Debrecen, 7 June 2007
DROUGHT ACTION PLAN IN THE SEGURA RIVER BASIN
7th WORLD GENERAL ASSEMBLY OF THE INTERNATIONAL NETWORK OF BASIN
ORGANISATIONS
DROUGHT ACTION PLAN IN THE SEGURA RIVER BASIN
Mario Andres Urrea Mallebrera, Head of the Water Management Planning Office of the Segura River Basin Authority
Debrecen, 7 June 2007
DROUGHT ACTION PLAN IN THE SEGURA RIVER BASIN
-2,00
-1,50
-1,00
-0,50
0,00
0,50
1,00
1,50
2,00
2,50
3,00
S P I EN LA CUENCA DEL S EGURA
serie 1940/ 41 - 2004/ 05
CHARACTERISATION OF EARLIER droughtS
-0,84 Moderada
-1,28 Severa
-1,65 Extrema
Debrecen, 7 June 2007
DROUGHT ACTION PLAN IN THE SEGURA RIVER BASIN
ELECTION OF THRESHOLD VALUES
1 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1
0
Normalidad (v>0,50)
Prealerta (0,35<v<0,50)
Alerta (0,20<v<0,35)
Emergencia (v<0,20)
ÍNDICE DE ESTADO
Emergencia (v<0,50); Alerta (0,20<v<0,35); Prealerta (0,35<v<0,50); Norm alidad (v>0,50)
Debrecen, 7 June 2007
DROUGHT ACTION PLAN IN THE SEGURA RIVER BASIN
ADOPTION OF drought INDICATORS (1/2)
• A system of representative status indicators is defined with respect to the evolution of the offer of resources and the demands to fulfil in each operation sub-systems (the Taibilla Canal Consortium System, the River Basin System and the Tajo-Segura Transfer System).
• These indicators are composed of various variables that include both reservoir storages and natural flows in the river basin.
• The indicators are adopted definitively after calibration and validation in relation to real situations in order to verify their adequacy.
Debrecen, 7 June 2007
DROUGHT ACTION PLAN IN THE SEGURA RIVER BASIN
The Special Action Plan for Drought Situations was approved on 21 March 2007 (BOE 23/03/07), the value of the index related to June 2007 was calculated according to the methodology described in this Plan.
Evolución del Índice de Estado del Sistema Cuenca
00,050,1
0,150,2
0,250,3
0,350,4
0,450,5
0,550,6
0,650,7
0,750,8
0,850,9
0,951
1-ag
o-04
1-se
p-04
1-oc
t-04
1-no
v-04
1-di
c-04
1-en
e-05
1-fe
b-05
1-m
ar-0
51-
abr-0
51-
may
-05
1-ju
n-05
1-ju
l-05
1-ag
o-05
1-se
p-05
1-oc
t-05
1-no
v-05
1-di
c-05
1-en
e-06
1-fe
b-06
1-m
ar-0
61-
abr-0
61-
may
-06
1-ju
n-06
1-ju
l-06
1-ag
o-06
1-se
p-06
1-oc
t-06
1-no
v-06
1-di
c-06
1-en
e-07
1-fe
b-07
1-m
ar-0
71-
abr-0
71-
may
-07
1-ju
n-07
Índi
ce d
e es
tado
Sistema CuencaLímite normalidad - prealertaLímite prealerta - alertaLímite alerta - emergencia
Alerta
Prealerta
Normalidad
Emergencia
Debrecen, 7 June 2007
DROUGHT ACTION PLAN IN THE SEGURA RIVER BASIN
Evolución del Índice de Estado del Sistema Trasvase
00,050,1
0,150,2
0,250,3
0,350,4
0,450,5
0,550,6
0,650,7
0,750,8
0,850,9
0,951
1-oc
t-04
1-no
v-04
1-di
c-04
1-en
e-05
1-fe
b-05
1-m
ar-0
51-
abr-0
51-
may
-05
1-ju
n-05
1-ju
l-05
1-ag
o-05
1-se
p-05
1-oc
t-05
1-no
v-05
1-di
c-05
1-en
e-06
1-fe
b-06
1-m
ar-0
61-
abr-0
61-
may
-06
1-ju
n-06
1-ju
l-06
1-ag
o-06
1-se
p-06
1-oc
t-06
1-no
v-06
1-di
c-06
1-en
e-07
1-fe
b-07
1-m
ar-0
71-
abr-0
71-
may
-07
1-ju
n-07
Índi
ce d
e es
tado
Sistema Trasvase
Límite normalidad - prealerta
Límite prealerta - alerta
Límite alerta - emergencia
Alerta
Prealerta
Normalidad
Emergencia
Debrecen, 7 June 2007
DROUGHT ACTION PLAN IN THE SEGURA RIVER BASIN
THE MANAGEMENT OF DROUGHTS
• The Reservoir Release Commission should deliberate and formulate proposals to the President of the River Basin Authority on the adequate filling and release of the reservoirs and aquifers in accordance with article 33 of the Consolidated Text of the Water Act (Legislative Royal Decree 1/2001).
• After the approval of the Drought Decree, a Drought Monitoring Permanent Commission is created, which includes the principal officers in charge of water resource management, the users and the principal stakeholders of the river basin.
• This Commission will be advised by the Drought Technical Office formed by a multidisciplinary technical team active in the scope of the river basin authority.
• A Public Participation Process will be undertaken, both for the adoption and approval procedure of the Plan and for the adoption the most significant measures.
Debrecen, 7 June 2007
DROUGHT ACTION PLAN IN THE SEGURA RIVER BASIN
• RD 10/2005 of urgent measures to reduce damages caused by drought and other climatic adversities in the agricultural sector.
• RD 1265/2005 to adopt exceptional administrative measures for water resources management and to repair the effects of drought in the Júcar, Segura and Tajo river basins.
• RDL 15/2005 of urgent measures for the regulation of water righttransactions.
• RD 287/2006 to regulate urgent works for the improvement and consolidation of irrigations in order to obtain adequate water savings that may alleviate the damages produced by the drought.
• RDL 9/2006 of urgent measures to alleviate the effects produced by the drought in urban water supply and in irrigated agricultural lands in certain river basins.
SUMMARY OF THE MEASURES TO BE ADOPTED SUMMARY OF THE MEASURES TO BE ADOPTED Regulatory MeasuresRegulatory Measures
Debrecen, 7 June 2007
DROUGHT ACTION PLAN IN THE SEGURA RIVER BASIN
RELATIONSHIP WITH THE URBAN WATER SUPPLY PLANS FOR MORE THAN 20,000 PEOPLE
• Act 10/2001 requires that the authorities responsible for urban water supply systems serving more than 20,000 people develop an Emergency Plan for drought situations.
• Within the Segura River Basin, there are 18 municipalities of more than 20,000 inhabitants (15 are supplied by the Taibilla Canal Consortium + Hellín, Yecla, Jumilla) the emergency plans of which were presented to the Segura River Basin Authority.
• The Special Drought Plan contains the definition of the basic elements for co-ordination and homogenisation of these emergency plans.
Debrecen, 7 June 2007
DROUGHT ACTION PLAN IN THE SEGURA RIVER BASIN
WATER SUPPLY
Structural Measures:
• Disconnect certain municipalities that may be supplied from other sources from the Taibilla sub-system.
• Extension of the Lorca water treatment plant (2,5 M euros).
• Connection of Lorquí, Ceutí, Archena, Ojós, Ricote, Ulea y Villanueva with the Sierra Espada WTP. (4 M euros).
Debrecen, 7 June 2007
DROUGHT ACTION PLAN IN THE SEGURA RIVER BASIN
WATER SUPPLY
Measures to Increment Resources
• Declare the desalination plant of de San Pedro del Pinatar II (89 M Euro) an emergency work 100% operational at present 24 hm3/año.
• Extraordinary abstractions from the Calasparra Sinclinal Aquifer (hm3).
2004 2005 2006 TOTAL
30,8 28,1 24,3 83,2
• Creation of a new strategic reserve in the Segura river basin of 17 hm3, (partly consumed already) and extraordinary transfers from the JucarRiver Basin
• Cession of water rights.
2006 C.R. Canal de las Aves (Tajo) 35,52 hm3/año
Arrozales de Hellín (2006) 1,20 hm3/año
2007 C.R. Canal de las Aves (Tajo) 36,00 hm3/año
Debrecen, 7 June 2007
DROUGHT ACTION PLAN IN THE SEGURA RIVER BASIN
Management measures
• Voluntary savings, facilitated by conservation campaigns.
• Prohibition of non essential uses (irrigation of gardens, sprinkling etc).
Debrecen, 7 June 2007
DROUGHT ACTION PLAN IN THE SEGURA RIVER BASIN
Irrigation
Both the Segura Drought Action Protocol and the SDP establishes the following restrictions:
Pre-Warning 10%
Warning 25%
Emergency 50%
Cession of water rights in favour of the SCRATS, of the irrigators of Extremera.
2005/06 34,05 hm3
2006/07 31,00 hm3
Debrecen, 7 June 2007
DROUGHT ACTION PLAN IN THE SEGURA RIVER BASIN
50,00Indirect re-use of STP
31,282,933Wells under entrustment
9,642,1734Wells ceded to the authority and operated by the Water Commissariat
36,883,64537Wells operated directly by the authority
V (hm3)
Qmm3/seg.
NºWELLS
TYPE
TOTAL 127,80
Debrecen, 7 June 2007
DROUGHT ACTION PLAN IN THE SEGURA RIVER BASIN
Environmental Management and Control
• Maintenance of minimum flows in the natural river beds. (River type water bodies)
Debrecen, 7 June 2007
DROUGHT ACTION PLAN IN THE SEGURA RIVER BASIN
Medium and Lower Valley. Segura river channelling. Heavily Modified Water Bodies.
Debrecen, 7 June 2007
DROUGHT ACTION PLAN IN THE SEGURA RIVER BASIN
Objectives
• Hydrologic analysis of wetlands and other areas of environmental interest related to groundwaters.
• Determine the impact caused by the drought and the exploitation of groundwaters.
Debrecen, 7 June 2007
DROUGHT ACTION PLAN IN THE SEGURA RIVER BASIN
• Biological quality network.
Contrast potential affections on fish life (no fish mortality).
• River gauging and groundwater level monitoring networks.
NO IRREVERSIBLE DAMAGES ARE REPORTED
MINIMUM FLOWS ON THE FINAL REACH OF THE SEGURA RIVER
Debrecen, 7 June 2007
DROUGHT ACTION PLAN IN THE SEGURA RIVER BASIN
CONCLUSIONSCONCLUSIONS
1.1. No restrictions have been implemented in urban water supplies No restrictions have been implemented in urban water supplies during the draught period and the related economic activities during the draught period and the related economic activities have been maintained throughout the river basin.have been maintained throughout the river basin.
2.2. From the environmental point of view, the ecological flows have From the environmental point of view, the ecological flows have been reduced to compatible minimum levels that do not cause been reduced to compatible minimum levels that do not cause irreparable affections in lower river reaches.irreparable affections in lower river reaches.
3.3. The restrictions implemented in irrigation consisted of reducingThe restrictions implemented in irrigation consisted of reducingthe normal flow rates to approximately 50% causing minimum the normal flow rates to approximately 50% causing minimum affections in tree crops and assignment of higher flows to cropsaffections in tree crops and assignment of higher flows to cropsof high socioof high socio--economic efficiency.economic efficiency.
Debrecen, 7 June 2007
DROUGHT ACTION PLAN IN THE SEGURA RIVER BASIN
GRACIAS POR SU ATENCION.GRACIAS POR SU ATENCION.THANK YOU FOR YOUR THANK YOU FOR YOUR
ATTENTION.ATTENTION.KKÖÖSZSZÖÖNNÖÖM A FIGYELMM A FIGYELMÜÜKET.KET.
Debrecen, 7 June 2007
DROUGHT ACTION PLAN IN THE SEGURA RIVER BASIN
• Payment exemptions derived from irrigation water use:
Exemption in irrigation water tariffs.
Exemption of fix and variable costs of the Tajo-Segura
Transfer tariff included in paragraphs b) and c).
• Compensation of revenue losses with earlier exemptions from the River Basin Authorities Contingency Funds.
2005 16,5 M Euros
2006 17,8 M Euros
Debrecen, 7 June 2007
DROUGHT ACTION PLAN IN THE SEGURA RIVER BASIN
86,5086,50Connection of desalination plants with Connection of desalination plants with C.P.C.P.
99,0099,00AlicanteAlicante II desalination plantII desalination plant
Emergency actionsEmergency actions
152,86152,8642,0642,06110,80110,80TOTALTOTAL
37,1237,1216,1216,1221,0021,00Management improvement and Management improvement and conservationconservation
89,0489,0426,7026,70
6,046,0419,9019,90
83,0083,006,806,80
Desalination plant San Pedro del Pinatar Desalination plant San Pedro del Pinatar Drought wellsDrought wells
Increase resourcesIncrease resources
TOTALTOTAL2006/072006/072005/062005/06Emergency actions (M Euro)Emergency actions (M Euro)
Debrecen, 7 June 2007
DROUGHT ACTION PLAN IN THE SEGURA RIVER BASIN
240,25240,25359,00359,00TOTALTOTAL
77,3277,32123,90123,90ValencianValencian CommunityCommunity
156,93156,93225,10225,10Region of MurciaRegion of Murcia
6,006,0010,0010,00AndalusiaAndalusia
MAXIMUM PUBLIC MAXIMUM PUBLIC INVESTMENT (M Euro)INVESTMENT (M Euro)
BUDGETBUDGET(M Euro)(M Euro)
AUTONOMIC COMMUNITYAUTONOMIC COMMUNITY