Pilot Project Planning and Preparation
Rod Stickland
2
Objectives of Pilot Corridor Improvement
Investigating and testing options for improving non-BRT bus services so as to:• Complement BRT and integrate public
transport services• Reduce dependence on private car usage• Improve operational efficiency; and• Provide better service to passengers
3
Recommended Approach•Keep the non-BRT services in the private sector, where – given an appropriate regulatory environment and reasonable fare levels – improved service levels can be achieved without recourse to subsidy•The Consultants believe that this solution is the most effective and will deliver the required service levels in the most efficient and cost-effective manner
4
Implementation Strategy•Investigate “reform” in cooperation with existing operators …. and develop a PILOT PROJECT to assess how best to implement in local context•Not practical to introduce all aspects at one time .. so focus initially on key aspects .. and subsequently phase in the less critical aspects
5
Key Elements of Pilot Project
•A package of REFORM measures to address the key deficiencies and problems•Four key aspects of Reform:a.Institutional – legal and contractual issues
b.Operational – scheduling and ticketing
c.Financial – fares, revenues, costs, salaries
d.Physical – traffic management, bus priority, new vehicles
6
Implementation Actions•Objective is to work WITH existing operators to find ways to: IMPROVE the service quality to travelling
public … Whilst ensuring operators’ financial
viability•Select routes/corridors with significant bus volumes that are NOT affected by BRT •Assemble data relating to bus movements and passenger demand
7
Key Components of Pilot Project (1)
Select Pilot Project/Route
Healthy Demand Separate from BRT
No direct rivals
Form Owners into CompanyVehicle ownership
transferred to Company
Drivers Salaried
Drivers and Helpers employed by
company
Set Service Standards
Establish frequency, number of vehicles, hours of operation
8
Key Components of Pilot Project (2)
Contract Arrangements
Establish basis of contract between
Company & DISHUB
Fares and Ticketing
Establish basis of fares and determine
maximum level
Setoran abolished
Fares revenue paid to Company: no
daily vehicle rental
Management & Operations
Scheduling, control, monitoring and
supervision
9
Additional Components
Physical On-Street WorksImprove roadway,
construct stops, control parking
Traffic Management
Bus priority measures, bus lanes,
junction priorities
Ticketing Systems
Distance related fares, fare box, smart cards, etc
Introduce New Urban BusLow floor, easy
access, maximum capacity (standees)
10
Implementation of the Pilot Project
Activities and Schedule
1. Preparatory work
2. Project Planning
3. Negotiate with owners
5. Implement operational change
7. Expand to additional corridors
4. Establish operating Company
6. Infrastructure Development
11
Implementation of the Pilot ProjectActivity Details Parties involved
Preparatory work - Field survey and observation- Secondary data collection- Selection of pilot route/corridor
IndIIDishub
Pilot Project Planning - Define detail of project service standardso Number of buses, Frequency / headwayo Fares and Ticketing
- Define contract arrangementso Vehicle provision; Maintenance arrangementso Fare collection and revenue allocation
IndIIDishub
Negotiate with Owners/operators
- Discuss, evaluate & agree operating procedures- Establish terms and conditions for service supply Dishub
Set up new Company - Transfer ownership of buses to Company- Establish management and control systems
DishubOperator(s)
Implement operational changes
- On-going monitoring & evaluation- Adjust as necessary
IndIIDishub
Infrastructure development
- Road repairs and preparation (including markings)- Construction of sidewalks, stops and terminals- Traffic management & bus priority measures- Strengthen Enforcement
IndIIDishub
Public WorksPolice
Expand to other corridors
- Expand and/or replicate the project- Publicise widely
IndIIDishub
12
Pilot Project Phasing
ActivityTime frame (months)
1 2 3 4 5 6 7 8 9 10 11 12
Preparatory work
Pilot Project Planning
Negotiate with Bus Owners
Set up new Company
Implement ’soft’ elements
Infrastructure development
Expansion
13
Pilot Route Planning
14