A DESIGN-BUILD PROJECT TECHNICAL PROPOSAL Odd Fellows Road Interchange at US Route 29/460 and Road Improvements along US Route 29/460 From: 0.6 Miles East of Candlers Mountain Road (Route 501 North) To: 0.5 Miles West of Campbell Avenue (Business Route 460/501) And Along Odd Fellows Road From: Top Ridge Road (Frontage Route 794) To: Lynchburg Expressway (Business Route 29/501) City of Lynchburg, Virginia State Project No.: 9999-118-240, R201, C501, B628 Federal Project No.: NH-5118(209) | Contract ID Number: C00105515DB78 Submitted to: Virginia Department of Transportation Submitted by: W.C. English, Inc. In association with: Parsons Brinckerhoff, Inc.

Transcript of A DESIGN-BUILD PROJECT TECHNICAL PROPOSAL Odd Fellows … · A DESIGN-BUILD PROJECT TECHNICAL...

  • A DESIGN-BUILD PROJECT

    TECHNICAL PROPOSAL

    Odd Fellows Road Interchange at US Route 29/460 and Road Improvements along US Route 29/460From: 0.6 Miles East of Candlers Mountain Road (Route 501 North) To: 0.5 Miles West of Campbell Avenue (Business Route 460/501) And Along Odd Fellows Road From: Top Ridge Road (Frontage Route 794) To: Lynchburg Expressway (Business Route 29/501) City of Lynchburg, Virginia State Project No.: 9999-118-240, R201, C501, B628 Federal Project No.: NH-5118(209) | Contract ID Number: C00105515DB78

    Submitted to: Virginia Department of Transportation

    Submitted by: W.C. English, Inc.In association with: Parsons Brinckerhoff, Inc.

  • 4.1 Letter of Submittal

  • 4.2 Attachments to the Letter of Subm

    ittal

  • 4.2.1 SOQ

    Confirmation

  • Page 34.2 AttAchments to the Letter of submittAL

    ODD FELLOWS ROAD INTERCHANGE at US Route 29/460 and Road Improvements Along US Route 29/460

    4.2.1 SOQ CONFIRMATION

    Per VDOT’s approval, two changes have been made to the Organizational Chart from that submitted in the SOQ:

    • Chris Moore, PE added to the Roadway discipline• Structural Discipline/Rex Gilley, PE added

    All other information contained in the SOQ remains true and accurate.

  • 4.2.2 Organizational Chart

  • Page 44.2 AttAchments to the Letter of submittAL

    ODD FELLOWS ROAD INTERCHANGE at US Route 29/460 and Road Improvements Along US Route 29/460

    ROAD

    WAY

    Mich

    elle

    Mar

    tin, P

    EJo

    seph

    Kor

    amCh

    ris M

    oore

    , PE

    TRAF

    FIC

    ENGI

    NEER

    ING

    (SIG

    NALS

    , TM

    P, M

    OT)

    Tim

    Ray

    ner,

    PE, P

    TOE

    Sure

    ndra

    Om

    kara

    m, P

    E, P

    TOE

    ROUN

    DABO

    UT

    DESI

    GN/A

    NALY

    SIS

    Jona

    than

    Rei

    d, P

    E, P

    TOE

    Tim

    Ray

    ner,

    PE, P

    TOE

    UTIL

    ITY

    DESI

    GN/

    UTIL

    ITY

    COOR

    DINA

    TION

    Gene

    Rut

    ledg

    e, P

    E

    HYDR

    AULI

    CSM

    eliss

    a Pr

    itcha

    rd, P

    EJu

    stin

    Lenn

    on, P

    E

    STRU

    CTUR

    ESRe

    x Gill

    ey, P

    E

    LAND

    SCAP

    ING

    Dave

    Pat

    ters

    on, R

    LA

    GEOT

    ECHN

    ICAL

    Ian

    Chan

    ey, P

    E

    ENVI

    RONM

    ENTA

    L PE

    RMIT

    TING

    Adam

    Meu

    rer,

    CHM

    M, P

    WS

    DESI

    GN Q

    CIn

    depe

    nden

    t Rev

    iewe

    rs

    VDOT

    PRE

    QUAL

    IFIE

    DFE

    E AP

    PRAI

    SER

    Crid

    er, B

    ouye

    , Elli

    ott

    VDOT

    PRE

    QUAL

    IFIE

    DRE

    VIEW

    APP

    RAIS

    ERAp

    prai

    sal R

    evie

    w Sp

    ecia

    lists

    VDOT

    PRE

    QUAL

    IFIE

    DRI

    GHT-

    OF-W

    AY M

    ANAG

    ERTi

    m C

    opel

    and,

    Jr.

    ENVI

    RONM

    ENTA

    L CO

    MPL

    IANC

    E M

    ANAG

    ERDo

    c Ham

    blen

    Brid

    ge S

    uper

    inte

    nden

    tM

    ark

    Hack

    ney

    QC M

    ANAG

    ERTo

    mm

    y Hal

    l

    QC IN

    SPEC

    TORS

    NXL,

    Inc.

    AMRL

    CER

    TIFI

    ED

    TECH

    NICI

    ANS/

    LAB

    NXL,

    Inc.

    DESI

    GN M

    ANAG

    ERDE

    SIGN

    QA/

    QCDe

    rek

    Pipe

    r, PE

    , AIC

    P

    CONS

    TRUC

    TION

    MAN

    AGER

    Darre

    ll Su

    lliva

    n

    QA IN

    SPEC

    TORS

    AMRL

    CER

    TIFI

    ED

    TECH

    NICI

    ANS/

    LAB

    ECS

    Mid

    -Atla

    ntic,

    LLC

    QA M

    ANAG

    ERJu

    lie P

    erko

    ski,

    PE

    SAFE

    TY M

    ANAG

    ERM

    ike

    Scot

    t

    DESI

    GN-B

    UILD

    PR

    OJEC

    T M

    ANAG

    ERJu

    dson

    Dal

    ton

    MOT

    MAN

    AGER

    Bran

    don

    Dodd

    s

    RAIL

    ROAD

    UTI

    LITY

    CO

    ORDI

    NATO

    RLa

    nder

    And

    erso

    n, Jr

    .

    KEY

    STAK

    EHOL

    DERS

    AND

    THIR

    D PA

    RTIE

    S

    City

    of L

    ynch

    burg

    , Lib

    erty

    Uni

    vers

    ity, N

    orfo

    lk

    Sout

    hern

    Rai

    lroad

    , Bra

    dley

    /Tho

    rnhi

    ll, L

    LC,

    Land

    Gro

    up, A

    Lim

    ited

    Partn

    ersh

    ip, G

    ener

    al

    Indu

    stry

    alo

    ng th

    e C

    orrid

    or

    PUBL

    IC IN

    VOLV

    EMEN

    T/PU

    BLIC

    REL

    ATIO

    NSJim

    Wrig

    ht

    LEGE

    ND

    W.C

    . Eng

    lish,

    Inc.

    Pars

    ons B

    rinck

    erho

    ff, In

    c.

    ECS

    Mid

    -Atla

    ntic,

    LLC

    NXL C

    onstr

    uctio

    n Co

    mpa

    ny, I

    nc.

    Pulsa

    r Adv

    ertis

    ing,

    Inc.

    Stan

    tec C

    onsu

    lting

    Ser

    vice

    s, In

    c.*

    Thom

    pson

    & Li

    tton

    *inclu

    ding A

    pprai

    sal R

    eview

    Speci

    alists

    , LLC

    /Crid

    er, Bo

    uye,E

    lliott

    SURV

    EYEr

    ic Ge

    ntry,

    LS

    KEY P

    ERSO

    NNEL

    D

    IRECT

    REPO

    RTIN

    G

    COM

    MUNI

    CATIO

    N

    VD

    OT AP

    PROV

    ED

    PE

    RSON

    NEL C

    HANG

    ES

  • Page 54.2 AttAchments to the Letter of submittAL

    ODD FELLOWS ROAD INTERCHANGE at US Route 29/460 and Road Improvements Along US Route 29/460

    The English team is structured to provide VDOT with a single point of contact, the Design-Build Project Manager (DBPM), Judson Dalton, who will be responsible for all design and construction activities and the overall management of a well-integrated team. Our reporting and functional relationships are described below and delineated on the Organizational Chart on the previous page. The English team organization has a straight-forward chain of command, with individual tasks, responsibilities, and functionalrelationshipsclearlyidentified.Further,adistinctseparationisshownbetweenconstructionandQA;includingtheseparationbetweentherespectiveQAandQCinspectionandfield/AMRL-certifiedlaboratorytestingfacilitiesinaccordancewiththeMinimum Requirements for Quality Assurance and Quality Control on Design Build and P3 Projects, January 2012. The Organizational Chart depicts VDOT and third parties, stakeholders, key personnel, support personnel, and their relationships and functions.

    AsapprovedbyVDOT,theOrganizationalCharthasbeenmodifiedtoincludetheadditionofaStructures discipline which will be led by Mr. Rex Gilley, PE, as well as supplementing the “Roadway” discipline with Mr. Christopher Moore, PE. Both Mr. Gilley and Mr. Moore are Virginia-licensed Professional Engineers with extensive experience in their respective disciplines.

    Functional Relationships and Communication among Participants, including Design and Construction Team Interaction throughout the project. The English team ascribes to the DBIA paradigm that “integrated development of the design and construction program is the cornerstone of DB delivery, and this methodology optimizes opportunities for collective excellence.” DB delivery carries with it a united team responsibility to gain a full understanding of the owner’s intentions and the factors that will drive value into the process and outcome. Put into practice, English’s DBPM, CM and construction personnel will interface with design counterparts from Parsons Brinckerhoff and Stantec’s right-of-way manager throughout the entire design and construction phases.

    Design–Construction Interface. The English team’s extensive DB experience has shown that a Task Force approach during the design stage and throughout project execution is critical to ensuring a successfulproject.LedbytheDBPM,theseregular,openforumsofdiscussionamongteammembersandVDOTtoaddressrespectiveprojectelementsservetoclearlydefineprojectcriteria,ensureVDOT’sintentions are being met, address corridor-wide constructability issues, and provide consistency in designbeforebecomingschedule-critical.Throughthisapproach,wecreateafirmrelationshipthatsets the foundation to interact and partner with VDOT and third-party stakeholders, streamline reviews, eliminatepotentialconstructionfieldissues,anddelivertheprojectsafely,ontime,andwithinbudget.

    4.2.2 ORGANIZATIONAL CHART AND KEY PERSONNEL

  • Page 64.2 AttAchments to the Letter of submittAL

    ODD FELLOWS ROAD INTERCHANGE at US Route 29/460 and Road Improvements Along US Route 29/460

    Role Design/Construction Interface

    Design-Build Project Manager(DBPM)Judson DaltonReports to VDOT

    - DB Team point of contact to VDOT. - Responsible for project design, permitting, R/W acquisition, utility relocation, construction, quality management and contract administration.

    - Directs DM, CM, and QAM - ChairsandmanagestheprojectTaskForces. - Responsible for overall project safety—design and construction.

    Quality Assurance Manager (QAM)Julie Perkoski, PEReports to DBPM

    - Independent from all construction operations. - Coordinates with the Design QA for DQMP compliance. - Interacts directly with the DBPM. - Authority to stop work on the project due to poor quality.

    Design Manager(DM) Derek Piper, PE, AICPReports to DBPM

    - Directs and coordinates the integration of design disciplines. - Responsible for the design schedule and overall design quality. - Through DBPM, coordinates with VDOT’s design review team. - Communicates with CM. - Collaborates with the R/W Manager during design development

    Construction Manager (CM)Darrell SullivanReports to DBPM

    - Coordinates with DM during design for constructability issues. - Manages and supervises all self-performed activities, MOT, E&S installation and maintenance, and all subcontractors.

    - Responsible for construction-related field issues.

  • 4.2.3 Conceptual Roadway Plans

  • Page 7

    ODD FELLOWS ROAD INTERCHANGE at US Route 29/460 and Road Improvements Along US Route 29/460

    4.2 AttAchments to the Letter of submittAL Page 7

    INTRODUCTIONTheOddFellowsRoadInterchangeandRoadImprovementsProject(theProject)representstheculmination of years of planning and design development to create a new interchange on US 29/460 at OddFellowsRoad.ThenewinterchangeandrelatedimprovementstoOddFellowsRoadwillprovidetheCitywithimprovedaccesstotheadjacentindustrialpark,LynchburgExpressway(US29Business)anddowntownLynchburg.TheimprovementstoOddFellowsRoadtocreateagatewaycorridorweredocumented in a Master Plan completed by the City in 2013.

    The English/Parsons Brinckerhoff Team has been closely pursuing this project for nearly two years. As such,weareveryfamiliarwithspecificelementsoftheproject,theon-goingcollaborationswithLibertyUniversity,andtheCity’splanstore-shapeOddFellowsRoadintoagatewaycorridorasaprimaryaccess.EnglishhasdeeprootsintheCityofLynchburgwithastrongdesiretoprovideVDOTwithaDesign/BuildteamthatcanmeetthespecificchallengesoftheProject.IndevelopingthisTechnicalProposal, the English/Parsons Brinckerhoff Team evaluated various alternative concepts in an effort to:

    • Ensureasafeandefficientconstructionworkzone,forboththetravelingpublicandconstructionstaff

    • Minimizetrafficimpactsduringconstruction• Exceed VDOT requirements for scope of work, quality, and schedule• Reduce initial construction cost and the duration of construction• Maintain access for existing businesses within the corridor

    TheEnglish/ParsonsBrinckerhoffTeamreviewedtheRFPConceptualPlansindetail.ForSegmentA,theplanswerefairlywelldevelopedwithasoliddesignthatdidn’trequiresignificantmodification.As discussed in the Proprietary Meeting, we evaluated various alternatives to reduce stream/wetland impacts in the interchange area, including lengthening the bridge over US 29/460 and using MSE walls. Afteradetailedanalysis,wesettledonmodifyingverticalgeometryofbothOddFellowsRoadandtheramps,inanefforttoreducethequantityoffillmaterialandthelimitsofdisturbance.

    ForSegmentB1,theRFPConceptualPlansprovidedbyVDOTwerenotnearlyasdevelopedasSegmentA.Again,wemodifiedverticalgeometry,primarilytotakeadvantageofthedesignexceptions/waiversnotedintheRFP.ForSegmentB1,wehaveincludedthesidewalkandsharedusepathonthe Conceptual Roadway Plans; however, including these elements will be determined based on acceptanceofthefinalscopealternativenotedinthePriceProposal.Further,wehadmodifiedthelocationoftheroundaboutatMayflowerDrivetominimizeimpactstoadjacentproperties.UponreceivingtheRFPAddendum,wehadtosignificantlymodifyouroriginaldesignfortheroundabouttofittheimprovementswithintheproposedRight-of-WaylinesprovidedbyVDOT,asshownwithintheConceptualRoadwayPlansincludedunderseparateattachment.Duringfinaldesign,wedointendtofurtherexploremodificationstotheroundaboutlayouttobestcomplywithNCHRP Report 672, Roundabouts: An Informational Guide, Second Edition.ModificationscouldinvolveshiftingthelocationoftheroundabouttoaccommodatetheexistingprofileofMayflowerDrive,butwithintheRight-of-WaylinespresentedontheRFPPlans,priortoAddendumNo.1.

    4.2.3 CONCEPTUAL ROADWAY PLANS

  • Page 8

    ODD FELLOWS ROAD INTERCHANGE at US Route 29/460 and Road Improvements Along US Route 29/460

    4.2 AttAchments to the Letter of submittAL Page 8

    As we developed the Conceptual Design Plans and prepared the Project Schedule and sequence of work, several concepts developed by our team clearly resulted in improvements, enhancements, less initialcost,andbenefitstothepublicandaffectedpropertyowners.ModificationstotheRFPPlansaredescribed below and presented on the Conceptual Roadway Plans in a separate volume and include the following:

    Segment A1. ModifiedthealignmentofOddFellowsRoad2. ModifiedtheprofileofOddFellowsRoadintheinterchangearea3. ModifiedtheprofilesforRampsA,B,C,andD.4. RevisedRampCstationingtobeginatStation10+00atOddFellowsRoadintersection5. Revised Ramp D stationing to begin at Station 10+00 along Route 29/4606. Modifiedthelocationandlayoutofstormwatermanagementfacilities

    Segment B11. ModifiedthealignmentofOddFellowsRoad2. RevisedtheOddFellowsRoadstationingtocontinue“upstation”fromSegmentA3. ExtendedMayflowerDriveconstructionlimitstoallowfortheprofiletie-inandroundabout

    design/construction to meet VDOT requirements

    In summary, the concept design presented on the Conceptual Roadway Plans prepared by the English/Parsons Brinckerhoff Team meets or exceeds the design criteria noted in the Technical Requirements, Attachment 2.2. Variations from the Geometric Design Criteria are limited to the design exceptions/waivers noted in Section 2.1.3 of the Technical Requirements. The limits of construction, including all stormwater management facilities, are within the existing/proposed Right-of-Way limits shown in the RFPPlans,withtheexceptionofpermanentandtemporaryeasements.

    4.2.3.1 | CONCEPTUAL ROADWAY PLANS

    The Conceptual Roadway Plans are included in a separate volume. AsrequiredperRFPPart1,Section 4.2.3, the Conceptual Roadway Plans include plans indicating general geometry including the number and width of lanes; horizontal alignments; typical sections of the roadway segments to include sidewalks, shared use path, retaining walls, and bridge structures; conceptual hydraulic and stormwater management design; proposed Right-of-Way limits (no differences in Right-of-Way are proposed from VDOT’sRFPConceptualRight-of-Waylimits);and,otherkeyProjectfeatures.Pleasenotethatthemaximum grade for all segments and connectors is presented as a table within this document. Proposed utilityimpactsarealsopresentedinatablewithinthisdocument.Finally,wehavenotincludedeasements for utilities, drainage, and construction, on the Conceptual Roadway Plans, as these will be fullydevelopedduringfinaldesign.

    GENERALGEOMETRY,HORIZONTALALIGNMENT,ANDTYPICALSECTIONSUS 29/460 – Improvements to US 29/460 are limited to the construction of auxiliary lanes along the existing eastbound and westbound alignment for connecting ramps, the construction of a bridge pier in

  • Page 9

    ODD FELLOWS ROAD INTERCHANGE at US Route 29/460 and Road Improvements Along US Route 29/460

    4.2 AttAchments to the Letter of submittAL Page 9

    the median, replacement of existing signs impacted by the Project, installation of new signs required for the new interchange, and pavement markings. Auxiliary lanes will be designed to meet the GS-5 geometric design criteria for 70 mph with rolling terrain. Auxiliary lanes will be a minimum of 12 feet wide, then transition to 16 feet for each ramp. Shoulder widths will vary between 14 and 17 feet (dependingoncutvs.fillandtheneedforguardrail),withthepavedportionof12feet.

    Ramps A, B, C, and D – The ramps will be designed to meet the GS-R geometric design criteria for 35 mph minimum with rolling terrain. The ramp pavement width will be 16 feet, while shoulder and paved shoulder widths will vary depending on the need for guardrail.

    OddFellowsRoad–ImprovementstoOddFellowsRoadwillbedesignedtomeetGS-6geometricdesigncriteriafor35mphwithrollingterrain.ThetypicalsectionforOddFellowsRoadvariesthroughthe length of the Project, from a three-lane section with and without a median, to a four-lane section with a concrete median for the bridge over US 29/460, all with minimum 12-foot lanes and VDOT standard CG-6 curb on the outside and VDOT CG-2 median curb, where indicated. The Conceptual Design was developed to accommodate a 10-foot wide shared use path and a 5-foot sidewalk.

    MayflowerDrive–ImprovementstoMayflowerDrivetoaccommodatethenewroundaboutwillbedesigned to meet GS-6 geometric design criteria for 35 mph with rolling terrain. The typical section for MayflowerDriveincludes12-footminimumtravellanesandVDOTstandardCG-6curbontheoutsideand was developed to accommodate future sidewalks.

    Top Ridge Road – Improvements to Top Ridge Road to accommodate the new roundabout will be designed to meet GS-8 geometric design criteria for 30 mph with rolling terrain. The typical section for Top Ridge Road includes 13-foot minimum travel lanes and VDOT standard CG-6 curb on the outside and was developed to accommodate future sidewalks.

    MAXIMUM GRADESThe maximum grades anticipated for all segments and connectors are presented in the table to the left.

    CONCEPTUALHYDRAULICANDSTORMWATERMANAGEMENTDESIGNThe English/Parsons Brinckerhoff Team has investigated VDOT stormwater and drainage requirements for the Project. As part of Conceptual Design, we have developedthemostefficientdesignpossible while minimizing waste, impacts totheenvironment,andtrafficdisruption.

    Segment/Connector Maximum GradeRoute 29/460 3.41%Ramp A 2.59%Ramp B 5.98%Ramp C 6.00%Ramp D 5.76%OddFellowsRoad(SegmentA) 8.00%OddFellowsRoad(SegmentB1) 9.86%*MayflowerDrive 7.32%Top Ridge Road 9.25%

    *Permitted at one location, per Design Exception No. 2

  • Page 10

    ODD FELLOWS ROAD INTERCHANGE at US Route 29/460 and Road Improvements Along US Route 29/460

    4.2 AttAchments to the Letter of submittAL Page 10

    Roadway Drainage and Stormwater Management

    Segment A – Odd Fellows Road and US 29/460 InterchangeTakingintoaccounttheexistingconditionsandnaturalflowofthestormwaterinthissegmentoftheProject,wehaveidentifiedwaystosimplifyandimproveuponthedrainagelayoutpresentedintheRFPConceptual Plans to minimize the installation of new piping, reduce stream impacts, and eliminate the need to jack and bore new stormwater piping under US Route 29/460. Discharges from the forested hillssouthofUSRoute29/460areconveyedprimarilythroughditchesandnorthtoFishingCreektributary via existing stormwater conduits. Additional impervious areas created by Ramps A/B and OddFellowsRoadsouthofUSRoute29/460areconveyedthroughstormwaterbasinsanddischargedthroughexistingconduitstothestreamsystem.ImpactstotheFishingCreektributarywereminimizedto the maximum extent possible. Three culverts are to be installed under new roadway sections (Odd FellowsRoad,RampDandRampC)toallowforfreeflowoftherelocatedstream.Fivebasinswerecreated to reduce the discharges into the stream, caused by additional impervious areas as described below. The English/Parsons Brinckerhoff Team has utilized the current versions of VDOT Drainage ManualandtheVirginiaStormwaterManagementHandbook(DCR,1999)tomeetthephosphorusremoval rate requirements for stormwater management for the Project.

    ThisprojectisconsideredgrandfatheredbytheVSMPauthorityasdefinedin9VAC25-870-48,andissubject to the technical criteria of Part II, Section C of the state stormwater regulations. All stormwater management facilities are located in Segment A of the project. Phosphorus reduction requirements for Segment B1 are combined with the reduction requirements in Segment A. To meet the combined reduction requirements of Segments A and B1 of the Project, the English/Parsons Brinckerhoff Team intendstodesignandconstructfivestormwatermanagementfacilitieswithinVDOT’sProposedRight-of-Way for Segment A, as presented on the Conceptual Roadway Plans. Doing so, we are able to treat the anticipated 12.91 pounds per year produced from the additional impervious area in the James River watershedcreatedbythisProject.Fourofthefacilitieswillbeenhancedextendeddetentionbasinswithpollutantremovalcapacityof50%,andthefifthfacilitywillbeanextendeddetentionbasinwithapollutant removal capacity of 35%. Three of the basins are located between Ramps A, B, and D and US Route 29/460. Because of the presence of existing wetlands, there is no basin between Ramp C and US Route29/460.TheothertwobasinsarelocatednorthwestofRampCandnorthofOddFellowsRoad.

    Section B1-Odd Fellows Road Roadway ImprovementsDrainageimprovementsforOddFellowsRoadfromtheinterchangetoMayflowerDrive(SegmentB1)will consist of a combination of curb inlets and closed conduit systems. Designs for the system will be completed in accordance to the VDOT Drainage Manual. Since Segment B1 road improvements consists of implementing curb and gutter, the bulk of the drainage facilities required will consist of inlets placed along the curb and gutter, connected to a closed storm sewer system. The closed system drainage pipe will convey stormwater to existing receiving channels which were analyzed to be adequate for the additionalflow.Flowsfrompropertiesadjacenttotheroadwereanalyzed,andwherenecessary,yardinlets were added to convey water from these properties to the new closed storm sewer system. There are no new cross culverts in our design concept. Existing cross culverts were analyzed and determined tobeabletohandleadditionalflow.Thoughtheconditionsofthesepipeshavenotbeennotedasbeingindisrepair,theywillbeinspectedduringconstructiontoconfirmthepipesareingoodcondition.Thereare no existing or proposed stormwater management facilities in Segment B1. To meet stormwater

  • Page 11

    ODD FELLOWS ROAD INTERCHANGE at US Route 29/460 and Road Improvements Along US Route 29/460

    4.2 AttAchments to the Letter of submittAL Page 11

    managementrequirementsforbothSegmentsofthisProject,fivenewstormwatermanagementfacilitieswere included in Segment A as noted described above.

    PROPOSEDUTILITYIMPACTS

    Utility OwnerUtility Description Approximate Location

    Conflict (Known or Potential) Corrective Action

    OVERHEADPOWERANDOVERHEADCOMMUNICATIONSAppalachian Power (AEP)

    OddFellowsRoad

    EastfromMayflowerDr.LocatedinROWonsouthside of road STA 220 – 249

    Polesinconflictwithproposed multi-purpose path

    Coordinate with AEP to design and relocate 2900 feet ofOHEandassociatedpoles.Replace service connections impacted by relocated poles

    UNDERGROUNDCOMMUNICATIONSUnderground Telephone/FiberOptic

    Outside existing ROW. Inside proposed ROW along east side of US 29/460 eastbound

    400 feet in cut sections of Ramps A and B (200 feet under each)

    Obtain utility easement. CoordinatewithT/FOcompany to design and relocate lines to avoid conflicts.

    Underground CATV

    OddFellowsRoadeastfromMayflowerDr.LocatedinROWonsouthside of road

    Potentialconflictswithproposed curb & gutter and stormwater

    Coordinate with CATV company to design and relocate 3500 feet underground CATV as necessarytoavoidconflicts

    Underground Telephone

    OddFellowsRoadeastfromMayflowerDr.LocatedinROWonsouthside of road

    Potentialconflictswithproposed curb & gutter and stormwater

    Coordinate with Telephone company to design and relocate 3500 feet underground T/Tg as necessarytoavoidconflicts

    Underground Telephone

    OddFellowsRoadrunning west from MayflowerDr.inROWalong south side of Odd FellowsRoad

    Potentialconflictswithproposed roundabout, curb & gutter and stormwater

    Coordinate with Telephone company to design and relocate 300 feet underground T/Tg as necessary to avoid conflicts

    UndergroundFiberOptic

    OddFellowsRoadeastfromMayflowerDr.LocatedinROWonsouthside of road

    Potentialconflictswithproposed curb & gutter and stormwater

    Coordinate with Communications company to design and relocate 3500 feetundergroundT/FOasnecessarytoavoidconflicts

    UndergroundFiberOptic

    OddFellowsRoadrunning west from MayflowerDr.inROWalong south side of Odd Fellows

    Potentialconflictswithproposed roundabout, curb & gutter and stormwater

    Coordinate with Communications company to design and relocate 300 feetundergroundT/FOasnecessarytoavoidconflicts

  • Page 12

    ODD FELLOWS ROAD INTERCHANGE at US Route 29/460 and Road Improvements Along US Route 29/460

    4.2 AttAchments to the Letter of submittAL Page 12

    Utility OwnerUtility Description Approximate Location

    Conflict (Known or Potential) Corrective Action

    GAS4” Columbia Gas line

    Running north on MayflowerDr.toOddFellowsRoadwhereittees off into (2) 2” gas linesalongOddFellows(one east and one west). LocatedinROWonwestsideofMayflowerDrive

    Potentialconflictswithproposed roadway and stormwater construction

    Coordinate with Columbia Gas company to relocate gas lines as necessary to avoid conflicts

    2” Columbia Gas line

    OddFellowsRoadeastfromMayflowerDr.LocatedinROWonsouthside of road

    Potentialconflictswithstormwater and anticipated relocation of other UG utilities along south side of OddFellowsRd.

    Coordinate with Columbia Gas company to relocate gas lines as necessary to avoid conflicts

    2” Columbia Gas line

    OddFellowsRoadwestfromMayflowerDr.LocatedinROWonsouthside of road

    Potentialconflictswithstormwater

    Coordinate with Columbia Gas company to relocate gas lines as necessary to avoid conflicts

    12” Columbia Gas

    high pressure line

    In easement along east side of US 29/460 eastbound

    650 feet of 12” gas in cut section

    Coordinate new easement for Columbia Gas. Coordinate design and relocation of 650 feet of 12” welded steel high pressure gas line

    WATER8” Water OddFellowsRoadeast

    fromMayflowerDr.LocatedinROWonsouthside of road

    STA 220 - STA 224

    400LF8”W–andFireHydrants-Potentialconflictswithproposedcurb & gutter and stormwater

    Coordinate with City of Lynchburgtodesignandrelocate 400 feet of 8” water line as necessary to avoid conflicts

    12” Water MayflowerDr.runningnorth/south through intersection with Odd FellowsRoad

    Potentialconflictswithproposed roundabout, curb & gutter and stormwater

    Coordinate with City of Lynchburgtodesignandrelocate 350 feet of 12” water line as necessary to avoid conflicts

  • Page 13

    ODD FELLOWS ROAD INTERCHANGE at US Route 29/460 and Road Improvements Along US Route 29/460

    4.2 AttAchments to the Letter of submittAL Page 13

    Utility OwnerUtility Description Approximate Location

    Conflict (Known or Potential) Corrective Action

    12” Water OddFellowsRoadrunning west from MayflowerDr.inROWalong south side of Odd FellowsRd.

    Potentialconflictswithproposed roundabout, curb & gutter and stormwater

    Coordinate with City of Lynchburgtodesignandrelocate 450 feet of 12” water line as necessary to avoid conflicts

    SANITARYSEWER8” Sanitary Sewer OddFellowsRoadeast

    fromMayflowerDr.LocatedinROWonnorthside of road

    STA 220 – STA 226

    Potentialconflictswithproposed curb & gutter and stormwater

    Coordinate with City of Lynchburgtodesignandrelocate 600 feet 8” sanitary sewer as necessary to avoid conflicts

    8” Sanitary Sewer OddFellowsRoadSTA238 to STA 241

    Potentialconflictswithproposed curb & gutter and stormwater

    Coordinate with City of Lynchburgtodesignandrelocate 300 feet of 8” sanitary sewer as necessary to avoidconflicts

    8” Sanitary Sewer MayflowerDr.runningnorth/south through intersection with Odd FellowsRoadLocatedin ROW on north side ofMayflowerDr.approaching intersection

    Potentialconflictswithproposed roundabout, curb & gutter and stormwater

    Coordinate with City of Lynchburgtodesignandrelocate 200-400 feet of 8” sewer as necessary to avoid conflict

    8” Sanitary Sewer OddFellowsRoadrun-ningwestfromMayflowerDr. in ROW along north sideofOddFellowsRoad

    Potentialconflictswithproposed roundabout, curb & gutter and stormwater conduits

    Coordinate with City of Lynchburgtodesignandre-locate 400 feet of 8” sewer as necessarytoavoidconflict

  • Page 14

    ODD FELLOWS ROAD INTERCHANGE at US Route 29/460 and Road Improvements Along US Route 29/460

    4.2 AttAchments to the Letter of submittAL Page 14

    OTHERKEYPROJECTFEATURESRoundaboutatMayflowerDrive–TheproposedpavementfortheroundaboutatMayflowerDrivewillbe designed and constructed as a 100-foot inscribed circle single lane roundabout in accordance with NCHRP Report 672, Roundabouts: An Informational Guide, Second Edition. Pavement markings, signage and channelization devices will be employed to provide positive lane control through the roundabout in accordance with the 2009 MUTCD. As noted above, the Conceptual Roadway Plans include the roundabout located within the Right-of-Way lines provided by VDOT as part of Addendum No.1.Duringfinaldesign,wedointendtofurtherexploremodificationstotheroundaboutlayout,tobest comply with NCHRP Report 672, Roundabouts: An Informational Guide, Second Edition. Such wouldinvolveshiftingthelocationoftheroundabouttoaccommodatetheexistingprofileofMayflowerDrive,butstillwithintheRight-of-WaylinespresentedontheoriginalRFPPlans(priortoAddendumNo.1).SuchashiftwouldbothreduceimpactsandallowfortwopointsofaccesstobemaintainedtotheFleetpridecommercialbusinessproperty,locatedinthenortheastcorneroftheintersection.

    RoadwayLighting–TheEnglish/ParsonsBrinckerhoffTeamwilldesignandconstructacontinuouslightingsystemalongOddFellowsRoadinSegmentsAandB1.WerecognizethatthelightingsystemisrequiredwithinSegmentB1,asmitigationforDesignExceptionNo.3.ImplementingaroadwaylightingsystemfortheentireOddFellowsRoadcorridorwillenhanceProjectoperationalsafety.Wewill design the lighting system using VDOT’s standard computer lighting design software, AGI32, to ensure proper illuminance levels and ratios in accordance with VDOT requirements. Of course, the lightingwillextendthroughthelimitsoftheroundaboutatMayflowerDrive,toproperlyilluminateallapproaches.

    4.2.3.2 | CONCEPTUAL STRUCTURAL PLANS

    The Conceptual Structural Plans are included in a separate volume. Descriptions of these Conceptual BridgePlansanddetailsregardingenhancementsmadetotheRFPPlansthatmeetand/orexceedprojectrequirements are as follows:

    ODDFELLOWSROADOVERROUTE29/460Typical Section–ThetypicalsectionisconsistentwiththeRFPPlansandprovidesone(1)12’-0”widetravel lane and one (1) 13’-0” wide left-turn lane in both the northbound and southbound directions. In the northbound direction, an offset of 4’-0” is provided between the travel lane and the standard VDOT BR27 barrier, 3’-6” tall (along the east edge of the bridge), making the total northbound roadway width equal to 29’-0”. In the southbound direction, an offset of 2’-0” is provided between the travel lane and theraisedsidewalk/sharedusepath,makingthetotalsouthboundroadwaywidthequalto27’-0”.Nooffset is required between the left-turn lanes and the raised concrete median. The raised concrete median is6”highand4’-0”wide,andiscenteredontheOddFellowsRoadConstructionBaseline.Theraisedconcrete sidewalk/shared use path is 6” high at the roadway gutter line and is 17’-6” wide. Due to the width of the sidewalk/shared use path, a barrier separation is not required between the sidewalk/shared usepathandthevehiculartraffic.AstandardVDOTBR27barrier,4’-6”tall,isprovidedattheoutsideedge of the sidewalk/shared use path (along the west edge of the bridge). Also provided along the west edgeofthebridgeisastandardVDOTBPF-5,TypeBPedestrianFence,whichisrequiredbyVDOTfor

  • Page 15

    ODD FELLOWS ROAD INTERCHANGE at US Route 29/460 and Road Improvements Along US Route 29/460

    4.2 AttAchments to the Letter of submittAL Page 15

    bridgescarryingpedestriantrafficoverfreeways.PerSection2.2oftheprojectRFP,Route29/460isfunctionallyclassifiedasanUrbanPrincipalArterial(Freeway).Theoverallwidthofthetypicalsectionis 79’-8” out to out.

    Structure Span/Type – The proposed structure consists of eight (8) prestressed concrete PCBT-77 beams spaced at 10’-6” on center and made composite with a 9” thick reinforced concrete deck slab. The span arrangement will be two (2) equal spans at 140’-0”, for a total bridge length (end of slab to end of slab) of 280’-0”. Abutments will be full integral type behind MSE walls, and will be supported by a single rowofsteelH-pilesontheirweakaxis.ThepierwillbelocatedinthemedianofRoute29/460soasnottoprecludethefuturewideningofUSRoute29/460,aspertherequirementsoftheRFPTechnicalRequirements Section 2.3.1, and will be supported on a spread footing.

    Finishes–PerSection2.3.9oftheRFPTechnicalRequirements,bothsidesofthebridgetrafficbarrierand terminal walls will receive architectural treatment (rustic brick). Per VDOT requirements, the standardbridgebarriersdiscussedabovewillbemodifiedasfollows:anadditional1”reliefwillbeprovidedontheinside(trafficside)faceandanadditional2”reliefwillbeprovidedontheoutside(non-traffic)face.Asaresult,thewidthofthestandardVDOTbarrierswillbeincreasedfrom10”to13”.Theconcretetrafficbarriersandterminalwallswillbecolor-coatedusingFederalColorNo.23617.ThesteelrailingandpedestrianfencewillbecoatedblackpertheprojectRFPTechnicalRequirements.MSE walls in front of the abutments will not receive architectural treatment, but will be color-coated to matchthetrafficbarriers.Decklightingmaybeprovidedonthebridgeifdeterminednecessaryduringfinaldesign.Ifdecklightingisneeded,standardVDOTlightpoleblisterswillbeprovidedontheback(non-traffic)sideoftheBR27barriers.Preliminaryhydrauliccalculationsshowthatbridgedeckdrainage is not required. Standard VDOT inlets will be provided just beyond the north end of the bridge.

    Construction Impacts, Safety and Operational Considerations – Since there is currently no bridge carryingtrafficoverRoute29/460andthisportionofOddFellowsRoadwillbeclosedduringconstruction, the bridge will be built in one piece (phased construction is not required). The locations of thesubstructureunitshavebeenselectedsuchthatbarrierpierprotection(TL-5barrier)isnotrequiredfor the proposed condition, nor the future condition where additional 12’-0” wide lanes are added to the eastbound and westbound directions of Route 29/460. A minimum horizontal clearance of 30’-0” from the edge of travelled lane to the face of Pier/MSE Wall will be maintained for both the present and future laneconfigurations.

  • 4.2.4 Proposal Schedule

  • ODD FELLOWS ROAD INTERCHANGE at US Route 29/460 and Road Improvements Along US Route 29/460

    4.2 AttAchments to the Letter of submittAL Page 16

    4.2.4.1 Proposal ScheduleThe Proposal Schedule is included under separate cover as an Attachment to this Technical Proposal.

    4.2.4.2 Odd Fellows Road Schedule Narrative

    Contract Milestones

    Activity ID Activity Name Activity Type Activity Status PlannedStartPlannedFinish

    Odd Fellows Drive Proposal Schedule Project Milestones

    0005 NTP Start Milestone NotStarted 18-Feb-150007 FinalCompletion FinishMilestone NotStarted 03-Aug-180016 Contract Award FinishMilestone NotStarted 18-Feb-15

    Overall Project PlanThe English/Parsons Brinckerhoff Team’s schedule and price is based on the following plan and phasing fortheOddFellowsRoadProject:DesigneffortswillbeginimmediatelyafterNTPtoestablishfinalgeometryandallowforutilitycoordinationnecessarytoestablishfinalright-of-wayandtemporary/permanenteasements.Right-of-wayacquisitionwillcommenceuponVDOTapprovaloftheFinalRight-of-Way Plans and authorization to commence acquisition. All activities for design, environmental approvals/permitting, utility relocation, and right-of-way acquisition have been detailed in the Proposal Schedule, so that they can be properly managed and tracked to facilitate early construction activities. TheOddFellowsRoadInterchange(SegmentA)willbecontainedwithinitsownworkbreakdownstructure, showing the areas of work subdivided further to include the bridge construction and work both northandsouthofUS29/460.TheimprovementstoOddFellowsRoadfromSegmentAtoMayflowerDrivetoincludearoundaboutatMayflowerDrive(SegmentB1)willbecontainedwiththeirownwork breakdown structure, further subdivided to show the proper MOT phasing, outlined below, and the90dayshutdownoftheOddFellowsRoad/MayflowerDriveintersection.PhaseIwillconsistofmaintainingalltrafficmovementsandwideningonthenorthsidewhilesubsequentphaseswillutilizenewlyconstructedandwidenedportionsofallroadways.Finally,thelastphaseofworkwillincludethesurfacepavement,finalpavementmarkings,landscaping,andtheconstructionofanyareanotavailableforconstructionintheearlierphasesduetoexistingtrafficconstraintsandtransitions.TheMOTphasingwillbefurtherrefinedduringthedesignphasetooptimizeproductivity,maintainaccesstoadjacent businesses, and reduce impacts to the traveling public.

    Detailed Project Plan for Initial 120 DaysAfterNoticetoProceed,thenoticeofintenttoenterandprojectsurveyswillcommenceimmediatelytoinitiatefinaldesign.Theright-of-wayacquisitionprocesswillalsobeginwhilepublic/privateutilityrelocationplansareinfinaldevelopment.PhaseIenvironmentalsiteassessmentsandreportsalong

    4.2.4 PROPOSAL SCHEDULE

  • ODD FELLOWS ROAD INTERCHANGE at US Route 29/460 and Road Improvements Along US Route 29/460

    4.2 AttAchments to the Letter of submittAL Page 17

    with geotechnical exploration and testing will lead to effective environmental management and quality assurance and control measures.

    Project Critical Path based on “Longest Path”TheprojectcriticalpathcommenceswiththeNoticetoProceedandcontinuesthroughsettingright-of-wayandeasementsnecessarytodevelopFinalRight-of-WayPlansforVDOTreviewandapproval.Thecritical path then proceeds through VDOT’s formal notice of authorization to commence right-of-way acquisition, then through the acquisition process. Upon the completion of right-of-way acquisition, the critical path then proceeds through utility relocations and the construction phases along existing Odd FellowsRoad(SegmentB1).

    Construction Phasing

    Segment A - Odd Fellows Road Interchange:The intent for the new interchange will be to construct it in one phase, to include the bridge construction andallworknorthandsouthofUS29/460NoworkwillbeperformedonexistingUS29/460other than ramp tie-ins, new/replacement signage, and pavement markings. As right-of-way and resourcesallow,wewillconstructOddFellowsRoadmainlineroadwaystoincludeallerosionandsedimentcontrols,clearingandgrubbing,stormdrainage,grading,abutmentfillsandMSEWalls,utility relocations, sewer and waterline activities, underdrain, stone placement, asphalt to include the intermediate pavement, lighting, curb and gutter, sidewalk and multi-use path, signage, and the roundabout at Top Ridge Road. The bridge construction will begin in the median of US 29/460 with theconstructionofthepierwhiletheapproachfillsandMSEwallsareunderconstruction.Oncetheapproachfillsareinplace,thebridgeconstructionwillcontinuewithabutmentconstructionandthenfinallythesuperstructureconstruction.Aspossible,thebridgeconstructionactivitieswillproceedconcurrentlywithallothergradingoperationsforSegmentA.Thefinalsurface,pavementmarkings,and signage will be completed in concert with those like operations for Segment B1, outlined below.

    Segment B1 – Odd Fellows Road (from Segment A thru Mayflower Drive):Phase I:TheintentistomaintainvehiculartrafficontheexistingpavementalongOddFellowsRoadduring Phase I, while the widening is constructed adjacent to the existing roadway. The construction included in Phase I would include all erosion and sediment controls, clearing and grubbing, storm drainage, grading, utility relocations, sanitary sewer, underdrain, stone placement, asphalt to include the intermediate pavement, underground lighting components, curb & gutter, signage, and temporary pavement markings.

    Phase II:DuringPhaseII,trafficwouldbeplacedonthenewpavementutilizingtemporarypavementmarkingsinthenewtrafficpattern.NewconstructionwillincludethewideningonthesouthsideoftheOddFellowsRoad,includingallerosionandsedimentcontrols,anyremaining

  • ODD FELLOWS ROAD INTERCHANGE at US Route 29/460 and Road Improvements Along US Route 29/460

    4.2 AttAchments to the Letter of submittAL Page 18

    clearingandgrubbing,limitedstormdrainage,massandfinegrading,utilityrelocations,underdrain, stone placement, asphalt to include the intermediate pavement, underground lighting components, curb and gutter, signage, and temporary pavement markings.

    Phase III:DuringPhaseIII,trafficwouldbeplacedonthenewpavement,constructedinPhaseIandII,utilizingthetemporarypavementmarkingsinthenewtrafficpattern.Newconstructionwillincludetheconstruction/reconstructionofanyremainingportioninthemiddleofOddFellowsRoadthatwerenotavailableforconstructionduringPhaseIorIIduetotrafficpatternsandmaintenanceoftrafficrequirements,andtoincludethefinalconstructionoftheroundaboutatMayflowerDrive,duringthe90dayintersectionclosure.Thisworkwouldincludelimitedstormdrainage,massandfinegrading,stoneplacement,asphalttoincludetheintermediatepavement,some median curb and gutter, and truck apron for the roundabout.

    Phase IV:PhaseIVwouldincludeallsurfacepavement,finalpavementmarkings,finallighting,andfinalsignage. This work will be performed concurrently with any other phase, as maintenance of trafficallows.

    Significant Submittal and Fabrication Items

    Activity ID Activity Name Original DurationStart Finish

    A11110 LightingPolesandFixturesFabrication and Procurement

    90 28-Jul-15 25-Oct-15

    A13680 BridgeGirdersFabricationandProcurement 60 31-Oct-15 29-Dec-15

    A13720 MSE Walls Fabrication and Procurement 90 31-Oct-15 28-Jan-16

    Work ShiftsEnglish’s normal work schedule is based on a single 10 hour shift per day, 7:00 am through 5:30 pm, fivedaysperweek.However,thesetimesareflexibleandwillbemodifiedasthedemandsofthejobdictate, as the time of year allows and to include activities that will require night operations. All work timeswillbeincompliancewiththeWorkHourRestrictionsoutlinedinPart2,Section2.10.2oftheRFP.

    Work Calendars5-Day (Includes Holidays):Thiscalendarisbasedonafive-daywork-weekwithholidaysconsiderednon-workdays.Thiscalendaris used for activities that are constrained by weekends and holidays.

  • ODD FELLOWS ROAD INTERCHANGE at US Route 29/460 and Road Improvements Along US Route 29/460

    4.2 AttAchments to the Letter of submittAL Page 19

    7-Day:This calendar is based on seven days per week. This calendar is used for review activities and concrete curing.

    Asphalt:Thiscalendarisbasedonafive-daywork-weekwithholidaysconsiderednon-workdaysandweatherdaysincorporatedusinga30-yearweathermeancompiledfromNationalOceanicandAtmosphericAdministration(NOAA).Thiscalendarisusedforactivitiesthatneedtobeconstrainedbyweatherandcold temperatures.

    Weather:Thiscalendarisbasedonafive-daywork-weekwithholidaysandcoldweatherconsiderednon-workdaysandweatherdaysincorporatedusingthe30-yearweathermeancompiledfromNOAA.Thiscalendar is used for any activity that can be affected by weather.

    Holidays:Thenon-workingholidaysincorporatedintotheworkingscheduleareasfollows:NewYear’sDay,MartinLutherKingJr.Day,FridaybeforeEaster,MemorialDay,IndependenceDay,LaborDay,Thanksgiving Day, the day after Thanksgiving, and Christmas.

  • Appendix

  • Attachment 4.0.1.1: Technical Proposal Checklist and Contents

  • ATTACHMENT 4.0.1.1

    ODD FELLOWS ROAD INTERCHANGE AT US ROUTE 29/460 AND ROAD IMPROVEMENTS

    TECHNICAL PROPOSAL CHECKLIST AND CONTENTS

    1 of 2

    Offerors shall furnish a copy of this Technical Proposal Checklist, with the page references added, with the Technical Proposal.

    Technical Proposal Component Form (if any) RFP Part 1

    Cross Reference Page

    Reference

    Technical Proposal Checklist and Contents Attachment 4.0.1.1 Section 4.0.1.1 Appendix

    Acknowledgement of RFP, Revisions, and/or Addenda Attachment 3.6

    (Form C-78-RFP) Sections 3.6, 4.0.1.1 Appendix

    Letter of Submittal NA Sections 4.1 1

    Letter of Submittal on Offeror’s letterhead NA Section 4.1.1 1

    Offeror’s official representative information NA Section 4.1.1 2

    Authorized representative’s original signature NA Section 4.1.1 2

    Declaration of intent NA Section 4.1.2.1 1

    120 day declaration NA Section 4.1.2.2 1

    Point of Contact information NA Section 4.1.2.3 2

    Principal Officer information NA Section 4.1.2.4 2

    Final Completion Date NA Section 4.1.2.5 2

    Written statement of percent DBE participation NA Section 4.1.2.6 2

    Proposal Payment Agreement or Waiver of Proposal Payment

    Attachment 4.1.3(a) or 4.1.3(b) Section 4.1.3 Appendix

    Certification Regarding Debarment Forms Attachment 11.8.6(a) Attachment 11.8.6(b) Section 4.1.4 Appendix

  • ATTACHMENT 4.0.1.1

    ODD FELLOWS ROAD INTERCHANGE AT US ROUTE 29/460 AND ROAD IMPROVEMENTS

    TECHNICAL PROPOSAL CHECKLIST AND CONTENTS

    2 of 2

    Technical Proposal Component Form (if any) RFP Part 1

    Cross Reference Page

    Reference

    Attachments to the Letter of Submittal NA Section 4.2 3

    Confirmation that the information provided in the SOQ submittal remains true and accurate NA Section 4.2.1 3

    Organizational chart with any updates since the SOQ submittal clearly identified NA Section 4.2.2 4

    Revised narrative when organizational chart includes updates since the SOQ submittal NA Section 4.2.2 5

    Conceptual Roadway Plans – Plan View NA Section 4.2.3 Separate Volume

    Conceptual Roadway Plans – Typical Sections NA Section 4.2.3 Separate Volume

    Conceptual Structural Plans – Elevation View NA Section 4.2.3 Separate Volume

    Conceptual Structural Plans – Transverse Section NA Section 4.2.3 Separate Volume

    Proposal Schedule NA Section 4.2.4 Separate Volume

    Proposal Schedule Narrative NA Section 4.2.4 16

    Proposal Schedule in electronic format (CD or DVD-Rom) NA Section 4.2.4 CD

  • Attachment 3.6: Form C-78-RFP

  • Attachment 4.1.3(a): Proposal Payment Agreement

  • Attachment 11.8.6: Debarment Forms

  • A DESIGN-BUILD PROJECT

    CONCEPTUAL ROADWAY PLANS

    Odd Fellows Road Interchange at US Route 29/460 and Road Improvements along US Route 29/460From: 0.6 Miles East of Candlers Mountain Road (Route 501 North) To: 0.5 Miles West of Campbell Avenue (Business Route 460/501) And Along Odd Fellows Road From: Top Ridge Road (Frontage Route 794) To: Lynchburg Expressway (Business Route 29/501) City of Lynchburg, Virginia

    State Project No.: 9999-118-240, R201, C501, B628 | Federal Project No.: NH-5118(209) | Contract ID Number: C00105515DB78

    Submitted to:

    Virginia Department of TransportationSubmitted by:

    W.C. English, Inc.In association with: Parsons Brinckerhoff, Inc.

  • Attachment 4.2.3: Conceptual Plans

  • 1

    2A

    2A

    Ramp D Sta. 12+63.71 to Sta. 23+74.30

    Ramp C Sta. 10+29.00 to Sta. 24+97.02

    Ramp B Sta. 10+31.00 to Sta. 22+54.45

    Ramp A Sta. 14+84.19 to Sta. 26+27.20

    10 6" Aggregate Base Material, Type I, Size 21B

    8 Existing Pavement to Remain

    7 9" Asphalt Concrete Base Course, Type BM-25.0D+0.8

    6 6" Aggregate Base Material, Type I, Size 21B

    5 6" Asphalt Concrete Base Course, Type BM-25.0D+0.8

    4 9" Aggregate Base Material, Type I, Size 21B

    3 11" Asphalt Concrete Base Course, Type BM-25.0D+0.8

    2 2" Asphalt Concrete, Type IM-19.0D

    1.5" Asphalt Concrete, Type SM-9.5D

    10

    VA.

    STATE

    ROUTE PROJECT

    VA.

    REVISEDSTATE

    STATE

    ROUTE PROJECTSHEET NO.

    PROJECT SHEET NO.

    DESIGN FEATURES RELATING TO CONSTRUCTION

    OR TO REGULATION AND CONTROL OF TRAFFIC

    MAY BE SUBJECT TO CHANGE AS DEEMED

    NECESSARY BY THE DEPARTMENT

    \\pwdcs\p

    wdcswrk\\34823\87105_51\O

    FR-C

    RD

    Y-T

    YP_01.dgn

    16:31

    10-D

    EC-2

    014

    PROJECT MANAGER

    SURVEYED BY

    DESIGN SUPERVISED BY

    DESIGNED BY Parsons Brinckerhoff (757) 466-1732

    XXX-XXX-XXXX

    XXX-XXX-XXXX

    XXX-XXX-XXXX

    460

    9999-118-240

    9999-118-240

    OnlyFor Information

    RFP PLANS

    DATE: 12/11/2014

  • 1

    2% 4:1 2:1 C

    UT S

    LOPE

    2:1 FILL SLOPE5'

    REQUIRED

    WHERE

    SIDEWALK

    E

    FF

    F

    E

    2A(1)

    2A(1)

    Roundabout

    50' for OddFellows Rd/ Mayflower Drive

    Roundabout

    OddFellows Rd/ Mayflower Drive

    100' Central Island for

    50 53+76.99

    Sta. 20+00.00 to Sta. 25+02.65

    Inset F

    Inset G

    31.83

    Inset G

    Inset G

    9 10" Jointed Stamped Concrete Pavement with Dowels, Class A3

    10 7" Aggregate Base Material, Type I, Size 21B

    5 6" Asphalt Concrete Base Course, Type BM-25.0D+0.8

    2 2" Asphalt Concrete, Type IM-19.0D

    1.5" Asphalt Concrete, Type SM-9.5D

    10

    10

    11 4" Hydraulic Cement Concrete, Class A3

    6 6" Aggregate Base Material, Type 1, Size 21B

    12 2" Asphalt Concrete, Type SM-9.5A

    116

    126

    INSET G

    Shared Used Path

    INSET F

    Sidewalk

    VA.

    STATE

    ROUTE PROJECT

    VA.

    REVISEDSTATE

    STATE

    ROUTE PROJECTSHEET NO.

    PROJECT SHEET NO.

    DESIGN FEATURES RELATING TO CONSTRUCTION

    OR TO REGULATION AND CONTROL OF TRAFFIC

    MAY BE SUBJECT TO CHANGE AS DEEMED

    NECESSARY BY THE DEPARTMENT

    \\pwdcs\p

    wdcswrk\\34823\87105_54\O

    FR-C

    RD

    Y-T

    YP_02.dgn

    16:35

    10-D

    EC-2

    014

    PROJECT MANAGER

    SURVEYED BY

    DESIGN SUPERVISED BY

    DESIGNED BY Parsons Brinckerhoff (757) 466-1732

    XXX-XXX-XXXX

    XXX-XXX-XXXX

    XXX-XXX-XXXX

    460

    9999-118-240

    9999-118-240

    OnlyFor Information

    RFP PLANS

    DATE: 12/11/2014

  • 1

    21'-18'

    Varies

    21'-18'

    Varies

    * 6' Where Guardrail is Required

    Sta. 214+00 to Sta. 216+25.00

    MAYFLOWER DRIVE Not to Scale

    ODD FELLOWS ROAD

    G

    Sidewalk

    2A(2)

    2A(2)

    G 4' Min Raised Medians, Std MS-1A

    Sta. 251+81.66 to 254+81.26

    Sta. 216+25.00 to 249+77.12

    Sta. 251+81.66 to 252+86.92

    Sta. 248+67.89 to 249+77.12

    Sta. 200+14.25 to Sta. 203+00

    H

    H 5' Sta. 218+20 to Sta. 219+20

    Sta. 103+74.72 to Sta. 105+50.00

    Sta. 98+74.00 to Sta. 101+78.72

    11 4" Hydraulic Cement Concrete, Class A3

    6 6" Aggregate Base Material, Type 1, Size 21B

    12 2" Asphalt Concrete, Type SM-9.5A

    116

    126

    Inset G

    Inset G

    Inset G

    10 7" Aggregate Base Material, Type I, Size 21B

    5 6" Asphalt Concrete Base Course, Type BM-25.0D+0.8

    2 2" Asphalt Concrete, Type IM-19.0D

    1.5" Asphalt Concrete, Type SM-9.5D

    Inset F

    INSET G

    Shared Used Path

    INSET F

    Sidewalk

    Inset G

    5'

    VA.

    STATE

    ROUTE PROJECT

    VA.

    REVISEDSTATE

    STATE

    ROUTE PROJECTSHEET NO.

    PROJECT SHEET NO.

    DESIGN FEATURES RELATING TO CONSTRUCTION

    OR TO REGULATION AND CONTROL OF TRAFFIC

    MAY BE SUBJECT TO CHANGE AS DEEMED

    NECESSARY BY THE DEPARTMENT

    \\pwdcs\p

    wdcswrk\\34823\87105_57\O

    FR-C

    RD

    Y-T

    YP_03.dgn

    17:32

    10-D

    EC-2

    014

    PROJECT MANAGER

    SURVEYED BY

    DESIGN SUPERVISED BY

    DESIGNED BY Parsons Brinckerhoff (757) 466-1732

    XXX-XXX-XXXX

    XXX-XXX-XXXX

    XXX-XXX-XXXX

    460

    9999-118-240

    9999-118-240

  • ODDFELLOWS RD

    ODDFELLOWS ROAD

    RO

    UT

    E 460

    RO

    UT

    E 460

    RA

    MP

    A

    RA

    MP

    D

    RA

    MP

    B

    RA

    MP

    C

    TOP

    RID

    GE

    RO

    AD

    ROAD ODDFELLOWS

    DRIV

    E

    MAY F

    LO

    WE

    R

    RAIL

    RO

    AD

    NO

    RF

    OL

    K S

    OU

    TH

    ER

    N

    VA.

    STATE

    ROUTE PROJECT

    VA.

    REVISEDSTATE

    STATE

    ROUTE PROJECTSHEET NO.

    PROJECT SHEET NO.

    DESIGN FEATURES RELATING TO CONSTRUCTION

    OR TO REGULATION AND CONTROL OF TRAFFIC

    MAY BE SUBJECT TO CHANGE AS DEEMED

    NECESSARY BY THE DEPARTMENT

    \\pwdcs\p

    wdcswrk\\34823\87105_50\O

    FR-C

    RD

    Y-P

    LN_index.dgn

    17:17

    10-D

    EC-2

    014

    PROJECT MANAGER

    SURVEYED BY

    DESIGN SUPERVISED BY

    DESIGNED BY Parsons Brinckerhoff (757) 466-1732

    XXX-XXX-XXXX

    XXX-XXX-XXXX

    XXX-XXX-XXXX

    460

    9999-118-240

    9999-118-240

    810.3

    5

    815.3

    5

    818.8

    6

    0.0

    0100.0

    0108.1

    0

    Conc.

    Guardrail

    Conc.

    Conc.

    Ce

    metery

    Conc.

    Conc.

    Ste

    ps

    Ste

    ps

    Ste

    ps

    Ste

    ps

    Cem

    eter

    y

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PLPL

    P LP L

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    Z

    Z

    Z Z

    Z

    Z

    Z

    Z

    Z

    Z

    Z

    PL

    PL

    PL

    PL

    PL PL

    PL

    PL

    PL

    PL

    PL

    PLPL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    Z

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    P L

    PLP L

    PL

    PL

    Z

    2.0'

    C&

    G

    2.0'

    C&

    G

    2.0'

    C&

    G

    2.0'

    C&

    G

    2.0'

    C&

    G

    2.5'

    C&

    G

    2.5'

    C&

    G

    Conc.

    Walk

    Conc.

    Conc.

    Conc.

    Conc.

    Conc. Walk

    Conc.

    Conc.

    Conc.

    Ste

    ps

    Ste

    ps

    Ste

    ps

    Conc.

    Ste

    ps

    Conc.

    Ste

    ps

    Ste

    ps

    Steps

    Steps

    Steps

    Ste

    ps

    PL

    Guardrail

    Guardrail

    Guardrail

    Guardrail

    Guardrail

    Guardrail

    Guardrail

    Guardrail

    Guardrail

    Guardrail G

    uardrail

    Guardrail

    Well H

    ouse

    Cin

    der Block

    House

    Well

    Conc.

    House

    Well

    Brick

    2

    S71°48'06"E

    114.74'

    (S69°15'56"E

    114.74')Sanitary Sew

    er Easem

    ent

    10' Storm

    Drainage E

    asem

    ent

    Storm

    & Sanitary S

    ewer E

    asem

    ent

    Ch. Distance 538.67

    Ch. Bearing S50°12'12"E

    717.4

    1R

    Ch. Distance 185.65

    Ch. Bearing S47°09'09"E

    787.4

    2R

    S38°2

    4'5

    8"W

    299.9

    3

    S38°2

    3'18

    "W

    300

    S52°56'14"E

    S38°2

    3'18

    "W

    199

    S38°2

    5'2

    1"W

    210

    S52°50'49"E

    S52°50'49"E

    226.19

    (S48°54'00E

    400.00')

    399.90'

    (S48°54'00"E

    400.17'

    400.00')

    (S48°54'00"E

    199.99'

    200.00')

    S52°52'24"E

    S52°52'24"E

    S38°2

    5'0

    9"W

    (S48°54'00"E

    342.90'

    342.90'

    (S48°55'35"E

    200.00'

    200.00')

    190.0

    5'

    209.9

    1'

    (S42°2

    3'0

    0"W

    190.10')

    S38°2

    5'0

    9"W

    (S42°2

    3'0

    0"W

    209.8

    0')

    S52°48'28"E

    Ch. Distance 217.06

    Ch. Bearing S43°56'47"E

    686 .66R

    1810.08 R

    Ch. Distance 5

    61.4

    2

    Ch. Distance S

    18°3

    2'2

    7"W

    Ch. Dista

    nce 279.78

    Ch. B

    earin

    g S37°5

    2'4

    2"W

    2217.9R

    1810.08

    R

    Ch. Dista

    nce 425.2

    0

    Ch. B

    earin

    g S37°4

    9'19

    "W

    Ch. Dista

    nce 425.3

    5)

    (Ch. B

    earin

    g S41°2

    9'E

    Ch. Dista

    nce 429.2

    5

    Ch. B

    earin

    g S37°5

    9'4

    4"W

    (Ch. Dista

    nce 429.75

    Ch. B

    earin

    g S41°4

    0'W)

    (Ch. Dista

    nce 279.70

    Ch. B

    earin

    g S41°5

    1'18"W)

    Ch. Dista

    nce 12

    5.7

    7

    Ch. B

    earin

    g S49°17'0

    6"W

    Ch. Dista

    nce 44.9

    6

    Ch. B

    earin

    g S59°5

    0'0

    2"W

    446 R

    446 R

    Ch. Dist. 14

    7.2

    9

    Ch. B

    earin

    g S52°0

    3'5

    9"W

    Norfolk Southern Railr

    oad

    Rig

    ht o

    f

    Way

    Norfolk Southern Railr

    oad

    Rig

    ht o

    f

    Way

    GA

    GA

    GA

    GA

    Oil T

    ank

    Nite L

    ight

    Nite L

    ight

    129-18

    58

    Aep #

    Fence

    Edge of Water

    Edge of Water

    Step

    s

    Fence

    Light P

    ole

    Parking Lot

    Chain Link Fence

    Chain Lin

    k Fence

    Veterin

    aria

    n Office

    Conc. Bridge

    Conc. Gutter

    Conc. G

    utte

    r

    Conc. W

    alk

    Handicap Ra

    mp

    Conc. P

    ad

    A1

    A2

    A3

    A4

    A5

    A7

    A8

    A9

    A6

    A10

    A11

    A12

    A13

    A14

    A15

    A16

    A17

    INV OUT= 7

    67.87

    INV IN

    = 768.38

    INV OUT 762.84

    INV IN 763.11

    INV OUT 760.37

    INV IN 760.56

    INV OUT 769.41

    INV IN 769.55

    INV IN 769.80

    Carroll A

    ve.

    Perkins St.

    Odd Fellows Rd.

    Odd Fellows Rd.

    Guardrail

    Guardrail

    Chain Lin

    k Fence

    Chain Lin

    k Fence

    Metal G

    ate Post

    Metal R

    ail F

    ence

    Diesel Fille

    r Cap

    Regular Fille

    r Cap

    Servic

    e Pu

    mps

    9

    10

    3

    4 5

    6

    8

    11

    12

    13

    7

  • 8215

    1B530

    Woods

    Woods

    Woods

    22" O

    ak

    24" O

    ak

    Gravel

    Rip Rap

    Rip Rap

    Conc. Ditc

    h

    Conc. Ditc

    h

    Sign

    Of CML Mini

    stry Propert

    ies, Inc." Date

    d March 7, 19

    94

    "Plat Showing

    ALTA/ACSM

    Land Title

    Survey Of Th

    e Property

    Taken From

    Unrecorded P

    lat By Hurt &

    Proffitt, Inc

    . Entitled

    DB97 PG99

    (Campbell Cou

    nty)Area i

    ncluded In A

    .T. & T. Blank

    et Easement

    PLPL

    P LP L

    Z Z

    RW Mon

    P L

    CM

    L

    Ministr

    y Propertie

    s, In

    c." D

    ate

    d

    March 7, 19

    94

    "Plat S

    howin

    g

    ALT

    A/

    ACS

    M

    Land Title Survey Of The Property Of

    Taken Fro

    m

    Unrecorded Plat B

    y Hurt &

    Proffitt, In

    c. E

    ntitle

    d

    DB292 P

    G582 P

    B15 P

    G5 (C

    ampbell C

    ounty)

    Re

    main

    der of Existin

    g 60' Wid

    e Ease

    ment F

    or Lynchburg

    Gas Co.

    Of C

    ML

    Ministr

    y Propertie

    s, In

    c." D

    ate

    d

    March 7, 19

    94

    "Plat S

    howin

    g

    ALT

    A/

    ACS

    M

    Land Title Survey Of The Property

    Taken Fro

    m

    Unrecorded Plat B

    y Hurt &

    Proffitt, In

    c. E

    ntitle

    d

    DB17

    3

    PG39 (C

    ampbell C

    ounty)

    Centerlin

    e Existin

    g 60' A.T. &

    T. E

    ase

    ment

    346.98'

    +06.14'

    Conc. Flume

    Brush

    Brush

    Rip Rap

    VD

    OT

    Proj. 6

    460-0

    15-10

    4, C

    501

    Existin

    g Limite

    d

    Access

    VD

    OT

    Proj. 6

    460-0

    15-10

    4, C

    501

    Existin

    g Limite

    d

    Access

    VD

    OT

    Proj. 6

    460-0

    15-10

    4, C

    501

    Existin

    g

    Rig

    ht O

    f

    Way

    T

    F.O. Marker

    Tel. P

    ed. #

    6

    Tel. Ped. No #

    Gas Witness Post

    Guy

    Wire

    Elec. M

    eter

    PP

    No #

    Guy

    Wire

    Gas Witness Post

    Gas Witness PostGas Test Station

    PP

    No #

    T

    S

    S

    3

    3

    SEE SHEET 11MATCH LINE STA.

    12+50SEE SHEET 11

    MATCH LINE STA. 2210+00SEE SHEET 11

    MATCH LINE STA. 3211+00

    SE

    E

    SH

    EE

    T 4

    MA

    TC

    H

    LIN

    E

    ST

    A. 208+0

    0

    ROUTE 460

    ODD FELLOWS ROAD

    SEE SHEET 10

    MATCH LINE STA. 24+00 SEE SHEET 10MATCH LINE STA. 3206+00

    SEE SHEET 10MATCH LINE STA. 2205+00

    Typical Sections 2A, 2A

    2205

    2206

    2207

    2208

    2209

    2210

    3206

    3207

    3208

    3209

    PC 3209+77.58

    3210

    3211

    24

    25

    26

    PT 26+06.20

    PI = 24+83.38

    T = 123.02'

    L = 245.84'

    R = 2,500.00'

    23+60.36PC =

    PT = 26+06.20

    10

    PC 10+50.00

    11

    12PT 12+08.82

    200

    201

    202

    203

    204

    205

    206

    207

    WE

    ST

    BO

    UN

    D

    RO

    UT

    E 460

    R=13'

    R=13'

    R=38'

    R=38'

    ODD FELLOWS ROAD

    16'

    16'12'

    25'

    12

    3

    8

    5

    2

    8

    STA. 204+00

    BEGIN BRIDGE B-624

    12

    14

    13

    7

    13

    14

    19'

    STA. 114+25.00

    BEGIN CONSTRUCTION TOP RIDGE ROAD

    7

    4

    27'

    29'

    80'

    12

    1

    50

    51

    52

    53

    Curve R1

    PI = 50+60.00

    DELTA = 90� 00' 00.00" (RT)

    D = 95� 29' 35"

    T = 60.00'

    L = 94.25'

    R = 60.00'

    50+00.00PC =

    PCC =50+94.25

    Curve R2

    PI = 51+54.25

    DELTA = 90� 00' 00.00" (RT)

    D = 95� 29' 35"

    T = 60.00'

    L = 94.25'

    R = 60.00'

    50+94.25PCC =

    PCC =51+88.50

    Curve R3

    PI = 52+48.50

    DELTA = 90� 00' 00.00" (RT)

    D = 95� 29' 35"

    T = 60.00'

    L = 94.25'

    R = 60.00'

    51+88.50PCC =

    PCC =52+82.74

    112

    113

    114

    115

    116

    117

    118

    119

    PC

    PTP

    CC

    PC

    C

    PCC

    +25.00

    ANGLE 90° LT.

    PI 199+40 ODD FELLOWS

    POT 116+47.17 TOP RIDGE ROADANGLE =90° RT.

    POT 203+00 ODD FELLOWS

    PI 26+56.20 RAMP A

    ANGLE =90° RT.

    POT 204+50.00 ODD FELLOWS

    POT 2207+51.57 RTE. 460 EBL

    ANGLE = 89° 58' 17" LT.

    POT 206+29.63 ODD FELLOWS

    POT 3208+57.56 RTE. 460 WBL

    R3

    R4

    R1

    R2

    119

    112

    22103211

    2205243206

    82' R

    175' R

    100' R

    88' R

    ANGLE =90° RT.

    POT 203+00 ODD FELLOWS

    PI 10+00.00 RAMP B

    USE PATHSHAREDPROP. 10'

    RO

    UT

    E 460

    EAS

    TB

    OU

    ND

    STA. 206+80

    END BRIDGE B-624

    USE PATHSHAREDPROP. 10'

    118' R

    348' R

    USE PATHPROP. 10' SHARED

    ODD FELLOWS ROAD

    PO

    T 19

    9+4

    0.0

    0

    200

    201

    202

    203

    204

    205

    206

    207

    208

    208

    TOP RIDGE ROAD7.65' RT. STA. 116+52.77 ROUNDABOUT CENTER

    Curve R4

    PI = 53+42.74

    DELTA = 90� 00' 00.00" (RT)

    D = 95� 29' 35"

    T = 60.00'

    L = 94.25'

    R = 60.00'

    52+82.74PCC =

    PT = 53+76.99STA. 118+31.83

    END CONSTRUCTION TOP RIDGE ROAD

    14' PAVED SHOULDER

    B1

    Curve Ramp A A2

    A2

    W2

    Lr = 59'

    e = 2.6%

    V = 35 MPH

    3-5

    3-1

    3-2

    3-3

    3-4

    ST

    A. 2

    00+5

    0.0

    0

    BE

    GIN

    LIMIT

    ED

    AC

    CE

    SS

    PR

    OP. R/

    W

    LIMIT

    ED

    AC

    CE

    SS

    LIN

    E

    PR

    OP. R/

    W

    &

    ST

    A. 2

    00+4

    5.5

    0

    EN

    D

    LIMIT

    ED

    AC

    CE

    SS

    Prop. Drain

    age Per

    m. E

    ase

    ment

    VA.

    STATE

    ROUTE PROJECT

    VA.

    REVISEDSTATE

    STATE

    ROUTE PROJECTSHEET NO.

    PROJECT SHEET NO.

    DESIGN FEATURES RELATING TO CONSTRUCTION

    OR TO REGULATION AND CONTROL OF TRAFFIC

    MAY BE SUBJECT TO CHANGE AS DEEMED

    NECESSARY BY THE DEPARTMENT

    \\pwdcs\p

    wdcswrk\\34827\87105_16\O

    FR-C

    RD

    Y-P

    LN_003.dgn

    16:39

    10-D

    EC-2

    014

    PROJECT MANAGER

    SURVEYED BY

    DESIGN SUPERVISED BY

    DESIGNED BY Parsons Brinckerhoff (757) 466-1732

    XXX-XXX-XXXX

    XXX-XXX-XXXX

    XXX-XXX-XXXX

    460

    9999-118-240

    9999-118-240

    REFERENCES

    ( PROFILES, DETAIL & DRAINAGE

    DESCRIPTION SHEETS, ETC. )

    Denotes Construction Limits in Cuts

    Denotes Construction Limits in FillsF

    C

    Denotes Proposed Pavement

    LEGEND

    EASEMENT FOR COLUMBIA GAS

    PROPOSED PERMANENT UTILITY

    EASEMENT FOR CITY OF LYNCHBURG

    PROPOSED PERMANENT UTILITY

    JOINT USE UTILITY EASEMENT

    PROPOSED PERMANENT VDOT

    12

    5

    4

    2

    1

    7

    3

    13

    8

    6

    14

    9

    10

    11

    ST'D. MS-1A REQ'D

    ST'D. CG-6 REQ'D

    ST'D. MS-2 REQ'D

    ST'D. CG-12, TYPE B REQ'D

    ST'D. GR-2 REQ'D

    ST'D. GR-9 REQ'D

    ST'D. GR-11 REQ'D

    SPECIAL DESIGN M.S.E WALL

    PIPE TO BE REMOVED

    DRAINAGE STRUCTURE TO BE REMOVED

    PIPE TO BE ABANDONED AND PLUGGED

    FENCE FE-11

    GR-FOA-2 TYPE 1

    GR-FOA-2 TYPE 2

    1

    3

    2

    Denotes Proposed Sidewalk or Apron

    Denotes Proposed Entrances

    OnlyFor Information

    RFP PLANS

    DATE: 12/11/2014

  • Metal P

    ost

    Metal P

    ost

    36" O

    ak

    Gravel

    Gravel

    Trailer

    Post

    Gravel

    10"

    Maple

    16" Pin

    e

    Bollard

    Post

    Conc.

    Asphalt

    Asphalt

    Asphalt

    Ce

    metery

    Canopy

    CanopyConc.

    Conc.

    Conc.

    Du

    mpster

    Bollards (3)

    # 310

    61-Sty.

    Br.

    Bld

    g.

    No #1 Sty. Metal Bldg.

    Shed

    Wood#3

    001

    1 Sty. F

    r.

    Shed

    Bric

    k

    P LP L

    PL

    PL

    PL

    PL

    PL

    Z

    PL

    PL

    PL

    Existing Right Of Way DB501 PG212

    Existing Right Of Way DB501 PG212

    Existing

    Rig

    ht

    Of

    Way D

    B501 P

    G212

    Existing

    Rig

    ht

    Of

    Way D

    B501 P

    G212

    Conc.

    Open Storage

    # 310

    51-Sty.

    Metal Bld

    g.

    Open Storage

    Asphalt

    Gravel

    Asphalt

    2.0'

    C&

    G

    0.5' Curb

    Conc. Walk

    Conc.

    Conc.

    Ste

    ps

    Ste

    ps

    6' C. L. Fence

    Fence

    3'

    Wire

    6' Chain

    Link Fenc

    e

    6'

    Chain Lin

    k Fence

    6'

    Chain Lin

    k Fence

    Woods

    Woods

    Brush

    Foot

    Path

    Rip Rap

    Rip Rap

    Conc.

    Witness Post

    House

    Well

    Gravel

    Gravel

    Odd Fellows Road

    Bldg. #3

    0081-Sty. M

    etal

    4' CLF

    Conc

    Bld

    g. N

    o #

    1-Sty. M

    etal

    T

    W

    T

    T

    Tel. P

    ed. #0-6

    0

    LP No#

    PP #15

    3-3

    1T

    Tel. P

    ed. #

    Pole 05

    Guy

    Wire

    Guy

    Wire

    Guy

    Wire

    Guy

    Wire

    WM

    WM

    WM

    WVFH

    WM

    WM

    WV

    FH

    WM

    WM

    H

    Elec.

    Meter

    FH

    WV

    Elec. M

    eter

    EOI

    PP # 12

    9-B

    4-2

    788

    PP # 12

    9-7

    012

    Tel. Ped. #21-X-94PP # 15

    3-3

    14

    Tel. P

    ed. #25-X-4

    2

    PP # 12

    9-3

    514

    PP # 12

    9-B

    4-2

    799

    PP

    No #

    Guy

    Wire

    PP #15

    3-3

    15

    Tel. P

    ed. #

    27-X-9

    2

    PP #15

    3-2

    72

    PP

    No #

    PP #15

    3-12

    5 (Ris

    er) P

    P # 12

    9-B

    4-2

    789 (Ris

    er)

    Guy

    Wire

    2x60 Verizon #

    No Id Aep #

    129-b4-2799 Aep #

    129-b4-2789 Aep #

    21x94 Verizon #

    153-314 Aep #

    Water Line 8"

    Water Line 12"

    Water Line 12"

    Water Line

    Underground Telephone Line

    Water Line

    Sig

    n (2)

    Sig

    n (2)

    4

    4

    SE

    E

    SH

    EE

    T 3

    MA

    TC

    H

    LIN

    E

    ST

    A. 208+0

    0

    SE

    E

    SH

    EE

    T 5

    MA

    TC

    H

    LIN

    E

    ST

    A. 220+0

    0

    ODD FELLOWS ROAD

    SEE SHEET 10MAT

    CH LINE STA. 2

    1+50

    SEE SHEET 11

    MATCH LINE STA. 12+50

    Typical Sections 2A(2)

    209

    210

    211

    212

    213

    R=13'

    R=13' R=38'

    R=48'

    1

    1

    16'12'

    16'

    25'

    25'

    25'

    3

    5

    7

    5

    6

    12

    12

    12

    5

    19'

    10

    PC 10+15.60

    11

    12

    13

    PT 13+38.70

    27'

    10

    11

    12

    POT 12+33.77

    4

    R=3

    0'

    R=3

    0'

    1

    1

    S 12° 15' 00" E

    S 61° 31' 16

    " E

    S 28° 2

    8' 4

    4" W

    S 28° 2

    8' 4

    4" W

    10

    11

    12

    POT 12

    +32.47

    20

    POT

    20+65.12

    PC

    PT

    PC

    PT 20'

    20'

    20' R

    20' R

    45'

    +81.13

    ANGLE = 90° LT.

    POT 213+07.82 ODD FELLOWS

    PI 10+00.00 ENTR. #1 LT.

    ANGLE = 90° LT.

    POT 209+47.92 ODD FELLOWS

    PI 10+00.00 RAMP C

    ANGLE =90° LT.

    POT 209+47.92 ODD FELLOWS

    PI 24+03.30 RAMP D

    ANGLE = 90° RT.

    POC 12+60.75 ENTR. 2 RT.

    /SW BASIN ENTR. #2

    PI 10+00.00 TURNAROUND

    ANGLE = 40° 43' 44" RT.

    PI 20+00.00 SW BASIN ENTR.

    POT 10+70.18 SW BASIN ENTR. #2

    17'

    17'

    19'

    100' 200'

    28'

    STA. 206+80

    END BRIDGE B-624

    USE PATHPROP. 10' SHARED

    USE PATHPROP. 10' SHARED

    2

    SHOULDER6' PAVED

    208

    209

    210

    211

    212

    213

    PC 213

    +87.2

    2214

    215 216

    PT 216

    +64.3

    2

    217 218 219 220

    PI = 215+25.80

    T = 138.59'

    L = 277.10'

    R = 5,000.00'

    213+87.22PC =

    PT = 216+64.32

    208

    220

    10

    PC 10+73.39

    11

    12

    22

    PT 22+28.05

    23

    24

    POT 24+03.30

    PI = 12+01.23

    T = 127.84'

    L = 253.41'

    R = 776.00'

    10+73.39PC =

    PT = 13+26.80

    RA

    MP

    D

    RA

    MP

    C

    18'

    18'

    ODD FELLOWS ROAD

    C1 ANGLE = 90° RT.

    POT 213+70.56 ODD FELLOWS

    PI 10+00.00 ENTR. #2 RT.

    PROP. SIDEWALK

    O1

    D2

    Curve Ramp C

    C1

    O1

    Curve ODD FELLOWS RD.

    Lr = 133'

    e = 5.9%

    V = 35 MPH

    4-12

    SW4

    9

    4-10

    4-9

    4-2

    4-3

    4-5

    4-6

    4-1

    4-4

    4-8

    4-7

    10

    9

    11-25

    PROP. R/W

    AC

    CE

    SS

    LIN

    E

    PR

    OP. LIMIT

    ED

    PR

    OP. P

    ER

    M. D

    RAIN

    AG

    E

    EAS

    E.

    PROP. R/W

    PROP. R/W

    STA. 212+53.94

    BEGIN LIMITED ACCESS

    STA. 212+72.92

    END LIMITED ACCESS

    PROP. R/W

    VA.

    STATE

    ROUTE PROJECT

    VA.

    REVISEDSTATE

    STATE

    ROUTE PROJECTSHEET NO.

    PROJECT SHEET NO.

    DESIGN FEATURES RELATING TO CONSTRUCTION

    OR TO REGULATION AND CONTROL OF TRAFFIC

    MAY BE SUBJECT TO CHANGE AS DEEMED

    NECESSARY BY THE DEPARTMENT

    \\pwdcs\p

    wdcswrk\\34823\87105_19\O

    FR-C

    RD

    Y-P

    LN_004.dgn

    16:31

    10-D

    EC-2

    014

    PROJECT MANAGER

    SURVEYED BY

    DESIGN SUPERVISED BY

    DESIGNED BY Parsons Brinckerhoff (757) 466-1732

    XXX-XXX-XXXX

    XXX-XXX-XXXX

    XXX-XXX-XXXX

    460

    9999-118-240

    9999-118-240

    Denotes Construction Limits in Cuts

    Denotes Construction Limits in FillsF

    C

    Denotes Proposed Pavement

    LEGEND

    EASEMENT FOR COLUMBIA GAS

    PROPOSED PERMANENT UTILITY

    EASEMENT FOR CITY OF LYNCHBURG

    PROPOSED PERMANENT UTILITY

    JOINT USE UTILITY EASEMENT

    PROPOSED PERMANENT VDOT

    12

    5

    4

    2

    1

    7

    3

    13

    8

    6

    14

    9

    10

    11

    ST'D. MS-1A REQ'D

    ST'D. CG-6 REQ'D

    ST'D. MS-2 REQ'D

    ST'D. CG-12, TYPE B REQ'D

    ST'D. GR-2 REQ'D

    ST'D. GR-9 REQ'D

    ST'D. GR-11 REQ'D

    SPECIAL DESIGN M.S.E WALL

    PIPE TO BE REMOVED

    DRAINAGE STRUCTURE TO BE REMOVED

    PIPE TO BE ABANDONED AND PLUGGED

    FENCE FE-11

    GR-FOA-2 TYPE 1

    GR-FOA-2 TYPE 2

    1

    3

    2

    Denotes Proposed Sidewalk or Apron

    Denotes Proposed Entrances

    REFERENCES

    ( PROFILES, DETAIL & DRAINAGE

    DESCRIPTION SHEETS, ETC. )

    OnlyFor Information

    RFP PLANS

    DATE: 12/11/2014

  • Brush

    Grass

    Grass

    24" Pin

    e

    Sig

    n

    Post

    Sig

    n

    Sign

    Sig

    n

    6'

    CLF

    Conc.

    Asphalt

    Asphalt

    Asphalt

    Asphalt

    Asphalt

    Conc.

    Sig

    n

    Fla

    g Pole

    Conc.

    Asphalt

    Asphalt

    Asphalt

    Asphalt

    Conc.

    Canopy

    Canopy

    Conc.

    Conc. Conc.

    Conc.

    Conc.

    Conc.

    Conc.Conc.

    Gravel

    Ste

    ps

    Ste

    ps

    Ste

    ps

    Ste

    ps

    Conc.

    Du

    mpster

    Sig

    n

    Sat. Dis

    h

    Fla

    g Pole

    Grass

    24"

    Oak

    Grass

    # 3116

    1-Sty. Metal Bldg.

    # 3110

    2-Sty.

    Metal/

    Br.

    Bld

    g.

    # 2915

    Fr. Dwl.

    1 Sty.

    Shed

    Wood

    6"

    Crape

    Myrtle

    6"

    Crape

    Myrtle

    Co

    mpany Rig

    ht

    Of

    Way

    100'

    Appala

    chia

    n Power

    DB501 PG212EasementSanitary and Storm S

    ewer Existing City of Lync

    hburg

    PC1 SL

    123Sewer Ea

    sement

    Existin

    g Sanitar

    y

    Existing

    Right Of Wa

    y DB501

    PG212

    Existing

    Right Of W

    ay PCA SL

    50 PG10

    PL

    PL

    PL

    PL

    PL

    PL

    Existing Right Of Way DB501 PG212

    Co

    mpany Rig

    ht

    Of

    Way

    100'

    Appala

    chia

    n Power

    6" Crape

    Myrtle (2)

    &

    Gravel

    Broken

    Asphalt

    Of Conc. Ditch In This Area

    Broken and Badly Eroded Sections

    Open Stora

    ge

    Odd Fellows Road

    Conc

    Myrtle (2)

    6"

    Crape

    DB501 P

    G212

    Sanitar

    y & Storm Sew

    er Esmt.

    Existing City of L

    ynchburg

    # 310

    91-Sty.

    Metal Bld

    g.

    # 310

    71-Sty.

    Metal Bld

    g.

    State Ro

    ute 128

    Asphalt

    Asphalt

    &

    Gravel

    Asphalt

    Broken

    Asphalt

    2.0'

    C&

    G

    2.0'

    C&

    G

    2.0'

    C&

    G

    0.5' Curb

    0.5' Curb

    0.5' Cu

    rb

    Conc.

    Walk

    Conc.

    Conc.

    Conc.

    Conc.

    Conc.

    Conc.

    Ste

    ps

    Conc.

    Ste

    ps

    Conc.

    Ste

    ps

    Ste

    ps

    Rip Rap

    Steps

    Steps

    Steps

    Ste

    ps

    6'

    Chain Lin

    k Fence

    8'

    Chain Lin

    k Fence

    8' Chain Lin

    k Fence

    8' Chai

    n Link Fe

    nce

    6'

    Chain Lin

    k Fence

    Avalon Road

    #3114

    1-Sty.

    Metal

    Bld

    g.

    Conc.

    Conc.

    Sig

    n

    Gate Posts

    Gate Posts

    Sig

    n

    Asphalt

    Asphalt

    Conc. Ditch

    Conc. Ditch

    Conc. Ditch

    Conc. Ditch

    Conc. Ditc

    h

    Rip Ra

    p

    Rip

    Rap

    Rip Rap

    DB501 P

    G212

    Sanitary

    & Storm Sewer Esmt.

    Existing City

    of Lyn

    chburg

    Asphalt

    Mayflowe

    r Drive

    Bradle

    y Drive

    Mayflo

    wer Drive

    # 31171-Sty. Metal Bldg

    .

    # 31151-Sty. Metal Bldg.

    No #

    Fr.1

    Sty.

    Shrubs

    Grass

    Woods

    Edge of Water

    Edge of Water

    2' Conc. C&G

    2' C

    onc. C

    &G

    2' C

    onc. C

    &G

    2' C

    onc. C

    &G

    Control P

    t. # 949

    S

    S

    SS

    S

    S

    S

    S

    S

    T

    T

    T

    T

    T

    W

    T

    WM

    H

    Water Vault

    PIV

    Tel. P

    ed#9-8-2

    Tel. P

    ed

    No #

    FH

    Hot

    Box

    WV

    FH

    Tel. P

    ed. #0-6

    0

    FH

    Guy

    Wire

    Guy

    Wire

    Guy

    Wire

    Guy

    Wire

    T

    Tel. P

    ed. #18

    X32

    Gas

    Witness Post

    Guy

    Wire

    WV (2)

    WV

    WM WV

    Gas

    Witness Post

    LP #129-B4-2748

    Flo

    od Lig

    ht (2)

    Elec.

    Meter

    WM

    PP #12

    9-B

    4-2

    893

    Guy

    Wire

    PP #129-B4-2868Guy Wire

    PP #12

    9-B

    4-2

    744

    PP #12

    9-B

    4-2

    745

    PP #12

    9-8

    4-2

    746

    Guy

    Wire

    WV

    PP

    No #

    PP

    No #

    PP # 12

    9-B

    4-2

    788

    Guy

    Wire (2)

    PP # 12

    9-2

    309-A

    PP

    No #

    PP #12

    9-B

    4-2

    787

    PP # 79-1831

    WM

    PP #12

    9-B

    4-2

    797

    PP # 12

    9-B

    4-2

    857

    PP # 12

    9-2

    558

    PP #12

    9-B

    4-2

    295

    PP #12

    9-B

    4-2

    296

    PP #129-2560

    PP

    No #

    PP #12

    9-B

    4-2

    747

    #2

    X65

    Tel. P

    ed.

    Tel. P

    ed.

    No #

    Tel. P

    ed. #P1

    Tel. P

    ed. 13

    X42

    T

    9 82 Verizon #

    13x42 Verizon #

    No Id Verizon #

    No Id Aep #

    443-46 Aep #

    129-b4-2746 Aep #

    129-b4-2745 Aep #

    No Id Aep #

    No Id

    129-b4-2867 Aep #

    129-b4-2868 Aep #

    129-b4-2869 Aep #

    129-b4-2787 Aep #

    79-1831 Aep #

    129-b4-2857 Aep #

    18x32 Adelphia #

    0-60 Verizon #

    129-b4-2788 Aep #

    No Id Aep #

    13x42 Verizon #

    Gas Line 2" PC

    Water Line 12"

    Water Line

    Water Line

    Water Line

    Water Line

    Water Line 8"

    Overhead Electric Line

    Overhead Electric Line

    No Id Comcast

    DB. 644 PG. 16

    5

    1.703 AC.

    MIC

    HEL R

    EAL E

    STATE PARTNERSHIP,

    INST.# 0

    50010831

    1.721 A

    C.

    D. V

    ANCE

    DRIS

    KILL,

    WINIF

    RE

    D T. D

    RIS

    KILL

    Parcel ID

    115-01-0

    06

    Parcel ID

    115-01-0

    16

    Sig

    n

    Sig

    n

    Sig

    n

    Sig

    n

    Sig

    n (2)

    Sig

    n

    Sig

    n

    5

    5

    SE

    E

    SH

    EE

    T 4

    MA

    TC

    H

    LIN

    E

    ST

    A. 220+0

    0

    S

    EE

    SH

    EE

    T 6

    MA

    TC

    H

    LIN

    E

    ST

    A. 229+0

    0

    ODD FELLOWS ROAD

    Typical Section 2A(2)

    ODD FELLOWS ROAD

    220

    221

    PI 2

    21+86.5

    2

    222

    223

    224

    225

    226

    227

    228

    229

    220

    229

    1

    1

    18'

    18'

    USE PATHPROP. 10' SHARED

    PROP. SIDEWALK

    BR

    AD

    LE

    Y

    DRIV

    E

    Existin

    g 4

    8" pipe

    5-2 5-3

    5-1

    5-4

    5-7

    5-6

    5-5

    5-8

    5-10

    5-9

    5-12

    10

    10

    9

    10 9

    5-11

    9

    9

    PROP. R/W

    EXIST. R/W

    EXIST. R/W

    VA.

    STATE

    ROUTE PROJECT

    VA.

    REVISEDSTATE

    STATE

    ROUTE PROJECTSHEET NO.

    PROJECT SHEET NO.

    DESIGN FEATURES RELATING TO CONSTRUCTION

    OR TO REGULATION AND CONTROL OF TRAFFIC

    MAY BE SUBJECT TO CHANGE AS DEEMED

    NECESSARY BY THE DEPARTMENT

    \\pwdcs\p

    wdcswrk\\34823\87105_23\O

    FR-C

    RD

    Y-P

    LN_005.dgn

    16:32

    10-D

    EC-2

    014

    PROJECT MANAGER

    SURVEYED BY

    DESIGN SUPERVISED BY

    DESIGNED BY Parsons Brinckerhoff (757) 466-1732

    XXX-XXX-XXXX

    XXX-XXX-XXXX

    XXX-XXX-XXXX

    460

    9999-118-240

    9999-118-240

    Denotes Construction Limits in Cuts

    Denotes Construction Limits in FillsF

    C

    Denotes Proposed Pavement

    LEGEND

    EASEMENT FOR COLUMBIA GAS

    PROPOSED PERMANENT UTILITY

    EASEMENT FOR CITY OF LYNCHBURG

    PROPOSED PERMANENT UTILITY

    JOINT USE UTILITY EASEMENT

    PROPOSED PERMANENT VDOT

    12

    5

    4

    2

    1

    7

    3

    13

    8

    6

    14

    9

    10

    11

    ST'D. MS-1A REQ'D

    ST'D. CG-6 REQ'D

    ST'D. MS-2 REQ'D

    ST'D. CG-12, TYPE B REQ'D

    ST'D. GR-2 REQ'D

    ST'D. GR-9 REQ'D

    ST'D. GR-11 REQ'D

    SPECIAL DESIGN M.S.E WALL

    PIPE TO BE REMOVED

    DRAINAGE STRUCTURE TO BE REMOVED

    PIPE TO BE ABANDONED AND PLUGGED

    FENCE FE-11

    GR-FOA-2 TYPE 1

    GR-FOA-2 TYPE 2

    1

    3

    2

    Denotes Proposed Sidewalk or Apron

    Denotes Proposed Entrances

    REFERENCES

    ( PROFILES, DETAIL & DRAINAGE

    DESCRIPTION SHEETS, ETC. )

    OnlyFor Information

    RFP PLANS

    DATE: 12/11/2014

  • 10"

    Hard

    wood

    # 3116

    1-Sty. Metal B

    ldg.

    Shed

    Wood

    6" Crape

    Myrtle

    Existing Right Of Way PCA SL50 PG10

    PL

    PL

    PL

    Existing Right Of Way DB501 PG212Existing Right Of Way DB501 PG212

    Asphalt

    DB501 P

    G212

    Sanitary & Stor

    m

    Sewer Es

    mt.

    Existing City of Lynchburg

    Stor

    m

    & Sanita

    ry Sewer Easement

    Ch. Distance 53

    8.67

    Ch. Bearing S50

    °12'12"E

    717.4

    1R

    Ch. Distanc

    e 185.65

    Ch. Bearing

    S47°09'09"E

    787.4

    2R

    GA

    GA

    GA

    GA

    1 - Sty. Brick Dwelling

    #3217

    Rose Bush

    4" D

    og

    wood

    36" W

    hite Oak

    16" W

    hite Oak

    Metal Sig

    n Post

    1 - Sty. Metal Bldg.

    #3201

    Charles L. Burton & Associates

    1 - Sty. Brick Bldg.

    Virginia Employment Commission

    30" M

    aple

    Shrubs

    12" C

    herry

    12" C

    herry

    4" C

    herry

    Scatte

    red Trees

    & Shrubs8" C

    herry

    3-8

    " Cherry

    1 - Sty. C.B. Bldg.

    Overhang

    4"C

    edar

    Shrub

    8" M

    aple

    5-6

    " Dog

    woods

    10" Pin

    Oak

    Shrubs 3-6

    " Bradford Pears

    Frame Shed

    4" Pin

    Oak

    2-3

    " Trees

    Woods

    Woods

    Fence

    Woods

    0.5' C

    onc. C

    urb

    2' C

    onc. C

    urb

    0.5' Conc. Curb

    2.5' C

    onc.

    C&G

    2.5' Conc. C&G

    2.5' Con

    c. C&G

    2.5' C

    onc. C

    &G

    2.5' Co

    nc. C&G

    2.5' Con

    c. C&G

    2' C

    onc. C

    &G

    0.5' C

    onc. C

    urb

    2' C

    onc. C&G

    0.5' C

    onc. C

    urb

    Control Pt. # 920

    Control Pt. # 927Control Pt. # 928

    Control Pt. # 934

    Control Pt. # 937

    Perkins St.

    Odd Fellow

    s Rd.

    4' C

    onc. Sid

    ewalk

    Conc. P

    ad

    W/

    Ste

    p

    Gravel P

    arkin

    g Lot

    4' C

    onc. Sid

    ewalk

    Chain Lin

    k Fence

    Asphalt P

    arkin

    g Lot

    Asphalt P

    arkin

    g Lot

    4' C

    onc. Sid

    ewalk

    4' C

    onc. Sid

    ewalk

    Metal Sig

    n

    Bric

    k

    &

    Metal Sig

    n

    Conc. P

    ad

    Asphalt P

    arkin

    g Lot

    Metal G

    ate Post

    4

    Ballard Posts

    Conc. Ste

    ps

    Underground Str

    ucture

    Conc. P

    ad8

    Ballard Posts

    Metal Ste

    ps

    Conc. P

    ad

    Asphalt P

    arkin

    g Lot

    Asphalt P

    arkin

    g Lot

    Conc. Ste