A1 - Central New Mexico Community College · PDF fileRemove brick wing wall Remove ACT...
Transcript of A1 - Central New Mexico Community College · PDF fileRemove brick wing wall Remove ACT...
T
ReceptionA101
LobbyA100
3
A1.1
3'-0"
5'-2" V.I.F.
2'-6"
3'-2
"3'
-6"
4'-9
"
30" Tall desk w/ (5) work stations
42" Tall service counter(e) D
ispl
ay ra
ck
Car
pet
Lino
Linoleum / Carpet
Lino MatLino(e) VCT
Lino
Lino (e) VCT
Carpet (e) Carpet
+ 100'-0"Finish Floor
+ 100'-0"Finish Floor
A1.24
A1.1
1 & 1A
Lino(e) VCT
3'-0
"
1'-0
"2'
-6"
Carpet #2
Desk w/ (1) work station
Lino
(e)
(e) Doors & glass panels to remain
Lino
Mat
Hallway
VestibuleA100A
Office / StorageA102
VestibuleA100B
Elect.A191
Hallway
Hallway
(e) Aluminum threshold
(e) Pair of automatic door hold-opens & exposed conduit to remain- Install new flooring under (e) conduit
Carpet tile #1/ seating area- Contractor to remove and reset (e) furniture . Coordinate furnitureschedule with owner.
Carpet #2
OfficeA101A
(e) Aluminum threshold
Carpet (e) Carpet
A1.24 sim.
6'-8"
18'-4
"EQ
EQ Power / data below counter - See Power & Special Systems Plan on this sheet
clear min.
BOLD DASHED LINE DENOTES THE AREA OF WORK
Alig
n
Patte
rnor
ient
atio
n
Patte
rnor
ient
atio
n
A1.12
Patte
rnor
ient
atio
n
2" ø Cable grommets to match counter (typ of 5)
1A1.1
No Paint
Re-Paint sign / display wall. Color as specified
Paint column
New recessed steel flooraccess cover
SF-2 SF-1
SF-3
New recessed floor mat.Enlarge existing recess to
accomodate new mat.
A100-A1A100-A2
8'-2 5/8"8'-10 1/4"(see A1.4)
ADDITAVE ALTERNATE #1 New gyp. bd. wall to match existing. Paint walls in lobby A100.See Sheet A1.2
(e)
New floor mat
3'-9"
Patch and Paint walls
ARCH I T
ECT
DERETSI
ER
G
ETATS
FO NEW MEXICO
SAMUEL M.
No. 3077STERLING
A1.0Project 1: MCO Reception Desk & Lobby Remodel. -Floor plans
-Demolition plans
-Special systems plan
100% Construction Documents
CNM Main Campus: Building A - MCO Renovations
525 Buena Vista Blvd SEAlbuquerque, NM 87106
PROJECT
SHEET INFO
SAM STERLING ARCHITECTURE, llc924 2nd street nw suite calbuquerque, new mexico 87102o: 505 232-2520 f 505.232.2521www.samsterlingarchitecture.com
S S A
DATE: October 3, 2013
REV:
STAMP
Building A Key PlanNot to Scale
Lobby & MCO Reception Floor PlanScale: 3/16" = 1'-0"2
FLOOR PLAN NOTES Dimensions: A. All dimensions to face of finish unless otherwise noted.B. Field verify all existing structure and conditions.C. Field verify rough openings of door.
FINISH & MATERIAL NOTES Gyp Board: A. Texture to match (e).
Paint:A. All new paint to match (e). Verify w/Owner and Architect.B. Paint all exposed conduit, data boxes and j-boxes to match
adjacent wall.
Receptacles / Data Ports / Coverplates:A. All new receptacles, data ports & coverplates to match
color & style of existing.
T
Mechanically remove (e) flooring & vinyl base complete
ReceptionA101
LobbyA100
Hallway
VestibuleA100A
VestibuleA100B
Elect.A191
Corridor
Corridor
OfficeA101A
Remove (e) carpet vinyl base complete. Remove desk complete.
Remove (e) carpet & vinyl base complete
Remove brick wing wall
Remove ACT ceiling, grid & light
Remove ACT ceiling and grid and light fixture
Remove floor mat
Remove tile and walk off mat and prepare surface of entire vestibule for new recessed mat
Remove mesh railing and door pushbutton
Remove metal hand rail
Remove door opener pushbutton
Remove door, sidelight, HM frame and gyp. bd to ceiling.
ADDITAVE ALTERNATE #1 Remove Roll-up window and counter.See Sheet A1.2
Remove doors and sidelights
T
Fl oor Vault L
id
Lobby & Reception
Lobby & MCO Reception Demo PlanScale: 3/16" = 1'-0"1
WALL LEGEND
Existing construction to remain.
Existing items to be demolished complete.
POWER & SPECIAL SYSTEMS KEYED NOTES
1. Provide and install (2) 1 1/4” conduits to 6" above accessible ceiling for data/comm wiring by others. Extend conduits under floor from east to desk.
2. Saw-cut floor and run conduits under floor and extend as indicated. At completion floor shall be repaired as appropriate for new finish.
3. Extend 4#12, 1#12g in .75” conduit to (2) 20a/1p spare circuit breakers in existing electrical panel located in Rm A191.
4. 20a, 120v duplex receptacle in single gang box, up 18” a.f.f. (typical).
5. 4” Square box with single-gang mud-ring for recessed data/comm outlets by others (typical).
6. Disconnect and remove existing receptacles and data/comm outlets completely along with condut and wiring.
4/A1
.1
7A1.1
MCO Reception Power & Special Systems PlanScale: 3/16" = 1'-0"3
6
T
ReceptionA101
Elect.A191
2
3
4(typ)
1
5
(typ)
(e) Electric panel
7/A1.2
8/A1.2
ARCH I T
ECT
DERETSI
ER
G
ETATS
FO NEW MEXICO
SAMUEL M.
No. 3077STERLING
A1.1Project 1: MCO Reception Desk & Lobby Remodel. - Details
- RCP
- Elevations
100% Construction Documents
CNM Main Campus: Building A - MCO Renovations
525 Buena Vista Blvd SEAlbuquerque, NM 87106
PROJECT
SHEET INFO
SAM STERLING ARCHITECTURE, llc924 2nd street nw suite calbuquerque, new mexico 87102o: 505 232-2520 f 505.232.2521www.samsterlingarchitecture.com
S S A
DATE: October 3, 2013
REV:
STAMP
Building A Key PlanNot to Scale
T
Fl oor Vault L
id
Lobby & Reception
G1
G1
G1G1G1
Clear anodized aluminum storefront assembly w/insulated glazing. See door schedule for door type and hardware schedule
Clear anodized aluminum storefront assembly w/insulated glazing. See door schedule for door type and hardware schedule
8'-7
"
10'-2 1/2"
V.I.F
V.I.
F
2" E.Q. 3'-0" 2" 3'-0" E.Q.
7'-0
"1'
-3"
G2
G2
G2G2G28'-7
"
10'-2 1/2"
V.I.F
V.I.
F
2" E.Q 3'-0" 3'-0" E.Q
GLAZING SCHEDULE
G1
MARK MONOLITHIC INSULATING NOTES
1" I.G.U.
SHGC Avg. U-Value
Solarban 60 Starphire (clear) tempered 0.41 0.28
G2 Clear tempered1/4" NA NA
Existing wall
Storefront detail Entry Door/Glazing Jamb (Head Sim.)Scale: 3/4" = 1'0"1
Sealant
Caulk
VESTIBULE EXTERIOR
Thermally broken aluminum storefront door/glazing in existing opening
Verify in field to match location of existing doors
Vestibule A100A West Elevation3/8"=1'-0"5
2'-1
0"
4'-0"EQ EQ 4'-0"
Wireless (RF) push button (Typ.)
Exterior Vestibule 100A
SF-1 Vestibule A100A Storefront Elevation (exterior)3/8" = 1"2
SF-2 Vestibule A100A Storefront Elevation(interior)3/8" = 1"3
8'-7
"
1'-3
"7'
-0"
3'-0"
G1
G1
SF-3 Vestibule A100B Storefront Elevation3/8" = 1"
4
Note: Provide tempered glazing where required by code.
B./(e) ACT
9'-9"
B./(E) Roof Deck
11'-8"
Bulkhead opening
7'-2"
5/8" painted gyp. bd. both sides of wall - Terminate gyp. bd. at deck
3 5/8" 25 ga metal stud min 16" O.C.
(e) Suspended acoustic ceiling system
(e) Corrugated metal roof deck
Bent stud or 16 ga. angle w/ #8 self tapping screws
Metal stud staggered 24" O.C. connected to concrete deck w/bent stud or 16 ga angle
Metal track
B./(e) ACT
7'-7"
8"
Bulkhead Section3/4" = 1-0"
7
New Ceiling8'7"
New Gyp. B CeilingMatch Existing
New 6" recessed can light to matchadjacent
Existing exit sign to remain(Protect during construction)
Relocate existing 2x4 luminaire. Replace Lens
Existing exit sign to remain(Protect during construction)
LobbyA100
New bulkhead. See detail 7 this sheet
A1.17
New 2x2 ACT
Sto
refro
nt
C LE
.Q.
E.Q
.
MCO - vestibule RCPScale: 3/16" =1'-0"6
Linoleum tile finish surface over aluminum smooth surface.
1/8" Aluminum Structure
2'-2"
2'-2
"
Flush to finish floor
EXISTING UTILITY VAULT
Floor Vault New Lid - Plan1-1/2" = 1'-0"8
1/4" Aluminum smooth platecover
Floor Vault New Lid - Section1-1/2" = 1'-0"9
Existing steel perim. frame
New 1" angle bracket
1/8" Aluminum structural frame
1/8" recess in cover
Fastener (removable)
ARCH I T
ECT
DERETSI
ER
G
ETATS
FO NEW MEXICO
SAMUEL M.
No. 3077STERLING
A1.2Project 1: MCO Reception Desk & Lobby Remodel
- Interior Elevations- Desk Details- Additive Alternate
100% Construction Documents
CNM Main Campus: Building A - MCO Renovations
525 Buena Vista Blvd SEAlbuquerque, NM 87106
PROJECT
SHEET INFO
SAM STERLING ARCHITECTURE, llc924 2nd street nw suite calbuquerque, new mexico 87102o: 505 232-2520 f 505.232.2521www.samsterlingarchitecture.com
S S A
DATE: October 3, 2013
REV:
STAMP
Building A Key PlanNot to Scale
T
Fl oor Vault L
id
Lobby & Reception
3'-6
"
1 1/
2"
1 1/2"
1 1/
2"
2'-6
"
Homasote pin-up panel
Power / data ports as specified (typ of 5)
TS steel brackets (typ of 9)
Solid surface desk w/matching end panels
(5) Cable grommets to match solid surface
P-lam over 3 5/8 metal stud frame below desk
2'-4
1/2
"
A1.14
(27"
cle
ar m
in.)
curved true elevation
Radius = 18'-6"- V.I.F. w/Architect prior to fabrication(see plan)
Reception - West ElevationScale: 3/8" = 1'-0"3
P-lam over 3 5/8 metal stud frame below desk
Solid surface desk w/matching end panels & p-lam face panel
P-lam face panels
Solid surface desk w/matching end panels
1 1/
2"
2'-6
"3'-6
"
4"
Cable grommet to match solid surface
P-lam toe kick
2'-4
1/2
"(2
7" c
lear
min
.)
Reception - South ElevationScale: 3/8" = 1'-0"2
curvedtrue elevation
3'-6
"
1 1/
2" P-lam face panel
Solid surface desk w/matching end panels
4"
P-lam toe kickA1.1
4
Mitered joints (typ)
Radius = 18'-6"- V.I.F. w/Architect prior to fabrication(see plan)
Reception - East ElevationScale: 3/8" = 1'-0"1
3'-6
"
1 1/
2"
Solid surface counter& matching end panels
4"
A - 1
/4"
B - 2
"C
- 8"
B - 7
"
C -
1'-3
"
B - 4
"C
- 1/
2"
A - 1
/4"
C -
2"B
- 1"
A - 1
/4"
C -
9"
B - 1
/2"
A - 1
"
B - 1
1/2
"A
- 1/2
"C
- 1/
2"
C -
1'-8
"
A - 2
"C
- 3
3/4"
B - 1
/2"
C -
10"
P-lam - Color: CNM Yellow- Color: CNM Blue- Color: CNM White
C -
2'-0
" Color C p-lam toe kick
C -
2'-0
"
C -
2'-0
"
C -
2'-0
"
Mitered joints (typ)
Reception Desk - East Elevation Scale: 3/8" = 1'-0"1A FLAT
Casework - Section DetailScale: 3/4" = 1'-0"4
1-1/2" x 1-1/2" TS brackets (typ of 9)- Attach to metal studs
1 1/
2"
Solid surface desk
Solid surface end panel (typ)
3 5/8" Metal studs @ 12" o.c.(double wall)
P-lam face panels over (2) 1/4" adhered substrate at curves.
Power / data as specified- See Power & Special Systems Plan this sheet
Solid surface service counter
3"
2'-6
"
P-lam toe kick
4"
3'-6
"3"
Homasote pin-up panelover 5/8 gyp. bd.- Adhere w/construction adhesive
1/8"
Gap
P-lam
27" c
lear
min
.
Mitered joints (typ)
3 1/2" x 3 1/2" x 31" tall TS column
31/2" x 71/2" x 1/2" thick steel base plate w/ 1/2" ø expansion bolts w/3 1/2" embedment
Carpet tile over (e) conc. slab
3" wide 12 ga. cont. horizontal strapping welded to horizontal support tubes.
MCO Reception Power & Special Systems PlanScale: 3/16" = 1'-0"5
6
T
ReceptionA101
Elect.A191
2
3
4(typ)
1
5
(typ)
(e) Electric panel
Remove roll-up window.
Remove plastic laminate panel and counter surface
Remove Gyp. board pilasters
New in-fill wall: 3-5/8 Metal stud wall w/ 5/8" gyp. bd.Paint to match existing.
New wall base as specified
6'-0 5/8"
7'-0
"
Existing conduit for power & data.Re-route around glass block & conceal conduit wall.
Patch & Paint as necessary.
Additive Alternate - Elevation (View from inside office/storage 102)3/8"=1'-0"8
New 3/4" plywood backing @ 48" to 72" Installed behind gyp. board.
Additive Alternate - Elevation (View from Lobby A100)3/8"=1'-0"7
ADDITIVE ALTERNATE #1
New 1" power and data conduit and recepticals roughed in for future flat screen
New Work
Demolition
Additive Alternate - Existing conditionNNTS9
T
T
T
OfficeA101D(e) ACT
(e) Gyp. bd. soffit
+ 8'-6" A.F.F.
Relocate (e) light fixture- All light fixtures in Office A101D to be on single switch- See Power Plan this sheet
+ 8'-5" A.F.F.
Extend gyp. bd. soffit to match (e)
Patch / repair ACT from demolition of wall to soffit as indicated by hatch- Match (e) grid & tiles
(e) VAV 48
(e) VAV 47
(e) VAV 46
10" o.d.
3
Terminate (e) duct from VAV 46 and reconnect register to VAV 48
10" o.d.
10" o.d.
2
Terminate (e) duct from VAV 48 and reconnect register to VAV 47
1
Terminate (e) duct from VAV 48 and reconnect registerto VAV 46
(typ)
4
Relocate Re-connect (e) register to new duct as indicated
5
6
(e) Existing ACT ceiling
Open Office Area(e) Carpet
+ 100'-0"Finish Floor
OfficeA101D
Carpet
3' x 6' Conf table
by Owner
Systems furniture by Owner(O.F.O.I.)
12'-0"
Systems furniture / panelsby Owner
15'-0"
(e) 4x4 TS column to remain (typ)- Paint to match HM frame
2A1.4
A101
1A/A1.4
Extend wall to deck and provide acoustic insulation
HM Frame / flush wood door w/side lite- See Schedules A1.3
CNM Room sign reused from storage demolition in this project
Line of (e) soffit above
1B/A1.4
(e) CarpetCarpet
Pattern
orientation
Paint (e) to match & provide new vinyl base
Office A101D Floor PlanScale: 3/16" = 1'-0"2
ARCH I T
ECT
DERETSI
ER
G
ETATS
FO NEW MEXICO
SAMUEL M.
No. 3077STERLING
A1.3Project 2: MCO Office A101D
Remodel
-Demolition Plan
- Floor Plan
- Special Systems Plan
- RCP & Mech. Plan
100% Construction Documents
CNM Main Campus: Building A - MCO Renovations
525 Buena Vista Blvd SEAlbuquerque, NM 87106
PROJECT
SHEET INFO
SAM STERLING ARCHITECTURE, llc924 2nd street nw suite calbuquerque, new mexico 87102o: 505 232-2520 f 505.232.2521www.samsterlingarchitecture.com
S S A
DATE: October 3, 2013
REV:
STAMP
Office A101D RCP & Mechanical PlanScale: 3/16" = 1'-0"3
T
Fl oor Vault L
id
MCO Office
Building A Key PlanNot to Scale
WALL LEGEND
Wall Type B: 3-5/8 Metal stud wall w/5/8" painted gyp. bd. w/acoustic batt insulation to deck. Gyp. bd. finish to match (e).
Existing wall to be demolished complete.
Wall Type A: 3-5/8 Metal stud wall extension w/ 5/8" gyp. bd. on top of (e) wall w/acoustic batt insulation to deck.
Storage / Office A101D Demo PlanScale: 3/16" = 1'-0"1
Open Office Area
StorageA101D
Remove (e) gyp. bd. in Storage A101D Demolish (e) wall, door & sidelight complete at Storage A101D
Remove (e) data raceway and re-route cabling in new wall
Remove (e) carpet & vinyl base complete
Remove (e) vinyl base
Office A101D Power & Special Systems PlanScale: 3/16" = 1'-0"4
OfficeA101D
Remove (e) data raceway and re-route cabling in new wall
6
3
4(typ)
To5
2(typ)
5
5
(e)
(e)
1
7
POWER & SPECIAL SYSTEMS KEYED NOTES
1. Relocate existing switch to new location shown. Re-circuit lighting in this new room to be controlled by this single switch.
2. 20A, 120V Duplex receptacle, at 18" A.F.F. (typical).
3. Extend (2) #12, (1) #12G in .75" conduit to 20A/1P spare circuit breaker in existing electrical panel.
4. 4" Square box with single-gang mud-ring for data / comm outlets by others (typical).
5. Provide and install (1) 1" conduits to 6" above accessible ceiling for data / comm wiring by others.
6. Disconnect and remove existing duplex receptacle.
7. Power & communication junction boxes and flexible whip connection to system furniture. Coordinate back box location and connection with Owner-furnished furniture.
MECHANICAL KEYED NOTES
1. Divide CFM from VAV unit equally among all supply diffusers served by VAV unit.
2. Ceiling space is tight - resize ductwork to maintain same free area as required. FIELD VERIFY ALL CONDITIONS.
3. Relocate existing thermostat and wiring as shown and recalibrate to proper operation.
4. Install sound boot on 24" x 12" return grille per Detail 4 / A1.4Run boot through wall above ACT and seal all around on both sides of wall.
5. Existing thermostat to remain.
6. Duct to penetrate wall at 90º.
FLOOR PLAN NOTES Dimensions: A. All dimensions to face of finish unless otherwise noted.B. Field verify all existing structure and conditions.C. Field verify rough openings of door and openings.
FINISH & MATERIAL NOTES Gyp Board: A. Texture to match (e).
Paint:A. All new paint to match (e). Verify w/Owner and Architect.B. Paint all exposed conduit, data boxes and j-boxes to match
adjacent wall.
Receptacles / Data Ports / Coverplates:A. All new receptacles, data ports & coverplates to match
color & style of existing.
Remove room sign and save for reuse in this project
New duct work. (size as noted) connected as indicated.
Existing duct work
true oblique
Wall base as specified
Power & data as specified
(e) Gyp. bd. soffit
(e) Power Data as specified
Painted gyp. bd.to match (e)
Area of (e) wall to be extended to deck (wall type 1A)
9'-6
"1'
-10"
HM Frame Jamb - Detail (Head sim)Scale: 1 1/2" = 1'-0"3
ARCH I T
ECT
DERETSI
ER
G
ETATS
FO NEW MEXICO
SAMUEL M.
No. 3077STERLING
A1.4Project 2: MCO Office A101D Remodel
- Wall Sections
- Interior Elevations
- Details
- Door Schedule
100% Construction Documents
CNM Main Campus: Building A - MCO Renovations
525 Buena Vista Blvd SEAlbuquerque, NM 87106
PROJECT
SHEET INFO
SAM STERLING ARCHITECTURE, llc924 2nd street nw suite calbuquerque, new mexico 87102o: 505 232-2520 f 505.232.2521www.samsterlingarchitecture.com
S S A
DATE: October 3, 2013
REV:
STAMP
T
Fl oor Vault L
id
MCO Office
Building A Key PlanNot to Scale
Interior ElevationScale: 3/8" = 1'-0"2
B./(e) ACT8'-6"
B./(e) Roof Deck11'-4"
B./(e) Open Web Joists10'-4
(e) Finish Floor100'-0"
Open Office Area Office A101D
Unfaced formaldehyde-free acoustic batt insulation (typ)
5/8" painted gyp. bd. both sides of wall - Terminate gyp. bd. at deck
3 5/8" 25 ga metal studs @ 16" o.c. - Secure track at top
Continuous acoustic sealant at floor (typ)(e) Carpet over concrete slab (typ) Carpet tile as specified over (e) conc. slab
Continuous acoustic sealant at deck (typ)
4" Vinyl wall base as specified, both sides of wall
(e) Suspended acoustic ceiling system
(e) Open-web steel joists at 4'-0" o.c.
(e) Corrugated metal roof deck
Wal
l Typ
e B
Wal
l Typ
e A
Exte
nd (e
) wal
l to
deck
HM frame & door to match (e) in MCO Department- Verify w/Owner & Architect- Anchor per manuf's recommendation- See Schedules this sheet
Flush wood door - See Schedules this sheet
5/8" Painted gyp. bd. over 3 5/8" metal studs both sides of wall- Finish to match (e)
1/2"
5/8" 3 5/8" 5/8"
4 7/8"
1/2"
DOOR SCHEDULE
LOCATIONQTY
SIZEDOOR TYPE FRAME HARDWARE
SET #GLAZING SPECIAL NOTES
ID ROOM N0 W H
A100-A1 A100A PR 3'0" 6'10"Wide stile glass SF
doorSwing SF 1 1" IGU tempered See Detail 4/A1.1
A100-A2 A100A PR 3'0" 6'10"Wide stile glass SF
doorSwing SF 2 1" IGU tempered See Detail 5/A1.1
A100C A100A 1 3'0" 6'8"Flush panel solid-core
wood Swing HM 3 NA
A100B A100B 1 3'0" 6'8"Wide stile glass SF
doorSwing SF 4 NA See Detail 8/A1.1
A101 A101D 1 3'0" 7'0"Flush panel solid-core wood w/lite
Swing HM 5 5/8" IGU, tempered
- w/1'-2" Wide side lite - finish to match existing See detail 3/A1.3
Hanger straps- Connect to structure
Opening to match neck size ofreturn air grille
Fabricate of sheetmetal w/1"interior acoustic lining- Paint inside flat black
(e) Return air grille - Verify size in field
Opening to match size neck size of return air grille
2D D
D
6" min.
Return Air Sound Elbow DetailScale: 3/4" = 1'-0"4
Type B Wall Section (New Wall)Scale: 3/4" = 1'-0"1B
B./(e) ACT8'-6"
B./(e) Roof Deck11'-4"
B./(e) Open Web Joists10'-4
(e) Finish Floor100'-0"
Open Office Area Office A101D
Unfaced formaldehyde-free acoustic batt insulation (typ)
5/8" painted gyp. bd. both sides of wall - Terminate gyp. bd. at deck
3 5/8" 25 ga metal studs @ 16" o.c. - Secure track at top
Continuous acoustic sealant at floor (typ)(e) Carpet over concrete slab (typ) Carpet tile as specified over (e) conc. slab
Continuous acoustic sealant at deck (typ)
4" Vinyl wall base as specified, both sides of wall
(e) Suspended acoustic ceiling system
(e) Open-web steel joists at 4'-0" o.c.
(e) Corrugated metal roof deck
Wal
l Typ
e B
Wal
l Typ
e A
Exte
nd (e
) wal
l to
deck
Type A Wall Section (Existing Wall Extension)Scale: 3/4" = 1'-0"1A
Unfaced formaldehyde-free acoustic batt insulation (typ)
5/8" painted gyp. bd. both sides of wall - Terminate gyp. bd. at deck
3 5/8" 25 ga metal studs @ 16" o.c. - Secure track at top
Continuous acoustic sealant at deck (typ)
(e) Suspended acoustic ceiling system
(e) Open-web steel joists at 4'-0" o.c.
(e) roof deck
B./(e) ACT8'-6"
B./(e) Roof Deck11'-4"
B./(e) Open Web Joists10'-4
Existing wall
OFFICE A101DOPEN OFFICE AREA
SCOPE OF WORK:
Project 1: MCO RECEPTION DESK AND LOBBY REMODEL
1A - Demolition: Remove existing built in desk in Reception A101. Remove brick wing wall at vestibule A100B. Remove doors, HM frames, sidelights walk-off mat and ACT at Vestibules A100A and A100B. Remove ceiling in A100A. Remove flooring in Lobby A100 and Reception A101, carpet in Office A101A and tile in vestibule A100A.
1B - Desk: New reception desk in Reception A101.
1C - Entry Vestibules: New storefront glazing and doors. New wall, door and HM frame in vestibule A100A for storage. New ceilings and lights. New ADA push buttons for door openers.
1D - Flooring: New carpet in Reception A101 and office A101A. New linoleum flooring and carpet in Lobby A100. New access hatch to existing floor vault. Linoleum and walk-off mats in vestibules A100A/B
1E - Paint: Paint gyp. board walls and exposed tube steel columns in Lobby A100.
1F - Systems: Power and Data as indicated at new reception desk
Project 2: MCO OFFICE A101D REMODEL
2A - Demolition: Remove partition wall at A101D Storage room. Remove carpet and base, and surface mounted data raceway.
2B - Construction: New partition walls at new Office A101D. Install new carpet wall base and door and HM frame with sidelight. Paint all walls. Some minor repairs to acoustic tile ceiling.
2C - Systems: Power and Data as required in new walls. Minor reconfiguration of existing HVAC ductwork. Minor reconfiguration of existing lights.
Alternate 1: ADDITIVE ALTERNATE #1 (see 7/8 A1.2)
1A - Demolition: Remove roll-up door, built in counter, pilasters and vertical plastic laminate panel at east wall of lobby A100.
2A - Construction: Infill with new gypsum board wall to match existing. Install a 3/4" plywood backing on lobby side portion of wall under gypsum. Paint to match.
2B - Power/Data: Re-route existing conduit inside wall and rough in 2 new recepticals.
SITE: CNM Main Campus Building A -Marketing & Communications Office
ARCH I T
ECT
DERETSI
ER
G
ETATS
FO NEW MEXICO
SAMUEL M.
No. 3077STERLING
PROJECT INFO:APPLICABLE CODES:2009 International Building Code2009 New Mexico Commercial Building Code2009 New Mexico Existing Building Code2009 New Mexico Mechanical Code2011 New Mexico Electrical Code2007 New Mexico Electrical Safety Code
LEGAL DESCRIPTION:CNM Main Campus525 Buena Vista Blvd SEAlbuquerque, New Mexico 87106
Lot: University Heights / TVISubdivision: University Heights Elementary SchoolUPC: 101505743810540410
ZONING:SU-2 / O-1
OWNER:Central New Mexico Community CollegeCNM Physical PlantJennifer Davis, Project ManagerFacilities Administration525 Buena Vista Dr. SEAlbuquerque, NM 87106t: 505.224.4578 f: 505.224.4566email: [email protected]
ARCHITECT:Sam Sterling Architecture, llcSam Sterling, AIA, PrincipalBron Heintz, Project Manager924 2nd Street NW Suite CAlbuquerque, New Mexico, 87102p: 1.505.232.2520 f: 1.505.232.2521e: [email protected]: [email protected]
G1.0Project Data
100% Construction Documents
CNM Main Campus: Building A - MCO Renovations
525 Buena Vista Blvd SEAlbuquerque, NM 87106
PROJECT
SHEET INFO
SAM STERLING ARCHITECTURE, llc924 2nd street nw suite calbuquerque, new mexico 87102o: 505 232-2520 f 505.232.2521www.samsterlingarchitecture.com
S S A
DATE: October 3, 2013
REV:
STAMP
Central New Mexico Community CollegeMain Campus
GENERAL NOTES
1. All work to conform to all applicable codes and ordinances.2. All dimensions are to face of finish unless otherwise noted.3. General Contractor must contact Architect during demolition for assessment of existing construction. Changes in detailing may be
required as a result of new findings during construction.4. General Contractor must field verify existing conditions and dimensions and notify the Architect of any discrepancies.5. All colors and materials to be reviewed and selected by the Architect from manufacturer's standards provided by the Contractor.6. General Contractor shall minimize noise and dust. All trash and debris shall be removed on a daily basis.7. General Contractor is responsible for repairing all damage as a result of construction.8. All doors to have accessible hardware.9. Provide all blocking, backing, and additional supporting structure as required for items called for in the drawings and specifications.10. Patch & repair all finishes affected by demolition to match existing.11. All new construction must be coordinated with existing site conditions.12. Locate and protect all existing underground utilities.13. General Contractor to coordinate with Owner's security system & IT consultant to allow system pre-wiring as required.14. Discrepancies: The General Contractor shall compare and coordinate the information shown on all drawings. Where in the opinion
of the General Contractor a discrepancy exists, it shall be promptly reported to the Architect for proper clarification or adjustment.15. Omissions: In the event that certain features of the construction are not fully shown on the drawings, then their construction shall
be the same character as the construction of similar conditions that are shown or noted on the drawings and specifications. If there is any doubt concerning the similarity of the condition, the General Contractor shall notify the Architect and request clarification.
16. The General Contractor shall coordinate with the Owner all Owner-installed items and equipment.17. The General Contractor shall verify required rough opening size for all doors and windows.18. The General Contractor shall verify that there are no conflicts between openings in walls or slabs and structural, mechanical,
electrical and/or plumbing requirements. In the event that a conflict occurs, the General Contractor shall notify the Architect immediately.
19. Definitions:A. Provide: Furnish and install, complete with all necessary accessories, ready for intended use. Pay for all related costs.B. Approved: Acceptance of item submitted for approval. Not a limitation or release from compliance with the Contract
Documents or regulatory requirements. C. Match Existing: Match existing as acceptable to the Owner and the Architect.
WORK COVERED BY CONTRACT DOCUMENTS
1. Permits: Unless otherwise noted, the General Contractor shall apply for, obtain, and pay for permits required to perform the work. Copies shall be submitted to the Architect.
2. Intent: A. Construction Documents are intended to provide the basis for proper completion of the work suitable for the intended use of
the Owner. Anything not expressly set forth but which is reasonably implied or necessary for proper performance of the project shall be included. The General Contractor shall furnish all labor, services, and material, etc. as required
to complete the project. Accordingly, the General Contractor shall determine the subdivision of all work for the varioustrades, subcontractors and suppliers.
B. All work and materials are not necessarily covered in both the drawings and specifications; such items, however, are a part of the work under this Contract if shown or called for by any of the Contract Documents.
C. The work of any one trade, subcontractor, or supplier is not necessarily grouped into one section of the specifications or on one portion of the drawings; all persons shall check all specifications and all drawings to determine the full extent of the
work for which they are responsible.3. Taxes: The General Contractor and all subcontractors shall pay all sales, consumer, Gross Receipts, and other similar taxes
required by law.4. General Guaranty: Neither the final certificate of payment nor any provision in the Contract Documents nor partial or entire
occupancy of the project by the Owner shall constitute acceptance of work not done in accordance with the Contract Documents or relieve the Contractor of liability in respect to any expressed warranties or responsibility for faulty materials or workmanship. The Contractor shall remedy all defects in the work and pay for damages to other work resulting therefrom, which shall appear within a period of one (1) year from the date of Substantial Completion of the work under the Contract. The Owner will give notice of observed defects with reasonable promptness.
Location Map: COA ZONE MAP K15 Not to Scale
N
WORK BY OTHERS
1. Data/phone/security/J-boxes: General Contractor to provide conduit and pull strings per drawings. Data & security cabling to be installed by Owner, or owners sub-contractor. General Contractor to coordinate work with Owner. General Contractor to ensure that system conduit installation is complete, and all device locations are correct prior to covering.
2. Furniture: All mountable furniture & systems furniture shown on drawings are by Owner.
Coal Avenue SE
Buen
a Vi
sta
Dr.
SEBldg. A
HAZARDOUS MATERIALS
1. Hazardous materials report on file with Owner.
DRAWING INDEX:
G1.0 Project Data
A1.0 Project 1: MCO Reception Desk & Lobby Remodel- Demolition Plan - Floor Plan- Power & Special Systems Plan
A1.1 Project 1: MCO Lobby Remodel Details- Interior Elevations- Reflected Ceiling Plan- Storefront Elevations
A1.2 Project 1: MCO Reception Desk Details- Interior Elevations- Casework Section Detail
A1.3 Project 2: MCO Office A101D Remodel- Demolition Plan- Floor Plan- Reflected Ceiling Plan & Mechanical Plan- Power & Special Systems Plan
A1.4 Project 2: MCO Office A101D Remodel- Wall Section- Interior Elevation-Details- Door / Hardware Schedule
XX Structural grid
Building section
Wall section
Exterior elevation
Detail (section)
Detail (plan)
Interior elevation
GENERAL SYMBOL LEGEND:
1/A2.0
1A6.0
1A6.0
1A4.0
1/A3.0
1/A3.0
#
Room ID
Door ID
Entry100
Storefront ID
Revision
Keyed note
Elevation benchmark
Existing(e)
Face of finishF.O.F.
Owner furnished, Contractor installedO.F.C.I
Owner furnished, installed by Others
O.F.I.O.
xx
xx
BUILDING A MARKETING AND COMMUNICATIONS OFFICE (MCO) RENOVATIONS 100% CONSTRUCTION DOCUMENTS
SALVAGE ITEMS
1. All door hardware2. Doors3. Door openers and closers4. Roll-up window in Lobby A100 (Alternate)