Power Sector
Opportunities and Issues
-
8/10/2019 76412604 India s Power Sector DB Jan0910
2/28
Power Sector -Overview
Policy Initiatives
Measures Undertaken
IDBIs Exposure in Power Sector
Top Private Players Announcements
Investment Opportunities
Issues & Concerns
Suggestions
2
Contents
-
8/10/2019 76412604 India s Power Sector DB Jan0910
3/28
-
8/10/2019 76412604 India s Power Sector DB Jan0910
4/28
Thermal Power Plant (Coal, Lignite, Natural gas, Naphtha, Diesel)
Hydel Power Plant (Water)
Nuclear / Atomic Power Plant (Radio-active fuels)
Non-conventional Power Plant (Wind, Solar, Biomass, Tidal, Co-generation)
Emerging Technologies
Coal based (Circulating Fluidized Bed Combustion, Integrated Gasification
Combined Cycle)
Nuclear Power Based (Pebble Bed Modular Reactor)
4
Power Sector OverviewTechnology
-
8/10/2019 76412604 India s Power Sector DB Jan0910
5/28
5
Power Sector OverviewGlobal Scenario
-
8/10/2019 76412604 India s Power Sector DB Jan0910
6/28
SEBs
CPSUs
IPPs &
Private
Licenses
Captive
SEBs/ STUs
PGCIL
Private Utilities
SEBs
Discoms
Pvt. Licensee
Energy sold =
Energy available
Energy lost
Transformation,
transmission &
Distribution
Losses including
unaccounted
energy
Agriculture
Domestic
CommercialIndustries Others
Captive
Power Trading Companies
Generation Transmission Distribution Consumption
Structure of the Indian Power Industry
open
Input
(KWh)
-
8/10/2019 76412604 India s Power Sector DB Jan0910
7/28
Power Segment wise break-up
7
Power Sector Overview- Present Indian Scenario
-
8/10/2019 76412604 India s Power Sector DB Jan0910
8/28
8
Power Sector Overview
Contractual Structure of a Power Project
-
8/10/2019 76412604 India s Power Sector DB Jan0910
9/28
Installed capacity increased from 1362 MW in 1947 to 1,50,323 MW at endof June 2009
Central Sector
48,971 MW33%
Private Sector24,988 MW
17%
State Sector
76,364 MW
50%
Hydro - 36,917 MW
Thermal - 96,044 MW
Nuclear - 4,120 MW
Renewable - 13,242 MW
Total 1,50,323 MW
Coal - 78,459 MW
Gas - 16,386 MW
Diesel - 1,200 MW
Sector-wise Installed Capacity
9
Power Sector Overview- Installed Capacity
-
8/10/2019 76412604 India s Power Sector DB Jan0910
10/28
Per Capita Consumption : 704.2 Kwh
Power Supply Position (2008-09)
Energy (in MU) Peak (in MW)
Demand 7,77,039 1,09,809
Availability 6,91,038 96,785
Shortage 86,001 13,024
% shortage 11.1% 11.9%
Average Plant Load Factor (PLF) : 77.19 % (Thermal, 2008-09)
10
Power Sector OverviewDemand-Supply Gap
-
8/10/2019 76412604 India s Power Sector DB Jan0910
11/28
11
Power Sector OverviewDemand Supply Position
-
8/10/2019 76412604 India s Power Sector DB Jan0910
12/28
Target & Achievements
Five year plan Year Target Achievement
Eight plan 1992-1997 30,538 16,423 (54%)
Ninth plan 1997-2002 40,245 19,025 (47%)
Tenth plan 2002-2007 41,110 21,180 (51%)
Eleventh plan 2007-2012 78,700* -
Twelfth plan 2012-2017 82,200 -
12
Power Sector OverviewCapacity Addition
* 12,716 MW added during last two years
-
8/10/2019 76412604 India s Power Sector DB Jan0910
13/28
Unsatisfactory Financial health of SEBs Poor quality of Supply
Un-scheduled load shedding, low voltages, voltage and frequency fluctuations
High T&D losses
Metering, Billing & Collection
Energy audit Average tariff lower than cost of supply
Commercial Losses without subsidy of SEBsApprox. Rs.265 billion (for2008-09)
Slow progress in T&D reforms
Subsidies
Escrow Cover
Political involvement
13
Power Sector Overview- Present Scenario
-
8/10/2019 76412604 India s Power Sector DB Jan0910
14/28
14
Power Sector OverviewPolicy Initiatives
Indian Electricity Act 1910
Technical & Operating Standards
Licenses for supplying power in specific areas
The Electricity (Supply) act 1948-
Development of State sector
Creation of SEBs, CGUs & CEAs
Amendment to Electricity (Supply) Act 1991
Private sector participation in generation
Awarding the IPPs through Pass Through Cost Basis route
100% foreign Equity participation: full dividend repatriation . Two part tariff structure - 16 % return on equity at PLF of 68.5%,
incentives for PLF above 68.5% with FX pass through
Guaranteed Off-take by SEBs
Counter guarantee by Central Government for 8 fast track IPPs
-
8/10/2019 76412604 India s Power Sector DB Jan0910
15/28
15
Power Sector OverviewPolicy Initiatives
Competitive Bidding Process (tariff) for IPPs was adopted since 1995 The Electricity Laws (Amendment) Act, 1998
Transmission of Electricity
Granting of transmission license
Electricity Regulatory Commission Act, 1998
Establishment of CERCs & SERCs. Creation of CTUs & STUs
Mega Power Policy, 1999
100% Customs duty waiver
PTC to buy power from Mega Projects & supply to SEBs
The Accelerated Power Development and Reform Programme (APDRP), 2000 Financial assistance/ incentives for T&D upgrades & SEB
profitability
Availability based tariff (ABT) notified by CERC
-
8/10/2019 76412604 India s Power Sector DB Jan0910
16/28
16
Power Sector OverviewPolicy Initiatives
Montek Singh Committee - Securitisation of SEBs over dues by CPSUs
However, capacity creation through private sector participation did not happen asdesired mainly due to the following:
SEBs reforms tardy
SEBs financial health continued to be poor
Dishonoring legally binding agreements
Pulling out by number of foreign utility companies
MOAs with Govt. of India to undertake reforms
The Electricity Act, 2003 enacted
The Electricity Amendment Act, 2007 Access to Electricity to all areas
Sale from captive units - No license required
Removal of provision for elimination of cross subsidy
-
8/10/2019 76412604 India s Power Sector DB Jan0910
17/28
17
Power Sector OverviewThe Electricity Act, 2003
Delicensing of generation including captive but excluding hydro and nuclear
Captive generation freely permitted
Non-discriminatory open access to network subject to surcharge: No surcharge for
captive use
Private transmission licensees allowed
Generation companies can undertake distribution activities and vice versa for
distribution licensees
Open accessconsumers permitted to purchase electricity from generators and other
distribution licensees 100% metering made mandatory
CERC and SERCs would be the licensing authorities for T & D and trading
-
8/10/2019 76412604 India s Power Sector DB Jan0910
18/28
18
Power Sector OverviewThe Electricity Act, 2003
Power trading is recognized as a regulated activity
Preparation of National Electricity Policy and Tariff Policy
An appellate tribunal would be set up for appeals against decisions of CERC and
SERCs
Setting up SERC made mandatory for all states
T & D surcharges are permitted but subsidies would be required to be phased out
gradually
Stringent penalty for power theft
-
8/10/2019 76412604 India s Power Sector DB Jan0910
19/28
19
Power Sector OverviewImpact of Electricity Act
Entry of more private players in generation
Captive power capacities by industrial players
Entry of few private players in transmission segment (JV with PGCIL)
16 states have unbundled the distribution (May 2009)
Orissa & Delhi privatized Bhiwandi, Nagpur , PirthipurFranchise route
Progress in reduction of T&D losses
Improvement in the system efficiency
Grid discipline in the system
Cross subsidization of consumers still continuing
Implementation of open access at retail level would take some more time (being
tested in Mumbai)
-
8/10/2019 76412604 India s Power Sector DB Jan0910
20/28
20
Power Sector Overview
Measures undertaken Ultra Mega Power Projects
Large sized projects, approx. 4000 MW
Estimated investmentRs.16,000 crore
Minimum Net WorthRs.200 crore
Maximum 3 projects can be awarded to a bidder
Developed on BOO basis
Use of Super Critical Technology
Dedicated captive coal blocks for pithead projects (4 projects)
Imported coal for coastal projects (5 projects)
Co-ordination from Ministry of Power
Power Finance Corporationidentified as the nodal agency
-
8/10/2019 76412604 India s Power Sector DB Jan0910
21/28
21
Power Sector Overview
Budget Impact
2009-10 Union Budget Impact on Power Sector
Take-out financing of 60% of bank loan by IIFCL ( up to Rs. 1 lac crore)
The budgetary allocations for the APDRP has been increased from Rs.800
crore to Rs.2080 croreThe allocation for RGGVY has been increased from Rs.5500 crore to
Rs.7000 crore
Customs duty on permanent magnet used in wind power generation reduced
from 7.5 per cent to 5 per cent
-
8/10/2019 76412604 India s Power Sector DB Jan0910
22/28
22
Power Sector OverviewMerchant Power Plants (MPP)
MPPs generate electricity for sale at market driven rates in the open
wholesale market.
Include sale of power under short-term PPAs and on spot basis
Can generate higher returns (vis-a-vis selling power through long term PPA)
Can sell power to the power trading companies (like the Power Trading
Corporation), the SEBs and industrial and bulk customers
Sale Price & Volume of Electricity Traded by the Trading Licensees
(12 licensee holders) are given in next slide
-
8/10/2019 76412604 India s Power Sector DB Jan0910
23/28
23
Power Sector OverviewTop Private Players Announcements
Total CRISIL estimates Balance of totalannouncements
Top private players Announcements Eleventh Planexpected in Twelfth
Plan
MW MW MW
Reliance Power 28195 900 27295
JSW Energy 15000 0 15000
IndiaBulls Power
Services (JV)11000 0 11000
Tata Power 10000 250 9750
Lanco 10000 970 9030
Adani 10000 0 10000
Jaypakash Power 5275 700 4575
Videocon 5000 0 5000
Jindal Power
(JSPL+JP)4670 1000 3670
Torrent Power 4500 1100 3400
CESC 4250 250 4000
Essar power 4000 0 4000
GVK Power 3660 600 3060
GMR Energy 3440 0 3440
Sterlite Energy 2400 0 2400
Visa Power 1200 0 1200
Top players 122590 5770 116820
-
8/10/2019 76412604 India s Power Sector DB Jan0910
24/28
24
Power Sector OverviewFund Requirement
Total capacity (MW) Generation Transmission Distribution investments
2007-08 9,263 417 163 73 653
2008-09 7,745 349 143 61 553
2009-10 8,014 361 147 63 571
2010-11 12,663 570 215 100 885
2011-12 12,120 545 207 95 848Total 49,805 2,241 876 392 3,510
Year wise investments in power (Eleventh Plan)
Fuel Capital Cost(Rs.crore/MW)
Levelised Tariff (15 years)(Rs. Per Kwh)
Coal 4.005.00 2.70
Naphtha 2.504.00 6.74
Gas 2.504.00 2.18
Transmission Target 37,150 MW (Present 20,750 MW)
Cost
-
8/10/2019 76412604 India s Power Sector DB Jan0910
25/28
25
Power Sector Overview
Issues in Financing Power Projects
Large Capital Costs
Long gestation period
Sector vulnerable to regulatory and policy changes;
Projects are contract driven leading to a lot of legal complexities
SponsorsTechnology
Fuel & Transportation
Evacuation
Market
Off takers (Financial health of SEB)Payment Security
Approvals & clearances
Foreign Exchange risk
-
8/10/2019 76412604 India s Power Sector DB Jan0910
26/28
26
Power Sector OverviewSuggestions Enforcement of implementation of the reform process by SERCs
High level of cross subsidy surcharge to be progressively reduced/eliminated
Effective implementation of the restructured APDRP in distribution sector in all States
Critical review and rationalization of duties & taxes
Single window clearance/ automatic clearances, needs to be introduced
Delay in securing clearances, commitments from state utilities for power purchase,resistance from environmentalists, demand for free power by states need to be
appropriately addressed for all power projects
There is an urgent need of a Regulator in Coal Sector. The Union coal ministry has
initiated work on setting up a regulatory body, which will be responsible for domestic
coal pricing
Opening up of coal sector to private sector participation to promote competition
Open access to the Gas network should be ensured to promote competition in gas sourcing
Role of Regulator in Oil & Gas sector needs to be expanded to include gas pricing.
-
8/10/2019 76412604 India s Power Sector DB Jan0910
27/28
27
Power Sector OverviewSuggestions
Augmentation of capital base of the banks
Raising of tax-free infrastructure bonds by FI/Banks.
Effective take-out financing mechanism [In the recent budget, FM has announced
a scheme for take-out financing of 60% of bank loan by IIFCL].
Softer provisioning norms for infrastructure projects. RBI has recently permitted a 2-
year period (originally COD) for determining asset classification of infrastructure
projects
Reintroduction of benefit of sec 10(23G) of IT Act 1961 (tax exemption on net
interest income in respect of infrastructure projects).
Review of ECB guidelines including allowing banks/institutions to extend guarantees
for financing infrastructure projects to make available cheaper foreign funds.
Reduction and harmonization of state level taxes and duties
-
8/10/2019 76412604 India s Power Sector DB Jan0910
28/28
28
Thank You