A Sustainable Residential Design Project Project 8 DS413: Design Studio 412 May 9 th,2012.

9
A Sustainable A Sustainable Residential Design Residential Design Project Project Project 8 Project 8 DS413: Design Studio 412 DS413: Design Studio 412 May 9 May 9 th th ,2012 ,2012

Transcript of A Sustainable Residential Design Project Project 8 DS413: Design Studio 412 May 9 th,2012.

A Sustainable Residential A Sustainable Residential Design ProjectDesign Project

Project 8Project 8

DS413: Design Studio 412DS413: Design Studio 412

May 9May 9thth,2012,2012

Coded Foorplan/SiteplanCoded Foorplan/Siteplan

3d View3d View

Sustainable SiteSustainable Site

1A previously developed site1A previously developed site 1B near residential areas and schools1B near residential areas and schools 1C area not subject to flooding1C area not subject to flooding 1D- left existing tree1D- left existing tree 1E- not affecting endangered species1E- not affecting endangered species

Water EffeciencyWater Effeciency

2A energy star appliances2A energy star appliances 2B rain garden2B rain garden 2C permeable walk way2C permeable walk way 2D harvest rain water2D harvest rain water 2E grey water system2E grey water system

Energy and atmosphereEnergy and atmosphere

3A window layout to max sunlight3A window layout to max sunlight 3B shades to block out sunlight3B shades to block out sunlight 3C environmentally safe HVAC system3C environmentally safe HVAC system 3D3D 3E3E

Materials and ResourcesMaterials and Resources

4A reduce amount of construction waste4A reduce amount of construction waste 4B building materials extracted within a 5 4B building materials extracted within a 5

mile radiusmile radius 4C use of raw materials taking 10 years or 4C use of raw materials taking 10 years or

less to growless to grow 4D 50% of all wood is FSC certified4D 50% of all wood is FSC certified 4E additional 10% recycled content4E additional 10% recycled content

Indoor environmental qualityIndoor environmental quality

5A carbon dioxide monitor installed5A carbon dioxide monitor installed 5B ventilate naturally5B ventilate naturally 5C Make sure that the quality of air is not 5C Make sure that the quality of air is not

detrimental detrimental to the people working on the to the people working on the construction site construction site

5D Complete flush out of building after 5D Complete flush out of building after construction is construction is finish and before it is occupied finish and before it is occupied

5E VOC limits are established in the South Coast Air 5E VOC limits are established in the South Coast Air Quality Management District Rule 1168 for Quality Management District Rule 1168 for

adhesives and sealants are complied with. adhesives and sealants are complied with.

Innovation and design ProcessInnovation and design Process

6A - educational building- more natural 6A - educational building- more natural lightlight

6B electronic dual flush technology6B electronic dual flush technology 6C 75% of the roof surface have a solar 6C 75% of the roof surface have a solar

reflective index of 78. (WHITE ROOF reflective index of 78. (WHITE ROOF MEMBRANE)MEMBRANE)

6D 25% Open green space6D 25% Open green space 6E organic landscaping6E organic landscaping