    Installation Instructions

    8 ft Antennas

    PA, PAL, PAD, PAX, PADX

    DA, UA, DAX, UDA, UXA HTT 81.221-10(e)

    These Installation Instructions are valid for antennas in the following version :

    Reflector 2.4 m (8 ft)

    Waveguide feed system Singleor Dualpolarized

    Pipe mount for installation on pipe 115mm

    Antenna offset to the left or the right

    Safety collar for easy installation

    2 spindles for fine adjustment ofAzimuth & Elevationof 5

    1 sway bar 60 mm x 3 m

    Reflector with shroud, the aperture covered by aflexible planar radome, or without

    shroud (see sketch above)

    Note : The assembly of the reflector and shroud for antennas with split

    reflector is described in the dedicated Installation Instructions.

    DA, UA, DAX, UDA, UXA PA, PAL, PAD, PAX, PADX

    It is important to mount the antenna exactly as described in this installation instruction.The installed antenna shall be inspected once per year by qualified personnel.

    RFS disclaims any responsibility for the result of improper or unsafe installation.This installation instruction has been written for qualified skilled personnel.We reserve the right to alter details, especially with respect to technical improvement.

  • 8/13/2019 8ft Antenna (HTT81.221-10)

    2/15

    HTT 81.221-10 (e) 2/15

    1. Tools required for installation(Tools are not included with antenna)Hoisting device for 400 daN Shackle

    Torque wrench from 0,5 to 25 daNm 2 ropes

    Wrenches for hexagon bolts: Mallet

    M5(8), M6(10), M10(17), M12(19) Water balance and compass

    M14(21), M16(24), M20(30) Square

    (values in brackets = openings of spanners)

    2. Assembly of the mount(For an installation offset right)For easy operation of the bolted joints, and correct torque tightening, Anti Seize Installation Paste must be applied to all threads of bolts and fine adjustment spindles.After this, keep the lubricated threads free of dust and dirt! (a Torque Table is attachedfor specifications)

    Left-L

    4 U-bolts M148 washers 1516 nuts M14

    Fine AZIMUTM20x300 spindle4 washers 214 nuts M20

    Right-L

    U-bracket swaybarScrew M20x110Washer 21SL washer 20Nut M20

    Screw M20x502 washers 21SL washer 20Nut M20

    Fine ELEVATIONSpindle M16x3002 brass nuts M16

    2 spherical washers C172 conical seats D19

    2 washers 17 50

    Screw M16x50Washer 17

    SL washer 16Nut M16

    2 screws M12x45

    2 washers 13 372 SL nuts M12

    Screw M20x502 washers 21SL washer 20

    Nut M20

    Screw M20x502 washers 21SL washer 20Nut M20

    4 screws M12x408 washers 13

    4 SL nuts M12

    Plate Az. Adjust. Support2 U-bolts M124 washers 13

    8 nuts M12

    Screw M20x60Washer 21SL washer 20Nut M20

    Bracket sway bar fixingScrew M20x50Washer 21SL washer 20Nut M20

    U-bolt M12Angle Az. Adjust.2 washers 134 nuts M12

    Safetyangle

    2 screws M12x45

    2 washers 13 372 SL nuts M12

    3 obturation plastic plugs(to install in backring holes)

    Site-L2 screws M12x45

    2 washers 13 372 SL nuts M12

  • 8/13/2019 8ft Antenna (HTT81.221-10)

    3/15

    HTT 81.221-10 (e) 3/15

    3. Antenna with split reflector

    If you have ordered an antenna with a split reflector, refer to specific installation instructionsjoined for reflector & backring assembly, otherwise skip this step.

    4. Brackets installation on backring

    2 screws M12x45

    2 screws M12x45

    Hoisting eyeat the Top

    Washer 13 37Washer 132 SL nuts M12

    Before starting the installation of the brackets on the backring, install the antennareflector on a thick cardboard or wooden planks to protect the antenna during theassembly (or the antenna top packing case for e.g.).

    Backring

    Reflector

    Zone freeof paint

    (grounding)

    2 screws M12x45Washer 13 37Washer 13

    Rightbracket

    (L70x70) 2 SL nuts M122 washers 13 37

    Elevation bracket(L100x75)Take care of theorientation

    Leftbracket

    (L70x70)

    Zone freeof paint

    (grounding)

    2 SL nuts M122 washers 13 37

  • 8/13/2019 8ft Antenna (HTT81.221-10)

    4/15

    HTT 81.221-10 (e) 4/15

    Sway barattachment

    Offset left Offset Right

    Sway barattachment

    It is mandatory to tighten all bolted joints of the mount accordingto the torque table joined, before lifting the antenna.

    Screw M20x502 washers 21SL washer 20

    Nut M20

    Screw M20x502 washers 21SL washer 20Nut M20

    Spindle M16x300Brass nuts M16

    Spherical washers C17Conical seat D19

    Conical seat D19Spherical washers C17Brass nuts M16

    2 screws M12x402 washers 13

    2 screws M12x402 washers 13

    2 washers 132 SL nuts M12

    2 washers 132 SL nuts M12

    2 screws M12x45

    2 washers 13 372 SL nuts M12

    Vertical bracket8/114 STD

    Bracket elevation adjust8-10/114 STD

    (L100x100

    Horizontal bracket8/114 STD

    5. Pre-assembly of the T-Mount & Antenna Offset

    T-Mount Pre-assembly(for an offset Right)

    (Rear view)for an offset right

    Notch atthe top

    After perpendicularitycheck between the 3 parts

    of the T-Mount, torquetighten the M12 bolts to

    lock the assembly.(Without square, you can

    help you with a sheet of

    Install the 3 plastic

    caps to close the100 mm holes on

    the backring

  • 8/13/2019 8ft Antenna (HTT81.221-10)

    5/15

    HTT 81.221-10 (e) 5/15

    6. Installation of the shroud panels(for antennas with shroud)

    6.36.1 6.2

    (Short panel length)7 hex screws M6x16

    14 washers 6.4 187 sl nuts M6

    (Long panel length)8 hex screws M6x16

    16 washers 6.4 188 sl nuts M6

    3 Stiffener plates with :

    4 hex screws M6x25

    8 washers 6.4 18

    4 sl nuts M6

    Do not tighten all jointsbefore complete shroud

    installation. See chapter 6.4for RF braid installation.

    x3x3

    Reflector / Shroudpanels assembly

    Shroud panelsassembly

    Shroud panelsreinforcement

    assembly

    - Install the reflector equipped with its mount on woodenbeams (to not damage mount parts with the ground) andkeep bolt threads free of dust.

    - The reflectors rim and the shroud panels must be clean and

    dry.

    - Dismount the hoisting eye of the reflector (installed at factory)

    - For the antennas ordered with a 250 km/h WindKit, if the 6galvanized steel pipes have been pre-installed in factory atreflectors back, you need to remove the 6 M20 bolts (locatedat the reflectors rim), before shroud panels installation, andre-use it for the assembly of the reflector/shroud junction at13 holes in front of the galvanized steel pipes (instead ofthe M6x25 bolts provided with the antenna).

    (Standard Installation)30 hex screws M6x25

    60 washers 6.4 18*30 sl nuts M6

    * for spots free of paint 90from TOP (left & right) add 2

    serrated lock washers A6.4

    (With 250 km/h WindKit)18 hex screws M6x25

    36 washers 6.4 18*18 sl nuts M6

    +6 hex screws M12x40

    12 washers A136 SL washers 12

    6 nuts M12

  • 8/13/2019 8ft Antenna (HTT81.221-10)

    6/15

    HTT 81.221-10 (e) 6/15

    6.4 RF Braid installation between shroud & reflector rim(for antennas with shroud)

    7. Hoisting eye re-installation(for antennas with shroud)

    8. Radome protection installation on shroud rim(for antennas with shroud)

    Shroud rim

    Edgeprotector

    Hoistingeyes

    2 screws M12x352 washers 132 SL washers4 nuts M12

    Shroud

    Reflector

    (Top View)

    Shroud

    Reflector

    - Squeeze the clip onto the RFbraid, then hook it onto boltbetween the reflector and ashroud rim

    - Overlap the RF braid ends - Removed spacers, and tightenall the bolts

  • 8/13/2019 8ft Antenna (HTT81.221-10)

    7/15

    HTT 81.221-10 (e) 7/15

    9. Feed Installation(for customized antennas, see specific Feed Install. Instructions joined)The feed is a precision component which should be handled with special care duringinstallation. For instance, always carry the feed, supporting casting plate side. Any damagemay degrade the antennas performance. Repair of feeds is not possible in the field.

    9.1 Polarization choice

    Single polarization

    Dual polarization

    9" FeedSystem

    (rear view)

    TOP Antenna

    14.5" FeedSystem

    (rear view)

    TOP Antenna

    Antennavertical

    axis

    9" FeedSystem

    (rear view)

    - Unscrew the 4 screws M6- Carefully rotate the feed of 90- Lock the 4 screws M6

    Verticalpolarization

    Horizontalpolarization

    TOP AntennaTOP Antenna

    - Unscrew the 8 screws M6- Carefully rotate the feed of 90- Lock the 8 screws M6

    14.5" FeedSystem

    (rear view)Vertical

    polarizationHorizontal

    polarization

    TOP AntennaTOP Antenna

    Antennavertical

    axis

  • 8/13/2019 8ft Antenna (HTT81.221-10)

    8/15

    HTT 81.221-10 (e) 8/15

    9.2 Guy wires assembly

    9.3 Polarization fine adjustment

    The final adjustment will be made after the antenna installation on tower

    Insert the 3 guy wires in the mounting holesfrom the rearof the reflector.

    Move the feed assembly partway through theconnecting ring.

    Hook the guy wires into rotatable ring.

    Move the feed and fix it, with the M6 screws inthe connecting ring.

    Spring compression5 mm Maxi

    Rotatablering

    Staying withspring system

    Same staying tensionon each guy wi res

    Reflector

    After control that each guy wires havethe same tension, lock the 2

    ndM8 nut

    on the 1stone with another wrench,

    keeping the first nut in his position.

    Check the feed system possiblerotation (H or V polarization)

    Polar.Adjust.

    Polar.Adjust.

    Polar.Adjust.

    Polar.Adjust.

    Polar.Adjust.

    Polar.Adjust.

    Polar.Adjust.

    Polar.Adjust.

    Loosen the 4 screws M6

    and adjust polarization byrotation of the feed system

    9" Feed System(rear view)

    Loosen the 8 screws M6

    and adjust polarization byrotation of the feed system

    14.5" Feed System(rear view)

    Antennavertical

    axis

    Single polar.Feed system

    Dual polar.Feed system

    Single polar.Feed system

    Dual polar.Feed system

  • 8/13/2019 8ft Antenna (HTT81.221-10)

    9/15

    HTT 81.221-10 (e) 9/15

    10. Installation of the planar radome(for antennas with shroud)Take care to avoid kinking of planar radomes during installation. Kinking will destroy theradomes, which are non-repairable

    11. Sway bar assembly(for an offset Right)

    After sway bar pipe installation, beforeantenna hoisting on the tower, attach thesway bar in vertical position at the elevationspindle with a small rope, to avoid possibleshock.

    For an easier sway bar orientation, keepthe U-bracket sway bar free in rotationwithout gap until sway bar final attachmentto the tower. At this time, all bolted jointswill be torque tighten.

    - Unpack the radome and carefully strech it over the shroud aperture- For radomes with RFS logo, align it with the vertical axis of the antenna

    - For radomes without RFS logo, the central air vent mosquito net aperture must be oriented towardsthe antenna top

    - Attach J-bolt with springs and smooth radome down as the springs are attached, but do notdisplace the edge protector on the shroud rim.

    - Align the length of the springs to approximately 135 mm at each J-bolt, this will provide properradome tension.

    U-Bracket sway bar installation Sway bar pipe installation

    U-bracket sway bar

    Washer 21Screw M20x50

    Nut M20SL washer 20Washer 21

    ScrewM20x110

    Washer 21SL washer 20

    Nut M20

    Air ventdetail

    Air vent mosquito net must be

    oriented towards top antenna,and inside of the shroud

    RFS logo towardsthe antenna top

    J-bolt

    Spring

    Radome

    135 mm

    Shroud

  • 8/13/2019 8ft Antenna (HTT81.221-10)

    10/15

    HTT 81.221-10 (e) 10/15

    12. Azimuth fine adjustment spindle pre-assembly(Handtighten)

    4 Nuts M122 washers 13

    8 Nuts M124 washers 13

    Nut M20SL washer 20Washer 21

    Screw M20x50

    Nut M20Washer 21

    Nut M20Washer 21

    Screw M20x60

    Washer 21SL washer 20

    Nut M20(Installed at sway bar

    attachment time on thetower structure)

    Sway bar fixing clamp(L100x100)

    M20x300Azimuth spindle

    2 U-bolts M12(keep 60 mm space for

    sway bar pipe insertion)

    U-bolt M12(keep 60 mm space forsway bar pipe insertion)

    Nut M20Washer 21

    Nut M20Washer 21

    Plate AzimuthAdjust Support 60

    (5 holes)

    Angle towerstructure

    Sway bar pipeextremity

    Typical sway bar installation on

    tower with angle structure

    Optional sway bar kit for sway bar

    installation on tower with pipe structure

    Sway bar Kit Option :

    SMA-SKO-60 (pipe 60)SMA-SKO-89 (pipe 89)SMA-SKO-114 (pipe 114)

    Sway bar pipeextremity

    Pipe towerstructure

    SMA-SKO-6089 or 114

    Angle Az. Adjust. 60(L100x75)

    Plate Azimuth Adjust

    Support 60 (6 holes)(Provided with kit)

  • 8/13/2019 8ft Antenna (HTT81.221-10)

    11/15

    HTT 81.221-10 (e) 11/15

    13. WindKit Installation

    If you have order a 250 km/h WindKit, refer to specific installation instructions joined, otherwiseskip this step.

    14. Safety collar installation on tower pipe support

    15. Hoisting on Tower

    Before antenna hoisting on the pylon, verify that all the bolted joint of the T-Mountstructure on the antenna have been torque tighten, otherwise the installation on thepipe support could be problematic.

    U-bolt

    M14

    2 washers 154 nuts M14

    200 mmminimumfree spaceabove U-bolt

    950 mmminimumfree spaceunder U-bolt

    Angle safetysupport

    Lifting strap (or a rope) fixed on thehoisting eye to keep the antennastreight (in horizontal line)

    Lifting strap fixed onthe mount (steel partof the antenna)

    Lifting strap fixed on themount (steel part of the

    antenna)

    Sway bar attached with a ropeto elevation spindle beforestarting the antenna hoisting

    Steel eye fixed on themount with the liftingstrap (it will received asecond rope to avoid anyturning, due to wind e.g)

    Strong rope or cablelinked to winch

    Steel roll or shackle

    Strong rope or cablefixed to antenna mount

    to avoid collision withthe tower structure

    during hoisting

  • 8/13/2019 8ft Antenna (HTT81.221-10)

    12/15

    HTT 81.221-10 (e) 12/15

    Strong rope or cable

    fixed to antenna steelmount to avoid

    collision with the towerstructure during

    hoisting

    Strong rope fixed at the tower top.

    The rope is slipping through a steel roll ora shackle, wich is fixed on the steel mountof the antenna (to avoid any turnings ofthe antenna e.g. due to wind)

    To winch

  • 8/13/2019 8ft Antenna (HTT81.221-10)

    13/15

    HTT 81.221-10 (e) 13/15

    16. Antenna installation on tower pipe(lifting accessories are not shown)

    17. Sway bar positionning

    4 washers 158 nuts M14

    2 U-bolts M14(Do not forget to apply antiseize installation paste on

    U-bolt threads)

    U-bolt M14(Do not forget to apply anti seize

    installation paste on U-bolt

    2 washers 154 nuts M14

    Max25

    - Angle the sway bar- Install the pre-assembled fine adjustment azimuth spindle on the

    sway bar pipe

    - Choose the optimal place on the tower, to fix the fine adjustmentazimuth spindle system (respect the 25 sway bar orientation)

    - After sway bar positionning, do not torque tighten nuts until elevation& azimuth adjustment.

    Adjust nut and bolts tightening to have a freerotation & orientation in any direction withoutgap between parts

  • 8/13/2019 8ft Antenna (HTT81.221-10)

    14/15

    HTT 81.221-10 (e) 14/15

    Loosen or tightenthe M16 brassnuts to adjustElevation

    The fine adjustmentAzimuth spindle systemmust have been loosen

    If the bolts are torquetighten, loosen of turnthe M20 nut of the right &left pivots

    18. Elevation adjustment

    After Elevation fine adjustment, lock each M20 nuts on the pivots at the specific torque

    value specified on the torque table joined(the threads must have been greased beforetorque tightening). Then torque tighten the M16 brass nuts of the Elevation spindle.

  • 8/13/2019 8ft Antenna (HTT81.221-10)

    15/15

    HTT 81.221-10 (e) 15/15

    If the nuts of the bottom U-bolt are torquetighten, loosen of turn the M14 nuts

    If the nuts of the

    2 upper U-boltsare torquetighten, loosen of turn the M14nuts

    (Do not loosen theU-Bolt of the Angle

    Safety Support)

    Loosen or tightenthis M20 nuts toadjust Azimuth

    This U-Bolt M12 must betorque tighten

    This 2 nuts M20 must be tighten

    This 2 U-bolts M12 must behandtighten

    This bolt mustbe torque

    tighten

    This boltmust be

    handtighten

    duringadjustment

    19. Azimuth adjustment

    20. Final Check

    After azimuth adjustment, lock each first nut on the M14 U-bolts at the specifictorque value specified on the torque table joined (the U-bolt threads must have beengreased before torque tightening), then tighten the second nut against the first oneusing usual wrench (Do not use 2 wrenches to fix the second nut). Then torquetighten all the nuts and bolts of the Azimuth spindle.

    When the installation of the antenna has been completed, it is necessary to makesure that the installation instructions have been followed in all aspects.It is especially important to check that all bolted joints are torque tightly

    locked.