9
3
09 AREAS VERDES, CONSTRUCCION DE BANCAS DE CONCRETO S10 METRADOS Und. Metrado 11 AREAS VERDES 11.01 AREAS VERDES m2 100.00 12 CONCRETO ARMADO 12.01 BANCAS DE CONCRETO u 10.00 COSTO DIRECTO SON : SEIS MIL CUATROCIENTOS SIETE Y 00/100 NUEVOS SOLES REHABILITACION, MEJORAMIENTO Y AMPLIACION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. MANUEL FIDENCIO HIDALGO FLORES
-
Upload
jose-chingay-nicolas -
Category
Documents
-
view
216 -
download
0
description
9
Transcript of 9
![Page 1: 9](https://reader036.fdocuments.net/reader036/viewer/2022082820/563dbb4a550346aa9aabe69e/html5/thumbnails/1.jpg)
09 AREAS VERDES, CONSTRUCCION DE BANCAS DE CONCRETO
S10 METRADOS Und. Metrado
11 AREAS VERDES
11.01 AREAS VERDES m2 100.00
12 CONCRETO ARMADO
12.01 BANCAS DE CONCRETO u 10.00
COSTO DIRECTO
SON : SEIS MIL CUATROCIENTOS SIETE Y 00/100 NUEVOS SOLES
REHABILITACION, MEJORAMIENTO Y AMPLIACION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. MANUEL FIDENCIO HIDALGO FLORES
![Page 2: 9](https://reader036.fdocuments.net/reader036/viewer/2022082820/563dbb4a550346aa9aabe69e/html5/thumbnails/2.jpg)
29.07
350.00
6,407.00
![Page 3: 9](https://reader036.fdocuments.net/reader036/viewer/2022082820/563dbb4a550346aa9aabe69e/html5/thumbnails/3.jpg)
009
2,907.00
2,907.00
3,500.00
3,500.00