A sustainable solution replacing an active and inefficient ...
Transcript of A sustainable solution replacing an active and inefficient ...
Joyce Cruz - Project Geologist – [email protected]
João Marcellino – Project Manager – [email protected]
Olivier Maurer – Senior Technologist – [email protected]
Christian Nogueira – Senior Reviewer – [email protected]
Renata Moura – Petrom Contract Manager - [email protected]
A sustainable solution replacing an active and inefficient Dual Phase Extraction System
2
Schedule
• Introduction
• NAPL distribution model
• Conceptual approach
• Construction
• Conclusions
3
A sustainable solution replacing an active and inefficient Dual Phase Extraction System
4
Introduction We will present the main steps of a Permeable Adsorp5ve Barrier system at the a chemical facility near São Paulo Brazil (Petrom, Mogi das Cruzes). :
-‐ to design
-‐ construct,
-‐ and operate
• Dual-‐Phase Extrac5on System in opera5on since 2007 to treat LNAPL, not sufficient enough and not sustainable.
• APer revising the Site Conceptual Model (CSM) a Passive Barrier System was viewed as a more sustainable solu5on to prevent poten5al light non-‐aqueous phase liquid (LNAPL) (di(2-‐ethylhexyl)phthalate (DEHP) and di-‐n-‐butyl phthalate (DBP)) from entering a channelized water stream crossing the facility, the main environmental receptor.
5
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
Localization
6
New Conceptual Site Model (CSM) • Provided the necessary support for the technical team to propose a
modification on the remedial approach to CETESB, with the replacement of the existing MPE system for a permeable reactive barrier (PAB wall).
Lost on MPE System efficiency
Significant long term expenditures, without knowing the closure plan
Company was looking for a consulting firm with exp. on Sustainable
Remediation
Main receptor of concern, not yet impacted.
7
Petrom Study Case • 2013 – first steps, select a more sustainable solution and gain support from authorities
– Review and revision of existing conceptual site model (CSM) and Human Health Risk Assessment,
– Presentation to CETESB of new remedial concept and approval
• 2014 – Barrier Construction
• 2015 – Cetesb presentation
• 2015 – Dual system evaluation
Suggested that the free product plume was relatively stable with low mobility
Narrow Valley
NAPL containing di(2-ethylhexyl)phthalate (DEHP)
and di-n-butyl phthalate (DBP)
8
MPE System Loss of Efficiency
0
2000
4000
6000
8000
10000
12000
0
500
1000
1500
2000
2500
3000
3500
4000
4500
Acu
mul
ated
(Lite
rs)
Volu
me
(Lite
rs)
Volume of Extract Product
! Product removed from1999 to sept/2006: 54.717L ! Clear lost on efficiency ! Heavy O&M scope, costs and energy consumption
9 Presentation Title
NAPL Distribution Model
10
Bis[2-ethylhexyl]phtalate Soil Plume
Figure 1 Bis [2-ethylhexyl] phthalate Soil Plume Petrom Mogi Das Cruzes, Brazil
Barrier Wall
11
0,1 % NAPL Saturation Plume
Figure 2a 0.1% LNAPL Saturation Plume Petrom Mogi Das Cruzes, Brazil
Barrier Wall Culverted Stream
12
0,5 % NAPL Saturation Plume
Figure 2b 0.5% LNAPL Saturation Plume Petrom Mogi Das Cruzes, Brazil
Barrier Wall
13
1,0 % NAPL Saturation Plume
Figure 2c 1.0% LNAPL Saturation Plume Petrom Mogi Das Cruzes, Brazil
Barrier Wall
14
2,0 % NAPL Saturation Plume
Figure 2d 2.0% LNAPL Saturation Plume Petrom Mogi Das Cruzes, Brazil
Barrier Wall
15 Presentation Title
Conceptual Approach
16
New Remedial System (PAB) • Passive Adsorptive Barrier, using the natural GW flow to protect the
primary receptor as well as collecting the free phase and treating the dissolved phase
Added collection trench associated with 2 sumps and
skimmers
PMs to monitor and control the system performance
17 Presentation Title
Construction
18
The Barrier System
• 4 main components: 1. LNAPL interceptor and a recovery trench;
2. Situated immediately upgradient of the PAB;
3. Cement-‐bentonite (CB) slurry wall sec5ons;
4. Sumps to recover and prevent LNAPL from accumula5ng at the upgradient faces of both wall sec5ons.
• Design: – Based on nature and es5mated quan55es of LNAPL
– Three key issues : 1. Preven5ng migra5on of the LNAPL through the PAB wall;
2. Clogging of the PAB wall by LNAPL; and,
3. Preven5ng migra5on of dissolved COCs through the PAB wall.
19
Layout
20
Cement-bentonite Barrier • Two cement-‐bentonite barriers were built in order to drive groundwater flow to the Drainage Barriers to the Adsorp5ve Permeable Sec5on;
• First barrier: 68 meters in length, depth of 4 meters and average width of 0.70 meters;
• Second barrier: 25 meters long, depth of 4 meters and 0.70 meters width;
• Preven5ng that the supernatant free phase contact the Tributary of Oropó Stream.
21
Cement-bentonite Barrier
22
Gravel Trench Draining Barrier
• The Draining Barrier was built about 30 meters, average width of 0.80 meters and depth of 2.70 meters;
• Lined with geotex5le (Bidim) and filled with graded gravel (#2);
• Two wells to extract product (with skimmers);
• To focus the groundwater flow (and free phase product), direct it to the collec5on wells.
23
Gravel Trench
24
Permeable Adsorptive Barrier (PAB) Filtering Barrier or Permeable Adsorp5ve Barrier (PAB)
Excavated with dimensions of 4.6x3.50 meters with depth of 4 meters, forming a filter box, "enveloped" by a permeable geosynthe5c.
25
Barriers Section
26 Presentation Title
Conclusions
27
Conclusions
• The system has collected more than 10,000 liters of product.
• Less O&M
• Energy consumption
• Carbon footprint,
• Innovation in Brazil
• Favorizing operation by local resources
Thanks