OFFICE OF THE CITY MANAGER 8140 Main Street Dexter, Michigan 48130-1092 (734) 426-8303 Fax (734) 426-5614
Memorandum To: Mayor Keough and City Council From: Courtney Nicholls, City Manager Re: Documents for Facility Work Session Date: July 7, 2020
Provided for Council’s review are the following documents:
- PowerPoint from Norfolk/Quinn Evans regarding the proposed office building at Broad/Forest o Cost estimate provided in January 2020 was approx. $302 per square foot on the first floor
and $227 per square foot on the second floor - 2016 estimates from Partners in Architecture to renovate 8140 Main for City Offices.
3 0 4 5 B R OA D S T R E E T R E D E V E LO P M E N T
29 January 2020
2
C I T Y CO U N C I L W O R K S H O P3 0 4 5 B r o a d S t r e e t R e d e v e l o p m e n t
Building 3 Expansion
Review Layouts, Pros & Cons
Open Discussion / Workshop
Next Steps
Today’s Objectives
Site Plan Overview
3
P R O J E C T O B J E C T I V E S3 0 4 5 B r o a d S t r e e t R e d e v e l o p m e n t
Create a high-density, mixed-use, and
pedestrian-friendly environment
Create pedestrian activity that is harmonious
with a walkable, downtown experience
Provide opportunities for convenience retail,
municipal services, offices, and public spaces
Provide upper story residential use to create a
24-hour, downtown live-work environment
Expand the Central Business District into the
surrounding Village Commerical areasE a s t o n T o w n C e n t e r E x p a n s i o n
Aerial Photo
4
P R O P O S E D S I T E P L A N3 0 4 5 B r o a d S t r e e t R e d e v e l o p m e n t
Activates site as a walkable,
high-density neighborhood
Creates pedestrian plaza
Enhances pedestrian connection
to downtown via Broad Street
Maintains visual connection with
Mill Creek Park
Benefits:
Aerial Photo
5
P R O P O S E D S I T E P L A N3 0 4 5 B r o a d S t r e e t R e d e v e l o p m e n t
Corner @ Broad St. & Forest St.
6
P R O P O S E D S I T E P L A N3 0 4 5 B r o a d S t r e e t R e d e v e l o p m e n t
Promotes Master Plan vision for
achieving high-density area
Provides on-site parking &
building services
Greater building efficiency
Allows multiple use groups,
including retail, office & residential
Catalyst for Village Commerical growth
Expands the Central Business District
Close proximity to historic downtown
Promotes walkable, downtown experience
7
Benefits to Community
Immediate and dedicated parking
C I T Y O F D E X T E R – C I T Y O F F I C E S3 0 4 5 B r o a d S t r e e t R e d e v e l o p m e n t
Potential shared resources for community
E a s t o n T o w n C e n t e r E x p a n s i o n
N e i g h b o r h o o d s a t S u m m i t P a r k
Surface Parking w/ limited Covered Area
Shared Community Space
Future Pedestrian Plaza
Prime Retail Location
2-Story Parking Garage with Dedicated City and Employee Spaces Below
Maximizes Retail Opportunities to Create Multiple Destinations
Shared Lobby, Restrooms, and Support Space w/ Senior Center
Increased Office Floor Area Creates Partial Covered
Parking Below
Limited Residential for 24-Hr Activation of Site
Shared Community Space
Future Pedestrian Plaza
Prime Retail Location
Maximizes Retail Opportunities to Create Multiple Destinations
2-Story Parking Garage with Dedicated City and Employee Spaces Below
Shared Lobby, Restrooms, & Support
Spaces w/ Senior Center Below
Direct Access from 2nd Floor Parking to Office Tenant
Spaces
2nd Floor Dedicated to Office Tenants
Open Public Parking at 2nd Level
Direct and Accessible Access
to City Offices off Broad Street
Isolated Retail Space along Forest Street
Shared Restrooms & Support Space Between
City and Senior Center
Future Pedestrian Plaza
2-Story Parking Garage with Dedicated City and Employee Spaces Below
Additional Ground Floor Space for Sheriff's Office
Isolated Retail Space along Forest Street
2-Story Parking Garage with Dedicated City and Residential Spaces Below
Direct and Accessible Access
to City Offices off Broad Street
Future Pedestrian Plaza
Shared Restrooms & Support Space Between
City and Senior Center
Total: (16) Residential Units along Forest Street (2nd & 3rd Floors)
Open Public Parking at 2nd Level
Office Tenants along Broad Street and
Separated from Residential Circulation
Direct Access from 2nd Floor Parking to Office
Tenant Spaces
Shared Restrooms & Support Space Between
City and Senior Center
Future Pedestrian Plaza
Prime Retail Location along
Broad Street, adjacent Plaza
2-Story Parking Garage with Dedicated City and Residential Spaces Below
Direct and Accessible Access to City Space from Street and Garage
All City Offices on Ground Floor along Forest Street
2nd Floor Dedicated to All Office and Separated from
3rd Floor Residential
Direct Access from 2nd Floor Parking to Office
Tenant Spaces
Open Public Parking at 2nd Level
3rd Floor Dedicated to All Residential and Separated
from 2nd Floor OfficeTotal: (16) Residential Units
Residential Views Across Plaza and into
Mill Creek Park
8
O P E N D I S C U S S I O N3 0 4 5 B r o a d S t r e e t R e d e v e l o p m e n t
Questions?
City of Dexter – Facility / Needs Assessment – Concepts Study Summary
5-27-2016
B2 11,160 11,000 1. 3 levels of public circulation for parking and park access. Sheriff covered parking is in deck.2. The Sheriff Department does not have a dedicated training room, an evidence vault, or equipment storage. 3. Vertical circulation and public areas are not included in the Optimum Program SF.
Sheriff Department New 3,990 2,600 2,5000
City Offices New 7,170 8,400 6,6000
Public Spaces * 0 3,2920
Sheriff Covered Parking 00
Parking11,000 12,392
City of Dexter Scheme Summary
Scheme
Optimum Space
Program SF
Space Line Items Indicated on Budget Sheet
Measured SF from Concept
Plans Variance / DescriptionB1 11,160 11,000 1. Sheriff mezzanine is bonus space.
2. The Sheriff Garage is not included in the Optimum Program SF.3. The Sheriff Department does not have a dedicated training room.4. The overall Sheriff Department area is less SF than Optimum.5. Vertical circulation and public areas are not included in the Optimum Program SF.
Sheriff Department New 3,990 1,804 150Reno 0 1,805
City Offices New 7,170 2,025 1,115Reno 6,250 4,749
Public Spaces * 0 2,010
Sheriff Garage 1,180 1,209Sheriff Mezzanine 0 900Parking
11,259 11,938
Concept Scheme - Comparisons
Scheme B1 NarrativeSeeks to repurpose the existing building as the New City Hall and Sheriff Substation with a complete rehabilitation of the existing building and approximately 2,000 added square feet of new building. This combination updates the building and provides parking from Main St for city functions and Sheriff Vehicle parking in the lower level at Park level. The layout utilizes the existing large bay height and column spacing to create openness and transparency through the space putting government on display. This approach requires new accommodations for the Fire Station elsewhere, but may also provide the least disruption to Fire Service functions with a move from this station to a new prepared station. See Concept Scheme C.
Scheme B2 NarrativeCombines a New City Hall and Sheriff Substation Facility as new ground up construction on the existing Fire Station site generally aligning with other buildings on Main St extending the Streetscape environment. This concept also emphasizes new parking and includes a multi‐level parking platform structure taking advantage of the site topography providing for a site total of about 110 total parking spaces. This approach requires new accommodations for the Fire Station elsewhere, like Scheme B1. The planning layout of this concept also allows for the integration of the City functions and Sheriff to share in the prominence and access from Main St. Like the Concept “A” approach this scheme also includes a Lobby Tower component that provides connectivity and accessibility from Main St to the Park level with toilet facilities available.
48 of 80Page 11 of 47
City of Dexter – Facility / Needs Assessment – Concepts Study Summary
5-27-2016
B1.1 City Offices/ Sheriff Repurposing at 8140 Main Street-
Budget Est $2,550,000
51 of 80Page 14 of 47
City of Dexter – Facility / Needs Assessment – Concepts Study Summary
5-27-2016
Detailed Conceptual Cost Comparisons
City of Dexter Municipal Campus Scheme B1 Concept - Design Estimate of Probable Project Cost
Gross Building Area - Approximately 11,000sf
Item Estimated Cost
Selective Demolition $40,000.00
Site Work $140,000.00
City New Building Area $355,000.00City Renovation $625,000.00
Sheriff Offices Renovation $199,000.00
Core Vertical Circulation $95,000.00
Sheriff Garage $83,000.00
Façade/Exterior Enhancement $120,000.00
Construction Subtotal Cost $1,537,000.00
Furnishings $80,000.00Audio / Visual Equipment $40,000.00Security / Technology $30,000.00Contractor General Conditions - 10% $166,000.00Contractor's OH&P - 6% $100,000.00Estimating Contingency - 5% $83,000.00
Project Construction Cost Estimate $2,036,000.00
Construction Contingency - 7.5% $162,000.00Professional Fees - Legal/Arch./Eng./Financing/Testing - 10% $216,000.00Other Owner Soft Cost Allowance (not including debt service) $17,000.00Consider 3-4% cost escalation per year after 2016
Total Probable Project Cost Estimate $2,431,000
75 of 80Page 22 of 47
City of Dexter – Facility / Needs Assessment – Concepts Study Summary
5-27-2016
Detailed Conceptual Cost Comparisons
City of Dexter Municipal Campus Scheme B2Concept - Design Estimate of Probable Project Cost
Gross Building Area - Approximately 11,000sf and an Additional 90 Parking Spaces
Item Estimated Cost
Building Demolition $80,000.00
Site Work $340,000.00
City New Building Area $1,344,000.00
Sheriff New Building Area $468,000.00
Core Vertical Circulation $180,000.00
Parking Structure $1,640,000.00
Construction Subtotal Cost $4,052,000.00
Furnishings $80,000.00Audio / Visual Equipment $40,000.00Security / Technology $30,000.00Contractor General Conditions - 10% $242,000.00Contractor's OH&P - 6% $145,000.00Estimating Contingency - 5% $121,000.00
Project Construction Cost Estimate $4,710,000.00
Construction Contingency - 7.5% $231,000.00Professional Fees - Legal/Arch./Eng./Financing/Testing - 10% $307,000.00Other Owner Soft Cost Allowance (not including debt service) $24,000.00Consider 3-4% cost escalation per year after 2016
Total Probable Project Cost Estimate $5,272,000
76 of 80Page 23 of 47
Village of Dexter Facility Assessment / Programming / Design
Space Qty.
Room /
Work Area
(Sq. Ft.)
Current
Space
Total Area (Sq.
Ft.)
Dexter Village Hall 5,590
Public Areas 586 2,450 Remarks
Vestibule 1 90 90
Lobby 1 200 62 300
Restrooms 2 200 200 400 Staff use also
Public Service Counters / Reception 1 200 153 200
Council Chambers / Community Room (w/ A/V closet &
vestibule) (Shared) 1 1200 0 1200
Conference Room 1 260 171 260
Adminstrative Areas 990 2,000 Remarks
Treasurer / Finance Director 1 140 138 140
Administrative Assistant 1 140 0 140
Billing Clerk 1 140 126 140
Assessor 1 140 0 140
Community Development 1 140 116 140
Drawing area 1 100 54 100
Building Official - Inspectors 1 0 Spare - expansion office
Council Office 1 140 0 140 Spare - expansion office
Assistant Village Manager 1 180 96 180
Village Manager 1 210 156 210
Document Storage 1 130 80 130
Staff break-out area 1 180 81 180
Work Room / General Storage / Supplies 1 160 143 160
Break Room 1 200 0 200
Building Support Spaces 170 1,140 Remarks
Stair(s) 2 200 400
Elevator 2 60 120
Elevator Machine Room 1 60 60
Tele. Data / MDF 1 60 30 60
Mechanical / Electrical Service Areas 1 160 160
Housekeeping 1 40 40
Archive Storage 1 300 140 300
Circulation Spaces at 25% 1,398
TOTAL USABLE AREA 1,746 5,590
GROSS FLOOR AREA 2570 6,988
PARTNERS in Architecture, PLC #14-126 July, 2014Page 43 of 47