Localization Roadmap Content Localization in DNN neXt Sebastian Leupold.
A Low Datarate Localization System - EPFL ICica · A Low Datarate Localization System IMST GmbH...
Transcript of A Low Datarate Localization System - EPFL ICica · A Low Datarate Localization System IMST GmbH...
1UWB4SN, 04-11-2005, EFPL, Lausanne
A Low Datarate Localization System
IMST GmbH Carl-Friedrich-Gauß-Straße 2 D-47475 Kamp-Lintfort, Germany
Jac RommePhone: +49-28 42-981 465Fax: +49-28 42-981 499E-Mail: romme<at>imst.de
2UWB4SN, 04-11-2005, EFPL, Lausanne
Outline
UWB @ IMST Puls-On Project InformationSystem ConceptImplementationProject Results (Movie)
3UWB4SN, 04-11-2005, EFPL, Lausanne
UWB @ IMST: Goals with UWB Technology
Specialisation on applications
Low Data Rate (LDR)
Robust Transmission
Localisation
Application ScenariosSensor Mesh
Industrial Facilities, Control/Monitoring
Entertainment-Theatre
Emergency Services
Localisation part of general Concept
IPOS (Currently, WLAN based Localization System)
Other Location
calculation
UWB Location
calculation
WLAN Location
calculation
Application
Postprocessing/Data distribution
Raw WLAN data Raw ... dataRaw UWB
data
4UWB4SN, 04-11-2005, EFPL, Lausanne
UWB @ IMST: Activity Summary
Protected by NDAOngoingIndustryAntenna Development
„UWB communication and localisation inindoor environments for emergencyservices“
Implementation & system demonstration
2004-2007EU 6th FP
STRP 2nd Call
EUROPCOM
Propagation measurementsChannel models
2004-2008EU 6th FP
IP 1st Call
PULSERS (II)
„UWB communication and localisation in indoor environments“
2003-2005NRWZukunfts-wettbewerb
PULS-ON
100 Mbit Communications usingTransmitted Reference
Design & Implementation
2002-2004NRWZukunfts-wettbewerb
BISON
Propagation measurements / modelsAir interface / coexistenceSystem capacity, System performance
2000-2004EU 5th FPWHYLESS.COM
5UWB4SN, 04-11-2005, EFPL, Lausanne
Puls-On Project Scope
Partners: IMST, VCS Nachrichtentechnik AGDuration: 07/2003 – 05/2005Budget: IMST 950kEUR, VCS 300kEURFunding: IMST 35%, VCS 35%IMST: Radio Layer and PositioningVCS: Data Concentration & Application
6UWB4SN, 04-11-2005, EFPL, Lausanne
Puls-On Project Objectives
Project objectives:Both LDR Communication and Positioning
Inside Buildings
Indoor 2 Outdoor
Implementation of a Functional Demonstrator
Extend Know-how on Localization:
RF front-end, Signal Processing,...
Restrictions:Limited Project Budget
7UWB4SN, 04-11-2005, EFPL, Lausanne
Puls-On: System Concept
USB
RS-MNT
RS-OEPOM
GPS Receiver
USBRS-232
Elektronischer Kompass
USB
RS-MNT
RS-OEPOM
GPS Receiver
USBRS-232
Elektronischer Kompass
PWR
OK
WIC0ACT/CH0
ACT/CH1
WIC0ACT/CH0
ACT/CH1
ETHACT
COL
WLAN Access PointKS Darstellungs-Monitor
USB
RS-MNT
RS-OEPOM
GPS Receiver
USBRS-232
Elektronischer Kompass MS
KS-Server
Mobile Station
Base Station
ControlStation
Base Station
Base Station
8UWB4SN, 04-11-2005, EFPL, Lausanne
System Concept – Mobile Station
Packet wise transmissionPulse-duration: 10 ns QPSK-TR signalling2 Pulses/frame QPSK -> 2 bit/FrameFrame = 220 ns Packet length = 2000 Symbols or 0.44ms
500 Acquisition and Training Symbols1500 Data Symbols
Packet rate 2.5 Hz
PulseGenerator
PulseGenerator
IQ-mod 1IQ-mod 1
I1
Q1
IQ-mod 2IQ-mod 2
I2
Q2
Att1Att1
Att2Att2
DelayDelay
DAC1DAC1
I1
DAC2DAC2
Q1
DAC3DAC3
I2
DAC4DAC4
Q2
Control UnitControl Unit
+
AmplifierOut
Bandpasfilter
9UWB4SN, 04-11-2005, EFPL, Lausanne
System Concept – Reference Station
0 20 40 60 80 100 120 140 160 180-5
-4
-3
-2
-1
0
1
2
3
4
5
Θ [°]
arg(U
1-U2)[r
ad]
2 GHz2.1 GHz2.2 GHz2.3 GHz2.4 GHz2.5 GHz2.6 GHz2.7 GHz2.8 GHz2.9 GHz 3 GHz
Demodulate packets & Determine Angle Of Arrival.
Port 2
Φθ
x
y
z
Port 1
Incident plane waves from φ=90° and 0°≤θ≤180°hit the antenna system
Phase difference of signal measured at the ports of the antenna system
10UWB4SN, 04-11-2005, EFPL, Lausanne
Implementation – Reference Station
Distr. PCB
Delayline
PositioningFinger
Comm.Finger
Baseband PCB
USB USB
PC IMSTADCs RX-FIFO
Data & Ctrl
Data & Ctrl
AGCPCB
Power Supply
DACs
Data & Ctrl
8 analog signals
6 bit
HF and Baseband
11UWB4SN, 04-11-2005, EFPL, Lausanne
Implementation – Reference Station
Data & Ctrl
Data & Ctrl
Power Supply
Data & Ctrl
8 analog signals
6 bit
HF and Baseband PCBs
12UWB4SN, 04-11-2005, EFPL, Lausanne
Implementation – Reference Station
AOASamples
COMSamples
Resampler
Resampler
Periodicaladdition
Find LOSand outputthe related
Phase
Phase2AOA
Channelestimation
WeightedSum
Combining
BarkerCode
QPSK offsetremoval
FrameSynchr QPSK2LLV
Viterbi+CRCcheck DLL
PPM offsetestimation
AOA plane
COM plane
ppm offset
Samples
Samples
2 pulseAOA PDP
WeightingCoefficients
IQ values
IQ values
IQ values
LLVchannel
bits
LLV
Info bits
AOAAOA
Barker CodeQPSK values
Signal Processing
13UWB4SN, 04-11-2005, EFPL, Lausanne
Project Results
Click here for Movieor here
http://www.centrum21.de/C21/de/inpos/gotomovie.html
14UWB4SN, 04-11-2005, EFPL, Lausanne
Thank you for your attention!
Info at: Info at: http://http://wwwwww.centrum21.de/.centrum21.de/
http://www.imst.dehttp://www.imst.de
rommeromme<at>imst.de<at>imst.de