A Quick Review ofSCE’s TOU-8 Rate

IceBank Energy Storage

Terry AndrewsCALMAC Manufacturing [email protected](714)585-6121

SCE’S TOU-8 RATE:

WHY IT IS A FANTASTIC RATE FOR ENERGY STORAGE

Energy Storage for a Cooler Future ™

CALMAC Mfg.Corp.2012©

Base Load

LightingFans

Pumps

Cooling

0

200

400

600

800

1000

1200

1400

1600

1800

2000

k

W

Demand - $/kW

SCE’s TOU-8 Rate – Demand verses Energy Charges

CALMAC Mfg.Corp.2012©

SCE’s TOU-8 Rate, 2-50 kV Service

• Demand charges are additive for many buildings– (Summer peak period is noon to 6pm, June thru September, 4 months)

• Summer demand charges include: + $ 23.74/kW during peak period

+ $ 14.88/kW for the facilities related demand

• What the heck is a facilities demand charge?– It’s a 2nd demand charge for high peak demand that occurs during the

previous month….independent of the time of day. It is defined in the rate sheet as follows:

”The Facilities Related Component shall be for the kW of Maximum Demand recorded during (or established for) the monthly billing period.”

$38.62/kW

CALMAC Mfg.Corp.2012©

Base Load

LightingFans

Pumps

Cooling

0

200

400

600

800

1000

1200

1400

1600

1800

2000

k

W

On Peak Demand – $23.74/kW Facilities Demand - $14.88/kWEffective Total Demand:

$38.62/kW

SCE’s TOU-8 Rate – Effective Demand Charges

Over $56,000 per monthIn 4 summer months

CALMAC Mfg.Corp.2012©

Base Load

LightingFans

Pumps

0200400600800

100012001400160018002000

k

W

Charging Storage

600 kW Shed

SCE’s TOU-8 Rate – Effective Demand Charges

For 4 Summer Months,Effective Total Demand:

$38.62/kW

Approximately $20,000/month saved in 4 summer months

CALMAC Mfg.Corp.2012©

Summer “Blended” Costs – Day vs. Night28 cents vs. 6 cents per kWh – 4X more during the day

CALMAC Mfg.Corp.2012©

SCE’s TOU-8 Rate, 2-50 kV Service

• In the winter (October through May) there is no peak period, the mid peak period covers the day.

• If we assume the building is an office, school or a building with a similar cooling load profile the peak is likely to occur in the afternoon.

• Thus, at this time the demand savings would be derived from reducing the size of facilities related demand …..and this is a significant charge:

$14.88/kW

CALMAC Mfg.Corp.2012©

Winter “Blended” Costs, Day vs. Night14 cents verses 7 cents per kWh – ½ price sale at night

CALMAC Mfg.Corp.2012©

SCE’s TOU-8 Rate, Summary

• The demand charges are significantly large and make day time energy costs expensive, FOR THE RIGHT BUILDING.

• There are potentially large savings when shifting load in a daytime peaking building.

• Electricity in the summer is approximately 79% cheaper at night

• Electricity in the winter is approximately 50% cheaper at night

CALMAC Mfg.Corp.2012©

Project Examples

Edwards AFBCA

Encinitas Civic CenterEncinitas, CA

Nordstrom Dept. StoreHawaii

Los PositasLivermore, CA

CALMAC Mfg.Corp.2012©

Project Examples

Irvine Presbyterian ChurchIrvine, CA

Los Angeles Community College,Los Angeles, CA

Chabot College Hayward ,CA

California State Lottery Sacramento, CA

CALMAC Mfg.Corp.2012©

University Example, U of Arizona

University of ArizonaTucson, AZ

Production22 Chillers – 34,350 tons205 CALMAC IceBank™ tanks at two sites

30,750 ton hours of storage

Distribution7 miles of underground pipes5,500,000 gallons of water in the loop11 Pumps – 3255 HP (0.095 HP / ton of refrigeration)There are no pumps outside of the chiller plants62,260 gpm circulation capacity (1.8 gpm / ton)12 psi - total campus pressure drop16 degrees – average yearly temperature rise of the chilled waterLoads

176 buildings11,750,000 square feet (342 tons / ft².)

Notable Results

Distributes the chilled water at an average of 0.683 KW/ton. Includes everything, chillers, pumps, towers.

Thermal storage is saving $423,000/year ($2,063/tank/yr)

CALMAC Mfg.Corp.2012©

Get Started with Pre-engineered Hybrid Storage Systems

You don’t have to start from scratch.

Air Cooled Hybrid Cooling with pre-selected equipment combinations:• A/C Chillers• IceBank™ Tanks and Plate Frame HX’s• Factory Assembled Smart Pumping Skid• Pre-packaged controls • Dashboards that document savings

Saves time and MONEY• Design and Installation phase• Commissioning phase• Operation & Maintenance phase

CALMAC Mfg.Corp.2012©

Jefferson County Community College StagingJefferson County Community College Running

$ 84,000 REBATE!......IF IN CA