A Vipingo Development and Centum Project...Awali is a project of Centum Investment Company PLC, a...
Transcript of A Vipingo Development and Centum Project...Awali is a project of Centum Investment Company PLC, a...
A Vipingo Development and Centum Project
Magnificent InEvery Respect
2
10,254 acres
Industrial
encompassing
CommercialResidential
Health Care
Hospitality
Institutional Use
3
Vipingo Development Limited (www.vipingodevelopment.com) is an integrated economic hub, sponsored by Centum Investment PLC (www.centum.co.ke) which promises to be a model for all new East African cities.
Set to break ground in July 2018, the project is spread over 10,254 acres. It is supported by an urban environment, high quality infrastructure and state of the art amenities and services, the project affords industrial, commercial, residential, hospitality, health care and institutional use.
About Vipingo Development
Vipingo Lifestyle City, part of the Vipingo Development, is a mixed-use development that will be anchored by a residential project.
The Lifestyle City will provide a vibrant urban mix that will comprise the following uses: residential, commercial, educational, entertainment and hospitality, with recreational parks and open, green spaces.
At the heart of Vipingo Lifestyle City lies Awali Estate, an exclusive and secure residential neighbourhood.
Vipingo Lifestyle City
4
5
Access to the prestine sandy beach at Vipingo
“...... creating the perfect environment for achieving a vibrant and balanced existence. “
6
Sitting next to the luxurious Vipingo Ridge Golf Estate, Awali estate is an exclusive, residential complex, within the Vipingo Lifestyle City. Located along the Mombasa-Malindi highway Awali is just 35 km from Mombasa CBD.
The development comprises of 152 units that sit on 30-acre site with a mix of 62 maisonettes and 90 bungalows.
The Maisonette has a total built up area of 210sqm that is inclusive of all the terraces (ground and first), 2 bedrooms, a master bedroom on the first floor with an outside terrace, dining area, kitchen, laundry area, dsq and a carport for 2 cars.
The Bungalow has a total built up area of 155sqm that includes, 2 bedrooms and a master bedroom, dining area, kitchen, laundry area, dsq, an outside terrace and a car port for 2 cars.
The development is supported by the following facilities; wide range of sports and recreational amenities, swimming pool, parks, kid play areas, outdoor gym, gazebo and visitors parking areas.
Awali Estate
7
Awali is in close proximity to Mombasa, with excellent highway access and quick connection to Mombasa’s CBD, the Miritini SGR station and the Mombasa International Airport, just 40 km away.
The Mariakani-Kaloleni-Mavueni bypass allows you direct entry from Nairobi. The Vipingo Airstrip, immediately beside Awali, has daily flights to and from Narobi.
Vipingo Ridge Golf Estate is right next to you and the white sandy beaches are a few minutes drive away.
Perfect Location
To Lamu300 Km
Mavueni
Proposed Train Stations
To Vipingo Industrial City56 Kms
Mariakani
To Nairobi500 km
A109
Vipingo Airport
Kilifi Town
Kijipwa Airstrip
Mombasa-Lamu Railway
THEVIPINGO
DEVELOPMENT10,254 ACRES
Moi International Airport
Shimba Hills National Reserve
Malindi Airport
Watamu MarineNational Park
Arabuko SokokeForest
Aga Khan HospitalNyali Centre
Braeburn Mombasa International School
City Mall ~Nyali
8
Whether you want to walk or fly home, Vipingo offers you the beauty of variety !
Mombasa -
Malindi
Road
Vipingo RidgeGolf course
Vipingo RidgeAir strip
Vipingo AwaliEstate
Vipingo Ridge Road
Indian Ocean
9
Site Plan
ZONE A
Total Units- 35 unitsBungalows- 20 unitsMaisonettes- 15 units
ZONE B
Total Units- 36 unitsBungalows- 20 unitsMaisonettes- 16 units
ZONE C
Total Units- 41 unitsBungalows- 22 unitsMaisonettes- 19 units
ZONE D
Total Units- 40 unitsBungalows- 28 unitsMaisonettes- 12 units
VIPINGO AWALI SITE PLAN
NO.OF UNITS 152BUNGALOWS 90 UNITSMAISONETTES 62 UNITS
10
11
Luxury living in anoasis of serenity
12
Each bungalow has a total built up area of 155 sqm that includes :
• 2 standard bedrooms• a master bedroom• dining area• kitchen• laundry area• an outside terrace• a carport for 2 cars
3 Bedroom Bungalow
13
Each maisonette has a total built up area of 210 sqm that includes :
• the ground and first floor terraces• 2 standard bedrooms• a master bedroom (on the first floor)• a dining area• kitchen• laundry area• a carport for 2 cars
3 Bedroom Maisonette
14
More time for living
From quiet, relaxing walks in its lush green parks, enjoyable picnics perhaps, to interactive engagements in the sporting and recreation facilities, Awali offers a wide range of possibilities for spending quality time with family and friends.
Facilities include a club house, outdoor gym, playgrounds, a jogging track, a swimming pool and a children’s play area. For golfers, the Vipingo Ridge Golf Course is next to Awali. Beach lovers have the white, sandy beaches of Vipingo and Kuriwutu a few minutes away.
You can venture a little further from the shoreline and go snorkeling at the Kuruwitu Marine Sanctuary where you will be able to view over 200 species of fish and other sea creatures.
If you want to experience the south coast, you can catch a flight from Diani to the nearby Vipingo Ridge Airstrip.
15
Support Facilities
Awali prides itself on high quality infrastructure services and amenities, within a controlled environment, to complement the tastefully designed houses. These include:
BUILDING AND LIFESTYLE AMENITIES
• Paved roads• Reliable power connection• Constant potable water supply from Vipingo desalination plant• Ample parking• Beautifully landscaped parks• Modern interior, sanitary and kitchen fittings• A fully-equipped gym• A club house• Playgrounds• A swimming pool• A children’s play area • A shopping mall• A restaurant
SOCIAL AMENITIES
• An international school• A hospital
SECURITY AMENITIES
• CCTV Surveillance• A perimeter fence• Security Patrols
Dams Green Parks
Security
RoadsMains Power
Sewer Treatment
Bungalow PricingStarting from KES 13M
Maisonette PricingStarting from KES 17M
16
17
The Developer
Awali is a project of Centum Investment Company PLC, a public limited liability company whose shares are listed on the Nairobi Securities Exchange (NSE) and the Uganda Securities Exchange (USE), is the largest investment company in East Africa with total assets of KES. 62.5 billion as at 30th September 2017.
Within the strategy period 2014/19, Centum has focused its development activities on eight key sectors as shown.
Through its subsidiary Athena Properties Limited, Centum’s strategy in real estate is to participate in the entire development process beginning with land development, to property development and property and portfolio management.
In addition to Vipingo Development Limited, other notable projects by Centum include Two Rivers Development in Nairobi, Kenya as well as Pearl Marina Estates Limited in Entebbe, Uganda.
• Two Rivers development, Nairobi (www.tworivers.co.ke)
Set on 102 acres within Nairobi’s diplomatic, blue zone, wedged between the Northern Bypass and Limuru Road, Two Rivers is a go-to address in East and Central Africa which integrates retail, entertainment, commercial, hospitality and lifestyle facilities. The development creates an environment of a sustainable city-within-a-city, incorporating state of the art infrastructure and amenities.
The Two Rivers Development has been constructed in phases and, when completed, will have an estimated built- up area of 1,500,000 m2. Phase 1 of the development has been completed, comprising the following:
• Two Rivers Mall; the largest retail mall in Sub-Saharan Africa, except for South Africa• 3 star hotel• Office blocks• Support infrastructure including roads, sewerage, power substation, water
and waste water treatment plants• An outdoor water entertainment park
16
17
• Pearl Marina, Uganda (www.pearlmarina.co.ug)
Pearl Marina is a mixed-use development on 389 acres on the Garuga Peninsula, Entebbe, Uganda.
The development integrates, as its name suggests, a marina, as well as luxury residences, top-notch hotel resorts, office parks, a retail centre and a wide range of sports and recreational activities, all supported by expertly planned, sustainable infrastructure.
Pearl Marina is being developed in phases and, when completed, the development will have a built-up area of 1,440,749 m2. Phase 1 of the development has been completed comprising the following:
• Luxury residential villas• Support Infrastructure including roads, water, sewerage and power
VIPINGO DEVELOPMENT LIMITED
1st Floor, Vipingo Ridge Conference CentreP.O Box 117-80119,Vipingo
Tel: +254 20 4400 215Mobile: +254 740 400 215
Email: [email protected] Website: www.vipingodevelopment.com
This brochure and plan and/or any marketing material and the information contained therein does not form part of any contract, agreement or legal relationship and while reasonable effort have been exerted to ensure the accuracy of such information;
this cannot serve as a guarantee and no representations and/or warranties (whether express, implied or otherwise) are excluded to the extent permitted by law. Awali estate does not make any assurance, indemnification and/or representation(s) in
respect of the brochure and plans and/or any marketing materials.
CONTACT INFORMATION
DISCLAIMER