Phase 1 - ConstructClassroom Wing "N"
Phase 3A - ConstructClassroom Wing "M"
Phase 2 Demolish -Classroom Wing "E"
Phase 5A - DemolishClassroom Wing "F"
Phase 3B - Addition to andRenovation of Building "B"
Phase 4 - Renovation of Building"C" (Additive Alternate No. 3)
New Canopy
"K" Wing (Shop)
"J" Wing(Home
Economics)
"H" Wing(Girl's Gym)
"M" Wing
"N" Wing
"D" Wing
"B" Wing(Administration
/ Media)
"C"Wing
"G" Wing(Boy's Gym)
"A" Wing(Auditorium)
Cafeteria
Kitchen
CoveredOutdoorDining
"F" Wing
"E" Wing
ModularBuilding
60'
60'
AdditiveAlternate
No. 2
AdditiveAlternate
No.1
425 Days
850 Days 775 Days
775 Days
Notes:Phase 1 includes:1. Modification to existing subsurface drainage, Re: Civil.2. Modification to existing electrical services, Re: Electrical
Phasing Drawing.3. Modification to existing underground plumbing, Re:
Plumbing.4. Construction of new 3-story Classroom Wing N.5. Modification to existing walkway where new Classroom
Wing N ties into existing walkway.6. Construct upgrades to West Cafeteria wall to provide 2
hour-rated separation.7. Modification of existing walkways were buildings is
demolished and walkways remain.8. Removal of a section of existing parking lot at south side
of new Classroom Wing N.9. The work included in this phase is to be Substantially
Complete in 425 days.
Phase 2 includes:1. Abatement of Classroom Wing E (Not In Contract, work to
be performed under a separate contract by Owner). Allow35 days for the abatement of Classroom Wing E.
2. Full demolition of existing 2-story Classroom Wing E.Demolition of Classroom Wing E must be completedduring Summer of 2016.
3. Modifications required at first and second floors ofBuildings A and B where Classroom Wing E wasremoved.
4. Removal of trees in courtyard.5. Removal and salvage of "Garden of Angels" monument to
be reinstalled in Phase 5B of the project.6. Removal of sidewalks in courtyard.7. Modification of subsurface drainage, Re: Civil.
Phase 3A includes (Work in Phases 3A and 3B is concurrent):1. Additional electrical service work, Re: Electrical.2. Construction of new 3-story Classroom Wing M.3. New connections to subsurface drainage for new
courtyard.4. Upgrade of openings in East Building H (Girl's Gym) wall
to provide 2-hour rated separation.5. Modification of existing covered walkway for construction
of new Classroom Wing M.6. New covered walkway connection at East end of
Classroom Wing M.7. The work included in this phase is to be Substantially
Complete in 850 days.
Phase 3B includes (Work in Phases 3A and 3B is concurrent):1. Abatement of Building B (Not In Contract, to be performed
by separate contract by Owner).2. As Additive Alternates No. 1 and No. 2, selective
demolition of areas of Building B (Administrative/Media).3. As Additive Alternates No. 1 and No. 2, renovation of
Building B (Administrative/Media).4. As Additive Alternate No. 1, addition to Building B
(Administrative/Media).5. As Additive Alternate No. 1, addition of new entrance to
school at Building B (Administrative/Media) including newsidewalks and planters.
6. The work included in this phase is to be SubstantiallyComplete in 775 days.
Phase 4 includes:1. Abatement of Building C (Not In Contract, to be performed
by separate contract by Owner).2. As Additive Alternate No. 3, selective demolition of
Building C and subsequent renovation of Building C. Alsoincluded is an new canopy to the South of Building C.
3. The work included in this phase is to be SubstantiallyComplete in 775 days.
Phase 5A includes:1. Abatement of Classroom Wing F (Not In Contract, work to
be performed under a separate contract by Owner). Allow35 days for the abatement of Classroom Wing F.
2. Complete demolition of Classroom F building andfoundation. Demolition of Classroom Wing F must becompleted during Summer of 2017.
3. Modifications required at Building B where ClassroomWing F was removed.
4. Final site grading.5. Implementation of new landscaping.
Phase 5B includes:1. Construction of new pad for "Garden of Angels"
monument.2. Construction of new sidewalks in courtyard.3. The work included in this phase is to be Substantially
Complete in 850 days.
General Notes for All Phases:1. During all phases of work school will be fully operational
during regular school calendar year. The schoolmaintains use of some facilities during the summer breakfor camps, etc. Safety of students, staff, and visitors isvery important. Fencing and barricades as required tokeep non-work personnel out of the construction site willbe Contractor's responsibility.
2. Coordinate with Owner to move out of existing spacesthat are to be demolished or renovated prior to Contractorneeding to obtain that space to work if necessary.
3. Reference instructions to bidders Article 11 CompletionTime for milestone time frames for each phase of worklisted above.
Sheet No.
Sheet Title
Date
Project No.
Seal
Consultant
333 Texas StreetSuite 1200Shreveport, LA 71101
OF
smbbarchitects.com
Issue
318.221.1623318.221.1626
January 15, 2015 BidDocuments
A0.10
Air
line
Hig
h S
cho
ol C
lass
roo
m W
ing
s28
01 A
irlin
e D
rive,
Bos
sier
City
, LA
711
11
BP
SB
Pro
ject
No.
CM
1211
−C
Phasing Plan
February 4,2015