5/13/2016 1 Rehabilitation of Division Street Bridge Structural Engineers Association of Illinois 13 th Annual Midwest Bridge Symposium April 28, 2016 Presented By: Brad Noack, PE, SE Project Manager Rehabilitation of Division Street Bridge 2 Rehabilitation of Division Street Bridge Owner: City of Blue Island Engineering Team: Prime Consultant Lochner Roadway/Survey/Civil Sub-Consultant Robinson Engineering Electrical Sub-Consultant – AAA Engineering Construction Management: Lochner Contractor: Kenny Construction Rehabilitation of Division Street Bridge 3 Location Map Project Location Project Location N

Transcript of 9-Noack - Final SEAOI Noack · handles gusset plates Rehabilitation of Division Street Bridge 19 19...

Page 1: 9-Noack - Final SEAOI Noack · handles gusset plates Rehabilitation of Division Street Bridge 19 19 2012 Phase I Update 20 Scope: • FHWA Gusset Plate Load Rating -Results Rehabilitation

5/13/2016

1

Rehabilitation of Division Street Bridge

Structural Engineers Association of Illinois13th Annual Midwest Bridge SymposiumApril 28, 2016

Presented By: Brad Noack, PE, SEProject Manager

Rehabilitation of Division Street Bridge 2

Rehabilitation of Division Street Bridge

Owner:City of Blue Island

Engineering Team:Prime Consultant – LochnerRoadway/Survey/Civil Sub-Consultant – Robinson EngineeringElectrical Sub-Consultant – AAA Engineering

Construction Management:Lochner

Contractor:Kenny Construction

Rehabilitation of Division Street Bridge 3

Location Map

Project LocationProject Location

N

Page 2: 9-Noack - Final SEAOI Noack · handles gusset plates Rehabilitation of Division Street Bridge 19 19 2012 Phase I Update 20 Scope: • FHWA Gusset Plate Load Rating -Results Rehabilitation

5/13/2016

2

Existing Camelback Thru Truss Bridge

Rehabilitation of Division Street Bridge 4

Rehabilitation of Division Street Bridge 5

Existing Camelback Thru Truss Bridge

6

• Large assets for suburb of 20,000• No maintenance in 40 years, 10 tons posted in 2003

Rehabilitation of Division Street Bridge 6

Background

Previous 1921 Structure

Page 3: 9-Noack - Final SEAOI Noack · handles gusset plates Rehabilitation of Division Street Bridge 19 19 2012 Phase I Update 20 Scope: • FHWA Gusset Plate Load Rating -Results Rehabilitation

5/13/2016

3

7

• 2004 Phase I study by Robinson Engineering• No Phase III funding, project stalls

Rehabilitation of Division Street Bridge 7

Background

8

• Lochner named NBIS Program Manager• Begins hands-on inspection of Chatham/Division bridges

Rehabilitation of Division Street Bridge 8

2007 Fracture Critical Inspection

9

• Findings -

Rehabilitation of Division Street Bridge 9

2007 Fracture Critical Inspection

Severe corrosion under floor drains and joints!

Page 4: 9-Noack - Final SEAOI Noack · handles gusset plates Rehabilitation of Division Street Bridge 19 19 2012 Phase I Update 20 Scope: • FHWA Gusset Plate Load Rating -Results Rehabilitation

5/13/2016

4

10

Recommendations:• Reduce posting to 3 tons• Major repairs needed!

Result:• No emergency vehicle/school bus crossing• No funding for repairs

Rehabilitation of Division Street Bridge 10

2007 Fracture Critical Inspection

11

• No funds for required hands-on fracture critical inspection• Visual inspection shows worsening conditions

Rehabilitation of Division Street Bridge 11

2010 Closure

12

Illinois Major Bridge Program funding request was rejected, but yielded valuable feedback

Reasons given:• Lack of justification for costs (up-to-date scope and cost

estimates needed)• Low ADT = 4,000 (2030)

Action Items:• Update Phase I study• City to develop TIF District

Rehabilitation of Division Street Bridge 12

Quest for Rehabilitation Funding

Page 5: 9-Noack - Final SEAOI Noack · handles gusset plates Rehabilitation of Division Street Bridge 19 19 2012 Phase I Update 20 Scope: • FHWA Gusset Plate Load Rating -Results Rehabilitation

5/13/2016

5

13

Scope:• Hands-on Inspection• Load Rating Analysis• BCR w/ Life Cycle Cost Analysis• Repair or Replace?

Rehabilitation of Division Street Bridge 13

2012 Phase I Update

Load up the barge!

14

Scope:• No As-Builts exist – field

measure everything

Rehabilitation of Division Street Bridge 14

2012 Phase I Update

Many members are different than original plans suggest…up to 25% larger

Roadway stringers:Per Plan = W24x76Field Verified = W27x94

15

Scope:• Load Rating Analysis

o AASHTOWare BrRo As-Built and As-Inspected Ratings

Rehabilitation of Division Street Bridge 15

2012 Phase I Update

Page 6: 9-Noack - Final SEAOI Noack · handles gusset plates Rehabilitation of Division Street Bridge 19 19 2012 Phase I Update 20 Scope: • FHWA Gusset Plate Load Rating -Results Rehabilitation

5/13/2016

6

16

Scope:• Load Rating Analysis

o BrR Truss Module for Span 2o BrR FB/Stringer Module for Span 1, 3 & 4o Use field measured sectionso Input section loss % as measured

Rehabilitation of Division Street Bridge 16

2012 Phase I Update

17

Scope:• Load Rating Analysis

o HS-20 Inventory Rating Results Stringers RF = 0.00 in 8 locations Floorbeam RF = 0.42 under north truss joint Truss Chord RF = 1.61

Gusset Plates RF = ???

Interior FB’s RF = 1.04 (Controlling As-Built)

Rehabilitation of Division Street Bridge 17

2012 Phase I Update

18

Scope:• FHWA Gusset Plate Load Rating

o Complete Field Documentationo Measure remaining section in corrosion areas

Rehabilitation of Division Street Bridge 18

2012 Phase I Update

Page 7: 9-Noack - Final SEAOI Noack · handles gusset plates Rehabilitation of Division Street Bridge 19 19 2012 Phase I Update 20 Scope: • FHWA Gusset Plate Load Rating -Results Rehabilitation

5/13/2016

7

Scope:• FHWA Gusset Plate Load

Ratingo Failure Modes Fasteners Yielding Fracture Rupture Buckling

o Huge MathCad efforto AASHTOWare BrR now

handles gusset plates

19Rehabilitation of Division Street Bridge 19

2012 Phase I Update

20

Scope:• FHWA Gusset Plate Load Rating - Results

Rehabilitation of Division Street Bridge 20

2012 Phase I Update

HS-20 Gusset Inventory RF = 1.82

GOOD!

(Does not control over Truss Chord

RF = 1.61)

21

Scope:• Bridge Condition Report

o Rehab Option Replace Deck (>30% defects) Replace Span 1, 3 & 4 Superstructure Replace Stringers 2 & 6/End FB’s in Span 2 Clean/Repaint Span 2

Rehabilitation of Division Street Bridge 21

2012 Phase I Update

Page 8: 9-Noack - Final SEAOI Noack · handles gusset plates Rehabilitation of Division Street Bridge 19 19 2012 Phase I Update 20 Scope: • FHWA Gusset Plate Load Rating -Results Rehabilitation

5/13/2016

8

22

Scope:• Bridge Condition Report

o Replacement Option Backspan distance/depth not available for Plate Girder Truss or Tied Arch

Rehabilitation of Division Street Bridge 22

2012 Phase I Update

23

Scope:• Life Cycle Cost Analysis (follows NCHRP Report 483)

o Assumed rehab extends life 35 yearso Analysis Period = 100 yearso Assumed maintenance cycleso Initial Costs = $6.8M for rehab, $12.0M for replacement

o Life Costs = $12.6M for rehab, $14.5M for replacement

Rehabilitation Option Recommended

Rehabilitation of Division Street Bridge 23

2012 Phase I Update

24

Reasons given for previous IMBP rejection:• Lack of justification for costs (accurate data, better

justifications, proper scope and cost estimates needed)• Chatham closed permanently, ADT = 9,000 (2040)

Case made for project:• Emergency vehicle/school bus rerouting• Effects on local business• Local fund match secured through TIF• Submit fund request September 2013

Rehabilitation of Division Street Bridge 24

Quest for Rehabilitation Funding (Take 2)

Page 9: 9-Noack - Final SEAOI Noack · handles gusset plates Rehabilitation of Division Street Bridge 19 19 2012 Phase I Update 20 Scope: • FHWA Gusset Plate Load Rating -Results Rehabilitation

5/13/2016

9

25Rehabilitation of Division Street Bridge

Scope:• Safety/durability/aesthetic improvements• Reduce Fracture Critical Members• P, S & E for complete rehabilitation

25

2014 Phase II

26

Scope:• Safety/durability/aesthetic improvements

Rehabilitation of Division Street Bridge 26

2014 Phase II

27

Scope:• Safety/durability/aesthetic improvements

Rehabilitation of Division Street Bridge 27

2014 Phase II

Page 10: 9-Noack - Final SEAOI Noack · handles gusset plates Rehabilitation of Division Street Bridge 19 19 2012 Phase I Update 20 Scope: • FHWA Gusset Plate Load Rating -Results Rehabilitation

5/13/2016

10

28

Scope:• Safety/durability/aesthetic improvements

Rehabilitation of Division Street Bridge 28

2014 Phase II

Joint & drain reduction• 6 open joints 4 sealed joints• 90 floor drains 8 scuppers

29

Scope:• Safety/durability/aesthetic improvements

Rehabilitation of Division Street Bridge 29

2014 Phase II

30

Scope:• Safety/durability/aesthetic improvements

Rehabilitation of Division Street Bridge 30

2014 Phase II

Page 11: 9-Noack - Final SEAOI Noack · handles gusset plates Rehabilitation of Division Street Bridge 19 19 2012 Phase I Update 20 Scope: • FHWA Gusset Plate Load Rating -Results Rehabilitation

5/13/2016

11

31

Scope:• Safety/durability/aesthetic improvements

Rehabilitation of Division Street Bridge 31

2014 Phase II

32

Scope:• Safety/durability/aesthetic improvements

Rehabilitation of Division Street Bridge 32

2014 Phase II

33

Scope:• Safety/durability/aesthetic improvements

Rehabilitation of Division Street Bridge 33

2014 Phase II

Page 12: 9-Noack - Final SEAOI Noack · handles gusset plates Rehabilitation of Division Street Bridge 19 19 2012 Phase I Update 20 Scope: • FHWA Gusset Plate Load Rating -Results Rehabilitation

5/13/2016

12

34

Scope:• Safety/durability/aesthetic improvements

o Additional improvements New weathering steel New deck is HPC Non-composite FB’s made composite

Rehabilitation of Division Street Bridge 34

2014 Phase II

35

Scope:• Reduce Fracture Critical Members (4 FB’s Removed)

Rehabilitation of Division Street Bridge 35

2014 Phase II

36

Scope:• Reduce Fracture Critical Members

o Consider additional loading on existing substructureo IDOT BCR Procedures Abbreviated Analysis (for “Good” condition, <115% DL) Detailed Analysis (for other cases)

Rehabilitation of Division Street Bridge 36

2014 Phase II

Page 13: 9-Noack - Final SEAOI Noack · handles gusset plates Rehabilitation of Division Street Bridge 19 19 2012 Phase I Update 20 Scope: • FHWA Gusset Plate Load Rating -Results Rehabilitation

5/13/2016

13

37

Scope:• Reduce Fracture Critical Members

o Consider additional loading on existing substructureo IDOT BCR Procedures Abbreviated Analysis (“Good” condition, 115% DL) Detailed Analysis

Rehabilitation of Division Street Bridge 37

2014 Phase II

38

Scope:• Reduce Fracture Critical Members

o Consider additional loading on existing substructureo IDOT BCR Procedures Abbreviated Analysis (“Good” condition, 115% DL) Detailed Analysis

Rehabilitation of Division Street Bridge 38

2014 Phase II

30 Ton Plans Pile Capacity x (1.36)= 40.8 Tons for Rehab Design

39

Scope:• Screed analysis

o Goals No negative/excessive fillets

o Challenges No camber diagrams in plans Variable existing deck thickness

Rehabilitation of Division Street Bridge 39

2014 Phase II

Page 14: 9-Noack - Final SEAOI Noack · handles gusset plates Rehabilitation of Division Street Bridge 19 19 2012 Phase I Update 20 Scope: • FHWA Gusset Plate Load Rating -Results Rehabilitation

5/13/2016

14

40

Scope:• Screed analysis

o Solution Deck survey at stringers NDT for deck thickness Combine for stringer

profile STAAD model Existing w/ old deck Existing w/o deck Existing w/ new deck

Determine camber anddeflection

Rehabilitation of Division Street Bridge 40

2014 Phase II

Average Existing Deck Thickness = 7.31”

41

Scope:• Maintain water main service

o Goal 8 hour outage maximum

o Challenges Water main is attached to deck Existing deck will be removed!

Rehabilitation of Division Street Bridge 41

2014 Phase II

42

Scope:• Maintain water main service

o Solution Temporary water main

Rehabilitation of Division Street Bridge 42

2014 Phase II

Page 15: 9-Noack - Final SEAOI Noack · handles gusset plates Rehabilitation of Division Street Bridge 19 19 2012 Phase I Update 20 Scope: • FHWA Gusset Plate Load Rating -Results Rehabilitation

5/13/2016

15

43

NBIS inspection reports on the evening news…

Rehabilitation of Division Street Bridge 43

“Breaking” News

44

Blue Island Bridges get media attention after Ashland also closed

Rehabilitation of Division Street Bridge 44

“Breaking” News

“A bridge problem in Blue Island has residents fuming, the state of Illinois scrambling and a new mayor dealing with a transportation nightmare” – abc7chicago 3/27/2014

45

Lots of progress….

FUNDING SECURED per May 2014 IMBP letter!

Phase II P, S & E SUBMITTED in January 2015

Project FAST-TRACKED to June 2015 Letting

Rehabilitation of Division Street Bridge 45

Quest for Rehabilitation Funding

Page 16: 9-Noack - Final SEAOI Noack · handles gusset plates Rehabilitation of Division Street Bridge 19 19 2012 Phase I Update 20 Scope: • FHWA Gusset Plate Load Rating -Results Rehabilitation

5/13/2016

16

46

Lots of progress….

FUNDING SECURED per May 2014 IMBP letter!

Phase II P, S & E SUBMITTED in January 2015

Project FAST-TRACKED to June 2015 Letting

Rehabilitation of Division Street Bridge 46

Quest for Rehabilitation Funding

47

Construction begins in September 2015• Phase III Engineer – Lochner• Phase III Contractor – Kenny Construction

Rehabilitation of Division Street Bridge 47

2015-2016 Phase III

48Rehabilitation of Division Street Bridge 48

2015-2016 Phase III

Page 17: 9-Noack - Final SEAOI Noack · handles gusset plates Rehabilitation of Division Street Bridge 19 19 2012 Phase I Update 20 Scope: • FHWA Gusset Plate Load Rating -Results Rehabilitation

5/13/2016

17

49Rehabilitation of Division Street Bridge 49

2015-2016 Phase III

50Rehabilitation of Division Street Bridge 50

2015-2016 Phase III

51Rehabilitation of Division Street Bridge 51

2015-2016 Phase IIITruss chord web repair – 5 Contract Plan locations

Page 18: 9-Noack - Final SEAOI Noack · handles gusset plates Rehabilitation of Division Street Bridge 19 19 2012 Phase I Update 20 Scope: • FHWA Gusset Plate Load Rating -Results Rehabilitation

5/13/2016

18

52

Additional defects found after deck removal…

Rehabilitation of Division Street Bridge 52

2015-2016 Phase III

Truss chord web repair – 5 Change Order locations

53

Additional defects found after deck removal…

Rehabilitation of Division Street Bridge 53

2015-2016 Phase III

FB stiffener repair – 5 Change Order locations

54

Additional defects found after deck removal…

Rehabilitation of Division Street Bridge 54

2015-2016 Phase III

FB tension rod replace – 14 Change Order locations

Page 19: 9-Noack - Final SEAOI Noack · handles gusset plates Rehabilitation of Division Street Bridge 19 19 2012 Phase I Update 20 Scope: • FHWA Gusset Plate Load Rating -Results Rehabilitation

5/13/2016

19

55

Additional defects caused by deck removal…

Rehabilitation of Division Street Bridge 55

2015-2016 Phase III

56

Additional defects caused by deck removal…

Rehabilitation of Division Street Bridge 56

2015-2016 Phase III

57

Additional defects caused by deck removal…

Rehabilitation of Division Street Bridge 57

2015-2016 Phase III

Page 20: 9-Noack - Final SEAOI Noack · handles gusset plates Rehabilitation of Division Street Bridge 19 19 2012 Phase I Update 20 Scope: • FHWA Gusset Plate Load Rating -Results Rehabilitation

5/13/2016

20

58Rehabilitation of Division Street Bridge 58

2015-2016 Phase III

59Rehabilitation of Division Street Bridge 59

2015-2016 Phase III

60Rehabilitation of Division Street Bridge 60

2015-2016 Phase III

Page 21: 9-Noack - Final SEAOI Noack · handles gusset plates Rehabilitation of Division Street Bridge 19 19 2012 Phase I Update 20 Scope: • FHWA Gusset Plate Load Rating -Results Rehabilitation

5/13/2016

21

61Rehabilitation of Division Street Bridge 61

2015-2016 Phase III

62Rehabilitation of Division Street Bridge 62

2015-2016 Phase III

Division Street Bridge

Structural Engineers Association of Illinois13th Annual Midwest Bridge SymposiumApril 28, 2016

Anticipated open to traffic July 2016

Page 22: 9-Noack - Final SEAOI Noack · handles gusset plates Rehabilitation of Division Street Bridge 19 19 2012 Phase I Update 20 Scope: • FHWA Gusset Plate Load Rating -Results Rehabilitation

5/13/2016

22

THANK YOU!!!QUESTIONS???

Structural Engineers Association of Illinois13th Annual Midwest Bridge SymposiumApril 28, 2016