SIGNAL CABLE SCHEDULE OF
PROJECT PLANT/AREA LEVEL APPD BY DOCUMENT NUMBER: DATE REVISION SUPPLIER
4CHKD BY 0 1 2 3 4
Cable from Inst to JB Cable from JB to MRRemarks Length Cable Local
Tag No From Ferrule No Cable Tag Cable type BC Route m To Ferrule No Ferrule No Cable Tag Cable type MC Route m Pair No Spare Pair Panel no Ferrule No Panel Terminal no
1 FI-0329 Balling Disc'B' FI-0329-04-AJB-01-1P-01
1P-1
04-A
JB-0
1
1
04-A
JB-0
1-E
ER
13_1
-6P
-01
1P-1
RIO
Pan
el E
ER
13_1
1P-2 2 1P-2
SH 3
2 FI-0229 Balling Disc'D' FI-0229-04-AJB-01-1P-02
1P-1 4 2P-1
1P-2 5 2P-2
SH 6
3 FI-0112 Balling Disc'F' FI-0112-04-AJB-01-1P-03
1P-1 7 3P-1
1P-2 8 3P-2
SH 9
10 4P-1
11 4P-2
12 5P-1
13 5P-2
14 6P-1
15 6P-2
16 SH
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
4.0 MTPA PELLETIZING PLANT, Line-2
PREPARED BY
Sl No
Core no(Pair
no)
Spare Pair
JB Trm No.
1P X 1 mm2 Flexible and Inner& Outer
Shield
6P X 1 mm2 Armoured and Inner
& Outer Shield
1. Terminal no. 17 to 45 is spare2. Pair no 4 to 6 is spare for cable tag no. 04-AJB-01-
EER13_1-6P-01 3. The shielding of all 1P cables for sl no 1 to 3 from
field and the overall shield of Multicore cable 04-AJB-01-EER13_1-6P-01 from DCS will be terminated at JB
terminal 16
1P X 1 mm2 Flexible and Inner& Outer
Shield
1P X 1 mm2 Flexible and Inner& Outer
Shield
![Page 2: A04 Signal Cable Schedule (Field JB RIO)](https://reader036.fdocuments.net/reader036/viewer/2022082822/55cf8c555503462b138b863a/html5/thumbnails/2.jpg)
SIGNAL CABLE SCHEDULE OF
PROJECT PLANT/AREA LEVEL APPD BY DOCUMENT NUMBER: DATE REVISION SUPPLIER
4CHKD BY 0 1 2 3 4
Cable from Inst to JB Cable from JB to MRRemarks Length Cable Local
Tag No From Ferrule No Cable Tag Cable type BC Route m To Ferrule No Ferrule No Cable Tag Cable type MC Route m Pair No Spare Pair Panel no Ferrule No Panel Terminal no
4.0 MTPA PELLETIZING PLANT, Line-2
PREPARED BY
Sl No
Core no(Pair
no)
Spare Pair
JB Trm No.
1 FI-0409 Balling Disc'A' FI-0409-04-AJB-02-1P-01
1P-1
04-A
JB-0
2
1
04-A
JB-0
2-E
ER
13_1
-6P
-02
1P-1
RIO
Pan
el E
ER
13_1
1P-2 2 1P-2
SH 3
2 FI-0309 Balling Disc'C' FI-0309-04-AJB-02-1P-02
1P-1 4 2P-1
1P-2 5 2P-2
SH 6
3 FI-0209 Balling Disc'E' FI-0209-04-AJB-02-1P-03
1P-1 7 3P-1
1P-2 8 3P-2
SH 9
4 FI-4111 Balling Disc'G' FI-4111-04-AJB-02-1P-04
1P-1 10 4P-1
1P-2 11 4P-2
SH 12
13 5P-1
14 5P-2
15 6P-1
16 6P-2
17 SH
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
1P X 1 mm2 Flexible and Inner& Outer
Shield
6P X 1 mm2 Armoured and Inner
& Outer Shield
1. Terminal no. 18 to 45 is spare2. Pair no 5 and 6 is spare for cable tag no. 04-AJB-02-
EER13_1-6P-02 3. The shielding of all 1P cables for sl no 1 to 4 from
field and the overall shield of Multicore cable 04-AJB-02-EER13_1-6P-02 from DCS will be terminated at JB
terminal 17.
1P X 1 mm2 Flexible and Inner& Outer
Shield
1P X 1 mm2 Flexible and Inner& Outer
Shield
1P X 1 mm2 Flexible and Inner& Outer
Shield