A brief overview of the ATLAS Pixel Detector

22
STAR coll. Meeting/ MIT , H.Pernegger 7/10/2006 A brief overview of the ATLAS Pixel Detector

description

A brief overview of the ATLAS Pixel Detector. Overview. It will (try) to give a brief overview over the layout, components and status of the Atlas Pixel system Layout Modules Sensors and chip Staves Support structure and integration - PowerPoint PPT Presentation

Transcript of A brief overview of the ATLAS Pixel Detector

Page 1: A brief overview of the ATLAS Pixel Detector

STAR coll. Meeting/ MIT , H.Pernegger 7/10/2006

A brief overviewof the

ATLASPixel Detector

Page 2: A brief overview of the ATLAS Pixel Detector

STAR coll. Meeting/ MIT , H.Pernegger 7/10/2006

Overview

• It will (try) to give a brief overview over the layout, components and status of the Atlas Pixel system– Layout– Modules– Sensors and chip– Staves– Support structure and integration

• Many thanks to the ATLAS Pixel Community for providing the information presented here– The Atlas Pixel Detector Project is a collaboration of 23 institutes

• In particular Chiara Meroni / INFN Milano and Kevin Einsweiler / LBL

Page 3: A brief overview of the ATLAS Pixel Detector

STAR coll. Meeting/ MIT , H.Pernegger 7/10/2006

The ATLAS Inner Detector

Page 4: A brief overview of the ATLAS Pixel Detector

STAR coll. Meeting/ MIT , H.Pernegger 7/10/2006

The ATLAS Pixel Detector

• Radiation hardness:

– NIEL > 1015 1 MeV neq/cm2

– 500 kGy

• Operates inside the 2T field

• Cooled by C3F8 evaporative system . Environmental temperature kept below 0C.

~1.3 m~1.3 m~380 mm~380 mm

• Vertex detector to provide 3 space points – R resolution ~ 13m

– Pixel size 50x400m

• based on 3 barrel layers (innermost is at R=5.1cm) + 2 endcaps with 3 layers each

• Coverage is up to ||<2.5

Page 5: A brief overview of the ATLAS Pixel Detector

STAR coll. Meeting/ MIT , H.Pernegger 7/10/2006

Layout

• Barrel layers build out of 112 staves (1456 modules) and EC out of disks (288 EC module total)

• Total of 1.8m2 and 80 MPixel • Operates at 2V with ~3500A supplied to FE

Page 6: A brief overview of the ATLAS Pixel Detector

STAR coll. Meeting/ MIT , H.Pernegger 7/10/2006

The module

16 FE chips

HV connection

Module Controller Chip

Sensor

Flex hybrid

Pigtail

• Self-contained unit controlled by a Module Controller Chip, which also performs the event building.

• All communications use low voltage differential signal on micro-cables before being converted in optical signals at the end of the whole pixel detector active area, Opto Board.

• It consists of a silicon sensor read-out by 16 front-end (FE) chips connected via bump bonding

• 46k channels / module

Page 7: A brief overview of the ATLAS Pixel Detector

STAR coll. Meeting/ MIT , H.Pernegger 7/10/2006

The Sensors

• Sensors are required to (also) operate under-depleted (max. operating bias 600V). Use oxygenated n-in-n sensors with pixel insulated by a moderate p-spray implant

• A bias grid is used to keep pixel at equipotential during sensor testing (thickness = 280 m)

• Implemented ganged pixels to avoid dead areas between chips

• Production finished at CiS/Germany and ON Semiconductor (TESLA), Czech Republic.

Page 8: A brief overview of the ATLAS Pixel Detector

STAR coll. Meeting/ MIT , H.Pernegger 7/10/2006

The rad-hard FE readout

• The front-electronics chip, FE-I3, is built in 0.25 m IBM technology:• Each chip reads out 2880 pixels (7.4x11mm die). Each pixel cell

consists of a fast preamplifier followed by a discriminator• sparse readout and store hits in EndOfColumn buffers until the level 1

trigger is received• Threshold can be adjusted by a 7-bit tuning DAC in each channel.• 8-bit pulse height information is obtained by the Time-over-

Threshold technique. ToT uniformity is obtained by a 3-bit tuning DAC• On wafer testing measured yield is 81% • Production finished ( >45000 chip)

• For a module noise is typically :– 150 e for standard pixels– 270 e for ganged pixels

• After irradiation, it is ~ 250 e (increased leakage current)

Page 9: A brief overview of the ATLAS Pixel Detector

STAR coll. Meeting/ MIT , H.Pernegger 7/10/2006

Bump bonding

IZM – PbSn

AMS - In

• Two techniques, from different manufacturers have been used for production modules:

– In bumps by Selex (ex Alenia-Marconi Systems), Rome– PbSn bumps by

Fraunhofer-Institut für Zuverlässigkeit und Mikrointegration, Berlin

• Bumping defects can be investigated by X-ray inspections, or electrical tests, and now are very rare: the production contract fixes a rejection ratio of 150 faulty bumps/modules (0.3%).

Page 10: A brief overview of the ATLAS Pixel Detector

STAR coll. Meeting/ MIT , H.Pernegger 7/10/2006

Some testbeam results

• Module tested in PS before and after irradiation– efficiency (TDR requirement >97%):

• >99.9% before irradiation• 97.8% after irradiation

(@500V, already fully depleted)– signal after irradiation ~15k e- @600V– resolution (TDR requirement < 13 m):

• 7.5 m at 10° incidence before irradiation,

• 9.7 m at 15° incidence after irradiation,

• Modules also tested with LHC-like particle flux– Check readout achitecture– Verify that efficiency is ok at LHC-like

occupancy

In-time efficiency as function ofTime -> plateau of 10ns width

Page 11: A brief overview of the ATLAS Pixel Detector

STAR coll. Meeting/ MIT , H.Pernegger 7/10/2006

Production testing

• Module performance is tested using internal calibration circuit

• Measure threshold and noise by injecting 200 different values

ToT for 1 pixel

Page 12: A brief overview of the ATLAS Pixel Detector

STAR coll. Meeting/ MIT , H.Pernegger 7/10/2006

Module Production

Module production is almost finished: need is 1744 modules

Production yield is ~ 93%

Modules are ranked to install the best on the B-layer and disk1, ranking =60 0.1% of dead pixel

Module Ranking

0,000

0,200

0,400

0,600

0,800

1,000

1,200

060

1201802403003604204807001000

ranking

fraction of modules

Status as of May 2006

Page 13: A brief overview of the ATLAS Pixel Detector

STAR coll. Meeting/ MIT , H.Pernegger 7/10/2006

Integration of the Pixel Detector

• Sequence of integration– Modules, after tests, are glued on CC support ladder which includes

cooling pipe (13/stave)– Staves are cabled and retested– 2 staves are inter connected with cooling pipe and mounted on

support half shells– Support half-shells and then surveyed and service panels installed

which include the opto-boards and all services to the end of the pixel detector package

– Halfshells integrated around beam pipe in cleanroom on the surface (ATLAS SR1) and installed in a single support tube.

– The complete Pixel detector with beam pipe is brought to the pit and installed as the last part the Inner Detector

Page 14: A brief overview of the ATLAS Pixel Detector

STAR coll. Meeting/ MIT , H.Pernegger 7/10/2006

Structure

• ~7m structure (all in CF, CC composite) with halfshells place in global support structure

Page 15: A brief overview of the ATLAS Pixel Detector

STAR coll. Meeting/ MIT , H.Pernegger 7/10/2006

The Endcaps

Sector assembly (1/8 of a disk):6 modules are mounted on carbon-carbon plates, sandwiching the cooling pipe.

All 6 disks have been assembled in LBL and ENDCAP C is now at CERN

Will be used for a first commissioning of the Pixel Detector using a cosmic setup in SR1

Page 16: A brief overview of the ATLAS Pixel Detector

STAR coll. Meeting/ MIT , H.Pernegger 7/10/2006

The Barrels• Stave consists of 13 modules on CF ladder which includes the Al cooling pipe• The barrel frame, made of carbon fiber laminate will hold the staves

L2 Layer

L1 Layer

B Layer

• Most staves at CERN now and are currently being cabled and made to bi-staves

Page 17: A brief overview of the ATLAS Pixel Detector

STAR coll. Meeting/ MIT , H.Pernegger 7/10/2006

Staves in halfshells

• Started with integration of bi-staves on halfshells (main activity during and after summer)

Page 18: A brief overview of the ATLAS Pixel Detector

STAR coll. Meeting/ MIT , H.Pernegger 7/10/2006

Summary

• Production of modules finished now and tests show that they perform as required

• All pixel disks and most staves produced by ow• Focus is now on integration of staves to halfshells and

halfshells together• In parallel a lot of emphasis is given to service installation

and integration of off-detector systems (DAQ, DCS, PS, cooling)

• Plan to install pixel system in ATLAS in March 2007 ready for commissioning with the ID and ATLAS

A 3 hit Pixel Detector is on its way to record LHC events in ATLAS

Page 19: A brief overview of the ATLAS Pixel Detector

STAR coll. Meeting/ MIT , H.Pernegger 7/10/2006

Backup slides

Page 20: A brief overview of the ATLAS Pixel Detector

STAR coll. Meeting/ MIT , H.Pernegger 7/10/2006

Rad-hard sensors

• External pixel layers will receive a yearly damage from NIEL corresponding to a fluence of 1014 neq/cm2

• B-layer at R=5.5 cm will be a factor two more.

• Initial specification were:– external layers must

withstand 10 years of operation at the LHC

– B-layer must withstand at least 5 years of operation

• That means:– NIEL >1015 neq/cm2

– dose > 500 kGy

Oxygenated FZ silicon was chosenbecause of improved hardnessto charge particle irradiation.

Page 21: A brief overview of the ATLAS Pixel Detector

STAR coll. Meeting/ MIT , H.Pernegger 7/10/2006

Module Controller (MCC) and hybrid

• Validated SEU resistance :– all critical registers are tripled and use a majority

decision logic;– in the FIFO’s, where data are stored, a bit-flip

safe encoding is used to unambiguously disentangle hits (for which a small corruption rate is acceptable) from event separators (whose loss would cause DAQ misalignment)

• At the PS irradiation facilities MCC were run for the equivalent of 100000 s at the B-layer, without the need to reconfigure the chip.

No. of transistors: 880 k

Dimensions: 6840 x 5140 m2

The MCC and decoupling capacitors, temperature sensors and resistors needed by the LVDS buffers, are mounted on flex hybrids (Dyconex, CH) which are glued on the backside of the sensorsShown is the support card used for module charactherization.

Page 22: A brief overview of the ATLAS Pixel Detector

STAR coll. Meeting/ MIT , H.Pernegger 7/10/2006

Problem during stave production found

• After 30% of stave production, significant leaks found in the end regions of some staves initiated a deep investigation. Leaks and corrosion were found even in the middle of some stave. The origin was in the brazing of the cooling fitting followed by not accurate enough QC procedure

• Strategy to recover was following a triple path:– Insertion of a new pipe in the already loaded stave to

restore integrity, after cleaning and passivating the existing corroding pipe.

– Repair: replace the present cooling pipe with a new pipe, via a controlled delamination of carbon-carbon structure and a subsequent re-assembly.

– New Staves: to compensate for the losses– All need new cooling tubes and fitting

• After a very dedicated effort , the stave production resumed

– Full support from ATLAS that modified the schedule to delay the Pixel insertion to the very last moment (03/07)