCK

COLOUR: EXECUTIVE GREY

MORTAR: SOLOMON 60X WHITE

17 m²

BL3 PRECAST SILL

COLOUR: LIGHT GREY

2 m²

BR1 WATSONTOWN BRICK

COLOUR: HUDSON KT TYPE 8

MORTAR: SOLOMON 60X WHITE

23 m²

FL1 CAP FLASHING

COLOUR: GREY

1 m²

FL2 METAL CORNICE

COLOUR: MATCH TO ADJACENT METAL PANEL

7 m²

GL1 GLAZED DOORS AND WINDOWS

MULLION COLOUR: BLACK

48 m²

PNL2 AL13 METAL PANELS / PANEL SYSTEM

COLOUR: SD324 PEARL

236 m²

PNL3 AL13 METAL PANELS / PANEL SYSTEM

COLOUR: SD326 FRENCH BEIGE

115 m²

EC2 METAL AWNING

COLOUR: BLACK

28 m²

EC3 H.M. DOORS & FRAMES

PREFINISHED HOLLOW METAL DOORS AND FRAMES

COLOUR: TO MATCH ADJACENT MATERIALS

9 m²

EC4 EXTERIOR LIGHTING FIXTURE 4 m²

EC5 METAL FILLER PANEL

COLOUR: MATCH TO MULLION

1 m²

1 : 100A2-3.2.1

NORTH ELEVATION2

1 : 100A2-3.2.1

SOUTH ELEVATION3

1 : 100A2-3.2.1

WEST ELEVATION1

1 : 100A2-3.2.1

EAST ELEVATION4

1 : 100A2-3.2.1

FLOOR PLAN5

NOT APPLICABLE

- ALL ROOF TOP UNITS TO BE SCREENED BY PARAPETS OR

SCREEN WALLS. SIZE AND LOCATION OF ROOF TOP UNITS

TO BE CONFIRMED

*NOTE

NOT APPLICABLE

NOT APPLICABLE

NOT APPLICABLE

NOT APPLICABLE

NOT APPLICABLE

NOT APPLICABLE

N.T.S.A2-3.2.1

OBC Matrix6