PAST:
The name was M/S. HI-TECH ANCILLARIES LTD.
A tiny family concern as private limited company with initial equity of Rs.4.25 lacs. By 31st March 1990, the annual sales was Rs.80 lacs, equity base was Rs.12.00 lacs and the accumulated loss was Rs.33.00 lacs (almost 3 times the equity base).
The total manpower was 75.
Technical collaboration with M/S. Arai Seisakusho Co. Ltd., Japan.
2
GROWING & ACHIEVING EXCELLENCE THROUGH PEOPLE
PRESENT:
The name is M/S. HI-TECH ARAI LTD.
As of 31st March 2007, the annual sales turnover has touched Rs.190 crores.
The profit before tax for the year 2006-2007 is Rs.30 crores, the equity base is Rs.5.60 crores, and the cumulative surplus (profit ploughed back) is Rs.65.00 crores.
GROWING & ACHIEVING EXCELLENCE THROUGH PEOPLE
CURRENT STATUS IN THE INDUSTRY:
Leader in the market in the OE market with 70% market share. Exports to Yamaha (Japan), Thailand, France, Indonesia ,China and Piaggio (Italy), all for OE market only. Now the Company is in Joint Venture with M/S.Arai Seisakusho Co. Ltd., Japan and M/S. Mitsubishi Corporation, Japan.
The Japanese equity holding is 47%
Now the company also has a Windmill Division with currently 16windmills in operation.(5.00 megawatts).
3
THE STATUS-THEN AND NOW
1990 2007SALES 80 Lacs
(COMPOUNDEDGROWTH
190 CroresANNUAL25%)
PROFIT BEFORE TAX
-8.4 Lacs(Loss)
30 Crores
ACCUMULATED PROFIT
-23 Lacs(Loss)
65 Crores
EQUITY 12 Lacs 5.6 Crores
MAN POWER 75 675
BUILDING TRUST
EMPLOYEE DIGNITYTRANSPARENCY (DECISION MAKING)VISIBILITY (ACTION)OWN THE WHOLE FAMILYCOUNSELLING
4
CORPORATE VALUES (GUIDING PRINCIPLES)
1. EMPOWERMENT
2. OPEN NESS
3. TEAM WORK
4. RESPONSIBILITY TOWARDS SOCIETY
20.827.7 32.1
39.954.2
69.4 78
100
120136
160
190
0
20
40
60
80
100
120
140
160
180
200
1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007
Gross Sales (Rs in Crores)
5
4 6.19.6 12.1 14.2
22 24.130
4045
55
65
0
10
20
30
40
50
60
70
1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007
Net Worth (Rs in Crores)
2.2 2.8 3.8 3.7 3.4 4.3 5.27.8
12.515
25
30
0
5
10
15
20
25
30
1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007
Profit Before Tax (Rs in Crores)
6
GROWING & ACHIEVING EXCELLENCE THROUGH PEOPLE
THE CORE BELIEF IS THAT IT IS POSSIBILE TO ACHIEVE ZERO DEFECT
AND ACHIEVE LEADERSHIP
IN THE MARKET
GROWING & ACHIEVING EXCELLENCE THROUGH PEOPLE
• TRAINING• BENCH MARKING• EMPLOYEE INVOLVEMENT• EMPLOYEE EMPOWERNMENT• ROOT CAUSE CORRECTIVE ACTION• TEAM WORK• UNIVERSAL RESPONSIBILITY• THINKING STATISTICALLY• ORGANISATION CULTURE BUILDING• SUSTAINED MANAGEMENT COMMITMENT
7
HI-TECH ARAI LIMITEDMILESTONES
1985- HI-TECH ANCILLARIES LTD WAS REGISTERED1986- 1ST UNIT IN TANAKKANKULAM1987- TECHNICAL COLLABORATION WITH ARAI
SEISAKUSHO CO LTD1990- TOTALLY PROFESSIONALISED1991- SECOND UNIT IN TRICHY1991- AWARDED BEST SSI UNIT IN THE DISTRICT1992- AWARDED BEST SSI UNIT IN THE DISTRICT1992- THIRD UNIT IN K.PUDUR1992- SET UP R&D CENTRE IN K.PUDUR1993- AWARDED BEST UNIT IN THE STATE1994- JOINT VENTURE WITH ARAI SEISAKUSHO CO LTD
AND MITSUBISHI CORPORATION, JAPAN
HI-TECH ARAI LIMITEDMILESTONES
1994- NAME CHANGED TO HI-TECH ARAI LTD.1995- NEW COMPOUNDING UNIT AT KAPPALUR1995- FOURTH UNIT IN K.PUDUR1997- FIFTH UNIT (DEDICATED TO MARUTI UDYOG LTD) IN
K.PUDUR1999- MOST MODERN FACTORY BEING SET UP AT
K.PUDUR1999- HI-TECH ARAI Q.C. CIRCLE TEAM WON THE FIRST
PLACE IN Q.C. CIRCLE COMPETITION IN TAMIL NADU STATE CONDUCTED BY CII(S.R.)
2000- HI-TECH ARAI Q.C.CIRCLE TEAM WON THE FIRST PLACE IN Q.C. CIRCLE COMPETITION IN SOUTHERN REGION CONDUCTED BY CII(SR)
CONTINUES………………
8
HI-TECH ARAI LIMITEDMILESTONES
2000- IN OCT 2000, HI-TECH ARAI ‘S TWO Q.C.CIRCLE TEAMSWON BOTH THE FIRST AND SECOND PLACE IN Q.C.CIRCLE COMPETITION IN TAMILNADU CONDUCTED BY CII (SR).
2000- IN JUNE 2000, THE CO. INITIATED ENVIRONMENT MGMT. SYSTEM CERTIFICATION PROGRAMME AND AND OBTAINED THE CERTIFICATION IN JULY 2001( ISO 14000)
2001- IN NOV.2001, A PRESTIGEOUS QUALITY PERFORMANCE AWARD FROM MARUTI UDYOG LTD. WAS RECEIVED.
2002- IN DEC.2002, TWO Q.C. TEAMS WON BOTH DISTINGUISED AWARD AND MERITOROUS AWARD IN AN INTERNATIONAL CONVENTION HELD BY QCFI .
2002- THE COMPANY INSTALLED TOTAL COST MANAGEMENT SYSTEM PROGRAM.
2003- THE COMPANY WAS ACCREDITED ISO 9000:2000 CERTIFICATION
CONTINUES………………
HI-TECH ARAI LIMITEDMILESTONES
2004- QC COMPETITION:STATE LEVEL (TAMIL NADU) - FIRSTREGIONAL LEVEL (SOUTHERN) - FIRSTNATIONAL LEVEL - SECOND
2005 - AWARDED BY CII & APAC (AIDS PREVENTION & CONTROL PROJECT) AS “BEST INDUSTRY IN PRACTISING THE HIV / AIDS PREVENTION PRACTICES”.
2006 - FIRST EXPORT ORDER FROM CHINA.
9
VISION1993- To become market leader
in the country within five years
1997- To become one of the top three in the world in the field of Oil Seals.
10
MISSIONMISSIONTO PRODUCE HIGH QUALITY PRODUCTS, AT COMPETITIVE PRICES, COMBINED WITH ON-
TIME DELIVERY, STRICTLY ADOPTING ENVIRONMENTAL
FRIENDLY PROCESSES
OathOur Company Philosophy is
TO PRODUCE HIGH QUALITY PRODUCTS AT COMPETITIVE PRICES COMBINED WITH ON-TIME DELIVERY STRICTLY
ADOPTING ENVIRONMENTAL FRIENDLY PROCESSES
This Philosophy is supported by followingdeep rooted beliefs
• High Quality products shall be produced by practisingTOTAL QUALITY MANAGEMENT AS A WAY OF LIFE
• Competitive Prices shall be achieved throughSUSTAINED EFFORT ON CONTINUOUS IMPROVEMENT
• On-Time Delivery shall be maintained throughTEAM EFFORT
• Environmental friendly processes shall be adopted by practisingENVIRONMENTAL MANAGEMENT SYSTEMS
11
ENVIRONMENTAL POLICY
WE, HI-TECH ARAI LIMITED,MADURAI, ARE ONE OF THE LEADING MANUFACTURERS OF PRECISION AUTO COMPONENTS NAMELY OIL SEALS,’O’ RINGS,REED VALVE ASSEMBLIES AND TECHNICALLY SPECIFIED MOULDED RUBBER PRODUCTS.
WE ARE COMMITTED TO:
-STRIVE FOR CONTINUAL IMPROVEMENT OF OUR ENVIRONMENTAL PERFORMANCE BY PREVENTION OF POLLUTION AND MINIMISATION OF WASTES
-PROMOTE ENERGY SAVINGS AND CONSERVATION OF RESOURCES
-COMPLY WITH ALL APPLICABLE LEGISLATIVE, REGULATORY AND OTHER REQUIREMENTS
-ACHIEVE THE ABOVE BY CREATING AWARENESS AMONG OUR EMPLOYEES THROUGH PROPER COMMUNICATION, TRAINING AND PROVIDING CONDUCIVE WORK ENVIRONMENT
12
OUR HIV / AIDS POLICYTo help maintain harmony at the workplace as well as strengthen the existing bond between employer and the employee, the company’s policy on HIV/AIDS would be as follows:1. The company would provide a safe and healthy work environment for employees.2. The company would educate its employees and the family on prevention, care and counseling
of HIV/ AIDS by providing information through posters ,leaflets, articles in the company journal and having interactive sessions. Particularly , attention would be given to dispel ill –conceived notions and myths.
3. A HIV Positive person would be allowed to continue to work in his/her job unless medical conditions interfere with the specific job that he/she is doing . In such case only if it is necessary , the employee will be shifted to another position where he/she would be comfortable.
4. The company would educate its employees on safe blood donation and transfusion.5. If an employee has been infected , information about the illness would be kept confidential by the
company. Only the immediate boss would be kept advised to prevent any eventuality on the shop floor.
6. No employee can refuse to work along with an HIV positive employee. In fact , the company would expect all employees to ensure that the affected person is comfortable and gets a feeling of being a part of the family.
7. The company , as a policy would not discriminate against any staff infected by HIV/AIDS with regard to promotions, training and other privileges as applicable to all employees of the company.
8. The company can ask a person who is being offered a job , to undergo general medical tests before the issue of the appointment letter. The test would not cover HIV / AIDS.
9. HIV / AIDS test will not be a part of the annual health check ups , unless specifically asked for by an employee.
10. The company would preferably arrange for the availability of condoms at the work place.It is hoped that with this policy , it would be possible to control the epidemic from spreading , to
build positive attitudes towards those infected , to promote health and safety amongst the employees. This , in turn , will assist in bringing about higher productivity and efficiency in the company’s operations.
HUMAN RESOURCE
28.151819000126752007
26.6717.651600036002006
23.4131360025812005
20.682012000-65692004
16.32810000NIL6202003
12.5811780076202002
12.06257000115802001
10.7737560095202000
8.63284100134751999
7.6114320034201998
6.8734280094071997
5.54422080113751996
4.34541470163381995
3.2862950282891994
2.62959082251993
2.59100540822081992
2.36337270141141991
1.06-80-751990
(RS. IN LACS)
PRODUCTION/ EMPLOYEE
(RS. IN LACS)GROWTH (%)
SALES
GROWTH (%)
NO. OF EMPLOYEESYEAR
13
Savings(Rs in Lakhs)
1631605NIL11994-95
22020801.2931995-96
28027703.7361996-97
380321011.27111997-98370399023.00171998-99340542031.00251999-00
4306940103.01332000-01
5207800132.69462001-02
642002-03
ProfitBefore tax
SalesTurnover
SavingsNo. ofCircles
Year
293 822003-04 12500 1250
10000 780219.30
Quality CirclesAnnual Savings (Rs.in lacs)
2002-031. 5 Star 1.082. Silver Star 2.043. Rock Fort 5.904. Polestar 5.725. Sun Flower 0.536. Millennium 0.217. Golden Star 1.078. Blue Diamond 0.839. Mount Everest 1.0210.Arai Star 3.9811.Madurai Jasmine 5.2912.White Rose 13.013.Peagle 1.7514.Windows 0.6015.Kurinchy 19.00
16.Agni 0.2917.Discovery 0.2518.Dolphin 0.1819.Thendral 0.1720.Prism 0.0921.Power 0.0522.HTA.Com 0.1123.Eagle 12.024.Everest 12.9925.Arai 9.326.Lion 29.2427.Marshin 2.0028.Sun 0.4029.Unix7 0.2030.Flora 0.1031.Sincere Seven 0.50
32.Madurai Meenakshi 3.0133.Golden Seven 0.1034.Sapthaswaram 3.1035.Radar 5.7336.Radiant 1.0037.Insaat 1.0038.Red Rose 1.0139.Blue Star 4.2540.Globe 2.7541.Titanic 9.20 42.Orchid 7.2043.Vectrum 19.0044.Park Friends 13.0045.Unity QC 7.0046.Butterfly 3.8147.Others 8.25
Total Savings = Rs.219.30 lacs
14
QC Circle Competition for Workersconducted by CII
at State, Regional & National Level• 1999-00
– State Level -First– Regional Level -First– National Level -Third
• 2000-01– State Level -First
& Second– Regional Level -First– National Level -Second
• 2001-02– State Level -Third– Regional Level -First– National Level - x
• 2002-03– State Level -Second– Regional Level - x– National Level - x
• 2003-04– State Level -First– Regional Level -First– National Level -Second
“Culture has got everything to do with it – because everything you say, our competitors could copy tomorrow. But they can’t
copy the culture, and they know it.”
15
“You can dream, create, design and build the most
wonderful place in the world but it takes people to make
the dream a reality”.- Walt Disney
Culture Building Activity is a marathon race
and not a sprint
16
17
Photo Album
by BANGERA
18
19
20
21
22
SCALING UP
• Demand to chase capacity• Achieve maximum from existing facilities• Every expansion should be for technologically
superior machinery / processes with improved productivity and not for just duplicating existing capacity.
• Step by step expansion• Sustainability of quality and culture after expansion.• Mass Customization.
Basic Philosophy on Scaling Up
23
SCALING UP
• Expansion funded by internal accruals and debt.• Use internal accruals maximum for long term debt to finance
scaling up and use the balance for working capital funding.• Reduce working capital funding by
– Long credit period from overseas suppliers at lower interest
– Shorter credit period for customers giving cash discount– Lower inventory and reduced process cycle
• Get the funds in time even at higher cost much more savings and contribution from timely completion of projects.
Funding Strategy
SCALING UP
• Transparency with Bankers• High on business growth and short on rations –
Achieve projected sales and profits targets – ratios and excess borrowings will be excused
• Build a good track record with banks and institutions• Build units in Industrial Estates- Speedy Pollution
Control Clearance, minimum spending on infrastructure like Power, Roads, Availability of manpower etc.
Funding Strategy
24
SCALING UP
• Go for Multiple Banking – competition for funding helps
• Foreign Currency Loans• FCNR-B Loans • Buyer’s Credit• Factoring• Debentures
Funding Strategy
SCALING UP
• Gap = Funds required for scaling up – Funds tied up
• This Gap to be managed innovatively till the project goes on the stream. Then the inflows from the project will take care of the Gap –Stretch the suppliers, get faster collections, tight inventory, tight first on overheads, off balance sheet financing etc.
Gap Management
25