‘Te Paerangi Ataata – Sky Song’ The horizon connects us, defying time and space. For here, in this ancient place, we are standing together. All the way south. We are connected. Ahakoa te tāwhiti, kua tūhonongia a tāua e te pae nei. I tēnei wāhi onamata, e tū ana a tāua inaianei. Ki te tai tonga rā āno, kua tūhonongia a tāua. General Notes: All dimensions to be checked on site. Copyright in all drawings, specifications and other documents and in the work executed from them remains the property of Studio of Pacific Architecture Ltd. © Studio of Pacific Architecture Limited 2019 True North: Original Paper size: Prepared For: Dunning Thornton Consultants Key Plan: Scale Bar Woods eCubed Ltd TBIG In association with: Les Boulton & Associates Ltd EN-GEO Rawlinsons Peers Brown Miller Yeomans Boffa Miskell Clough and Associates Rev Description Date D E F G H For Information- Governance Group Presentation Issue 70% Detailed Design Resource Consent Issue Detailed Design 95% For Co-ordination Resource Consent Revised 2019-07-11 2019-08-09 2019-08-20 2019-08-23 2019-09-11 Printed: 13/09/19,12:10 PM CAD Ref:2494 Erebus Memorial Cover Cover Page Revision: Project Title: for Ministry for Culture and Heritage at Dove Myer-Robinson Park, Auckland Part Allotment 4 Section 2 Suburbs of Auckland (Recreation Reserve) National Erebus Memorial www.studiopacific.co.nz [email protected] TEL: 64 4 802 5444 FAX: 64 4 802 5446 Architects Urban Designers Interior Designers Landscape Architects Level 2 74 Cuba St P.O. Box 11-517 Wellington, NZ studiopacificarchitecture 0 10 50 A1 Layout ID. A-00-01 Job No.: 2494 Layout Name: Resource Consent Revised H Studio J - Jason O'Hara Warren Maxwell

Transcript of A1...Dove Myer-Robinson Park, Auckland Part Allotment 4 Section 2 Suburbs of Auckland (Recreation...

Page 1: A1...Dove Myer-Robinson Park, Auckland Part Allotment 4 Section 2 Suburbs of Auckland (Recreation Reserve) National Erebus Memorial architects@studiopacific.co.nz TEL: 64 4 802 5444

‘Te Paerangi Ataata – Sky Song’

The horizon connects us, defying time and space.For here, in this ancient place, we are standing together. All the way south. We are connected.

Ahakoa te tāwhiti, kua tūhonongia a tāua e te pae nei.I tēnei wāhi onamata, e tū ana a tāua inaianei. Ki te tai tonga rā āno, kua tūhonongia a tāua.

OUTWARD JOURNEY

TE PAERANGI ATAATA; SKY SONG

ED 030

General Notes:All dimensions to be checked on site.

Copyright in all drawings, specifications and other documentsand in the work executed from them remains the property ofStudio of Pacific Architecture Ltd.

© Studio of Pacific Architecture Limited 2019

True North: Original Paper size:

Prepared For:

Dunning Thornton Consultants

Key Plan:

Scale Bar

WoodseCubed Ltd

TBIG

In association with:

Les Boulton & Associates LtdEN-GEO

RawlinsonsPeers Brown MillerYeomansBoffa MiskellClough and Associates

Rev Description Date

D

E

F

G

H

For Information- Governance GroupPresentation Issue

70% Detailed Design

Resource Consent Issue

Detailed Design 95%For Co-ordination

Resource Consent Revised

2019-07-11

2019-08-09

2019-08-20

2019-08-23

2019-09-11

Printed: 13/09/19,12:10 PM CAD Ref:2494 Erebus Memorial

CoverCover Page

Revision:

Project Title:

forMinistry for Culture and HeritageatDove Myer-Robinson Park, AucklandPart Allotment 4 Section 2 Suburbs of Auckland(Recreation Reserve)

National ErebusMemorial

[email protected]

TEL: 64 4 802 5444FAX: 64 4 802 5446

A r c h i t e c t sU r b a n D e s i g n e r sI n t e r i o r D e s i g n e r sL a n d s c a p e A r c h i t e c t sL e v e l 27 4 C u b a S tP . O . B o x 1 1 - 5 1 7W e l l i n g t o n , N Z

studiopacificarchitecture

0 10 50

A1

Layout ID.

A-00-01Job No.:

2494

Layout Name:

Resource Consent Revised

H

S t u d i o J - J a s o n O ' H a r aW a r r e n M a x w e l l

Page 2: A1...Dove Myer-Robinson Park, Auckland Part Allotment 4 Section 2 Suburbs of Auckland (Recreation Reserve) National Erebus Memorial architects@studiopacific.co.nz TEL: 64 4 802 5444

210-00

The site

SITE NOTES:Refer Civil Engineer for enabling works incl temporary haulroad.

Site Setout to be established with Surveyor from identifiedsetout points (CAD files will be made available for this purpose).

1-

Site Location- mapNTS

2-

Site Location- aerial photographNTS

(indicative only)

PLEASE PRINT THIS PAGE IN COLOUR

Image source: Googlemaps, June 2019Image source: Googlemaps, June 2019

General Notes:All dimensions to be checked on site.

Copyright in all drawings, specifications and other documentsand in the work executed from them remains the property ofStudio of Pacific Architecture Ltd.

© Studio of Pacific Architecture Limited 2019

True North: Original Paper size:

Prepared For:

Dunning Thornton Consultants

Key Plan:

Scale Bar

WoodseCubed Ltd

TBIG

In association with:

Les Boulton & Associates LtdEN-GEO

RawlinsonsPeers Brown MillerYeomansBoffa MiskellClough and Associates

Rev Description Date

C

D

E

F

G

For Information- Governance GroupPresentation Issue

70% Detailed Design

Resource Consent Issue

Detailed Design 95%For Co-ordination

Resource Consent Revised

2019-07-11

2019-08-09

2019-08-20

2019-08-23

2019-09-11

Printed: 13/09/19,12:10 PM CAD Ref:2494 Erebus Memorial

SiteLocation Plan

Revision:

Project Title:

forMinistry for Culture and HeritageatDove Myer-Robinson Park, AucklandPart Allotment 4 Section 2 Suburbs of Auckland(Recreation Reserve)

National ErebusMemorial

[email protected]

TEL: 64 4 802 5444FAX: 64 4 802 5446

A r c h i t e c t sU r b a n D e s i g n e r sI n t e r i o r D e s i g n e r sL a n d s c a p e A r c h i t e c t sL e v e l 27 4 C u b a S tP . O . B o x 1 1 - 5 1 7W e l l i n g t o n , N Z

studiopacificarchitecture

0 10 50

A1

Layout ID.

A-10-00Job No.:

2494

Layout Name:

Resource Consent Revised

G

S t u d i o J - J a s o n O ' H a r aW a r r e n M a x w e l l

Page 3: A1...Dove Myer-Robinson Park, Auckland Part Allotment 4 Section 2 Suburbs of Auckland (Recreation Reserve) National Erebus Memorial architects@studiopacific.co.nz TEL: 64 4 802 5444

21.74 20.69

23.47

22.65

24.01

22.79

22.01

22.81

23.61

24.96

26.90

26.79

21.73

19.73

20.34

20.01

19.98

25.10

15.19

16.23

26.55

26.54

26.53

26.47

26.38

23.52

23.71

21.26

22.43

24.55

23.96

19.9520.65

21.87

22.56

23.00

23.1523.34

23.68

23.89

24.2524.73

25.25

25.32

26.35

25.21

25.15

25.1324.85 24.44

24.16

24.20

23.92

23.88

24.07

24.23

24.27 23.72

23.30

22.86

22.50

21.95

21.7421.45

21.27

19.93

20.2120.36

20.13

20.01

19.70

19.75

19.5119.40

19.2219.33

19.12 19.00

18.88

18.91

18.99 18.95

19.0219.12

19.10

19.14

19.04

19.24

19.37

19.13

19.3019.51

24.73

24.7824.85

25.02

24.99

25.00

25.0325.05

25.0925.03

25.10

25.25

25.20

25.3425.40

19.63

19.54

19.39

19.22

19.31

19.15

19.05

19.23

19.44

19.70

20.06

20.38

19.57

19.49

20.17

19.76

19.52

19.30

19.34

23.0721.55

21.82

23.20

23.31

22.31

24.05

26.6226.26

26.3025.18

25.1826.2826.28

26.63

21.99

22.14

22.55

22.93

25.31

25.27

25.13

25.11

25.00

24.96

SeatingSeating

Seating

Seating

PalmTree

PalmTree

PalmTree

PohutukawaTree Trunk

OakTree

TotaraTree

Tree

SealedFootpathSealedFootpath

SealedFootpath

Top of BankTop of Bank

Top of Bank

Top of Bank

Bottom of Bank

Top of Bank

SealedFootpath

SealedFootpath

NETHERLANDSCOMMUNITYMEMORIAL

StepsDripline

Dripline

Dripline

Dripline

OakDripline

PohutukawaDriplinePohutukaw

aDripline

Dripline

TotaraTree

SealedFootpath

Timber Barrier

Timber Barrier

Timber Barrier

Steep Slopes inDense Vegetation

Tree

Tree

Tree

Bore HoleMarker StakeRL16.98

Bore HoleMarker StakeRL20.75Bore HoleMarker StakeRL19.59

Bore HoleMarker StakeRL21.09

Bore HoleMarker StakeRL22.00

Bore HoleMarker StakeRL23.31

Bore HoleMarker StakeRL23.35

Bore HoleMarker StakeRL24.00

Rock N

ib

Rock N

ib

RubbishBin

LightStandard

186°

DIRE

CTIO

N TO

MT

EREB

US

16.0

17.0

18.0

19.0

19.0

20.0

20.0

21.0

21.022.0

22.022.0

22.0

23.0

23.023.0

24.0

24.0

25.0

25.0

25.0

25.0

25.0

26.026.0

15.6

15.8

16.216.416.616.8

17.217.417.617.8

18.218.418.6

18.8

18.8

19.2

19.2

19.4

19.4

19.6

19.6

19.819.8

20.2

20.2

20.2

20.4

20.4

20.6

20.6

20.8

20.8

21.2

21.2

21.4

21.4

21.6

21.6

21.8

21.8

21.8

22.2

22.2

22.2

22.4

22.422.6

22.6

22.6

22.8

22.8

22.8

23.223.2

23.2

23.4

23.4

23.4

23.623.6

23.8

23.8

24.2

24.2

24.4

24.4

24.4

24.6

24.6

24.6

24.8

24.8

24.8

24.8

25.2

25.2

25.2

25.4

25.425.4

25.625.6

25.625.8

25.825.8

26.226.2

26.4

26.426.6

26.6

26.8

N

EXIS

TIN

G P

ATH

max. 1:20 fall

Bore HoleMarker StakeRL16.98On-Site Datum(Iron Spike in SealedFootpath803 422.86mN402 050.47mERL18.87

On-Site Datum(Iron Spike in SealedFootpath803 422.86mN402 050.47mERL18.87

On-Site Datum(Iron Spike in SealedFootpath803 422.86mN402 050.47mERL18.87

SITE NOTES:Refer Civil Engineer for enabling works incl temporary haulroad.

Site Setout to be established with Surveyor from identifiedsetout points (CAD files will be made available for this purpose).

1-

Site Plan ExistingScale 1:100

Netherlands Community Memorial

Existing Seat

Listed Pohutukawa Tree

Existing Seat

Existing Palm Tree to be removed2221 4.3 REMOVE TREES

Existing Palm Tree to be removed2221 4.3 REMOVE TREES

Existing Palm Tree to be removed2221 4.3 REMOVE TREES

LOCATION OF MEMORIAL SHOWNDASHED FOR REFERENCE

Existing Seat

2221 4.4 RELOCATED TREES

Existing juvenile oak tree to berelocated. Location TBC Referspecification

Indicative location of proposedWhakanoa (dashed red)

Hatched area zone of existinglandscape terrace

Existing Karo Tree to be removed2221 4.3 REMOVE TREES

Indicative location shown arboristto confirm on site

Survey info source: Yeomans '8216-MINISTRY FOR CULTURE & HERITAGE-EREBUS MEM-Site Survey RevA May19.dwg'

PLEASE PRINT THIS PAGE IN COLOUR

General Notes:All dimensions to be checked on site.

Copyright in all drawings, specifications and other documentsand in the work executed from them remains the property ofStudio of Pacific Architecture Ltd.

© Studio of Pacific Architecture Limited 2019

True North: Original Paper size:

Prepared For:

Dunning Thornton Consultants

Key Plan:

Scale Bar

WoodseCubed Ltd

TBIG

In association with:

Les Boulton & Associates LtdEN-GEO

RawlinsonsPeers Brown MillerYeomansBoffa MiskellClough and Associates

Rev Description Date

B

C

D

E

F

For Information- Governance GroupPresentation Issue

70% Detailed Design

Resource Consent Issue

Detailed Design 95%For Co-ordination

Resource Consent Revised

2019-07-11

2019-08-09

2019-08-20

2019-08-23

2019-09-11

Printed: 13/09/19,12:10 PM CAD Ref:2494 Erebus Memorial

SiteExisting Plan

Revision:

Project Title:

forMinistry for Culture and HeritageatDove Myer-Robinson Park, AucklandPart Allotment 4 Section 2 Suburbs of Auckland(Recreation Reserve)

National ErebusMemorial

[email protected]

TEL: 64 4 802 5444FAX: 64 4 802 5446

A r c h i t e c t sU r b a n D e s i g n e r sI n t e r i o r D e s i g n e r sL a n d s c a p e A r c h i t e c t sL e v e l 27 4 C u b a S tP . O . B o x 1 1 - 5 1 7W e l l i n g t o n , N Z

studiopacificarchitecture

0 10 50

A1

Layout ID.

A-10-01Job No.:

2494

Layout Name:

Resource Consent Revised

F

S t u d i o J - J a s o n O ' H a r aW a r r e n M a x w e l l

Page 4: A1...Dove Myer-Robinson Park, Auckland Part Allotment 4 Section 2 Suburbs of Auckland (Recreation Reserve) National Erebus Memorial architects@studiopacific.co.nz TEL: 64 4 802 5444

SITE NOTES:Refer Civil Engineer for enabling works incl temporary haulroad.

Site Setout to be established with Surveyor from identifiedsetout points (CAD files will be made available for this purpose).

112-01

439-03

N

1,50

0

1,500

1,50

0

996

6,82

2

1,354 3,603

9,532

9,05

9

1,400

R 1,500

R 3,000

R 13,9518461 4.1 SEATS

8461 4.1 SEATS

EXISTING SEAT, RETAINED

EXISTING SEAT, RETAINED

8226 4.2 PAVING - GRAVEL MIX

INDICATIVE WHAKANOA LOCATION

EXISTING SEAT, RETAINED

8461 4.1 SEATS

NOTE: REFER TO CIVIL ENGINEERFOR EXTENT OF EARTHWORKS.

Foundation for light

Inground box with water supply tap

SNOWDRIFT WALL

ICE WALL ICE WALL LANDING

EXISTING SEAT, RETAINED

Indicative extent of earthworks showndashed for reference. Refer CivilEngineer

TERRACE SEATING #1

TERRACE SEATING #2

SNOWDRIFT WALL

SNOWDRIFT WALL LANDING

Surveyor setout point: Grids 3/C Surveyor setout point: Grids 2/CSurveyor setout point: Grids 4/C

Surveyor setout point: Grids 2/B

1:20

NEW

PATH

1:20

DRIP

LIN

E

EXIS

TIN

G P

ATH

On-Site Datum- refer Survey

max. 1:20 fall

NEW SEATS TOMATCH EXISTINGSEATING. CHECK ONSITE

NEW SEATS TOMATCH EXISTINGSEATING. CHECK ONSITE

NEW SEATS TOMATCH EXISTINGSEATING. CHECK ONSITE

Hydroseeding to extent of earthworks.Confirm final extents on site and allow formaking good of disturbed grassed areas.

ALIGN WITH EXISTING

ALIGN WITH EXISTING

ALIGN WITH EXISTING

A

BB

CC

34 12

LANDSCAPE CREASE EXTENTSHATCHED. NO EARTHWORKS TO THIS

ZONE

1-

Site Plan ProposedScale 1:100

PLEASE PRINT THIS PAGE IN COLOUR

General Notes:All dimensions to be checked on site.

Copyright in all drawings, specifications and other documentsand in the work executed from them remains the property ofStudio of Pacific Architecture Ltd.

© Studio of Pacific Architecture Limited 2019

True North: Original Paper size:

Prepared For:

Dunning Thornton Consultants

Key Plan:

Scale Bar

WoodseCubed Ltd

TBIG

In association with:

Les Boulton & Associates LtdEN-GEO

RawlinsonsPeers Brown MillerYeomansBoffa MiskellClough and Associates

Rev Description Date

B

C

D

E

F

For Information- Governance GroupPresentation Issue

70% Detailed Design

Resource Consent Issue

Detailed Design 95%For Co-ordination

Resource Consent Revised

2019-07-11

2019-08-09

2019-08-20

2019-08-23

2019-09-11

Printed: 13/09/19,12:11 PM CAD Ref:2494 Erebus Memorial

SiteProposed Plan

Revision:

Project Title:

forMinistry for Culture and HeritageatDove Myer-Robinson Park, AucklandPart Allotment 4 Section 2 Suburbs of Auckland(Recreation Reserve)

National ErebusMemorial

[email protected]

TEL: 64 4 802 5444FAX: 64 4 802 5446

A r c h i t e c t sU r b a n D e s i g n e r sI n t e r i o r D e s i g n e r sL a n d s c a p e A r c h i t e c t sL e v e l 27 4 C u b a S tP . O . B o x 1 1 - 5 1 7W e l l i n g t o n , N Z

studiopacificarchitecture

0 10 50

A1

Layout ID.

A-10-02Job No.:

2494

Layout Name:

Resource Consent Revised

F

S t u d i o J - J a s o n O ' H a r aW a r r e n M a x w e l l

Page 5: A1...Dove Myer-Robinson Park, Auckland Part Allotment 4 Section 2 Suburbs of Auckland (Recreation Reserve) National Erebus Memorial architects@studiopacific.co.nz TEL: 64 4 802 5444

GA NOTES:General:Drawings to be read in conjunction with Civil, Structural andServices Eng docs.Please clarify any discrepancies before proceeding.

Setout:Refer Structural Engineer for setout of Snowdrift wall and insituconcrete elements of IceWall.IceWall 'Shards' are setout as identified on 38-03.Setout of lighting elements to be confirmed on site.

PLEASE PRINT THIS PAGE IN COLOUR

N

238-02

138-01

138-03

5,39082010,44010,016

8,250 8,400

200

EXISTING PATH

4,690 COS

2,15

5 C

OS

2,30

0

820 COS

23,590

115-01

215-01

315-01

Spot lights cast in slab. ReferElectrical Engineer.

SNOWDRIFT WALL

ICE WALL

Slot

dra

in

1:20 ramp

Fulc

rum

Sloped footing type 'B'Sloped footing type 'A'

cLcL

Foundation wall dashed, below. ReferStructural Engineer.

max. 1:20 fall

Refer Structural Engineer.

Refer Structural Engineer for setout.

ICE WALL LANDING1:20 ramp

B

C

34 12

139-02

139-01

A16-01

A16-01

E16-02

E16-02

B16-01

D16-02

D16-02

F16-02

F16-02

C16-02

C16-02

G16-02

G16-02

3102 4.2 INSITU CONCRETE WHITENON-SLIP FINISH

3102 4.2 INSITU CONCRETE WHITENON-SLIP FINISH

4924 4.1 STAINLESS STEELSNOWDRIFT WALL

8226 4.2 PAVING - GRAVEL MIX

Box for in-ground lighting below-to light underside of skywalkcantilever. Refer ElectricalEngineer's drawings. Final sizeand location TBC.

In-ground lighting- to light outsideof icewall (refer to ElectricalEngineer's drawings- final positionto be determined on site).

3102 4.4 INSITU CONCRETE GREYHIDDEN

4611VE 4.3 MAIN GLASS BALUSTRADE

4611VE 4.4 SIDE LANDING GLASSBALUSTRADE

3102 4.3 INSITU CONCRETE WHITESMOOTH FINISH

Toby-(refer to ElectricalEngineer's drawings-final position to bedetermined on site).

8320 4.2 HYDROSEEDED LAWN

Mowing strip below, dashed.

BCDEFGHIJKLMNOPQRSTUVWXYZZAZBZCZDZEZFZGZHZIZJZKZLZMZNZOZPZQ

110-02

GA PlanScale 1:50

General Notes:All dimensions to be checked on site.

Copyright in all drawings, specifications and other documentsand in the work executed from them remains the property ofStudio of Pacific Architecture Ltd.

© Studio of Pacific Architecture Limited 2019

True North: Original Paper size:

Prepared For:

Dunning Thornton Consultants

Key Plan:

Scale Bar

WoodseCubed Ltd

TBIG

In association with:

Les Boulton & Associates LtdEN-GEO

RawlinsonsPeers Brown MillerYeomansBoffa MiskellClough and Associates

Rev Description Date

D

E

F

G

H

For Information- Governance GroupPresentation Issue

70% Detailed Design

Resource Consent Issue

Detailed Design 95%For Co-ordination

Resource Consent Revised

2019-07-11

2019-08-09

2019-08-20

2019-08-23

2019-09-11

Printed: 13/09/19,12:11 PM CAD Ref:2494 Erebus Memorial

GA PlansLevel 00 Plan

Revision:

Project Title:

forMinistry for Culture and HeritageatDove Myer-Robinson Park, AucklandPart Allotment 4 Section 2 Suburbs of Auckland(Recreation Reserve)

National ErebusMemorial

[email protected]

TEL: 64 4 802 5444FAX: 64 4 802 5446

A r c h i t e c t sU r b a n D e s i g n e r sI n t e r i o r D e s i g n e r sL a n d s c a p e A r c h i t e c t sL e v e l 27 4 C u b a S tP . O . B o x 1 1 - 5 1 7W e l l i n g t o n , N Z

studiopacificarchitecture

0 10 50

A1

Layout ID.

A-12-01Job No.:

2494

Layout Name:

Resource Consent Revised

H

S t u d i o J - J a s o n O ' H a r aW a r r e n M a x w e l l

Page 6: A1...Dove Myer-Robinson Park, Auckland Part Allotment 4 Section 2 Suburbs of Auckland (Recreation Reserve) National Erebus Memorial architects@studiopacific.co.nz TEL: 64 4 802 5444

4 3 12

238-01

+22.000Level 00 (Ground)

1,095 1,500 1,500 1,500 1,500 1,500 1,500 355 1,145 1,500 1,500 1,500 1,500 1,105 395 1,500 1,410 1,500 1,500 1,500 59510,450 8,250 8,400

23.982

863

(1/3

)1,

752

(2/3

)

315

(1/3

)62

9(2

/3)

330

1,74

3

26.684

24.418

24.018

265

CO

S49

0 C

OS

984

CO

S49

0C

OS

D16-02

E16-02

F16-02

C16-02

Wall inclined at 10 degrees.

Land raised against Memorial foundations

Cupboard for electricalequipment inside shard ZA.Refer 38-03, and ServicesEng Docs.

5mm neg between landwardsand skywards portions of theIcewall.

Sound equipmentcupboard, and access tospeaker inside shard ZD.Refer 38-03, and ServicesEng Docs.

Cupboard to accessspeaker inside shard ZL.Refer details 38-03, andServices Eng Docs.

Snowdrift wall beyond.

FOOTPATHZONE

Proposed ground plane

Existing ground plane

Form tie setout:

Extent of Icewall (dashed)Landing strip footing (dashed)

Note form ties below ground level to this area

Icewall continues below ground level (dashed)

Walkway level (dashed beyond)Formtie setout line (dot and dash)

3102 4.3 INSITU CONCRETE WHITESMOOTH FINISH

4924 4.2 SIDE LANDING BALUSTRADE

3102 4.2 INSITU CONCRETE WHITENON-SLIP FINISH

4924 4.2 SIDE LANDING BALUSTRADE

4924 4.7 SERVICE CUPBOARD DOORAND FRAME

1 3 42

26.794

F16-02

E16-02

D16-02

C16-02

Curved, with wall raking wall

4924 4.1 STAINLESS STEELSNOWDRIFT WALL

3102 4.2 INSITU CONCRETE WHITENON-SLIP FINISH

(Underside of raking walkway).

Land raised against Memorial foundations

Ice Wall Beyond

1:20 Gravel Path4924 4.1 STAINLESS STEEL

SNOWDRIFT WALL

Constant 100mm gapto mowing strip below

3102 4.2 INSITU CONCRETE WHITENON-SLIP FINISH

Snowdrift wall Landing

Proposed ground plane

OPEN

Existing ground plane

Refer Structural Engineer for setout.

C B

538-01

B16-01

A16-01

Wall inclined at 10 degrees.

4924 4.1 STAINLESS STEELSNOWDRIFT WALL

Land raised against Memorial foundations

4611VE 4.3 MAIN GLASS BALUSTRADE

Constant 100mm negative below snowdrift wall100m gap to walkway above

Snowdrift Wall Landing

In-ground lighting- to light underside ofskywalk cantilever.

3102 4.3 INSITU CONCRETE WHITESMOOTH FINISH 3102 4.2 INSITU CONCRETE WHITE

NON-SLIP FINISH

4611VE 4.4 SIDE LANDING GLASSBALUSTRADE

ELEVATION NOTES:

Setout:Refer Structural Engineer for setout of Snowdrift wall and insituconcrete elements of IceWall.Key levels shown only.

Services Cupboard:Confirm dimensions of services cupboard prior to fabrication.Note dimensions shown vertically are not true dimensions(IceWall inclines 10 degrees).

Formtie locations:Formtie preferred locations are shown. Please discuss anychanges and confirm with Architect prior to fabrication. Notedimensions shown vertically are not true dimensions (IceWallinclines 10 degrees).

112-01

Elevation - SouthElevation 1:50

212-01

Elevation - NorthElevation 1:50

312-01

Elevation - EastElevation 1:50

General Notes:All dimensions to be checked on site.

Copyright in all drawings, specifications and other documentsand in the work executed from them remains the property ofStudio of Pacific Architecture Ltd.

© Studio of Pacific Architecture Limited 2019

True North: Original Paper size:

Prepared For:

Dunning Thornton Consultants

Key Plan:

Scale Bar

WoodseCubed Ltd

TBIG

In association with:

Les Boulton & Associates LtdEN-GEO

RawlinsonsPeers Brown MillerYeomansBoffa MiskellClough and Associates

Rev Description Date

D

E

F

G

H

For Information- Governance GroupPresentation Issue

70% Detailed Design

Resource Consent Issue

Detailed Design 95%For Co-ordination

Resource Consent Revised

2019-07-11

2019-08-09

2019-08-20

2019-08-23

2019-09-11

Printed: 13/09/19,12:11 PM CAD Ref:2494 Erebus Memorial

GA ElevationsNorth, South Elevations

Revision:

Project Title:

forMinistry for Culture and HeritageatDove Myer-Robinson Park, AucklandPart Allotment 4 Section 2 Suburbs of Auckland(Recreation Reserve)

National ErebusMemorial

[email protected]

TEL: 64 4 802 5444FAX: 64 4 802 5446

A r c h i t e c t sU r b a n D e s i g n e r sI n t e r i o r D e s i g n e r sL a n d s c a p e A r c h i t e c t sL e v e l 27 4 C u b a S tP . O . B o x 1 1 - 5 1 7W e l l i n g t o n , N Z

studiopacificarchitecture

0 10 50

A1

Layout ID.

A-15-01Job No.:

2494

Layout Name:

Resource Consent Revised

H

S t u d i o J - J a s o n O ' H a r aW a r r e n M a x w e l l

Page 7: A1...Dove Myer-Robinson Park, Auckland Part Allotment 4 Section 2 Suburbs of Auckland (Recreation Reserve) National Erebus Memorial architects@studiopacific.co.nz TEL: 64 4 802 5444

1 2 3 4

338-02

+22.0000 Level 00 (Ground)

24.418

23.590

Landwards Shards Z-ZH (sloped footing condition 'B') Landwards Shards ZI to ZP (sloped footing condition 'A') Landwards End Shard ZQRole of Names Shards C-YSkywards

End Shard B

F16-02

E16-02

D16-02

C16-02

3102 4.3 INSITU CONCRETE WHITESMOOTH FINISH

3102 4.4 INSITU CONCRETE GREYHIDDEN

SIM

839-03

134-01

334-01

234-01

1038-01

534-01

26.684

Refer cross section for taperedslab profile.

Existing footpath.

In-ground lighting- to lightunderside of skywalk cantilever.

3130 4.2 PRECAST CONCRETESHARD PANELS

Wall inclined at 10 degrees. -Refer 31-01 SHARD COMPONENT DETAILS forshard profiles and dimensions.-Shards C-Y have cast Roles of Names. Refer to93 SERIES for Role of Names setout.

3102 4.3 INSITU CONCRETE WHITESMOOTH FINISH

Proposed ground plane

Existing ground plane

Electrical equipmentlocation 3102 4.4 INSITU CONCRETE GREY

HIDDEN

Footing in 2 sloped sections 'A' and 'B'.

Sounds of Antarcticaequipment location

Narrative setout

Role of Names setout

Poem setoutDedication setout

Sounds of Antarcticaequipment location

4924 4.6 SLOT DRAIN ANGLE

Refer Structural Engineer for slot draindetail

C D E F G H I J K L M N O P Q R S T U V W X Y Z ZA ZBOPEN

FOOTPATHZONE

ZC ZD ZE ZF ZG ZH ZI ZJ ZKB ZL ZM ZN ZO ZP ZQ

4 3 12

1038-01

+22.0000 Level 00 (Ground)

24.418

26.794

23.590

D16-02

E16-02

F16-02

C16-02

Curved and raking wall, referStructural Engineer for setout.There are 257 individual snowflakeoutline perforations - refer 34-01 forgraphic setout.

Note profile tapers. ReferStructural Engineer for setout.

3102 4.2 INSITU CONCRETE WHITENON-SLIP FINISH

4924 4.1 STAINLESS STEELSNOWDRIFT WALL

3102 4.3 INSITU CONCRETE WHITESMOOTH FINISH 8226 4.2 PAVING - GRAVEL MIX

8320 4.2 HYDROSEEDED LAWN

4611VE 4.3 MAIN GLASS BALUSTRADE

OPEN

FOOTPATHZONE

Tree

Drip

Lin

e

SIM

HARD FILL

239-02

3102 4.4 INSITU CONCRETE GREYHIDDEN

SIM

A12-01

Long Section AA'Section 1:50

B12-01

Long Section BB'Section 1:50

Notes:Refer Structural Engineer documentation for setout.

General Notes:All dimensions to be checked on site.

Copyright in all drawings, specifications and other documentsand in the work executed from them remains the property ofStudio of Pacific Architecture Ltd.

© Studio of Pacific Architecture Limited 2019

True North: Original Paper size:

Prepared For:

Dunning Thornton Consultants

Key Plan:

Scale Bar

WoodseCubed Ltd

TBIG

In association with:

Les Boulton & Associates LtdEN-GEO

RawlinsonsPeers Brown MillerYeomansBoffa MiskellClough and Associates

Rev Description Date

D

E

F

G

H

For Information- Governance GroupPresentation Issue

70% Detailed Design

Resource Consent Issue

Detailed Design 95%For Co-ordination

Resource Consent Revised

2019-07-11

2019-08-09

2019-08-20

2019-08-23

2019-09-11

Printed: 13/09/19,12:11 PM CAD Ref:2494 Erebus Memorial

GA SectionsLong Sections

Revision:

Project Title:

forMinistry for Culture and HeritageatDove Myer-Robinson Park, AucklandPart Allotment 4 Section 2 Suburbs of Auckland(Recreation Reserve)

National ErebusMemorial

[email protected]

TEL: 64 4 802 5444FAX: 64 4 802 5446

A r c h i t e c t sU r b a n D e s i g n e r sI n t e r i o r D e s i g n e r sL a n d s c a p e A r c h i t e c t sL e v e l 27 4 C u b a S tP . O . B o x 1 1 - 5 1 7W e l l i n g t o n , N Z

studiopacificarchitecture

0 10 50

A1

Layout ID.

A-16-01Job No.:

2494

Layout Name:

Resource Consent Revised

H

S t u d i o J - J a s o n O ' H a r aW a r r e n M a x w e l l

Page 8: A1...Dove Myer-Robinson Park, Auckland Part Allotment 4 Section 2 Suburbs of Auckland (Recreation Reserve) National Erebus Memorial architects@studiopacific.co.nz TEL: 64 4 802 5444

B C

350

max

Contour built up to side exitlanding.

Proposed ground level

Existing ground level

Typical mowing strip detail -refer detail 5 39-01

WALKWAY

SNOWDRIFTWALL ICEWALL

LANDING

Allow an in-slab uplight at baseof each shard panel. ReferServices Eng Docs.

HARD FILL

CB

438-01 Allow an in-slab uplight at base

of each shard panel.

Cantilevered IceWall Landing.

Contour built up to side exitplatform (dashed in front).

Opening for side exit to IcewallLanding.

WALKWAY

SNOWDRIFTWALL

ICEWALL

B C

2,300

WALKWAY

SNOWDRIFTWALL

ICEWALL

Proposed ground level

Existing ground level

639-03

2,300

Compacted gravel on hardfill. Refer LandscapeTypical Details 39-01. Notesection cut notperpendicular to wall.

Proposed ground level

Existing ground level

Existing ground level

4924 4.1 STAINLESS STEELSNOWDRIFT WALL SNOWDRIFT

WALLICEWALL

PATH

Refer Structural Engineer for setout.

SIM

CB

539-01

238-03

Foundation strip footing 'B',sloped and with exposed 75mmx400nom wide upstand for lightinstall. 20mm neg betweenupstand and base of shard.

Services cupboard for accessto Sounds of Antarticaequipment. Refer 38-03 andServices Eng Docs.

539-03

+22.0000 Level 00 (Ground)

Existing Ground Level

D12-01

Cross Section DD'Section 1:50

E12-01

Cross Section EE'Section 1:50

F12-01

Cross Section FF'Section 1:50

C12-01

Cross Section CC'Section 1:50

G12-01

Cross Section GG'Scale 1:50

General Notes:All dimensions to be checked on site.

Copyright in all drawings, specifications and other documentsand in the work executed from them remains the property ofStudio of Pacific Architecture Ltd.

© Studio of Pacific Architecture Limited 2019

True North: Original Paper size:

Prepared For:

Dunning Thornton Consultants

Key Plan:

Scale Bar

WoodseCubed Ltd

TBIG

In association with:

Les Boulton & Associates LtdEN-GEO

RawlinsonsPeers Brown MillerYeomansBoffa MiskellClough and Associates

Rev Description Date

D

E

F

G

H

For Information- Governance GroupPresentation Issue

70% Detailed Design

Resource Consent Issue

Detailed Design 95%For Co-ordination

Resource Consent Revised

2019-07-11

2019-08-09

2019-08-20

2019-08-23

2019-09-11

Printed: 13/09/19,12:11 PM CAD Ref:2494 Erebus Memorial

GA SectionsCross Sections

Revision:

Project Title:

forMinistry for Culture and HeritageatDove Myer-Robinson Park, AucklandPart Allotment 4 Section 2 Suburbs of Auckland(Recreation Reserve)

National ErebusMemorial

[email protected]

TEL: 64 4 802 5444FAX: 64 4 802 5446

A r c h i t e c t sU r b a n D e s i g n e r sI n t e r i o r D e s i g n e r sL a n d s c a p e A r c h i t e c t sL e v e l 27 4 C u b a S tP . O . B o x 1 1 - 5 1 7W e l l i n g t o n , N Z

studiopacificarchitecture

0 10 50

A1

Layout ID.

A-16-02Job No.:

2494

Layout Name:

Resource Consent Revised

H

S t u d i o J - J a s o n O ' H a r aW a r r e n M a x w e l l