Purple Line ExtensionSection 1 Construction Community Meeting September 17, 2015
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
2/64
Agenda
2
• Section 2 and 3 Update
• Construction Update
• Eat, Shop, Play Highlights
• Doing Business With Metro• Business Interruption Fund
• Break Out Q&A
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
3/64
Purple Line Extension
Project Alignment
3
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
4/64
Section 2 and 3
Status
Under Construction Forecasted Schedule
Section 1 Section 2 Section 3
Length 3.9 Miles 2.55 Miles 2.48 Miles
New Stations Wilshire/La BreaWilshire/Fairfax
Wilshire/La Cienega
Wilshire/RodeoCentury City/
Constellation
Westwood/UCLAWestwood/VA
Hospital
Pre-Construction Activities Current - 2016 2015 - 2018 2025 - 2027
Construction 2015 - 2023 2019 - 2026 2027 - 2035
Operations 2024 2026 2035 4
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
5/64
PLE Section 1
Alignment
5
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
6/64
Purple Line Maintenance Facility
6
Butterfield Property
590 S Santa Fe Avenue
• Located in Arts District
downtown, near 6th St Bridge
• Building demolition completed
• Environmental review of property
– Department of Toxic Substance
Control (DTSC) conducting public
comment period now through
October 7th on draft removal action
work plan for site.
– For more information contact DTSCProject Manager Jessy Fierro at
818-717-6563
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
7/64
Tie-in at Western Station
7
Pothole Work (Underground Utility Investigation)•September 14 thru October 9th
– Wilshire between Manhattan Place and Western
– Daytime: 9:00am to 3:30pm
Acquire Buildings/Abatement – Properties anticipated to be acquired by October 2015
– Demo will follow in spring 2016
Example of utility work at Fairfax
Rendering of AUR Work
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
8/64
Crenshaw Yard Staging Site
Wilshire/Crenshaw • Used throughout Section 1 utility relocation and construction
• Mitigation efforts and maintenance:
– “Right Turn Only” signs at Lorraine Gate
– “No Metro Contractor Parking on City Street” signs
– Noise awareness training – Nightly noise readings
– Maintenance inside and outside of yard
8Signage at the Crenshaw Yard
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
9/64
La Brea Station
Rendering shows length of the La Brea underground station boxon Wilshire Blvd from Orange Dr to Detroit St 9
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
10/64
La Brea Station
ConstructionLADWP Electrical Duct Bank Work• Currently underway on NE corner of Wilshire
and La Brea, 8pm to 6am, Sunday thru
Thursday
• Anticipated completion date September 30th
Pothole Work (Underground Utility
Investigation)• September 14 thru October 23rd
• Orange Dr to Detroit St
• Daytime: 9:00am to 3:30pm
• Nighttime: 8:00pm to 6:00am
Sewer/Storm Drain• October 4 thru Oct 25
• Nightime: 8:00pm to 6:00am
10
LADWP Electrical Duct bank Work
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
11/64
• Completed demolition of former Metro
Customer Service Center, Blockbuster
and Lawrence of La Brea buildings
• Sound wall construction underway
• Daytime operation: 7am to 4pm
• Work began August 28th and will continue
until October 29th
• Sound wall will be 20 feet high
La Brea Station
North La Brea Staging Yard
11
Demolition of Buildings at N La Brea Staging Yard
Construction of Noise Barrier around yard
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
12/64
• Demolition of former Bank of America
Property Completed
• Metro acquired adjacent property on the
southeast corner of Wilshire/Detroit end of
August.
– Abatement activities underway – 7am-4pm, Monday thru Friday
– Demolition of buildings anticipated to begin in
October
• Future South La Brea Staging Yard
– Sound wall construction anticipated to begin in
October.
La Brea Station
South La Brea Staging Yard
12
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
13/64
• Demolition of former
Bank of America
Property completed
• Metro acquired
adjacent property on
the southeast corner ofWilshire/Detroit end of
August.
La Brea Station
South La Brea Staging Yard
13
Demolition of Buildings at S La Brea Staging Yard
Abatement work currently underway at former
business buildings on SE corner of Wilshire/ Detroit
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
14/64
La Brea Station
Mitigation
14
Noise Blankets during nighttime Ductbank
work at NE corner of Wilshire and La Brea
Design of Sound Wall for N/S La Brea yards
Crenshaw Staging Yard Maintenance
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
15/64
La Brea Tree Removal
• La Brea Tree removal begins end of September• 16 trees will be removed in medians
• 6 Sidewalk Trees removed and relocated
– 4 Trees relocated to Crenshaw Staging Yard
– 2 Trees relocated to LAPD Wilshire Division
• Trees posted for removal May 9, 2015
• Board of Public Works approved Tree removalplan July 22, 2015
• Tree removal schedule
– Fairfax: summer 2016
– La Cienega: late 2016
• End of project trees will be replaced 2:1
15
Trees being removed at median located on Wilshire
between La Brea and Detroit
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
16/64
La Brea Median Removal
16
Median on Wilshire between
Sycamore and La Brea
Median on Wilshire between
La Brea and Detroit
October 2015• 3 medians removed on Wilshire between Sycamore and Cloverdale
• Medians returned after project completion with landscape
• Work required to reconfigure Wilshire to 2 lanes in each direction for pile drilling operations
Median on Wilshire between
Detroit and Cloverdale
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
17/64
La Brea Station
Pile Installation
17
November 2015 through Summer 2016*• First major construction activity of subway at La Brea.
• Length of pile installation will be on Wilshire from Orange Dr.
to Detroit St.
• Pile installation includes:
– Rig to construct 95ft (L) deep hole on 7 center to center spacing
– Crane lifting 95Ft (L) , 24 Inch H-piles into holes
– 1-2 piles per day, 390 piles total
– Drilling, pile installation and backfilled concrete completed same
day
• All work occurs behind a k-rail.
• Operation anticipated to take approximately 4-6 months on
each side of the street.• Typical works hours 7am-11pm.
• Wilshire will be reduced to two lanes each way during
construction.*dates subject to change
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
18/64
La Brea Station
Pile Installation
18
• Wilshire Reconfiguration, Cloverdale to Mansfield• 2 lane westbound Wilshire, 2 lanes eastbound Wilshire
• No medians, no parking on Wilshire
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
19/64
La Brea Station
Pile Installation
19
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
20/64
La Brea Station
Decking Layout
20
• Green: Hard closures at
Highland and La Brea
• 7 full weeks
OR
• 16 weekends
• Purple: Hard closure at La
Brea and Detroit
• 3 weekends, Detroit to
La Brea
• 3 weekends, La Brea
intersection
*Dates subject to change
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
21/64
La Brea Station
Decking Options
Decking• Construction of a concrete deck, curb to curb on Wilshire, between
Orange Dr and Detroit St.
• After concrete panels are installed, traffic can travel over the
surface while the station is constructed underground.
• Will follow pile operations; anticipated spring 2016
Option 1*• 7 week full closure of Wilshire, from Highland and La Brea
– 7 days a week, 7am-11pm above deck, 11pm-7am below deck
– 15 Nights of work
• 6 weekend closures La Brea to Detroit
– 9pm Friday thru 6am Monday, work continuous
Option 2*• Approximately 22 weekend closures
– 9pm Friday thru 6am Monday, work continuous
– 66 Nights of work
21
Have a preferred option? Send comments to
[email protected], Subject: Decking Options
*Dates subject to change
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
22/64
La Brea Station Decking
22
Early detours: South on Crenshaw, west on Olympic, north on La BreaDetour at hard closure: South on Highland, west on Olympic, north on La Brea
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
23/64
La Brea Station Decking
23
• Work Area: Wilshire Blvd from Orange Dr to Detroit StDriveway Access Maintained to Businesses and Residents
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
24/64
La Brea Station DeckingDecking Photos from Crenshaw/LAX project
24
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
25/64
La Brea Station Decking
Community Outreach
25
• Marketing Campaign• Social Media: Facebook, Twitter
• Advertising: Newspapers, radio
• Media Coverage: Press Release, event
• Business and resident outreach
• Meetings with local groups, leaders
• Elected Official Briefings• Safety Presentations
• School Presentations
• Community PartnershipsI-405 Freeway Closure “ Carmageddon”
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
26/64
La Brea Station Decking
Process of Determination
• August/September: Outreach started directly to businesses and residents,La Brea to Highland
• September 17-November 11: Outreach continues to businesses and
residents
• November 12: Next Construction Community Meeting
– Will make determination by this meeting
• If approved, November - March 2016: Contractor and Metro work to get
approvals from
– City Council Member Ryu, CD4
– LA Department of Transportation
– LA Bureau of Engineering
– Board of Public Works
Have a preferred option? Send comments to [email protected], Subject: Decking Options
26
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
27/64
Detours: Wilshire Full Closure
27
• LADOT approves all detour routes
for each construction activity
• Will avoid local streets
• Proposed detours
• South to Olympic
• North to 3rd Street.
LADOT Dash Map
• Bus lines that use Wilshirebetween Fairfax and La Brea
• Metro 720
• Metro 20
• LADOT Dash Fairfax
• Antelope Valley Transit (AVT)
• No buses use 8th currently• DASH uses 6th
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
28/64
Parking Utilization Study
• La Brea Utilization study completed
– Investigated from Highland to Ridgeley, 6th to 8th
• Station located in Miracle Mile
– High demand for parking on and off-street – Several Preferred Parking Districts
• Examined parking utilization rate of existing
parking spaces
• Determined initial additional spaces needed for
Parking Management Plan
28
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
29/64
Parking Relocation
Proposed Parking Replacement Plan
• Turn 2 way street into 1 way street
– Removes parallel parking on one side
– Replaces one side with angled parking
• Current prospects: Cloverdale and Ridgeley• Will remain 2 way street up to public parking lots. After lots,
northbound one way street from Wilshire to 6th
• Requires 2/3 approval by building owners/managers of both sides of
each street
• Meeting with residents/owners August 20, 2015• Overall opinion: NOT SUPPORTED
• Metro evaluating EIR for any further parking requirements
29
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
30/64
Fairfax Station
Rendering shows length of the Fairfax underground station box
on Wilshire Blvd from west of Fairfax to just west of Ogden Dr. 30
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
31/64
Fairfax Station
Construction Metro Advanced Utility Relocation (AUR) Work• Electrical, water and gas work continues
• Work Hours:
Day work:
o Monday thru Friday: 9am-3:30pm
o Saturday: 8am-6pm
Night work:
o Sunday thru Thursday: 8pm-6am
o Friday: 10pm-8am
31
Photos of recent AUR work for Fairfax Station
Photos of recent AUR work at Wilshire/Fairfax
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
32/64
Fairfax Utility Relocation
2 Years *Schedule is subject to change. Updated as of July 2015.
32
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
33/64
Fairfax Station
Mitigation • Noisy activities re-scheduled from night to day work or to be completed by
11 p.m. Activities are monitored throughout each shift.
• Torch cutters used in place of traditional plate cutters.
• Sound blankets shifted and additional blankets added when needed.
• Low impact back up alarms installed on mobile equipment for night work.
• Battery powered (solar charged) lights eliminate noise from generators.
33Photos of noise mitigation at Wilshire/Fairfax
Fairfax Station
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
34/64
Fairfax StationOgden Staging Yard
• Buildings on Wilshire atOgden and Orange
Grove have been
abated.
• Future Ogden Staging
Yard
Next Steps:
• Demo anticipated
end of October 2015
34
Buildings at 6010-6030 Wilshire
Fairfax Station
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
35/64
Fairfax Station
North Fairfax Staging Yard
• North Fairfax Staging Yard
• Demolition of Marinello building
– Scheduled to begin Sept 21- October 19
– Work hours: 7am-4pm
• Temporary re-routing of the adjacent alley atWilshire required
– Deliveries will be maintained to 99cent store
– Work hours: 9am-4pm
35
Johnnies
Fairfax Station
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
36/64
Fairfax StationFairfax Coordinated Construction Projects (FCCP)
Multiple construction projects are underway within a
3 block radius of Wilshire and Fairfax.
• Metro Purple Line Extension
• The Petersen Automotive Museum
• The Academy of Motion Pictures Arts and Science
• Alliance residential and commercial
The FCCP committee members meet every 2 months to discuss and
review the specifics of local construction relating to timelines and
coordinated traffic control as a continuing effort to reduce the impact
on the community.
36
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
37/64
La Cienega Station
Rendering shows length of the La Cienega underground station
box on Wilshire Blvd from La Cienega to Tower Dr. 37
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
38/64
La Cienega Station
Construction
Metro Advanced Utility Relocation (AUR) Work• Electrical, sewer and telecommunication work continues from La
Cienega to San Vicente and on La Cienega north of Wilshire
Photo of recent AUR work for the La Cienega Station
38
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
39/64
La Cienega Utility Relocation
30 Months *Schedule is subject to change. Last updated September 2015
39
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
AT&T
2017
Fiber
Gas
AT&T
Water, Sewer, Storm Drain and Power
Fiber
2014 2015 2016
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
40/64
La Cienega Station
What’s Next
April through December 2015
• AUR activities occur mostly during
daytime hours.
• Days and Hours
o Monday thru Friday: 7am – 4pmo Saturday or Sunday: 8am – 6pm
o Night Time Hours:
• 8pm – 6am or
• 1am – 9am
40
for La Cienega Station
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
41/64
La Cienega Station
Gale Staging Yard • Recently acquired properties for
future staging yard on Gale
• Abatement work at 111 N. Gale
scheduled September 7- 18, 2105
– Work hours: 7am-3:30pm
41
i i
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
42/64
La Cienega Station
What’s Next • Future N La Cienega Staging
Yard
• Abatement activities in progress
for properties acquired
– Former Citibank
– Former Phoenix Restaurant
42
W k d Di ti l Cl
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
43/64
Weekend Directional Closures
Wilshire, La Cienega to San Vicente
43
• 7 weekends total
• September 11-12 complete!
• This weekend: Friday at 10pm through Sunday, Sept 20
at 6pm
• 5 more weekends through October 24, 2015
• Directional closures (either full EB or WB Wilshire),between La Cienega to San Vicente
• Days and Hours
o Start: Friday 10pm or 1am*
o End: Sunday by 6pm
*start time depends on the Saban Theatre performance schedule
Detours:• EB Wilshire closed at La Cienega:
Detour NB La Cienega, SB SanVicente, EB Wilshire
• WB Wilshire: One lane open fromSan Vicente to La Cienega.
• NB San Vicente left turn to WB
Wilshire: Closed
E t Sh Pl Wil hi
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
44/64
44
Eat, Shop, Play Wilshire
Lunch Meet-up at Hill Bar & Grill • On September 1, we held our 2nd #espWilshire Lunch Meet-up at The
Hill Bar & Grill, a locally-owned restaurant located diagonally across the
street from the future La Cienega Station. 45 diners attended to show
their support for EAT, SHOP, PLAY Wilshire.
– Address: 8442 Wilshire Blvd. Beverly Hills, CA 90211
– For more info visit: www.thehillbarandgrill.net
E t Sh Pl Wil hi
http://www.thehillbarandgrill.net/http://www.thehillbarandgrill.net/
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
45/64
45
Eat, Shop, Play Wilshire
Vendor Day
Zimmer Children’s Museum
Vendor Day, Thursday, August 20th (Gateway Lobby)
The Zimmer is designed for children 8 & under, this museum boasts hands-on
exhibits and frequent family programs.6505 Wilshire Blvd. , Los Angeles, 90048
More info: http://www.metro.net/service/discounts/esp-purple-line/zimmer-
childrens-museum/
Dysonna City Art GalleryVendor Day, Thursday, July 10th (Union Station)• Dysonna City Art Gallery presents new and experienced artist
from across the United States. All types of art are featured every
month from abstract to figurative fine art to photography. The
Gallery also has special events, painting classes and so much
more.
• Address: 5373 Wilshire Blvd, Los Angeles, 90036• More Info: http://www.metro.net/service/discounts/esp-purple-
line/dysonna-city-art-gallery/
Eat Shop Play Wilshire
http://www.metro.net/service/discounts/esp-purple-line/zimmer-childrens-museum/http://www.metro.net/service/discounts/esp-purple-line/zimmer-childrens-museum/http://www.metro.net/service/discounts/esp-purple-line/dysonna-city-art-gallery/http://www.metro.net/service/discounts/esp-purple-line/dysonna-city-art-gallery/http://www.metro.net/service/discounts/esp-purple-line/dysonna-city-art-gallery/http://www.metro.net/service/discounts/esp-purple-line/dysonna-city-art-gallery/http://www.metro.net/service/discounts/esp-purple-line/dysonna-city-art-gallery/http://www.metro.net/service/discounts/esp-purple-line/dysonna-city-art-gallery/http://www.metro.net/service/discounts/esp-purple-line/dysonna-city-art-gallery/http://www.metro.net/service/discounts/esp-purple-line/dysonna-city-art-gallery/http://www.metro.net/service/discounts/esp-purple-line/dysonna-city-art-gallery/http://www.metro.net/service/discounts/esp-purple-line/dysonna-city-art-gallery/http://www.metro.net/service/discounts/esp-purple-line/dysonna-city-art-gallery/http://www.metro.net/service/discounts/esp-purple-line/dysonna-city-art-gallery/http://www.metro.net/service/discounts/esp-purple-line/dysonna-city-art-gallery/http://www.metro.net/service/discounts/esp-purple-line/zimmer-childrens-museum/http://www.metro.net/service/discounts/esp-purple-line/zimmer-childrens-museum/http://www.metro.net/service/discounts/esp-purple-line/zimmer-childrens-museum/http://www.metro.net/service/discounts/esp-purple-line/zimmer-childrens-museum/http://www.metro.net/service/discounts/esp-purple-line/zimmer-childrens-museum/http://www.metro.net/service/discounts/esp-purple-line/zimmer-childrens-museum/http://www.metro.net/service/discounts/esp-purple-line/zimmer-childrens-museum/http://www.metro.net/service/discounts/esp-purple-line/zimmer-childrens-museum/http://www.metro.net/service/discounts/esp-purple-line/zimmer-childrens-museum/
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
46/64
46
Eat, Shop, Play Wilshire
Candela Taco Bar and Grill Candela Taco Bar & Lounge serves over 15 types of tacos, entrees and deliciousdrinks. They also have Tango Night Tuesdays starting at 7 p.m. and $1 taco night
every Wednesday. There’s also a private event space for up to 600 guests.
Mention “Metro” or “Purple Line Extension” and receive 20% off an appetizer.
– Address: 831 South La Brea, Los Angeles, CA 90036
– For more info visit: http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/
Eat Shop Play Wilshire
http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/http://www.metro.net/service/discounts/esp-purple-line/candela-taco-bar-lounge/
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
47/64
47
Eat, Shop, Play Wilshire
ESP Spotlight LACMA
GO METRO: and receive $2.00 discount on general admission
Info: http://www.metro.net/service/discounts/esp-purple-line/lacma /
Eat Shop Play Wilshire
http://www.metro.net/service/discounts/esp-purple-line/lacma/http://www.metro.net/service/discounts/esp-purple-line/lacma/http://www.metro.net/service/discounts/esp-purple-line/lacma/http://www.metro.net/service/discounts/esp-purple-line/lacma/http://www.metro.net/service/discounts/esp-purple-line/lacma/http://www.metro.net/service/discounts/esp-purple-line/lacma/http://www.metro.net/service/discounts/esp-purple-line/lacma/http://www.metro.net/service/discounts/esp-purple-line/lacma/http://www.metro.net/service/discounts/esp-purple-line/lacma/http://www.metro.net/service/discounts/esp-purple-line/lacma/
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
48/64
48
Eat, Shop, Play Wilshire
Speedy Computer Center • Speedy Computer Center is a neighborhood computer center that
provides on-site services, usually within 2 hours of your call or a
technician can be sent to your home, office and or business. Rates in
store and on-site are reasonable and most repairs are same day service,
some even while you wait.
– Address: 5217 Wilshire Blvd, Los Angeles, CA 90036
– For more info visit: http://www.metro.net/service/discounts/esp-purple-
line/speedy-computer-center/
http://www.metro.net/service/discounts/esp-purple-line/speedy-computer-center/http://www.metro.net/service/discounts/esp-purple-line/speedy-computer-center/http://www.metro.net/service/discounts/esp-purple-line/speedy-computer-center/http://www.metro.net/service/discounts/esp-purple-line/speedy-computer-center/http://www.metro.net/service/discounts/esp-purple-line/speedy-computer-center/http://www.metro.net/service/discounts/esp-purple-line/speedy-computer-center/http://www.metro.net/service/discounts/esp-purple-line/speedy-computer-center/http://www.metro.net/service/discounts/esp-purple-line/speedy-computer-center/http://www.metro.net/service/discounts/esp-purple-line/speedy-computer-center/http://www.metro.net/service/discounts/esp-purple-line/speedy-computer-center/http://www.metro.net/service/discounts/esp-purple-line/speedy-computer-center/http://www.metro.net/service/discounts/esp-purple-line/speedy-computer-center/http://www.metro.net/service/discounts/esp-purple-line/speedy-computer-center/http://www.metro.net/service/discounts/esp-purple-line/speedy-computer-center/
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
49/64
How To DoBusiness WithMetro Workshop
September 17, 2015
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
50/64
DEOD’s Responsibilities
Administer and oversee
Gather data & generate reports
Publicize contract opportunities
Provide training and resources
Set DBE/SBE/DVBE goals
Monitor compliance
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
51/64
About Metro
Multimodal transportation agency
1) Operator of buses and rail
2) Transportation planning and programmingagency
3) Construction agency of mobility relatedbuilding projects
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
52/64
What does that Mean?
Largest public works programs in the country
Dozen of projects
$30 to $40 Billion over 30 years
Metro is changing the urban landscape
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
53/64
Why is that Important?
Metro needs contractors to:Design & build projects
Service & maintain existing projects andinfrastructure
Metro needs a LOT of:
Prime contractorsSmall Business Enterprises (SBEs)
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
54/64
Metro’s Commitment to Small Businesses
Long history of support
Values and encourages participation of smallbusinesses
We need you
DEOD’s role
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
55/64
DEOD’s Resources Information
DEOD website 6 Steps to Doing Business with Metro Small Business Programs Events Calendar Fact Sheets Certification Application Current & Future Solicitations Useful Links Today’s Presentation
metro net/connect
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
56/64
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
57/64
BIF Introduction
• Metro’s Goal Help small “mom and pop”
businesses continue to thrive throughout
construction and post construction
• Financial assistance to small “mom and pop” businesses directly impacted by Metro transitrail construction along three project areas: – Regional Connector, Little Tokyo area
– Crenshaw/LAX Transit Project
– Metro Purple Line Extension, Phase 1
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
58/64
BIF Eligibility Requirements
• Small “mom and pop” business with 25 or fewer total employees • Businesses located immediately adjacent to the rail corridor and
directly impacted by Metro construction
• For-profit business or non-religious, non-profit
•Continuous operation for at least 2 years along the corridor
• Must be a solvent business
• Must be able to produce relevant financial records demonstratinga loss of business revenue directly related to period of Metro’sconstruction disruption
• Must be in good standing with all local, state and federal taxingand licensing authorities
• Must meet all technical qualifications as outlined in Metro’s BIFAdministrative Guidelines
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
59/64
BIF Financial Threshold
• Financial threshold: The lesser total of amountof 50,000 or 60% of annual business revenuelosses per business
– Maximum annual per business not to exceed
$50,0000
• Covered fixed operating expenses: Utilities,Insurance, Rent/Mortgage, Payroll and Othersupon review
Note: Special provisions exists for commercialproperty owners
BIF P R
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
60/64
BIF Program Resources
>
BIF Program Materials• Factsheet (take one)• 4 Step Easy Guide
> BIF Application• Online
• Paper (per request to PCR)• In person
> BIF Business Advisors> BIF Workshop Series
• Date: Wednesday, October 14, 2015• Time: 11:30am – 12:30pm• Location: 5200 Wilshire Apartments*Refer to Metro’s BIF Workshop schedule for additional locations, dates and times
BIF W k h S i
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
61/64
BIF Workshop Series
Purple Line Extension, Phase 1Wednesday, October 14, 2015
11:30am-12:30pm
5200 Wilshire Apartments
Los Angeles, CA 90036
Community Room, 3rd Floor
**Street parking only
Regional Connector, Little Tokyo area
Tuesday, November 10, 2015
10:30am-11:30am
Little Tokyo Branch Library, L.A. Public
Library203 S. Los Angeles Street
Los Angeles, CA 90012
Crenshaw/LAX Transit Project CorridorWednesday, September 30, 2015
4:00pm-5:00pm
Metro’s Business Solution Center
(Co-located at the L.A. Urban League)
3450 Mount Vernon Drive
Los Angeles, CA 90008
Tuesday, October 27, 2015
10:30am-11:30am
Inglewood City Hall
Community Room A, 9th Floor
One Manchester Blvd.Inglewood, CA 90301
For additional infomration and to RSVP, please email Adriana Hernandez
at [email protected] or call (213) 922-2614.
d d i i
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
62/64
BIF Fund Administrator
Pacific Coast Regional, Small BusinessDevelopment Corp. (PCR)
Angela Winston
Vice President & Program Manager
3255 Wilshire Blvd., Suite 1501
Los Angeles, CA 90010
(213)739-2999 ext. 223
[email protected] www.pcrcorp.org
mailto:[email protected]://www.pcrcorp.org/http://www.pcrcorp.org/mailto:[email protected]
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
63/64
Future Community Meetings
• Next Section 1 Community Meeting: November 12, 2015 atJohn Burroughs Middle School Auditorium, 600 S.
McCadden Pl.
• Community Meetings held on the 3rd Thursday of every other month
(except November, which is the 2
nd
Thursday of the month due to Thanksgiving) – Community Meeting location will rotate along the alignment
– Section 1 Advisory Group will meet as needed to discuss station
specific issues. Meetings will be open to the public.
• Sign up for the newsletter to receive project updates!
63
-
8/20/2019 9.17.15 Section 1 Community Meeting Presentation
64/64
Stay in Touch
www.metro.net/purplelineext
twitter.com/purplelineext
facebook.com/purplelineext
213.922.6934