A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ......
Transcript of A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ......
![Page 1: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/1.jpg)
ASCE Structural Conference
A DISCUSSION OF DOWNDRAG
AND DRAGLOAD:
DOES DRAGLOAD REALLY EXIST AND IF SO,
HOW DO WE DEAL WITH IT?
Aaron S. Budge, Ph.D., P.E.
Center for Transportation Research and Implementation
Minnesota State University, Mankato
![Page 2: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/2.jpg)
A LITTLE (MORE) ABOUT ME
• B.S. Utah State University - 1998
• M.S. Utah State University - 2000
• Ph.D. Utah State University and UT Austin – 2004
• Licensed Professional
Engineer in MN – 2009
• Sabbatical leave with Barr
Engineering and Minnesota
Department of Transportation
during 2012-2013 academic year
(“Triple Agent” status)
![Page 3: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/3.jpg)
TRIPLE AGENT???
• What are the major careers in Civil
Engineering?
– Public Sector (DOT, City Engr., County
Engr., Etc.)
– Private Sector (Consulting companies,
Etc.)
– Academia (University faculty,
researchers, etc.)
![Page 4: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/4.jpg)
TRIPLE AGENT???
• What have I been up to lately?
– All of the above!
– Barr Engineering – Geotechnical Discipline
Group
– MnDOT Consultant – Geotechnical Special
Projects
– And, on occasion, I still make it to campus!
![Page 5: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/5.jpg)
FUNDAMENTAL QUESTION #0:
(YES, Number Zero, not a typo…)
WHAT IS A GEOTECH DOING AT A
STRUCTURAL ENGINEERING
CONFERENCE?
![Page 6: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/6.jpg)
FUNDAMENTAL QUESTION #1:
WHAT IS DOWNDRAG?
Downward load at
pile top resisted by
upward skin friction
in soil layers and end
bearing at the pile toe
– USUALLY...
But, what if the soil
moves downward
with respect to the
pile???
![Page 7: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/7.jpg)
FUNDAMENTAL QUESTION #2:
IF IT EXISTS, HOW MUCH IS THERE?
MnDOT has funded several
studies to quantify the magnitude
of downdrag experienced at
several sites where settlement of
the foundation material with
respect to the piling was
anticipated (i.e., fill placed near
piles AFTER pile driving.)
So, how can we measure Rs1?
![Page 8: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/8.jpg)
FUNDAMENTAL QUESTION #3:
WHAT WOULD A “TYPICAL” LOAD
DISTRIBUTION LOOK LIKE?
(i.e. Static Load Test results, perhaps)
![Page 9: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/9.jpg)
![Page 10: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/10.jpg)
DOWNDRAG MONITORING BY
MINNESOTA DEPT OF TRANSPORTATION
Six projects completed to date (others ongoing):
• Crosstown Commons Expansion, BR 27V74
• Highway 169/CSAH 81 Interchange
Reconstruction, BR 27R20
• Forest Lake at Washington County 82 and
CSAH 2, BR 82527
• Highway 169/I-494 Interchange, BR 27V97
• Butterfield Bridge Addition, BR 83040
• Steele County Bridge at Owatonna,
BR 74551
![Page 11: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/11.jpg)
CROSSTOWN COMMONS EXPANSION
Sixteen inch CIPC piles instrumented prior to
driving (Geokon VW gages)
Instrumentation on one standard pipe pile and two
Teflon-coated piles
Gage placement from pile toe to near pile head
Multiple gages and/or cables damaged during
driving, leaving an incomplete data set, BUT…
![Page 12: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/12.jpg)
![Page 13: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/13.jpg)
![Page 14: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/14.jpg)
CROSSTOWN COMMONS EXPANSION
![Page 15: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/15.jpg)
CROSSTOWN COMMONS EXPANSION
![Page 16: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/16.jpg)
CROSSTOWN COMMONS EXPANSION
![Page 17: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/17.jpg)
CROSSTOWN COMMONS EXPANSION
![Page 18: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/18.jpg)
DOES DRAGLOAD EXIST?
Well, honestly, we don’t have a clear idea from
THIS project.
Limited data suggests POTENTIALLY more
dragload in the Teflon-coated piles relative to
the standard piles, but there isn’t adequate data
to truly compare the two.
However, a young researcher made some
significant strides in the instrumentation arena
and subsequent projects were more conclusive!
![Page 19: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/19.jpg)
HIGHWAY 169/CSAH 81 INTERCHANGE
RECONSTRUCTION
12.75 inch CIPC piles instrumented with sister bar
coil rod after driving (Geokon VW gages)
Instrumentation on one sleeved pipe pile and one
unsleeved pile (all other production piles also
sleeved)
Gage placement from pile toe to near pile head
![Page 20: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/20.jpg)
HIGHWAY 169/CSAH 81 INTERCHANGE
RECONSTRUCTION
![Page 21: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/21.jpg)
QUICK “ASIDE” - OPTIONS AVAILABLE TO
REDUCE NEGATIVE SKIN FRICTION?
• Bitumen Coating
• Plastic coating
• Teflon coating
• Pile sleeves
• Other
![Page 22: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/22.jpg)
HIGHWAY 169/CSAH 81 INTERCHANGE
RECONSTRUCTION
![Page 23: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/23.jpg)
HIGHWAY 169/CSAH 81 INTERCHANGE
RECONSTRUCTIONInstrumented
Sleeved PileInstrumented
Unsleeved Pile
![Page 24: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/24.jpg)
HIGHWAY 169/CSAH 81 INTERCHANGE
RECONSTRUCTION
![Page 25: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/25.jpg)
HIGHWAY 169/CSAH 81 INTERCHANGE
RECONSTRUCTION
![Page 26: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/26.jpg)
HIGHWAY 169/CSAH 81 INTERCHANGE
RECONSTRUCTION (FIRST 50 DAYS)
![Page 27: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/27.jpg)
HIGHWAY 169/CSAH 81 INTERCHANGE
RECONSTRUCTION (FIRST YEAR)
![Page 28: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/28.jpg)
HIGHWAY 169/CSAH 81 INTERCHANGE
RECONSTRUCTION (FIRST YEAR)
![Page 29: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/29.jpg)
HIGHWAY 169/CSAH 81 INTERCHANGE
RECONSTRUCTION
Unsleeved Sleeved
![Page 30: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/30.jpg)
LOAD PROFILE REGIONS
0 50 100 150 200 250 300
0
10
20
30
40
50
60
70
0 50 100 150 200 250 300
UnsleevedSleeved
• Region 1
![Page 31: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/31.jpg)
• Region 2
0 50 100 150 200 250 300
0
10
20
30
40
50
60
70
0 50 100 150 200 250 300
UnsleevedSleeved
LOAD PROFILE REGIONS
![Page 32: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/32.jpg)
• Region 3
0 50 100 150 200 250 300
0
10
20
30
40
50
60
70
0 50 100 150 200 250 300
UnsleevedSleeved
LOAD PROFILE REGIONS
![Page 33: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/33.jpg)
DOES DRAGLOAD EXIST?
This project got some attention!
Significant load accumulated in BOTH piles before
true “structural” loads were applied to the piles.
The sleeves seemed to reduce “dragload” in the fill
zone, but increases in pile load in the foundation
soil were present for both the sleeved and the
unsleeved piles.
![Page 34: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/34.jpg)
FOREST LAKE AT WASHINGTON
COUNTY 82 AND CSAH 2
Sixteen inch CIPC piles instrumented after driving
(Geokon VW gages)
Instrumentation on two piles, cap at grade
Gage placement from pile toe to near pile head
![Page 35: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/35.jpg)
FOREST LAKE AT WASHINGTON
COUNTY 82 AND CSAH 2
![Page 36: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/36.jpg)
FOREST LAKE AT WASHINGTON
COUNTY 82 AND CSAH 2
North (side hill) South (centerline)
![Page 37: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/37.jpg)
DOES DRAGLOAD EXIST?
Where is the maximum pile load? Convinced?
![Page 38: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/38.jpg)
HIGHWAY 169/I-494 INTERCHANGE
12.75 inch CIPC piles instrumented after driving
(Geokon VW gages)
Instrumentation on two piles
Gage placement from pile toe to near pile head
![Page 39: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/39.jpg)
North South
HIGHWAY 169/I-494 INTERCHANGE
![Page 40: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/40.jpg)
SAME QUESTION?
Where is the maximum pile load? Neutral Plane?
You have to admit, this is some nice data!
![Page 41: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/41.jpg)
BUTTERFIELD BRIDGE ADDITION
12.75 inch CIPC piles instrumented after driving
(Geokon VW gages)
Instrumentation on two piles (one static load test
pile, one reaction pile left unloaded!)
Gage placement from pile toe to near pile head
![Page 42: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/42.jpg)
BUTTERFIELD BRIDGE ADDITION
![Page 43: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/43.jpg)
SRP-2 SLT-5
(No top load applied!)
BUTTERFIELD BRIDGE ADDITION
![Page 44: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/44.jpg)
“DELTA”
BUTTERFIELD BRIDGE ADDITION
![Page 45: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/45.jpg)
STEELE COUNTY BRIDGE AT
OWATONNA
12x53 H-piles to bedrock, instrumented prior to
driving (Geokon VW gages, resistance gages and
fiber optic gages)
Instrumentation on one sleeved pile and one
unsleeved pile
Gage placement from pile toe to near pile head
Compressible clay overlays bedrock bearing layer
(IF DRAGLOAD EXISTS, THIS IS THE
PERFECT SCENARIO!!!)
![Page 46: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/46.jpg)
SPT N values from 5 to 12 in clay foundation material
Several percent strain predicted
![Page 47: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/47.jpg)
STEELE COUNTY BRIDGE AT
OWATONNA
![Page 48: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/48.jpg)
STEELE COUNTY BRIDGE AT
OWATONNA
![Page 49: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/49.jpg)
STEELE COUNTY BRIDGE AT
OWATONNA
![Page 50: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/50.jpg)
STEELE COUNTY BRIDGE AT
OWATONNA
![Page 51: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/51.jpg)
STEELE COUNTY BRIDGE AT
OWATONNA
![Page 52: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/52.jpg)
STEELE COUNTY BRIDGE AT
OWATONNA (SLEEVED PILE)
![Page 53: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/53.jpg)
STEELE COUNTY BRIDGE AT
OWATONNA
![Page 54: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/54.jpg)
CONCLUSIONS
Each project showed measureable dragload, with
load distributions in the instrumented piles
indicating maximum loads at depths well below
the pile head.
At multiple sites, significant pile loads were
measured (particularly at MSE wall sites) prior
to addition of structural loads (parapet walls,
bridge beams, etc.).
For one project (Butterfield) with an “unloaded”
pile, the impact of dragload was evident.
![Page 55: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/55.jpg)
CONCLUSIONS
At these sites, the magnitude of the measured
dragload was on the same order as the
anticipated structural loads, and more than would
be incorporated into design if dragload were
ignored. No structural or geotechnical
performance issues have been documented,
overall measured loads on the piles have in some
cases exceeded factored design loads.
![Page 56: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/56.jpg)
CONCLUSIONS
Several sites showed a distinct neutral plane, where
a reversal of skin friction confirms transition
from negative to positive skin friction.
![Page 57: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/57.jpg)
CONCLUSIONS
(FOR THE BUILDING FOLKS)
At least two of the bridge sites discussed showed
measureable dragloads with only a couple feet of
“working platform” fill material. It doesn’t take
much fill (or much relative downward movement
of the soil relative to the pile) to develop
negative skin friction.
Remember that fill is not the only way the effective
stress can increase (dewatering, etc.)
![Page 58: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/58.jpg)
SO, ASSUMING WE BELIEVE THAT
DRAGLOAD EXISTS…
Is it a problem?
When/how do we account for it?
When can we safely ignore it?
MnDOT dragload policy recently established
FHWA considering a degree of implementation!
![Page 59: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/59.jpg)
SUMMARY OF MnDOT
OBSERVATIONS/APPROACH AS
FOLLOWS:1) Dragload always occurs- but in most cases it is
so small as to not be measurable unless you are
looking for it.
2) The nominal geotechnical resistance is the same
with or without it, making it “mysterious”.
![Page 60: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/60.jpg)
SUMMARY OF MnDOT
OBSERVATIONS/APPROACH AS
FOLLOWS:3) Since the dragload later becomes available to
restrain top load, the MnDOT Bridge Office has
established they do not care if the pile is more
heavily loaded at the NP than other portions of
the pile; it can exceed what would otherwise be
allowable, as the total geotechnical capacity will
be unchanged even if the pile is “pre-stressed” or
“residually stressed”.
![Page 61: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/61.jpg)
SUMMARY OF MnDOT
OBSERVATIONS/APPROACH AS
FOLLOWS:4) Downdrag can most “practically” evidence itself
by some minor changes in the deformation
profile- but we haven’t been looking for it, so no
effects have been attributable to it to date.
![Page 62: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/62.jpg)
SUMMARY OF MnDOT
OBSERVATIONS/APPROACH AS
FOLLOWS:5) In most cases, except for piles in the most
compliant soup or when installed through
compressible soils bearing on the stiffest rock-
effects aren’t deleterious owing to relatively
large factors of safety applied in general to
protect against other performance problems.
![Page 63: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/63.jpg)
SUMMARY OF MnDOT
OBSERVATIONS/APPROACH AS
FOLLOWS:6) Dragload doesn’t so much “go away” with added
live-load, as an elaborate redistribution of load
and deformation occurs to re-establish
equilibrium in the soil-pile interaction profile
where different components of side friction and
end bearing mobilize, based on material stiffness
and non-linear behaviors along the pile column.
![Page 64: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/64.jpg)
SUMMARY OF MnDOT
OBSERVATIONS/APPROACH AS
FOLLOWS:7) And to “relieve dragload” you actually need to
add top load, so you are closer to geotechnical
strength limit failure, so don’t bother with that.
Money for coatings, sleeves, and other work-
arounds (other than perhaps use of spread
footings in-lieu of deep foundations) appear of
questionable worth.
![Page 65: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/65.jpg)
Derrick Dasenbrock
Dan Mattison
And several others!
MANY THANKS TO MY
COLLEAGUES AT MnDOT
![Page 66: A DISCUSSION OF DOWNDRAG AND DRAGLOAD · PDF fileA DISCUSSION OF DOWNDRAG AND DRAGLOAD: ... the MnDOT Bridge Office has ... footings in-lieu of deep foundations) appear of](https://reader031.fdocuments.net/reader031/viewer/2022021818/5aa771ea7f8b9a424f8c5348/html5/thumbnails/66.jpg)
QUESTIONS???