A Step-by-Step Procedure for Quantity calculation Using Object wise Data Entry Using Formulator...

download A Step-by-Step Procedure for Quantity calculation Using Object wise Data Entry Using Formulator Select Ensoft Formulator Icon From Desktop Start Program

of 43

  • date post

    14-Dec-2015
  • Category

    Documents

  • view

    214
  • download

    0

Embed Size (px)

Transcript of A Step-by-Step Procedure for Quantity calculation Using Object wise Data Entry Using Formulator...

  • Slide 1

A Step-by-Step Procedure for Quantity calculation Using Object wise Data Entry Using Formulator Select Ensoft Formulator Icon From Desktop Start Program FORMULATOR from above List Slide 2 Quantities can be worked out easily for Standard Library of RCC Objects using FORMULATOR Slide 3 Select NEW PROJECT Option from PROJECT Menu to Create a New FMDB file. Slide 4 By Default New Folder is Created in BQ2009Projects folder Slide 5 Enter Project Code Name as PROJECT2 Slide 6 Select YES Option for Copying Definitions of Library Objects from MASTER FILE which has come with the package. Slide 7 MASTERRCC.fmdb file is available in folder C:\Program Files\Ensoft\BuildQuant 2009\Formulator MASTERRCC.fmdb file is available in folder C:\Program Files\Ensoft\BuildQuant 2009\Formulator Slide 8 A New file PROJECT2.fmdb will be created without any Objects Slide 9 Select ADD OBJECT from EDIT menu to add data for a Sample Object Beam. Slide 10 MASTERRCC.fmdb file contains Formula for Calculating Quantities Types of RCC Objects Listed above. User can ADD new. Select Object Type as BeamWithFactorLength ContinuosToBoth as type of Footing to be added. MASTERRCC.fmdb file contains Formula for Calculating Quantities Types of RCC Objects Listed above. User can ADD new. Select Object Type as BeamWithFactorLength ContinuosToBoth as type of Footing to be added. Slide 11 Enter Object Name as B3 and Object Nos. as 1 Slide 12 Tick Option Show Object Type Sketch to Display Sketch of BeamWithFactorLength ContinuousToBoth while making data entry. Slide 13 Enter Dimensions of Object B3 as desired. Object Sketch displays variable names. Slide 14 Slide 15 Slide 16 Program Calculates Quantities of Object B3 Slide 17 Right Click on the View (Or Click Edit Menu) and Select ADD OBJECT to add another Slide 18 Select Object Type ColumnRCCRectangle with With08BarsLinkType1 for Column Slide 19 Enter Object Name as C8 and Object Nos. as 1 Slide 20 Press OK to Proceed Further. Slide 21 Enter Column Variable Data as Shown for generating Column Quantity Slide 22 Program Calculates Column Quantities for Column C8 Slide 23 Right Click on the View (Or Click Edit Menu) and Select ADD OBJECT to add Plinth Beam Slide 24 Select Object Type BEAM DISCONTINUOUS on BOTH ENDS for a Sample Plinth Beam Slide 25 Enter Object Name as F5 and Object Nos. as 1 there is 1 Footing Slide 26 Enter Footing Object Dimension data as shown. Program will calculate Quantities for Footing Slide 27 Add Slab S1 of Type SlabWithBentUpBars CantileverSlab Slide 28 Slab S1 of Type SlabWithBentUpBars CantileverSlab is added Slide 29 Right click on View and Click on Show Details to see the detail calculations Slide 30 Detail calculations are shown here Slide 31 Slide 32 Select Item Wise Summary from Report menu Slide 33 Tick All Items of work Slide 34 Press on OK Slide 35 Select All Objects radio button Slide 36 Item Wise Summary with Diameter wise steel is shown Slide 37 Right Click on View, Click on Show Details Slide 38 Detail Item Wise Summary is Shown here Slide 39 Right Click on View and untick ShowDetails Slide 40 Right Click on View, Click on Show Cost Slide 41 Cost of Items is displayed Slide 42 Select EXIT to quit FORMULATOR and Start BarBeQue to read Project2.FMDB file created. Slide 43 Press OK to Close FORMULATOR