79th Street boat basin - ‘a’ dock · 8 ‘a’ dock, view west. Power pedestal, 3” Fdny water...
Transcript of 79th Street boat basin - ‘a’ dock · 8 ‘a’ dock, view west. Power pedestal, 3” Fdny water...
C o m m u n i t y b o a r d 7 pa r k s a n d e n v i r o n m e n t c o m m i t t e e
city of new york parks and recreation
September 24, 2012
79th Street boat basin - ‘a’ dockRIVERSIDE PARK AND THE HUDSON RIVER, NEW YORK, NY 10024
Haks enGineers, arcHitects & Lands surveyors, p.c / aBeL Bainnson ButZ, LLp Landscape arcHitects | site pLanners
borough Context neighborhood Context
proJect site
ro
ute 9
a
WeSt e
nd
av
e
Cen
tr
al P
ar
k W
eSt
W 79th St
W 74th St
W 86th St
riv
erSi
de
driv
e
amnh
Central Park
riverSidePark
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
aerial Scale: ntS
Site Context
brooklyn
bronx
79th Street boat baSin
QueenS
Staten iSland
ma
nh
atta
n
proJect site
ro
ute 9
a
Hu
dso
n r
iver
Gr
een
wa
y
w 79tH st
79tH street Boat Basin cafe
dockmaster’s office
riverside park‘a’ dock
“c” d
ock
“B” dock
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
aerial Scale: ntS
Project Site
nkey Plan
riverside Park and boat basin at 79nd Street, 1956Source: nyC Parks Photo archive
a b
a
79th Street boat basin, undated Source: nyC Parks Photo archive
b
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
PhotosScale: ntS
historical Context
nkey Plan
C d
PhotosScale: ntS
historical Context
C
boat basin marina, 1959, Source: nyC Parks Photo archive
d
boat basin marina, 1959 Source: nyC Parks Photo archive
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
boat basin marina, ca. 1940 Source: nyC Parks Photo archive
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
historical Context
renderingScale: ntS
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
General Plan1937
historical drawingScale: ntS
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
dockmaster’s office, 1937
historical drawing elevationScale: ntS
Source: nyC dPr
Contemporary Photograph
Contemporary Photograph
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
dockmaster’s office, 1937
historic drawing elevation Scale: ntS
Source: nyC dPr
Contemporary Photograph
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
handrail, 1937historic drawing detailScale: ntS
railing detail: metal Stanchion and Wood railSource: nyC dPrSource: nyC dPr
header shows hollow section; broken pile
header showing signs of soft rot. rotten section of stringer.
Pile and bents are tilted away, no support for pile cap beam; rotten section of header shown; Portion of fender missing
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
existing Conditions
Site PhotosScale: ntS
nkey Plan
2
13
79th Street boat baSin ‘a’ doCk
entry to 79th Street boat basin1
Concrete foundation3boat basin entry with steel picket gate2
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
existing Conditions
Site PhotosScale: ntS
nkey Plan
5
4679th Street boat baSin ‘a’ doCk
truss bridge entry at truss bridge, view west looking toward the hudson river.5 6
4 boat basin entry, from truss bridge, view east towards riverside Park.
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
8 9‘a’ dock, view west. Power pedestal, 3” Fdny water pipe and existing decking pattern.
existing post and rope sea rail with timber curb. ice breaker and timber dolphins in distance.
nkey Plan
89
7 79th Street boat baSin ‘a’ doCk
7 ‘a’ dock, view to the east towards riverside Park.
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
existing Conditions
Site PhotosScale: ntS
10
11
Power pedestal (blue), lighthouse power pedestal (white), and end dock.
end dock with timber curb, lighthouse power pedestal and existing lightpole.
11
1210
nkey Plan
79th Street boat baSin ‘a’ doCk
12 end dock, view south
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
existing Conditions
Site PhotosScale: ntS
14
13
15
nkey Plan
79th Street boat baSin ‘a’ doCk
13
14
view south towards floating dock and dockmaster’s office
Floating dock and ramp 15 Grade change at end of pier
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
Site PhotosScale: ntS
existing Conditions
existing 3” Fdny Water Pipe existing Gate on dock and Water valve existing Cleat
existing lighthouse Power Pedestalexisting Power Pedestalexisting lightpole existing Fire extinguisher
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
existing Siteelements
Site PhotosScale: ntS
40’10’ 20’0’
Lightpole
Post and Rope Railing
Timber Curb
Lighthouse Power Pedestal
Power Pedestal
Fire Extinguisher
3” FDNY Water PipeWater Valve
Electrical Box
timber dolphins
ice breaker dolphins
existing bulkhead railing P
ro
men
ad
e
riverSide Park
double Gate
ConcreteFoundation
truss bridge
Combined Sewer outfall
Single Gate / kayak launch
Floating docks12” x 12” timber Curb with Post and rope railing (removable)
12” x 12” timber Curb without railing
hudSon river
n
legend
+3.81+2.40
+2.20
+2.20
3.81+ 4.65+
327’-0”273’-0”
54’-0”
59’-0
”
14’-0”
15’-
0”
25’-0”
11’-0”
12’-0
”
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
PlanScale: ntS
existing Conditions
4’2’0’
4” x 8” Sheathing outer Side only
SeCtion bSeCtion a
b
b
a
a
mud line mud line
m.h.W. -0.7 m.h.W. -0.7
m.l.W. -4.8 m.l.W. -4.8
nkey Plan
79th Street boat baSin “a”doCk
4” x 8” Sheathing outer Side only
2’-
0”
2’-
0”
4” x 12”Stringers (typ.)
4” x12”Stringers (typ.)
3” Fdny Water Pipe
25’-0” 15’-0”
top of deck 3” x 4” Planking el. 3.75
top of deck 3” x 4”Planking el. 3.75
12” x 12” @ 12’-0” C.C. approximate
12” x 12” @ 12’-0” C.C. approx
3” x 8” Cross bracing 3” x 8” Cross bracing12” dia. treated
Wood Pile
12” treated Wood Pile
12” x 12” timber Curb 12” x 12” timber Curb
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
existing Conditions
SectionScale: ntS
40’10’ 20’0’n
ex. Steel Picket Fence and double Gate to remain
existing bulkhead railing
See enlargement Plan
timber Curb with Post and Chain railing (removable)
existing Floating dock
Pole mounted Fixture
4’-0” Wide Single Gate
Power Pedestal4’-0” Wide Single Gate / kayak launch
hudSon river
Pr
om
en
ad
e
riverSide Park
timber Curb with Cable railing / Wood top rail
Lightpole
Lighthouse Power Pedestal
Power Pedestal
Post and Chain RailingCable Railing with Wood Top Rail
3” FDNY Water Pipe (Below Deck)
legend
+4.65+4.65
+4.65
el 4.65+
327’-0”
59’-0
”
12’-6”
25’-0”
12’-6”
12’-0
”
15’-
0”
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
PlanScale: ntS
Proposed Plan
b
b
a
a
nkey Plan
79th Street boat baSin “a”doCk
lamp Post and Fixture
18” x 24” x 16’-4” Cast-in-Place Concrete Pile Cap
3” dia. Fdny Water Pipe
3” dia. Fdny Water Pipe
timber band Joist
18” x 24” x 15’-0” Cast-in-Place Concrete Pile Cap
12” dia. Steel Pipe Filled with Conc. alternate Pipes shall be battered.
Pile Cap extension for lamp Post
6”
2’-0”
3’-
8”
1’-1
”
1’-6
”3
’-8
”3
’-5
”
9’-
4”
timber band Joist
Fiberglass i-beam
4” x 8” timber Wave Wall
m.h.W.-0.7
5 Stringers at 3’-0” o.C.
15’-0”
m.l.W. -4.8
8”
1’-0”1’-0”
2” x 6” Pressure treated Southern yellow Pine
el 4.65
1’-6”1’-6” 11’-0”
timber band Joist
SeCtion a: main doCk SeCtion b: liGhtPole @ main doCk
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
SectionScale: ntS
Proposed Section
nkey Plan
79th Street boat baSin “a”doCk
C
C
4” x 4” timber Joist at 16” o.C.
lamp Post and Fixture
Fiberglass i-beam
18” x 24” x 24’-0” Cast-in-Place Concrete Pile Cap
12”dia. Steel Pipe Filled with Concrete alternate Piles shall be battered.
el. 4.65
2” x 6” Pressure treated Southern yellow Pine
2” dia. Steel Post (typ.)
6” x 12” P.t. timber Curb (typ.)
m.h.W.-0.7
m.l.W. -4.8
25’-0”
24’-0”10’-6”
6”
10’-6” 1’-6”
1’-0”
3’-
6”
1’-1
”9
’-4
”
8 Stringers at 3’-2” o.C.
1’-6
”3
’-8
”3
’-4
”
1’-6”
SeCtion C: end doCk
timber band Joist
4” x 8” timber Wave Wall
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
SectionScale: ntS
Proposedend dock
10’5’0’n
79th Street boat baSin “a”doCk
key Plan n
Cable railing with Wood top rail
bike racks
2” x 6” Wood decking
litter receptacle
4’-0” W. Single Gate
light Pole
reclaimed 12 x 12 timber benches
historic riverside Park railing
ex. 8’-0” ht.Steel Picket Fence
ex. 8’-0” ht. double Gate
existing Floating dock
Wooden r
amp
41’-0”
45’
-0”
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
PlanScale: 1”=10’-0”
dock entryenlargement
10’5’0’n
Pole mounted Fixture
lighthouse Power Pedestal
Pressure treated Southern yellow Pine 3” x 4”
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
existingdeck Pattern
enlarged PlanScale: ntS
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
historicaldeck Pattern
enlarged PlanScale: ntS
10’5’0’n
Pole mounted Fixture
lighthouse Power Pedestal
Pressure treated Southern yellow Pine2” x 6”
Post and Chain railing (removable)
Cable railing with Wood top rail
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
Proposeddeck Pattern
enlarged PlanScale: ntS
riverwalk railingexisting railing at boat basin: dockmaster’s office
riverside South railing existing railing at riverside Park Promenade
B d ca
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
aerial+ Photos railing typologies
railing Precedent at riverwalk
elevation: PoSt and Chain railinG at end doCk
elevation: Cable railinG at main doCk
Wood rail top
opening for S.S. Cable
2” dia. S.S. Post6 x 12 timber Curb
4’-0” Wide Single Gate with lock
2” dia. S.S. Post
6 x 12 timber Curb
2 x 6 Wood decking
2” dia. removable S.S. Post
removable S.S. Chain
6 x 12 timber Curb
2 x 6 Wood decking
typ.
typ.
typ
.
typ
.
eQ
. S
paces
Wood top railturnbuckle
3/8” (8mm) dia. S.S. Cable
SeCtion
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
elevationScale: ntS
railing
Power Pedestal handrail: vertical Grain douglas Fir
decking: Pressure treated Southern yellow Pine
light Pole
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
materialsScale: ntS
Site amenities
1 3
Hatteras Li ght
Power Pedesta l
Th e H a ttera s L i g h t i s a n e l ega n t a n d l ow cost
a l tern a ti ve to th e L i g h th ou se . I t u ti l i zes th e sam e
360 deg ree l i g h t a ssem b l y a s th e L i g h th ou se , yet i s
on l y 30 i n ch es ta l l . Th ou sa n ds of th ese a ttra cti ve
pedesta l s a re fou n d n ot on l y i n m a r i n a s , b u t a l so
a rou n d poo l s , d eck a rea s, boa rdwa l ks a n d l a n d scape
a rea s . Th e h ou s i n g wi l l n ever ru st o r co rrode an d
com es wi th a l i m i ted l i feti m e wa rra n ty. Th i s u n i t i s
popu l a r fo r sm a l l e r s l i p s a t m a r i n a s wi th th e
L i g h th ou se an d fo r p r i va te docks .
Above :
H a tte ra s L i g h t Powe r Pede s ta l s
EATON CORPORATION M ar i n a Power E qu i pm en t www.m a r i n a power. com 1 -800-723-8009
Scarborough trash receptacleCircular bike rack ‘Cityrack’ reclaimed timber bench Precedent
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
materialsScale: ntS
Site amenities
Cable railing with Wood top rail
6” x 12” timber Curb
Power Pedestal
4’-0” Wide Gate
light Pole
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
elevationScale: ntS
main dock
6” x 12” timber Curb
Power Pedestal
light Pole
removable Stainless Steel Post
removeble Chain railing
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
elevationScale: ntS
end dock
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
PerspectiveScale: ntS
view 1
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
PerspectiveScale: ntS
view 2
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
PerspectiveScale: ntS
view 3
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
PerspectiveScale: ntS
view 4
79th Street boat baSin‘a’ doCk
nyC dPrhakS engineersabel bainnson butz, llP September 24, 2012
For review Purposes only - Subject to Change
PerspectiveScale: ntS
view 5