A Project on Dspcl
-
Upload
apfindingmyself7785 -
Category
Documents
-
view
218 -
download
0
Transcript of A Project on Dspcl
-
8/14/2019 A Project on Dspcl
1/9
A Project On DSPCL (Seebpore
Unit)
Presented By:
1. Angshuman Pal
2. AnsumanSamanta
3. Bhim Sarkar
4. Debranjan Maji
5. Kaustuv Adhikary
6. Manab NarayanSen
7. ManindraChandra Sarkar
8. Pallab KumarGhoshal
9. Pulak Mondal10. Rajib
Bhandari
(Students ofB.tech 3rd YearNPTI(ER))
-
8/14/2019 A Project on Dspcl
2/9
ACKNOWLEDGEMENT:
We Would Like to Thank The
following people for theirsupport in arranging for ourTraining and their support infield:
Mr. G. Dalal
Mr. Ranjit Das Mr. S.K. Bose
-
8/14/2019 A Project on Dspcl
3/9
We would also like to
thank many other peoplefor their support.
DPSC Limited SYSTEM consists mainly of 2generating stations one each at Chinakuriand Dishergarh and two 11KV networks onecovering Dishergarh and Chinakuri areasand the other covering Seebpore, Luchipurand Satgram areas. The present generating
-
8/14/2019 A Project on Dspcl
4/9
capacity of Chinakuri Power Station (CPS) is30MW . Generating Capacity of DishergarhPower Station is about 12MW .TheGenerating Stations are basically providing
survival power requirement to ourconsumers. These generating stationssupply 42MW power out of our totalrequirement of 122 MW. The balance poweris mainly drawn from DVC's system at fourintake points viz., Dishergarh, Satgram,Seebpore and Luchipur. The Power fromDVC system is taken at 33 KV and it is then
stepped down to 11 KV for distribution forour consumers. The Company's generationmeets about 32% of its system demand,while the balance 68% is sourced from DVCand WBSEB.The system details are asfollows :
2003-04 2004-05 2005-06
MillionUnits
MillionUnits
MillionUnits
Own Generation 219.98 243.27 245.91
Power Purchase :DVCWBSEB
577.0350.48
610.7042.20
643.0738.49
Units Available for 847.49 896.17 927.47
Sales to :WBSEBEastern CoalfieldsOther Sales Viz.,Public UtilitiesCommercial
194.75466.62
140.53
196.72474.97
168.50
163.80484.53
193.83
-
8/14/2019 A Project on Dspcl
5/9
Consumers
System Loss 43.87 45.53 42.81
Sytem Loss as % of
Sytem Units 5.68 % 5.17 % 4.62 %
Power Distribution: Network System
The present peak load of the company is122 MW and Power is supplied
predominantly at 11kv.Around 32% of theload is met from own generation , while thebalance is met through imports of powerfrom DVC and WBSEB.Imports of power takeplace from DVC at four points spread overits licensed area and from WBSEB at onepoint.The Company supplies power toWBSEB consumer at 18 different points in its
licensed area spread over Asansol/RaniganjCoal & Industrial belts.
Power Distribution:Transmission is anintermediary between Generation & Supplyof Power. DPSC Limited is transmits of powerat 33 kV from DTPS to Company's area ofsupply in Asansol - Raniganj for delivery toSupply Division after stepping down to 11 kVthrough a 550 kV network linking
Sales
-
8/14/2019 A Project on Dspcl
6/9
Growth Due to
Maintaining & supplying good quality powerto its consumers.
Development of New Industries in thelicensed area.
Increase in sales of the Energy.
Reduce Auxiliary and Coal Consumptions inthe power stations.
Reduce T&D Losses. Maximize generation from own low-cost
generating station (CPS).
-
8/14/2019 A Project on Dspcl
7/9
System Loss
DPSC Limited is maintaining a testing
laboratory with sizeable work force toimprove metering system and to arrestcommercial losses as well.
Major activities undertaken for the lasttwo / three years:
Introduction of microprocessor based State-
of the -Art static meter in consumerpremises.
Introduction of new tamper proof meteringbox / cubicle to reduce attempt of theft.
Improvement of meter sealing system.
Phasing out existing meters by good qualitymeters.
Increasing vigilance for supervision andchecking of meter readings.
System study of the consumers' pointincluding load pattern and period ofoperation.
Computerized billing and follow up action.
Augmentation of overloaded overhead /underground lines.
Improvement of system power factor by wayof installing reactive power compensation
-
8/14/2019 A Project on Dspcl
8/9
units.
Shifting of Distribution / Power ReceivingPoints at load centres.
Installation of 132 kV / 33 kV capacitors tomaintain quality of power to consumers
The total load of the system is 122 MW.Due to restriction on constructing 33KV Transmission network due to DVC
Act, the distribution had to be done at11KV.In spite of the above limitation,the T&D loss is in the range of 6%which is one of the lowest in thecountry.
Consumer Profile
Eastern Coalfields Limited (ECL) is thesingle largest consumer of theCompany constituting 60% of the Loadof the Company. About 25% of the Load
-
8/14/2019 A Project on Dspcl
9/9
is that of WBSEB who buy power fromDPS at 11 KV. Balance 15% of the loadabsorbed by other industries and byessential services like Hospitals,
Nursing Homes, Pumping Stations,Railways, TV & Radio Stations Etc.