    7.0 Mine Operating Cost Estimation

    For feasibility studies, mine operating costs are typically developed by miningfunction (drilling, blasting, loading, hauling, roads and dumps, general mine,general maintenance, and mine administration) with each function defined in termsof operating labor, maintenance labor, and repair parts and consumables. Costsare developed by mining period from equipment levels derived as a function of total

    material mining rates. The mine production schedule and equipment requirementsfor use in this exercise are summarized in Table 7-1.

    Salaried manpower levels and cost by mining period are developed in Table 7-2.The annual salaries shown are typical western-US rates and include a 45 percentburden. Supervisory and technical manpower levels may vary significantly fromproperty to property, reflecting both corporate philosophy and complexity ofoperations.

    Hourly labor requirements and costs are calculated in Table 7-3. Labor ratesshown are again typical western-US. Manpower levels for major equipment arecalculated from the average number of units operating during each period, whichare included in Table 7-1, multiplied by the number of crews required and anallowance for vacation, sick leave, and absenteeism (VSA) plus the degree ofcross-training. VSA coverage usually requires a 7-8 percent increase in manpowerand the adjustment has been brought up to 10 percent to consider a significant

    degree of cross-training (a lesser degree of cross-training would require a higherfactor).

    The number of mechanics required for each mining period is a function of thehourly maintenance labor cost for each piece of equipment and is calculated inTable 7-6 and brought back to this table. Historically, each type of equipment hadits own distribution of mechanics, welders, and electricians. With the maintenancefunction increasingly becoming one of component exchange, rather than

    specialization, a generic mechanic is used to simplify calculations.

    Manning levels for non-equipment areas (Trainees, laborers, pumpmen, lubemen,tiremen, utilitymen, etc.) are a function of local conditions and operating practice.

    The costs calculated in Table 7-3 are used to develop operating labor costs by

  • 8/22/2019 7.0 Operating Cost

    2/34

    Maintenance labor costs are calculated by mining function in Table 7-6. Summingall the equipment-generated labor costs and dividing that total by the period cost for

    one mechanic calculates the number of mechanics required for each period. Thiscalculated number of mechanics is adjusted by the VSA and cross training factordeveloped in Table 7-3 to arrive at the total mechanics required. The cost of thetotal number of mechanics is greater that that required by the itemized equipment,due to rounding up to whole numbers, and the difference is allocated GeneralMaintenance to cover small vehicle maintenance.

    Costs for explosives are developed in Table 7-7.

    In Table 7-8, functional costs for repair parts and other consumables are derived ona functional basis. An allowance of $0.03 per ton has been added to the GeneralMine costs to cover miscellaneous supplies. To account for gasoline and smallvehicle maintenance/supplies, an allowance of $0.04 per ton is added to GeneralMaintenance. An additional $0.05 per ton has been included in Mine Administrationto cover a dispatch system, surveying and mine computer hardware/software, andother similar items.

    Table 7-9 summarizes mine operating costs both by mining function and by majorcost center.

    Table 7-10 summarizes diesel fuel and prill consumption by mining period and theresults are used to size storage facilities (tank farm and prill silos).

    Table 7-11 summarizes mine capital costs by mining period in terms ofpreproduction stripping, mine equipment, and mine facilities.

    Table 7-12 summarizes mine production, equipment, manpower, operating costs,equipment capital, facilities capital, and the preproduction stripping cost by miningperiod.

  • 8/22/2019 7.0 Operating Cost

    3/34

  • 8/22/2019 7.0 Operating Cost

    4/34

  • 8/22/2019 7.0 Operating Cost

    5/34

    AnnualSalary

    ($x1000) No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost

    ktonnes Mined 8,213 20,788 30,303 68,010 89,997 90,001 90,000 90,004 90,000 89,999 90,000

    Mine Manager 157.6 1 79 1 158 1 158 1 158 1 158 1 158 1 158 1 158 1 158 1 158 1 158Secretary 46.8 1 23 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 47Mine Superindendent 140.8 1 70 1 141 1 141 1 141 1 141 1 141 1 141 1 141 1 141 1 141 1 141

    Secretary 46.8 1 23 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 47General Foreman 117.3 1 59 1 117 1 117 1 117 1 117 1 117 1 117 1 117 1 117 1 117 1 117D&B Foreman 95.0 1 48 1 95 1 95 1 95 1 95 1 95 1 95 1 95 1 95 1 95 1 95Shift Foreman 95.0 4 190 4 380 4 380 4 380 4 380 4 380 4 380 4 380 4 380 4 380 4 380Relief Foreman 95.0 1 48 1 95 1 95 1 95 1 95 1 95 1 95 1 95 1 95 1 95 1 95

    Mine Maintenance Supt. 140.8 1 70 1 141 1 141 1 141 1 141 1 141 1 141 1 141 1 141 1 141 1 141Secretary 46.8 1 23 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 47

    Salaried Manpower Requirements and Cost ($x1000)

    Table 7-2

    Annual Rates Include 45% Burden

    Year 5 Year 6 Year 7 Year 8Year -3 Year -2 Year -1 Year 1 Year 2 Year 3 Year 4

    er .Maintenance Planner 95.0 1 48 1 95 1 95 1 95 1 95 1 95 1 95 1 95 1 95 1 95 1 95General Foreman 117.3 1 59 1 117 1 117 1 117 1 117 1 117 1 117 1 117 1 117 1 117 1 117Shift Foreman 95.0 4 190 4 380 4 380 4 380 4 380 4 380 4 380 4 380 4 380 4 380 4 380Shop Foreman 95.0 6 285 6 570 6 570 6 570 6 570 6 570 6 570 6 570 6 570 6 570 6 570

    Chief Mine Engineer 122.7 1 61 1 123 1 123 1 123 1 123 1 123 1 123 1 123 1 123 1 123 1 123Mine Engineer 95.5 3 143 3 287 3 287 3 287 3 287 3 287 3 287 3 287 3 287 3 287 3 287Geologist 87.6 3 131 3 263 3 263 3 263 3 263 3 263 3 263 3 263 3 263 3 263 3 263Ore Control Tech. 67.2 3 101 3 202 3 202 3 202 3 202 3 202 3 202 3 202 3 202 3 202 3 202

    Surveyor 67.2 3 101 3 202 3 202 3 202 3 202 3 202 3 202 3 202 3 202 3 202 3 202Technician 67.2 3 101 3 202 3 202 3 202 3 202 3 202 3 202 3 202 3 202 3 202 3 202

    Total Cost: $x1000 42 1,876 42 3,753 42 3,753 42 3,753 42 3,753 42 3,753 42 3,753 42 3,753 42 3,753 42 3,753 42 3,753$/tonne Mined 0.2285 0.1805 0.1238 0.0552 0.0417 0.0417 0.0417 0.0417 0.0417 0.0417 0.0417

  • 8/22/2019 7.0 Operating Cost

    6/34

    AnnualSalary

    ($x1000) No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost

    ktonnes Mined 90,000 89,997 90,000 90,003 89,898 89,997 89,998 90,003 89,998 89,999 82,745

    Mine Manager 157.6 1 158 1 158 1 158 1 158 1 158 1 158 1 158 1 158 1 158 1 158 1 158Secretary 46.8 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 47Mine Superindendent 140.8 1 141 1 141 1 141 1 141 1 141 1 141 1 141 1 141 1 141 1 141 1 141

    Secretary 46.8 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 47General Foreman 117.3 1 117 1 117 1 117 1 117 1 117 1 117 1 117 1 117 1 117 1 117 1 117D&B Foreman 95.0 1 95 1 95 1 95 1 95 1 95 1 95 1 95 1 95 1 95 1 95 1 95

    Shift Foreman 95.0 4 380 4 380 4 380 4 380 4 380 4 380 4 380 4 380 4 380 4 380 4 380Relief Foreman 95.0 1 95 1 95 1 95 1 95 1 95 1 95 1 95 1 95 1 95 1 95 1 95

    Mine Maintenance Supt. 140.8 1 141 1 141 1 141 1 141 1 141 1 141 1 141 1 141 1 141 1 141 1 141Secretary 46.8 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 47

    Salaried Manpower Requirements and Cost ($x1000)Annual Rates Include 45% Burden

    Year 11 Year 12 Year 13 Year 14 Year 15 Year 16

    Table 7-2 (Continued)

    Year 17 Year 18 Year 19Year 9 Year 10

    er .Maintenance Planner 95.0 1 95 1 95 1 95 1 95 1 95 1 95 1 95 1 95 1 95 1 95 1 95General Foreman 117.3 1 117 1 117 1 117 1 117 1 117 1 117 1 117 1 117 1 117 1 117 1 117Shift Foreman 95.0 4 380 4 380 4 380 4 380 4 380 4 380 4 380 4 380 4 380 4 380 4 380Shop Foreman 95.0 6 570 6 570 6 570 6 570 6 570 6 570 6 570 6 570 6 570 6 570 6 570

    Chief Mine Engineer 122.7 1 123 1 123 1 123 1 123 1 123 1 123 1 123 1 123 1 123 1 123 1 123Mine Engineer 95.5 3 287 3 287 3 287 3 287 3 287 3 287 3 287 3 287 3 287 3 287 3 287Geologist 87.6 3 263 3 263 3 263 3 263 3 263 3 263 3 263 3 263 3 263 3 263 3 263Ore Control Tech. 67.2 3 202 3 202 3 202 3 202 3 202 3 202 3 202 3 202 3 202 3 202 3 202

    Surveyor 67.2 3 202 3 202 3 202 3 202 3 202 3 202 3 202 3 202 3 202 3 202 3 202Technician 67.2 3 202 3 202 3 202 3 202 3 202 3 202 3 202 3 202 3 202 3 202 3 202

    Total Cost: $x1000 42 3,753 42 3,753 42 3,753 42 3,753 42 3,753 42 3,753 42 3,753 42 3,753 42 3,753 42 3,753 42 3,753$/tonne Mined 0.0417 0.0417 0.0417 0.0417 0.0417 0.0417 0.0417 0.0417 0.0417 0.0417 0.0454

  • 8/22/2019 7.0 Operating Cost

    7/34

    AnnualSalary

    ($x1000) No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost

    ktonnes Mined 87,022 55,262 49,385 42,667 39,596 33,360 33,360 33,360 33,360 3,657

    Mine Manager 157.6 1 158 1 158 1 158 1 158 1 158 1 158 1 158 1 158 1 158 1 17Secretary 46.8 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 5Mine Superindendent 140.8 1 141 1 141 1 141 1 141 1 141 1 141 1 141 1 141 1 141 1 15

    Secretary 46.8 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 5General Foreman 117.3 1 117 1 117 1 117 1 117 1 117 0 0 0 0 0 0 0 0 0 0D&B Foreman 95.0 1 95 1 95 1 95 1 95 1 95 0 0 0 0 0 0 0 0 0 0

    Shift Foreman 95.0 4 380 4 380 4 380 4 380 4 380 4 380 4 380 4 380 4 380 4 42Relief Foreman 95.0 1 95 1 95 1 95 1 95 1 95 1 95 1 95 1 95 1 95 1 10

    Mine Maintenance Supt. 140.8 1 141 1 141 1 141 1 141 1 141 1 141 1 141 1 141 1 141 1 15Secretary 46.8 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 47 1 5

    2,150,982

    4,8241,4334,310

    3,1082,518

    11,6322,9084,3101,433

    1,433

    Table 7-2 (Continued)

    Salaried Manpower Requirements and Cost ($x1000)Annual Rates Include 45% Burden

    Life ofYear 29Year 22

    CostMineYear 23 Year 24 Year 25 Year 26 Year 27 Year 28Year 20 Year 21

    er .Maintenance Planner 95.0 1 95 1 95 1 95 1 95 1 95 1 95 1 95 1 95 1 95 1 10General Foreman 117.3 1 117 1 117 1 117 1 117 1 117 0 0 0 0 0 0 0 0 0 0Shift Foreman 95.0 4 380 4 380 4 380 4 380 4 380 4 380 4 380 4 380 4 380 4 42Shop Foreman 95.0 6 570 6 570 6 570 6 570 6 570 1 95 1 95 1 95 1 95 1 10

    Chief Mine Engineer 122.7 1 123 1 123 1 123 1 123 1 123 1 123 1 123 1 123 1 123 1 13Mine Engineer 95.5 3 287 3 287 3 287 3 287 3 287 1 96 1 96 1 96 1 96 1 10Geologist 87.6 3 263 3 263 3 263 3 263 3 263 1 88 1 88 1 88 1 88 1 10Ore Control Tech. 67.2 3 202 3 202 3 202 3 202 3 202 2 134 2 134 2 134 2 134 2 15

    Surveyor 67.2 3 202 3 202 3 202 3 202 3 202 2 134 2 134 2 134 2 134 2 15Technician 67.2 3 202 3 202 3 202 3 202 3 202 2 134 2 134 2 134 2 134 2 15

    Total Cost: $x1000 42 3,753 42 3,753 42 3,753 42 3,753 42 3,753 27 2,380 27 2,380 27 2,380 27 2,380 27 261$/tonne Mined 0.0431 0.0679 0.0760 0.0880 0.0948 0.0714 0.0714 0.0714 0.0714 0.0714 0.0508

    7,9857,3245,895

    5,8955,895

    109,232

    3,756

    ,2,9083,10811,63215,495

  • 8/22/2019 7.0 Operating Cost

    8/34

    Hrs/man/year:

    40 ours/week x 52 eeks/year = 2,080 hours/year VSA / cross-training factor = 1.1Less 80 hours/year vacation = 2,000 hours/year Number of crews required = 4Less 40 hours/year sick leave = 1,960 hours/year Burden = 45%Unscheduled overtime @ 10% = 196 hours/year 196 hours @ time-and-a-half = 294 hours/year (straight time)

    Total paid = 2,254 hours/man/year

    Cost/Base Brdnd Year Rate Rate ($x1000) No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost

    MINE OPERATIONSDriller 22.00 31.90 71.9 2 72 2 144 3 216 6 431 10 719 10 719 9 647 10 719 10 719 9 647 10 719Blasting Tech 16.00 23.20 52.3 1 26 1 52 2 105 2 105 2 105 2 105 2 105 2 105 2 105 2 105 2 105Powderman 15.00 21.75 49.0 1 25 1 49 2 98 2 98 2 98 2 98 2 98 2 98 2 98 2 98 2 98Shovel Operator 25.00 36.25 81.7 0 0 4 327 5 409 11 899 14 1,144 14 1,144 14 1,144 14 1,144 14 1,144 14 1,144 14 1,144

    i

    Year -3 Year -2 Year -1 Year 1 Year 2 Year 3 Year 4 Year 5

    Table 7-3

    Hourly Labor Requirements and Cost ($x1000)

    Year 6 Year 7 Year 8

    i . . . , , , , , , , , , ,Aux.Equip.Op. 20.00 29.00 65.4 26 850 23 1,503 27 1,765 36 2,353 36 2,353 36 2,353 36 2,353 36 2,353 36 2,353 36 2,353 36 2,353Trainee/Laborer 15.00 21.75 49.0 8 196 8 392 8 392 8 392 8 392 8 392 8 392 8 392 8 392 8 392 8 392

    Operations Subtotal 64 2,018 65 4,167 87 5,599 133 8,723 170 11,217 178 11,740 195 12,844 186 12,263 177 11,674 187 12,321 199 13,112MINE MAINTENANCE

    Mechanic 23.00 33.35 75.2 40 1,503 46 3,458 65 4,886 113 8,494 152 11,426 159 11,952 173 13,005 166 12,478 159 11,952 167 12,554 176 13,230Lube Tech 18.40 26.68 60.1 4 120 4 241 8 481 8 481 8 481 8 481 8 481 8 481 8 481 8 481 8 481Tireman 18.40 26.68 60.1 4 120 4 241 8 481 8 481 8 481 8 481 8 481 8 481 8 481 8 481 8 481Utilityman/helper 17.25 25.01 56.4 4 113 4 226 8 451 8 451 8 451 8 451 8 451 8 451 8 451 8 451 8 451

    Maintenance Subtotal 52 1,857 58 4,164 89 6,299 137 9,908 176 12,839 183 13,365 197 14,418 190 13,892 183 13,365 191 13,967 200 14,643

    HOURLY TOTAL 116 3,875 123 8,332 176 11,898 270 18,631 346 24,056 361 25,105 392 27,262 376 26,154 360 25,040 378 26,288 399 27,756

  • 8/22/2019 7.0 Operating Cost

    9/34

    Cost/Base Brdnd Year Rate Rate ($x1000) No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost

    MINE OPERATIONSDriller 22.00 31.90 71.9 10 719 10 719 10 719 10 719 10 719 10 719 10 719 10 719 10 719 10 719 10 719Blasting Tech 16.00 23.20 52.3 2 105 2 105 2 105 2 105 2 105 2 105 2 105 2 105 2 105 2 105 2 105Powderman 15.00 21.75 49.0 2 98 2 98 2 98 2 98 2 98 2 98 2 98 2 98 2 98 2 98 2 98Shovel Operator 25.00 36.25 81.7 14 1,144 14 1,144 14 1,144 14 1,144 14 1,144 14 1,144 14 1,144 14 1,144 14 1,144 14 1,144 13 1,062

    Truck Driver 20.00 29.00 65.4 105 6,863 101 6,602 108 7,060 115 7,517 117 7,648 114 7,452 113 7,386 121 7,909 125 8,171 122 7,975 115 7,517Aux.Equip.Op. 20.00 29.00 65.4 36 2,353 36 2,353 36 2,353 36 2,353 36 2,353 36 2,353 36 2,353 36 2,353 36 2,353 36 2,353 36 2,353Trainee/Laborer 15.00 21.75 49.0 8 392 8 392 8 392 8 392 8 392 8 392 8 392 8 392 8 392 8 392 8 392

    Operations Subtotal 177 11,674 173 11,413 180 11,870 187 12,328 189 12,459 186 12,263 185 12,197 193 12,720 197 12,982 194 12,786 186 12,246MINE MAINTENANCE

    Year 15 Year 16 Year 17 Year 18 Year 19Year 14

    Table 7-3 (Continued)

    Hourly Labor Requirements and Cost ($x1000)

    Year 9 Year 10 Year 11 Year 12 Year 13

    Mechanic 23.00 33.35 75.2 158 11,877 155 11,651 161 12,103 167 12,554 169 12,704 167 12,554 166 12,478 172 12,929 175 13,155 173 13,005 163 12,253Lube Tech 18.40 26.68 60.1 8 481 8 481 8 481 8 481 8 481 8 481 8 481 8 481 8 481 8 481 8 481Tireman 18.40 26.68 60.1 8 481 8 481 8 481 8 481 8 481 8 481 8 481 8 481 8 481 8 481 8 481Utilityman/helper 17.25 25.01 56.4 8 451 8 451 8 451 8 451 8 451 8 451 8 451 8 451 8 451 8 451 8 451

    Maintenance Subtotal 182 13,290 179 13,065 185 13,516 191 13,967 193 14,117 191 13,967 190 13,892 196 14,343 199 14,568 197 14,418 187 13,666

    HOURLY TOTAL 359 24,965 352 24,478 365 25,386 378 26,295 382 26,576 377 26,229 375 26,089 389 27,063 396 27,550 391 27,203 373 25,912

  • 8/22/2019 7.0 Operating Cost

    10/34

    Cost/Base Brdnd Year Rate Rate ($x1000) No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost No. Cost

    MINE OPERATIONSDriller 22.00 31.90 71.9 10 719 7 503 6 431 5 360 3 216 0 0 0 0 0 0 0 0 0 0Blasting Tech 16.00 23.20 52.3 1 52 1 52 1 52 1 52 1 52 0 0 0 0 0 0 0 0 0 0Powderman 15.00 21.75 49.0 1 49 1 49 1 49 1 49 1 49 0 0 0 0 0 0 0 0 0 0Shovel Operator 25.00 36.25 81.7 13 1,062 9 735 8 654 7 572 6 490 5 409 5 409 5 409 5 409 5 45

    Truck Driver 20.00 29.00 65.4 106 6,929 75 4,902 77 5,033 74 4,837 56 3,660 26 1,700 25 1,634 23 1,503 21 1,373 23 165Aux.Equip.Op. 20.00 29.00 65.4 36 2,353 36 2,353 34 2,222 34 2,222 32 2,092 21 1,373 21 1,373 16 1,046 12 784 12 86Trainee/Laborer 15.00 21.75 49.0 8 392 8 392 8 392 8 392 4 196 4 196 4 196 4 196 4 196 4 21

    Operations Subtotal 175 11,557 137 8,988 135 8,834 130 8,485 103 6,756 56 3,677 55 3,611 48 3,154 42 2,762 44 317MINE MAINTENANCE

    64,73311,003298,757

    15,8902,4322,28027,335

    175,084

    Year 27 Year 28 Year 29

    Table 7-3 (Continued)

    Hourly Labor Requirements and Cost ($x1000)

    Life ofMineYear 21 Year 22 Year 23 Year 24 Year 25 Year 26Year 20Cost

    Mechanic 23.00 33.35 75.2 158 11,877 115 8,645 110 8,269 103 7,743 82 6,164 44 3,308 43 3,232 40 3,007 36 2,706 5 41Lube Tech 18.40 26.68 60.1 8 481 8 481 8 481 8 481 8 481 8 481 8 481 8 481 8 481 8 481Tireman 18.40 26.68 60.1 8 481 8 481 8 481 8 481 8 481 8 481 8 481 8 481 8 481 8 481Utilityman/helper 17.25 25.01 56.4 8 451 8 451 8 451 8 451 8 451 8 451 8 451 8 451 8 451 8 451

    Maintenance Subtotal 182 13,290 139 10,058 134 9,682 127 9,156 106 7,577 68 4,721 67 4,646 64 4,420 60 4,119 29 1,454

    HOURLY TOTAL 357 24,847 276 19,046 269 18,516 257 17,640 209 14,333 124 8,398 122 8,257 112 7,574 102 6,881 73 1,771

    340,648

    639,405

    297,19214,79414,79413,869

  • 8/22/2019 7.0 Operating Cost

    11/34

    Year -3 Year -2 Year -1 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8

    ktonnes Mined 8,213 20,788 30,303 68,010 89,997 90,001 90,000 90,004 90,000 89,999 90,000DRILLING

    $x1000 72 144 216 431 719 719 647 719 719 647 719$/tonne mined 0.0088 0.0069 0.0071 0.0063 0.0080 0.0080 0.0072 0.0080 0.0080 0.0072 0.0080

    BLASTING$x1000 51 101 203 203 203 203 203 203 203 203 203$/tonne mined 0.0062 0.0049 0.0067 0.0030 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023

    LOADING$x1000 0 327 409 899 1,144 1,144 1,144 1,144 1,144 1,144 1,144

    $/tonne mined 0.0000 0.0157 0.0135 0.0132 0.0127 0.0127 0.0127 0.0127 0.0127 0.0127 0.0127HAULING

    $x1000 850 1,700 2,615 4,445 6,406 6,929 8,105 7,452 6,863 7,582 8,301

    Table 7-4

    Operating Labor Costs

    $/tonne mined 0.1035 0.0818 0.0863 0.0654 0.0712 0.0770 0.0901 0.0828 0.0763 0.0843 0.0922ROADS & DUMPS

    $x1000 850 1,503 1,765 2,353 2,353 2,353 2,353 2,353 2,353 2,353 2,353$/tonne mined 0.1035 0.0723 0.0582 0.0346 0.0261 0.0261 0.0261 0.0261 0.0261 0.0261 0.0261

    GENERAL MINE$x1000 196 392 392 392 392 392 392 392 392 392 392$/tonne mined 0.0239 0.0189 0.0129 0.0058 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044

    GENERAL MAINTENANCE$x1000 0 0 0 0 0 0 0 0 0 0 0$/tonne mined 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

    TOTAL$x1000 2,018 4,167 5,599 8,723 11,217 11,740 12,844 12,263 11,674 12,321 13,112$/tonne mined 0.2457 0.2005 0.1848 0.1283 0.1246 0.1304 0.1427 0.1362 0.1297 0.1369 0.1457

  • 8/22/2019 7.0 Operating Cost

    12/34

    Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19

    ktonnes Mined 90,000 89,997 90,000 90,003 89,898 89,997 89,998 90,003 89,998 89,999 82,745DRILLING

    $x1000 719 719 719 719 719 719 719 719 719 719 719$/tonne mined 0.0080 0.0080 0.0080 0.0080 0.0080 0.0080 0.0080 0.0080 0.0080 0.0080 0.0087

    BLASTING$x1000 203 203 203 203 203 203 203 203 203 203 203$/tonne mined 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0024

    LOADING$x1000 1,144 1,144 1,144 1,144 1,144 1,144 1,144 1,144 1,144 1,144 1,062

    $/tonne mined 0.0127 0.0127 0.0127 0.0127 0.0127 0.0127 0.0127 0.0127 0.0127 0.0127 0.0128HAULING

    $x1000 6,863 6,602 7,060 7,517 7,648 7,452 7,386 7,909 8,171 7,975 7,517

    Table 7-4 (Continued)

    Operating Labor Costs

    $/tonne mined 0.0763 0.0734 0.0784 0.0835 0.0851 0.0828 0.0821 0.0879 0.0908 0.0886 0.0908ROADS & DUMPS

    $x1000 2,353 2,353 2,353 2,353 2,353 2,353 2,353 2,353 2,353 2,353 2,353$/tonne mined 0.0261 0.0261 0.0261 0.0261 0.0262 0.0261 0.0261 0.0261 0.0261 0.0261 0.0284

    GENERAL MINE$x1000 392 392 392 392 392 392 392 392 392 392 392

    $/tonne mined 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0047GENERAL MAINTENANCE

    $x1000 0 0 0 0 0 0 0 0 0 0 0$/tonne mined 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

    TOTAL$x1000 11,674 11,413 11,870 12,328 12,459 12,263 12,197 12,720 12,982 12,786 12,246$/tonne mined 0.1297 0.1268 0.1319 0.1370 0.1386 0.1363 0.1355 0.1413 0.1442 0.1421 0.1480

  • 8/22/2019 7.0 Operating Cost

    13/34

    Life ofYear 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26 Year 27 Year 28 Year 29 Mine

    ktonnes Mined

    DRILLING 87,022 55,262 49,385 42,667 39,596 33,360 33,360 33,360 33,360 3,657 2,150,982$x1000$/tonne mined 719 503 431 360 216 0 0 0 0 0 15,890

    BLASTING 0.0083 0.0091 0.0087 0.0084 0.0054 0.0000 0.0000 0.0000 0.0000 0.0000 0.0074$x1000$/tonne mined 101 101 101 101 101 0 0 0 0 0 4,711

    LOADING 0.0012 0.0018 0.0021 0.0024 0.0026 0.0000 0.0000 0.0000 0.0000 0.0000 0.0022$x1000

    $/tonne mined 1,062 735 654 572 490 409 409 409 409 45 27,335HAULING 0.0122 0.0133 0.0132 0.0134 0.0124 0.0122 0.0122 0.0122 0.0122 0.0122 0.0127$x1000

    Table 7-4 (Continued)

    Operating Labor Costs

    , , , , , , , , , ,ROADS & DUMPS 0.0796 0.0887 0.1019 0.1134 0.0924 0.0509 0.0490 0.0451 0.0411 0.0451 0.0814

    $x1000$/tonne mined 2,353 2,353 2,222 2,222 2,092 1,373 1,373 1,046 784 86 64,733

    GENERAL MINE 0.0270 0.0426 0.0450 0.0521 0.0528 0.0411 0.0411 0.0314 0.0235 0.0235 0.0301$x1000

    $/tonne mined 392 392 392 392 196 196 196 196 196 21 11,003GENERAL MAINTENAN 0.0045 0.0071 0.0079 0.0092 0.0050 0.0059 0.0059 0.0059 0.0059 0.0059 0.0051

    $x1000$/tonne mined 0 0 0 0 0 0 0 0 0 0 0

    TOTAL 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

    $x1000$/tonne mined 11,557 8,988 8,834 8,485 6,756 3,677 3,611 3,154 2,762 317 298,757

    0.1328 0.1626 0.1789 0.1989 0.1706 0.1102 0.1083 0.0945 0.0828 0.0867 0.1389

  • 8/22/2019 7.0 Operating Cost

    14/34

    Diesel fuel = 2.50 $/gallon Shift length = 12 hours0.660 $/liter Base = 23.00 $/hr Less shift change = 30 min

    Burden = 0.45 % Less meal break = 30 minPower cost = 0.080 $/kwh Total = 33.35 $/hr Balance @ 55 min/hr M&R factor = 1.00 Effective time = 605 min/shift

    Delivered price factor = 1.00 Operating efficiency = 84.0%or 50.4 min/hr

    DeliveredPrice Repair Power Bits & Total

    Unit US Metric ($x1000) Mtc/Op Cost Parts lit/hr Cost kwh/hr Cost Lube $/tire Life Cost GEC Steel $/hr

    Blasthole DrillP&H 320XPC 12.25 in 311 mm 3,903 2.54 71.18 61.65 0 0.00 300 20.17 34.95 0 0 0.00 0.00 70.00 257.94

    Cable Shovel

    Table 7-5

    Equipment Purchase Prices and Hourly Operating Costs (excluding operating labor)

    M&RFuel Tires

    Maintenance Labor

    LaborSize

    . . , . . . . . . . . . .Haul Trucks

    Cat 793D 250 st 226.8 mt 3,352 1.00 28.02 27.61 181 100.41 0 0.00 25.23 25,500 5,000 25.71 0.00 0.00 206.99Wheel Loader

    Cat 994F 310 hp 231 kw 3,064 0.96 26.90 29.43 133 73.73 0 0.00 19.57 50,750 3,000 85.29 1.25 0.00 236.18Track Dozer

    Cat D10T 580 hp 433 kw 1,195 0.51 14.29 12.92 74 40.96 0 0.00 7.71 0 0 0.00 13.07 0.00 88.95Rubber-Tired Dozer

    Cat 834H 500 hp 373 kw 824 0.50 14.01 12.56 62 34.45 0 0.00 5.64 7,000 3,000 7.84 0.00 0.00 74.51

    GraderCat 16M 16 ft. 4.9 m 726 0.51 14.29 25.11 35 19.33 0 0.00 4.45 2,350 5,000 2.37 1.02 0.00 66.56

    Water TruckCat 777F WW 13,209 gal 50,000 lit 1,623 1.57 44.00 30.49 175 97.05 0 0.00 11.50 9,375 5,000 6.30 0.00 0.00 189.34

  • 8/22/2019 7.0 Operating Cost

    15/34

    Year -3 Year -2 Year -1 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8

    ktonnes Mined 8,213 20,788 30,303 68,010 89,997 90,001 90,000 90,004 90,000 89,999 90,000DRILLING

    Oprtg. Shifts 112 314 476 970 1,546 1,539 1,506 1,568 1,560 1,483 1,541$/shift 854.15 854.15 854.15 854.15 854.15 854.15 854.15 854.15 854.15 854.15 854.15$x1000 95.8 268.4 406.4 828.3 1,320.6 1,314.7 1,286.4 1,339.1 1,332.5 1,266.8 1,316.1

    $/tonne mined 0.0117 0.0129 0.0134 0.0122 0.0147 0.0146 0.0143 0.0149 0.0148 0.0141 0.0146BLASTING$x1000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0$/tonne mined 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

    LOADINGOprtg. Shifts 0 521 756 1,684 2,215 2,218 2,221 2,212 2,214 2,218 2,215$/shift 988.66 988.66 988.66 988.66 988.66 988.66 988.66 988.66 988.66 988.66 988.66$x1000 0.0 515.1 747.0 1,665.4 2,189.6 2,192.9 2,195.8 2,187.2 2,188.5 2,192.4 2,189.7

    $/tonne mined 0.0000 0.0248 0.0246 0.0245 0.0243 0.0244 0.0244 0.0243 0.0243 0.0244 0.0243HAULING

    Oprtg. Shifts 2,099 4,225 6,569 11,257 16,191 17,573 20,487 18,841 17,435 19,248 21,036$/shift 336.28 336.28 336.28 336.28 336.28 336.28 336.28 336.28 336.28 336.28 336.28$x1000 705.8 1,420.7 2,208.9 3,785.4 5,444.6 5,909.6 6,889.3 6,335.8 5,863.1 6,472.7 7,074.1

    $/tonne mined 0.0859 0.0683 0.0729 0.0557 0.0605 0.0657 0.0765 0.0704 0.0651 0.0719 0.0786ROADS & DUMPS994F Wheel loader

    Oprtg. Shifts 311 100 100 100 100 100 100 100 100 100 100$/shift 322.83 322.83 322.83 322.83 322.83 322.83 322.83 322.83 322.83 322.83 322.83$x1000 100.6 32.3 32.3 32.3 32.3 32.3 32.3 32.3 32.3 32.3 32.3

    D10T Track dozersOprtg. Shifts 730 1,460 1,460 2,190 2,190 2,190 2,190 2,190 2,190 2,190 2,190$/shift 171.50 171.50 171.50 171.50 171.50 171.50 171.50 171.50 171.50 171.50 171.50$x1000 125.2 250.4 250.4 375.6 375.6 375.6 375.6 375.6 375.6 375.6 375.6

    834H Wheel dozerOprtg. Shifts 365 730 1,460 1,460 1,460 1,460 1,460 1,460 1,460 1,460 1,460$/shift 168.14 168.14 168.14 168.14 168.14 168.14 168.14 168.14 168.14 168.14 168.14

    Table 7-6Maintenance Labor Costs

    . . . . . . . . . . .

    $x1000 61.4 122.7 245.5 245.5 245.5 245.5 245.5 245.5 245.5 245.5 245.516M GraderOprtg. Shifts 365 730 730 1,095 1,095 1,095 1,095 1,095 1,095 1,095 1,095$/shift 171.50 171.50 171.50 171.50 171.50 171.50 171.50 171.50 171.50 171.50 171.50$x1000 62.6 125.2 125.2 187.8 187.8 187.8 187.8 187.8 187.8 187.8 187.8

    777F WW Water truckOprtg. Shifts 365 730 730 1,095 1,095 1,095 1,095 1,095 1,095 1,095 1,095$/shift 527.96 527.96 527.96 527.96 527.96 527.96 527.96 527.96 527.96 527.96 527.96$x1000 192.7 385.4 385.4 578.1 578.1 578.1 578.1 578.1 578.1 578.1 578.1

    Total $x1000 542.4 916.0 1,038.8 1,419.3 1,419.3 1,419.3 1,419.3 1,419.3 1,419.3 1,419.3 1,419.3$/tonne mined 0.0660 0.0441 0.0343 0.0209 0.0158 0.0158 0.0158 0.0158 0.0158 0.0158 0.0158

    GENERAL MINE$x1000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

    $/tonne mined 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000GENERAL MAINTENANCE$x1000 512.6 1,044.3 1,898.2 2,209.1 2,465.1 2,528.9 2,627.1 2,610.2 2,562.0 2,615.5 2,644.1$/tonne mined 0.0624 0.0502 0.0626 0.0325 0.0274 0.0281 0.0292 0.0290 0.0285 0.0291 0.0294

    MINE ADMINISTRATION$x1000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0$/tonne mined 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

    TOTAL$x1000 1,856.7 4,164.5 6,299.3 9,907.5 12,839.2 13,365.4 14,417.8 13,891.6 13,365.4 13,966.8 14,643.3$/tonne mined 0 2261 0 2003 0 2079 0 1457 0 1427 0 1485 0 1602 0 1543 0 1485 0 1552 0 1627

  • 8/22/2019 7.0 Operating Cost

    16/34

    Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19

    ktonnes Mined 90,000 89,997 90,000 90,003 89,898 89,997 89,998 90,003 89,998 89,999 82,745DRILLING

    Oprtg. Shifts 1,586 1,629 1,640 1,627 1,653 1,642 1,636 1,617 1,620 1,639 1,522$/shift 854.15 854.15 854.15 854.15 854.15 854.15 854.15 854.15 854.15 854.15 854.15$x1000 1,354.5 1,391.4 1,400.9 1,389.6 1,412.3 1,402.9 1,397.6 1,380.8 1,383.9 1,400.1 1,299.8$/tonne mined 0.0150 0.0155 0.0156 0.0154 0.0157 0.0156 0.0155 0.0153 0.0154 0.0156 0.0157

    BLASTING$x1000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0$/tonne mined 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

    LOADINGOprtg. Shifts 2,212 2,209 2,210 2,211 2,207 2,210 2,211 2,212 2,212 2,211 2,031$/shift 988.66 988.66 988.66 988.66 988.66 988.66 988.66 988.66 988.66 988.66 988.66$x1000 2,186.5 2,184.2 2,185.2 2,185.8 2,181.8 2,185.3 2,185.9 2,186.9 2,186.7 2,185.9 2,007.6

    $/tonne mined 0.0243 0.0243 0.0243 0.0243 0.0243 0.0243 0.0243 0.0243 0.0243 0.0243 0.0243HAULING

    Oprtg. Shifts 17,280 16,622 17,815 18,972 19,420 18,896 18,707 20,041 20,708 20,253 18,955$/shift 336.28 336.28 336.28 336.28 336.28 336.28 336.28 336.28 336.28 336.28 336.28$x1000 5,811.0 5,589.5 5,990.9 6,379.8 6,530.6 6,354.3 6,290.9 6,739.3 6,963.8 6,810.5 6,374.2

    $/tonne mined 0.0646 0.0621 0.0666 0.0709 0.0726 0.0706 0.0699 0.0749 0.0774 0.0757 0.0770ROADS & DUMPS

    994F Wheel loaderOprtg. Shifts 100 100 100 100 100 100 100 100 100 100 100$/shift 322.83 322.83 322.83 322.83 322.83 322.83 322.83 322.83 322.83 322.83 322.83$x1000 32.3 32.3 32.3 32.3 32.3 32.3 32.3 32.3 32.3 32.3 32.3

    D10T Track dozersOprtg. Shifts 2,190 2,190 2,190 2,190 2,190 2,190 2,190 2,190 2,190 2,190 2,190$/shift 171.50 171.50 171.50 171.50 171.50 171.50 171.50 171.50 171.50 171.50 171.50$x1000 375.6 375.6 375.6 375.6 375.6 375.6 375.6 375.6 375.6 375.6 375.6

    834H Wheel dozerOprtg. Shifts 1,460 1,460 1,460 1,460 1,460 1,460 1,460 1,460 1,460 1,460 1,460$/shift 168.14 168.14 168.14 168.14 168.14 168.14 168.14 168.14 168.14 168.14 168.14

    Table 7-6 (Continued)

    Maintenance Labor Costs

    . . . . . . . . . . .$x1000 245.5 245.5 245.5 245.5 245.5 245.5 245.5 245.5 245.5 245.5 245.5

    16M GraderOprtg. Shifts 1,095 1,095 1,095 1,095 1,095 1,095 1,095 1,095 1,095 1,095 1,095$/shift 171.50 171.50 171.50 171.50 171.50 171.50 171.50 171.50 171.50 171.50 171.50$x1000 187.8 187.8 187.8 187.8 187.8 187.8 187.8 187.8 187.8 187.8 187.8

    777F WW Water truckOprtg. Shifts 1,095 1,095 1,095 1,095 1,095 1,095 1,095 1,095 1,095 1,095 1,095$/shift 527.96 527.96 527.96 527.96 527.96 527.96 527.96 527.96 527.96 527.96 527.96$x1000 578.1 578.1 578.1 578.1 578.1 578.1 578.1 578.1 578.1 578.1 578.1

    Total $x1000 1,419.3 1,419.3 1,419.3 1,419.3 1,419.3 1,419.3 1,419.3 1,419.3 1,419.3 1,419.3 1,419.3$/tonne mined 0.0158 0.0158 0.0158 0.0158 0.0158 0.0158 0.0158 0.0158 0.0158 0.0158 0.0172

    GENERAL MINE$x1000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0$/tonne mined 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

    GENERAL MAINTENANCE$x1000 2,519.0 2,480.4 2,519.4 2,592.3 2,573.1 2,605.0 2,597.9 2,616.4 2,614.4 2,602.0 2,565.1$/tonne mined 0.0280 0.0276 0.0280 0.0288 0.0286 0.0289 0.0289 0.0291 0.0291 0.0289 0.0310

    MINE ADMINISTRATION$x1000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0$/tonne mined 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

    TOTAL$x1000 13,290.2 13,064.7 13,515.7 13,966.8 14,117.1 13,966.8 13,891.6 14,342.6 14,568.1 14,417.8 13,666.1$/tonne mined 0 1477 0 1452 0 1502 0 1552 0 1570 0 1552 0 1544 0 1594 0 1619 0 1602 0 1652

  • 8/22/2019 7.0 Operating Cost

    17/34

    Life ofYear 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26 Year 27 Year 28 Year 29 Mine

    ktonnes Mined 87,022 55,262 49,385 42,667 39,596 33,360 33,360 33,360 33,360 3,657 2,150,982DRILLING

    Oprtg. Shifts 1,636 1,047 935 806 385 0 0 0 0 0 35,235$/shift 854.15 854.15 854.15 854.15 854.15 854.15 854.15 854.15 854.15 854.15 854.15$x1000 1,397.0 894.3 798.6 688.7 328.8 0.0 0.0 0.0 0.0 0.0 30,096$/tonne mined 0.0161 0.0162 0.0162 0.0161 0.0083 0.0000 0.0000 0.0000 0.0000 0.0000 0.0140

    BLASTING$x1000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0$/tonne mined 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

    LOADINGOprtg. Shifts 2,134 1,350 1,205 1,039 969 818 818 818 818 90 52,669$/shift 988.66 988.66 988.66 988.66 988.66 988.66 988.66 988.66 988.66 988.66 988.66$x1000 2,109.7 1,334.8 1,191.5 1,027.7 957.8 809.2 809.2 809.2 809.2 88.7 52,072

    $/tonne mined 0.0242 0.0242 0.0241 0.0241 0.0242 0.0243 0.0243 0.0243 0.0243 0.0243 0.0242HAULING

    Oprtg. Shifts 17,453 12,442 12,675 12,181 9,285 4,215 4,009 3,802 3,492 418 442,603$/shift 336.28 336.28 336.28 336.28 336.28 336.28 336.28 336.28 336.28 336.28 336.28$x1000 5,869.1 4,184.0 4,262.4 4,096.1 3,122.4 1,417.5 1,348.1 1,278.6 1,174.4 140.6 148,838

    $/tonne mined 0.0674 0.0757 0.0863 0.0960 0.0789 0.0425 0.0404 0.0383 0.0352 0.0385 0.0692ROADS & DUMPS

    994F Wheel loaderOprtg. Shifts 100 100 100 100 100 100 100 100 100 11 3,322$/shift 322.83 322.83 322.83 322.83 322.83 322.83 322.83 322.83 322.83 322.83 322.83$x1000 32.3 32.3 32.3 32.3 32.3 32.3 32.3 32.3 32.3 3.5 1,073

    D10T Track dozersOprtg. Shifts 2,190 2,190 2,190 2,190 2,190 1,460 1,460 730 730 80 60,670$/shift 171.50 171.50 171.50 171.50 171.50 171.50 171.50 171.50 171.50 171.50 171.50$x1000 375.6 375.6 375.6 375.6 375.6 250.4 250.4 125.2 125.2 13.7 10,405

    834H Wheel dozerOprtg. Shifts 1,460 1,460 1,460 1,460 1,460 730 730 730 365 40 40,190$/shift 168.14 168.14 168.14 168.14 168.14 168.14 168.14 168.14 168.14 168.14 168.14

    Table 7-6 (Continued)Maintenance Labor Costs

    . . . . . . . . . . .$x1000 245.5 245.5 245.5 245.5 245.5 122.7 122.7 122.7 61.4 6.7 6,758

    16M GraderOprtg. Shifts 1,095 1,095 1,095 1,095 730 730 730 730 365 40 30,335$/shift 171.50 171.50 171.50 171.50 171.50 171.50 171.50 171.50 171.50 171.50 171.50$x1000 187.8 187.8 187.8 187.8 125.2 125.2 125.2 125.2 62.6 6.9 5,203

    777F WW Water truckOprtg. Shifts 1,095 1,095 730 730 730 365 365 365 365 40 28,510$/shift 527.96 527.96 527.96 527.96 527.96 527.96 527.96 527.96 527.96 527.96 527.96$x1000 578.1 578.1 385.4 385.4 385.4 192.7 192.7 192.7 192.7 21.1 15,052

    Total $x1000 1,419.3 1,419.3 1,226.6 1,226.6 1,164.0 723.3 723.3 598.1 474.2 52.0 38,490$/tonne mined 0.0163 0.0257 0.0248 0.0287 0.0294 0.0217 0.0217 0.0179 0.0142 0.0142 0.0179

    GENERAL MINE$x1000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0$/tonne mined 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

    GENERAL MAINTENANCE$x1000 2,495.2 2,225.5 2,203.0 2,116.7 2,004.3 1,770.7 1,765.0 1,734.2 1,661.7 1,173.1 71,152$/tonne mined 0.0287 0.0403 0.0446 0.0496 0.0506 0.0531 0.0529 0.0520 0.0498 0.3208 0.0331

    MINE ADMINISTRATION$x1000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0$/tonne mined 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

    TOTAL$x1000 13,290.2 10,057.9 9,682.0 9,155.8 7,577.2 4,720.7 4,645.6 4,420.0 4,119.4 1,454.4 340,648$/tonne mined 0 1527 0 1820 0 1961 0 2146 0 1914 0 1415 0 1393 0 1325 0 1235 0 3977 0 1584

  • 8/22/2019 7.0 Operating Cost

    18/34

    Prill cost = 550 $/tonne0.550 $/kg

    Diesel = 0.660 $/liter / 0.84 kg/liter = 0.786 $/kg

    ANFO: 94% prills @ 0.550 $/kg6% diesel 0.786 $/k

    Table 7-7

    Explosives Cost

    .

    100% 0.564 $/kg plus 40% for supplies

  • 8/22/2019 7.0 Operating Cost

    19/34

    Year -3 Year -2 Year -1 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8

    ktonnes Mined 8,213 20,788 30,303 68,010 89,997 90,001 90,000 90,004 90,000 89,999 90,000DRILLING

    Operating Shifts 112 314 476 970 1,546 1,539 1,506 1,568 1,560 1,483 1,541$/shift

    Repair Parts 739.81 739.81 739.81 739.81 739.81 739.81 739.81 739.81 739.81 739.81 739.81Power 242.00 242.00 242.00 242.00 242.00 242.00 242.00 242.00 242.00 242.00 242.00Lube 419.37 419.37 419.37 419.37 419.37 419.37 419.37 419.37 419.37 419.37 419.37Bits & Steel 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

    Total 2,241.18 2,241.18 2,241.18 2,241.18 2,241.18 2,241.18 2,241.18 2,241.18 2,241.18 2,241.18 2,241.18$/tonne Mined

    Repair Parts 0.0101 0.0112 0.0116 0.0105 0.0127 0.0127 0.0124 0.0129 0.0128 0.0122 0.0127Power 0.0033 0.0037 0.0038 0.0035 0.0042 0.0041 0.0040 0.0042 0.0042 0.0040 0.0041Lube 0.0057 0.0063 0.0066 0.0060 0.0072 0.0072 0.0070 0.0073 0.0073 0.0069 0.0072Bits & Steel 0.0115 0.0127 0.0132 0.0120 0.0144 0.0144 0.0141 0.0146 0.0146 0.0138 0.0144

    Total 0.0306 0.0339 0.0352 0.0320 0.0385 0.0383 0.0375 0.0390 0.0388 0.0369 0.0384BLASTING

    $/tonne MinedExplosives 0.1128 0.1128 0.1128 0.1128 0.1128 0.1128 0.1128 0.1128 0.1128 0.1128 0.1128Supplies 0.0451 0.0451 0.0451 0.0451 0.0451 0.0451 0.0451 0.0451 0.0451 0.0451 0.0451

    Total 0.1580 0.1580 0.1580 0.1580 0.1580 0.1580 0.1580 0.1580 0.1580 0.1580 0.1580LOADING

    Operating Shifts 0 521 756 1,684 2,215 2,218 2,221 2,212 2,214 2,218 2,215$/shift

    Repair Parts 1,664.56 1,664.56 1,664.56 1,664.56 1,664.56 1,664.56 1,664.56 1,664.56 1,664.56 1,664.56 1,664.56Power 782.47 782.47 782.47 782.47 782.47 782.47 782.47 782.47 782.47 782.47 782.47Lube 419.37 419.37 419.37 419.37 419.37 419.37 419.37 419.37 419.37 419.37 419.37

    GEC 173.94 173.94 173.94 173.94 173.94 173.94 173.94 173.94 173.94 173.94 173.94Total 3,040.33 3,040.33 3,040.33 3,040.33 3,040.33 3,040.33 3,040.33 3,040.33 3,040.33 3,040.33 3,040.33$/tonne Mined

    Repair Parts 0.0000 0.0417 0.0415 0.0412 0.0410 0.0410 0.0411 0.0409 0.0409 0.0410 0.0410Power 0.0000 0.0196 0.0195 0.0194 0.0193 0.0193 0.0193 0.0192 0.0192 0.0193 0.0193Lube 0.0000 0.0105 0.0105 0.0104 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103GEC 0.0000 0.0044 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043

    Total 0.0000 0.0762 0.0758 0.0753 0.0748 0.0749 0.0750 0.0747 0.0748 0.0749 0.0748HAULING

    Operating Shifts 2,099 4,225 6,569 11,257 16,191 17,573 20,487 18,841 17,435 19,248 21,036$/shift

    Repair Parts 331.34 331.34 331.34 331.34 331.34 331.34 331.34 331.34 331.34 331.34 331.34Diesel Fuel 1,204.96 1,204.96 1,204.96 1,204.96 1,204.96 1,204.96 1,204.96 1,204.96 1,204.96 1,204.96 1,204.96

    Table 7-8

    Parts and Consumables Costs

    Lube 302.70 302.70 302.70 302.70 302.70 302.70 302.70 302.70 302.70 302.70 302.70

    Tires 308.55 308.55 308.55 308.55 308.55 308.55 308.55 308.55 308.55 308.55 308.55Total 2,147.55 2,147.55 2,147.55 2,147.55 2,147.55 2,147.55 2,147.55 2,147.55 2,147.55 2,147.55 2,147.55

    $/tonne MinedRepair Parts 0.0847 0.0673 0.0718 0.0548 0.0596 0.0647 0.0754 0.0694 0.0642 0.0709 0.0774Diesel Fuel 0.3079 0.2449 0.2612 0.1994 0.2168 0.2353 0.2743 0.2522 0.2334 0.2577 0.2816Lube 0.0774 0.0615 0.0656 0.0501 0.0545 0.0591 0.0689 0.0634 0.0586 0.0647 0.0708Tires 0.0789 0.0627 0.0669 0.0511 0.0555 0.0602 0.0702 0.0646 0.0598 0.0660 0.0721

    Total 0.5488 0.4365 0.4655 0.3555 0.3864 0.4193 0.4888 0.4496 0.4160 0.4593 0.5020ROADS & DUMPS

    994F Wheel loaderOperating Shifts 311 100 100 100 100 100 100 100 100 100 100$/shift

    Repair Parts 353.22 353.22 353.22 353.22 353.22 353.22 353.22 353.22 353.22 353.22 353.22Diesel Fuel 884.81 884.81 884.81 884.81 884.81 884.81 884.81 884.81 884.81 884.81 884.81

    Lube 234.84 234.84 234.84 234.84 234.84 234.84 234.84 234.84 234.84 234.84 234.84Tires 1,023.46 1,023.46 1,023.46 1,023.46 1,023.46 1,023.46 1,023.46 1,023.46 1,023.46 1,023.46 1,023.46GEC 15.02 15.02 15.02 15.02 15.02 15.02 15.02 15.02 15.02 15.02 15.02

    Total 2,511.36 2,511.36 2,511.36 2,511.36 2,511.36 2,511.36 2,511.36 2,511.36 2,511.36 2,511.36 2,511.36$/tonne Mined

    Repair Parts 0.0134 0.0017 0.0012 0.0005 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004Diesel Fuel 0.0336 0.0043 0.0029 0.0013 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010Lube 0.0089 0.0011 0.0008 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003Tires 0.0388 0.0049 0.0034 0.0015 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011GEC 0 0006 0 0001 0 0000 0 0000 0 0000 0 0000 0 0000 0 0000 0 0000 0 0000 0 0000

  • 8/22/2019 7.0 Operating Cost

    20/34

    Year -3 Year -2 Year -1 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8

    834H Wheel DozerOperating Shifts 365 730 1,460 1,460 1,460 1,460 1,460 1,460 1,460 1,460 1,460$/shift

    Repair Parts 150.75 150.75 150.75 150.75 150.75 150.75 150.75 150.75 150.75 150.75 150.75Diesel Fuel 413.42 413.42 413.42 413.42 413.42 413.42 413.42 413.42 413.42 413.42 413.42Lube 67.66 67.66 67.66 67.66 67.66 67.66 67.66 67.66 67.66 67.66 67.66Tires 94.11 94.11 94.11 94.11 94.11 94.11 94.11 94.11 94.11 94.11 94.11GEC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Total 725.93 725.93 725.93 725.93 725.93 725.93 725.93 725.93 725.93 725.93 725.93$/tonne Mined

    Repair Parts 0.0067 0.0053 0.0073 0.0032 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024Diesel Fuel 0.0184 0.0145 0.0199 0.0089 0.0067 0.0067 0.0067 0.0067 0.0067 0.0067 0.0067Lube 0.0030 0.0024 0.0033 0.0015 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011Tires 0.0042 0.0033 0.0045 0.0020 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015GEC 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

    Total 0.0323 0.0255 0.0350 0.0156 0.0118 0.0118 0.0118 0.0118 0.0118 0.0118 0.011816M Grader

    Operating Shifts 365 730 730 1,095 1,095 1,095 1,095 1,095 1,095 1,095 1,095$/shift

    Repair Parts 301.29 301.29 301.29 301.29 301.29 301.29 301.29 301.29 301.29 301.29 301.29Diesel Fuel 231.92 231.92 231.92 231.92 231.92 231.92 231.92 231.92 231.92 231.92 231.92Lube 53.34 53.34 53.34 53.34 53.34 53.34 53.34 53.34 53.34 53.34 53.34Tires 28.44 28.44 28.44 28.44 28.44 28.44 28.44 28.44 28.44 28.44 28.44GEC 12.20 12.20 12.20 12.20 12.20 12.20 12.20 12.20 12.20 12.20 12.20

    Total 627.18 627.18 627.18 627.18 627.18 627.18 627.18 627.18 627.18 627.18 627.18$/tonne Mined

    Repair Parts 0.0134 0.0106 0.0073 0.0049 0.0037 0.0037 0.0037 0.0037 0.0037 0.0037 0.0037Diesel Fuel 0.0103 0.0081 0.0056 0.0037 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028Lube 0.0024 0.0019 0.0013 0.0009 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006Tires 0.0013 0.0010 0.0007 0.0005 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003GEC 0.0005 0.0004 0.0003 0.0002 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001

    Total 0.0279 0.0220 0.0151 0.0101 0.0076 0.0076 0.0076 0.0076 0.0076 0.0076 0.0076777F WW Water Truck

    Operating Shifts 365 730 730 1,095 1,095 1,095 1,095 1,095 1,095 1,095 1,095$/shift

    Repair Parts 365.82 365.82 365.82 365.82 365.82 365.82 365.82 365.82 365.82 365.82 365.82Diesel Fuel 1,164.63 1,164.63 1,164.63 1,164.63 1,164.63 1,164.63 1,164.63 1,164.63 1,164.63 1,164.63 1,164.63Lube 138.04 138.04 138.04 138.04 138.04 138.04 138.04 138.04 138.04 138.04 138.04Tires 75.63 75.63 75.63 75.63 75.63 75.63 75.63 75.63 75.63 75.63 75.63

    l

    Table 7-8 (Continued)

    Parts and Consumables Costs

    Total 1,744.11 1,744.11 1,744.11 1,744.11 1,744.11 1,744.11 1,744.11 1,744.11 1,744.11 1,744.11 1,744.11

    $/tonne MinedRepair Parts 0.0163 0.0128 0.0088 0.0059 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045Diesel Fuel 0.0518 0.0409 0.0281 0.0188 0.0142 0.0142 0.0142 0.0142 0.0142 0.0142 0.0142Lube 0.0061 0.0048 0.0033 0.0022 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017Tires 0.0034 0.0027 0.0018 0.0012 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009

    Total 0.0775 0.0612 0.0420 0.0281 0.0212 0.0212 0.0212 0.0212 0.0212 0.0212 0.0212Roads $ Dumps Total

    $/tonne MinedRepair Parts 0.0635 0.0413 0.0320 0.0195 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147Diesel Fuel 0.1577 0.1023 0.0802 0.0485 0.0366 0.0366 0.0366 0.0366 0.0366 0.0366 0.0366Lube 0.0286 0.0167 0.0131 0.0079 0.0059 0.0059 0.0059 0.0059 0.0059 0.0059 0.0059Tires 0.0476 0.0119 0.0104 0.0052 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039GEC 0.0151 0.0115 0.0079 0.0053 0.0040 0.0040 0.0040 0.0040 0.0040 0.0040 0.0040

    Total 0.3125 0.1838 0.1436 0.0863 0.0652 0.0652 0.0652 0.0652 0.0652 0.0652 0.0652

    GENERAL MINE$/tonne mined

    Miscelaneous 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300GENERAL MAINTENANCE

    $/tonne minedMiscelaneous 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400

    MINE ADMINISTRATION$/tonne mined

    Miscelaneous 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500TOTAL COST

  • 8/22/2019 7.0 Operating Cost

    21/34

    Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19

    ktonnes Mined 90,000 89,997 90,000 90,003 89,898 89,997 89,998 90,003 89,998 89,999 82,745DRILLING

    Operating Shifts 1,586 1,629 1,640 1,627 1,653 1,642 1,636 1,617 1,620 1,639 1,522$/shift

    Repair Parts 739.81 739.81 739.81 739.81 739.81 739.81 739.81 739.81 739.81 739.81 739.81Power 242.00 242.00 242.00 242.00 242.00 242.00 242.00 242.00 242.00 242.00 242.00Lube 419.37 419.37 419.37 419.37 419.37 419.37 419.37 419.37 419.37 419.37 419.37Bits & Steel 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

    Total 2,241.18 2,241.18 2,241.18 2,241.18 2,241.18 2,241.18 2,241.18 2,241.18 2,241.18 2,241.18 2,241.18$/tonne Mined

    Repair Parts 0.0130 0.0134 0.0135 0.0134 0.0136 0.0135 0.0135 0.0133 0.0133 0.0135 0.0136Power 0.0043 0.0044 0.0044 0.0044 0.0045 0.0044 0.0044 0.0043 0.0044 0.0044 0.0045Lube 0.0074 0.0076 0.0076 0.0076 0.0077 0.0077 0.0076 0.0075 0.0075 0.0076 0.0077Bits & Steel 0.0148 0.0152 0.0153 0.0152 0.0154 0.0153 0.0153 0.0151 0.0151 0.0153 0.0154

    Total 0.0395 0.0406 0.0408 0.0405 0.0412 0.0409 0.0407 0.0403 0.0403 0.0408 0.0412BLASTING

    $/tonne MinedExplosives 0.1128 0.1128 0.1128 0.1128 0.1128 0.1128 0.1128 0.1128 0.1128 0.1128 0.1128Supplies 0.0451 0.0451 0.0451 0.0451 0.0451 0.0451 0.0451 0.0451 0.0451 0.0451 0.0451

    Total 0.1580 0.1580 0.1580 0.1580 0.1580 0.1580 0.1580 0.1580 0.1580 0.1580 0.1580LOADING

    Operating Shifts 2,212 2,209 2,210 2,211 2,207 2,210 2,211 2,212 2,212 2,211 2,031$/shift

    Repair Parts 1,664.56 1,664.56 1,664.56 1,664.56 1,664.56 1,664.56 1,664.56 1,664.56 1,664.56 1,664.56 1,664.56Power 782.47 782.47 782.47 782.47 782.47 782.47 782.47 782.47 782.47 782.47 782.47Lube 419.37 419.37 419.37 419.37 419.37 419.37 419.37 419.37 419.37 419.37 419.37

    GEC 173.94 173.94 173.94 173.94 173.94 173.94 173.94 173.94 173.94 173.94 173.94Total 3,040.33 3,040.33 3,040.33 3,040.33 3,040.33 3,040.33 3,040.33 3,040.33 3,040.33 3,040.33 3,040.33$/tonne Mined

    Repair Parts 0.0409 0.0409 0.0409 0.0409 0.0409 0.0409 0.0409 0.0409 0.0409 0.0409 0.0408Power 0.0192 0.0192 0.0192 0.0192 0.0192 0.0192 0.0192 0.0192 0.0192 0.0192 0.0192Lube 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103GEC 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043

    Total 0.0747 0.0746 0.0747 0.0747 0.0746 0.0747 0.0747 0.0747 0.0747 0.0747 0.0746HAULING

    Operating Shifts 17,280 16,622 17,815 18,972 19,420 18,896 18,707 20,041 20,708 20,253 18,955$/shift

    Repair Parts 331.34 331.34 331.34 331.34 331.34 331.34 331.34 331.34 331.34 331.34 331.34Diesel Fuel 1,204.96 1,204.96 1,204.96 1,204.96 1,204.96 1,204.96 1,204.96 1,204.96 1,204.96 1,204.96 1,204.96

    Table 7-8 (Continued)

    Parts and Consumables Costs

    Lube 302.70 302.70 302.70 302.70 302.70 302.70 302.70 302.70 302.70 302.70 302.70

    Tires 308.55 308.55 308.55 308.55 308.55 308.55 308.55 308.55 308.55 308.55 308.55Total 2,147.55 2,147.55 2,147.55 2,147.55 2,147.55 2,147.55 2,147.55 2,147.55 2,147.55 2,147.55 2,147.55

    $/tonne MinedRepair Parts 0.0636 0.0612 0.0656 0.0698 0.0716 0.0696 0.0689 0.0738 0.0762 0.0746 0.0759Diesel Fuel 0.2314 0.2225 0.2385 0.2540 0.2603 0.2530 0.2505 0.2683 0.2773 0.2712 0.2760Lube 0.0581 0.0559 0.0599 0.0638 0.0654 0.0636 0.0629 0.0674 0.0697 0.0681 0.0693Tires 0.0592 0.0570 0.0611 0.0650 0.0667 0.0648 0.0641 0.0687 0.0710 0.0694 0.0707

    Total 0.4123 0.3966 0.4251 0.4527 0.4639 0.4509 0.4464 0.4782 0.4941 0.4833 0.4920ROADS & DUMPS

    994F Wheel loaderOperating Shifts 100 100 100 100 100 100 100 100 100 100 100$/shift

    Repair Parts 353.22 353.22 353.22 353.22 353.22 353.22 353.22 353.22 353.22 353.22 353.22Diesel Fuel 884.81 884.81 884.81 884.81 884.81 884.81 884.81 884.81 884.81 884.81 884.81

    Lube 234.84 234.84 234.84 234.84 234.84 234.84 234.84 234.84 234.84 234.84 234.84Tires 1,023.46 1,023.46 1,023.46 1,023.46 1,023.46 1,023.46 1,023.46 1,023.46 1,023.46 1,023.46 1,023.46GEC 15.02 15.02 15.02 15.02 15.02 15.02 15.02 15.02 15.02 15.02 15.02

    Total 2,511.36 2,511.36 2,511.36 2,511.36 2,511.36 2,511.36 2,511.36 2,511.36 2,511.36 2,511.36 2,511.36$/tonne Mined

    Repair Parts 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004Diesel Fuel 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0011Lube 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003Tires 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0012GEC 0 0000 0 0000 0 0000 0 0000 0 0000 0 0000 0 0000 0 0000 0 0000 0 0000 0 0000

  • 8/22/2019 7.0 Operating Cost

    22/34

    Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19

    834H Wheel DozerOperating Shifts 1,460 1,460 1,460 1,460 1,460 1,460 1,460 1,460 1,460 1,460 1,460$/shift

    Repair Parts 150.75 150.75 150.75 150.75 150.75 150.75 150.75 150.75 150.75 150.75 150.75Diesel Fuel 413.42 413.42 413.42 413.42 413.42 413.42 413.42 413.42 413.42 413.42 413.42Lube 67.66 67.66 67.66 67.66 67.66 67.66 67.66 67.66 67.66 67.66 67.66Tires 94.11 94.11 94.11 94.11 94.11 94.11 94.11 94.11 94.11 94.11 94.11GEC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Total 725.93 725.93 725.93 725.93 725.93 725.93 725.93 725.93 725.93 725.93 725.93$/tonne Mined

    Repair Parts 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0027Diesel Fuel 0.0067 0.0067 0.0067 0.0067 0.0067 0.0067 0.0067 0.0067 0.0067 0.0067 0.0073Lube 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0012Tires 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0017GEC 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

    Total 0.0118 0.0118 0.0118 0.0118 0.0118 0.0118 0.0118 0.0118 0.0118 0.0118 0.012816M Grader

    Operating Shifts 1,095 1,095 1,095 1,095 1,095 1,095 1,095 1,095 1,095 1,095 1,095$/shift

    Repair Parts 301.29 301.29 301.29 301.29 301.29 301.29 301.29 301.29 301.29 301.29 301.29Diesel Fuel 231.92 231.92 231.92 231.92 231.92 231.92 231.92 231.92 231.92 231.92 231.92Lube 53.34 53.34 53.34 53.34 53.34 53.34 53.34 53.34 53.34 53.34 53.34Tires 28.44 28.44 28.44 28.44 28.44 28.44 28.44 28.44 28.44 28.44 28.44GEC 12.20 12.20 12.20 12.20 12.20 12.20 12.20 12.20 12.20 12.20 12.20

    Total 627.18 627.18 627.18 627.18 627.18 627.18 627.18 627.18 627.18 627.18 627.18$/tonne Mined

    Repair Parts 0.0037 0.0037 0.0037 0.0037 0.0037 0.0037 0.0037 0.0037 0.0037 0.0037 0.0040Diesel Fuel 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0031Lube 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0007Tires 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0004GEC 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0002

    Total 0.0076 0.0076 0.0076 0.0076 0.0076 0.0076 0.0076 0.0076 0.0076 0.0076 0.0083777F WW Water Truck

    Operating Shifts 1,095 1,095 1,095 1,095 1,095 1,095 1,095 1,095 1,095 1,095 1,095$/shift

    Repair Parts 365.82 365.82 365.82 365.82 365.82 365.82 365.82 365.82 365.82 365.82 365.82Diesel Fuel 1,164.63 1,164.63 1,164.63 1,164.63 1,164.63 1,164.63 1,164.63 1,164.63 1,164.63 1,164.63 1,164.63Lube 138.04 138.04 138.04 138.04 138.04 138.04 138.04 138.04 138.04 138.04 138.04Tires 75.63 75.63 75.63 75.63 75.63 75.63 75.63 75.63 75.63 75.63 75.63

    l

    Table 7-8 (Continued)

    Parts and Consumables Costs

    Total 1,744.11 1,744.11 1,744.11 1,744.11 1,744.11 1,744.11 1,744.11 1,744.11 1,744.11 1,744.11 1,744.11

    $/tonne MinedRepair Parts 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0048Diesel Fuel 0.0142 0.0142 0.0142 0.0142 0.0142 0.0142 0.0142 0.0142 0.0142 0.0142 0.0154Lube 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0018Tires 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0010

    Total 0.0212 0.0212 0.0212 0.0212 0.0212 0.0212 0.0212 0.0212 0.0212 0.0212 0.0231Roads $ Dumps Total

    $/tonne MinedRepair Parts 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0160Diesel Fuel 0.0366 0.0366 0.0366 0.0366 0.0367 0.0366 0.0366 0.0366 0.0366 0.0366 0.0399Lube 0.0059 0.0059 0.0059 0.0059 0.0059 0.0059 0.0059 0.0059 0.0059 0.0059 0.0065Tires 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0043GEC 0.0040 0.0040 0.0040 0.0040 0.0040 0.0040 0.0040 0.0040 0.0040 0.0040 0.0043

    Total 0.0652 0.0652 0.0652 0.0652 0.0653 0.0652 0.0652 0.0652 0.0652 0.0652 0.0709

    GENERAL MINE$/tonne mined

    Miscelaneous 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300GENERAL MAINTENANCE

    $/tonne minedMiscelaneous 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400

    MINE ADMINISTRATION$/tonne mined

    Miscelaneous 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500TOTAL COST

  • 8/22/2019 7.0 Operating Cost

    23/34

    Life ofYear 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26 Year 27 Year 28 Year 29 Mine

    ktonnes Mined 87,022 55,262 49,385 42,667 39,596 33,360 33,360 33,360 33,360 3,657 2,150,982DRILLING

    Operating Shifts 1,636 1,047 935 806 385 0 0 0 0 0 35,235$/shift

    Repair Parts 739.81 739.81 739.81 739.81 739.81 739.81 739.81 739.81 739.81 739.81 739.81Power 242.00 242.00 242.00 242.00 242.00 242.00 242.00 242.00 242.00 242.00 242.00Lube 419.37 419.37 419.37 419.37 419.37 419.37 419.37 419.37 419.37 419.37 419.37Bits & Steel 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

    Total 2,241.18 2,241.18 2,241.18 2,241.18 2,241.18 2,241.18 2,241.18 2,241.18 2,241.18 2,241.18 2,241.18$/tonne Mined

    Repair Parts 0.0139 0.0140 0.0140 0.0140 0.0072 0.0000 0.0000 0.0000 0.0000 0.0000 0.0121Power 0.0045 0.0046 0.0046 0.0046 0.0024 0.0000 0.0000 0.0000 0.0000 0.0000 0.0040Lube 0.0079 0.0079 0.0079 0.0079 0.0041 0.0000 0.0000 0.0000 0.0000 0.0000 0.0069Bits & Steel 0.0158 0.0159 0.0159 0.0159 0.0082 0.0000 0.0000 0.0000 0.0000 0.0000 0.0138

    Total 0.0421 0.0425 0.0424 0.0424 0.0218 0.0000 0.0000 0.0000 0.0000 0.0000 0.0367BLASTING

    $/tonne MinedExplosives 0.1128 0.1128 0.1128 0.1128 0.1128 0.0000 0.0000 0.0000 0.0000 0.0000 0.1056Supplies 0.0451 0.0451 0.0451 0.0451 0.0451 0.0000 0.0000 0.0000 0.0000 0.0000 0.0423

    Total 0.1580 0.1580 0.1580 0.1580 0.1580 0.0000 0.0000 0.0000 0.0000 0.0000 0.1479LOADING

    Operating Shifts 2,134 1,350 1,205 1,039 969 818 818 818 818 90 52,669$/shift

    Repair Parts 1,664.56 1,664.56 1,664.56 1,664.56 1,664.56 1,664.56 1,664.56 1,664.56 1,664.56 1,664.56 1,664.56Power 782.47 782.47 782.47 782.47 782.47 782.47 782.47 782.47 782.47 782.47 782.47Lube 419.37 419.37 419.37 419.37 419.37 419.37 419.37 419.37 419.37 419.37 419.37

    GEC 173.94 173.94 173.94 173.94 173.94 173.94 173.94 173.94 173.94 173.94 173.94Total 3,040.33 3,040.33 3,040.33 3,040.33 3,040.33 3,040.33 3,040.33 3,040.33 3,040.33 3,040.33 3,040.33$/tonne Mined

    Repair Parts 0.0408 0.0407 0.0406 0.0406 0.0407 0.0408 0.0408 0.0408 0.0408 0.0408 0.0408Power 0.0192 0.0191 0.0191 0.0191 0.0191 0.0192 0.0192 0.0192 0.0192 0.0192 0.0192Lube 0.0103 0.0102 0.0102 0.0102 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103GEC 0.0043 0.0042 0.0042 0.0042 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043

    Total 0.0746 0.0743 0.0742 0.0741 0.0744 0.0746 0.0746 0.0746 0.0746 0.0746 0.0744HAULING

    Operating Shifts 17,453 12,442 12,675 12,181 9,285 4,215 4,009 3,802 3,492 418 442,603$/shift

    Repair Parts 331.34 331.34 331.34 331.34 331.34 331.34 331.34 331.34 331.34 331.34 331.34Diesel Fuel 1,204.96 1,204.96 1,204.96 1,204.96 1,204.96 1,204.96 1,204.96 1,204.96 1,204.96 1,204.96 1,204.96

    Table 7-8 (Continued)

    Parts and Consumables Costs

    Lube 302.70 302.70 302.70 302.70 302.70 302.70 302.70 302.70 302.70 302.70 302.70

    Tires 308.55 308.55 308.55 308.55 308.55 308.55 308.55 308.55 308.55 308.55 308.55Total 2,147.55 2,147.55 2,147.55 2,147.55 2,147.55 2,147.55 2,147.55 2,147.55 2,147.55 2,147.55 2,147.55

    $/tonne MinedRepair Parts 0.0665 0.0746 0.0850 0.0946 0.0777 0.0419 0.0398 0.0378 0.0347 0.0379 0.0682Diesel Fuel 0.2417 0.2713 0.3093 0.3440 0.2826 0.1523 0.1448 0.1373 0.1261 0.1378 0.2479Lube 0.0607 0.0682 0.0777 0.0864 0.0710 0.0382 0.0364 0.0345 0.0317 0.0346 0.0623Tires 0.0619 0.0695 0.0792 0.0881 0.0724 0.0390 0.0371 0.0352 0.0323 0.0353 0.0635

    Total 0.4307 0.4835 0.5512 0.6131 0.5036 0.2714 0.2581 0.2448 0.2248 0.2456 0.4419ROADS & DUMPS

    994F Wheel loaderOperating Shifts 100 100 100 100 100 100 100 100 100 11 3,322$/shift

    Repair Parts 353.22 353.22 353.22 353.22 353.22 353.22 353.22 353.22 353.22 353.22 353.22Diesel Fuel 884.81 884.81 884.81 884.81 884.81 884.81 884.81 884.81 884.81 884.81 884.81

    Lube 234.84 234.84 234.84 234.84 234.84 234.84 234.84 234.84 234.84 234.84 234.84Tires 1,023.46 1,023.46 1,023.46 1,023.46 1,023.46 1,023.46 1,023.46 1,023.46 1,023.46 1,023.46 1,023.46GEC 15.02 15.02 15.02 15.02 15.02 15.02 15.02 15.02 15.02 15.02 15.02

    Total 2,511.36 2,511.36 2,511.36 2,511.36 2,511.36 2,511.36 2,511.36 2,511.36 2,511.36 2,511.36 2,511.36$/tonne Mined

    Repair Parts 0.0004 0.0006 0.0007 0.0008 0.0009 0.0011 0.0011 0.0011 0.0011 0.0011 0.0005Diesel Fuel 0.0010 0.0016 0.0018 0.0021 0.0022 0.0027 0.0027 0.0027 0.0027 0.0027 0.0014Lube 0.0003 0.0004 0.0005 0.0006 0.0006 0.0007 0.0007 0.0007 0.0007 0.0007 0.0004Tires 0.0012 0.0019 0.0021 0.0024 0.0026 0.0031 0.0031 0.0031 0.0031 0.0031 0.0016GEC 0 0000 0 0000 0 0000 0 0000 0 0000 0 0000 0 0000 0 0000 0 0000 0 0000 0 0000

  • 8/22/2019 7.0 Operating Cost

    24/34

    Life ofYear 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26 Year 27 Year 28 Year 29 Mine

    834H Wheel DozerOperating Shifts 1,460 1,460 1,460 1,460 1,460 730 730 730 365 40 37,595$/shift

    Repair Parts 150.75 150.75 150.75 150.75 150.75 150.75 150.75 150.75 150.75 150.75 150.75Diesel Fuel 413.42 413.42 413.42 413.42 413.42 413.42 413.42 413.42 413.42 413.42 413.42Lube 67.66 67.66 67.66 67.66 67.66 67.66 67.66 67.66 67.66 67.66 67.66Tires 94.11 94.11 94.11 94.11 94.11 94.11 94.11 94.11 94.11 94.11 94.11GEC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Total 725.93 725.93 725.93 725.93 725.93 725.93 725.93 725.93 725.93 725.93 725.93$/tonne Mined

    Repair Parts 0.0025 0.0040 0.0045 0.0052 0.0056 0.0033 0.0033 0.0033 0.0016 0.0016 0.0026Diesel Fuel 0.0069 0.0109 0.0122 0.0141 0.0152 0.0090 0.0090 0.0090 0.0045 0.0045 0.0072Lube 0.0011 0.0018 0.0020 0.0023 0.0025 0.0015 0.0015 0.0015 0.0007 0.0007 0.0012

    Tires 0.0016 0.0025 0.0028 0.0032 0.0035 0.0021 0.0021 0.0021 0.0010 0.0010 0.0016GEC 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

    Total 0.0122 0.0192 0.0215 0.0248 0.0268 0.0159 0.0159 0.0159 0.0079 0.0079 0.012716M Grader

    Operating Shifts 1,095 1,095 1,095 1,095 730 730 730 730 365 40 30,335$/shift

    Repair Parts 301.29 301.29 301.29 301.29 301.29 301.29 301.29 301.29 301.29 301.29 301.29Diesel Fuel 231.92 231.92 231.92 231.92 231.92 231.92 231.92 231.92 231.92 231.92 231.92Lube 53.34 53.34 53.34 53.34 53.34 53.34 53.34 53.34 53.34 53.34 53.34Tires 28.44 28.44 28.44 28.44 28.44 28.44 28.44 28.44 28.44 28.44 28.44GEC 12.20 12.20 12.20 12.20 12.20 12.20 12.20 12.20 12.20 12.20 12.20

    Total 627.18 627.18 627.18 627.18 627.18 627.18 627.18 627.18 627.18 627.18 627.18$/tonne Mined

    Repair Parts 0.0038 0.0060 0.0067 0.0077 0.0056 0.0066 0.0066 0.0066 0.0033 0.0033 0.0042Diesel Fuel 0.0029 0.0046 0.0051 0.0060 0.0043 0.0051 0.0051 0.0051 0.0025 0.0025 0.0033Lube 0.0007 0.0011 0.0012 0.0014 0.0010 0.0012 0.0012 0.0012 0.0006 0.0006 0.0008Tires 0.0004 0.0006 0.0006 0.0007 0.0005 0.0006 0.0006 0.0006 0.0003 0.0003 0.0004GEC 0.0002 0.0002 0.0003 0.0003 0.0002 0.0003 0.0003 0.0003 0.0001 0.0001 0.0002

    Total 0.0079 0.0124 0.0139 0.0161 0.0116 0.0137 0.0137 0.0137 0.0069 0.0069 0.0088777F WW Water Truck

    Operating Shifts 1,095 1,095 730 730 730 365 365 365 365 40 28,510$/shift

    Repair Parts 365.82 365.82 365.82 365.82 365.82 365.82 365.82 365.82 365.82 365.82 365.82Diesel Fuel 1,164.63 1,164.63 1,164.63 1,164.63 1,164.63 1,164.63 1,164.63 1,164.63 1,164.63 1,164.63 1,164.63Lube 138.04 138.04 138.04 138.04 138.04 138.04 138.04 138.04 138.04 138.04 138.04Tires 75.63 75.63 75.63 75.63 75.63 75.63 75.63 75.63 75.63 75.63 75.63

    l

    Table 7-8 (Continued)

    Parts and Consumables Costs

    Total 1,744.11 1,744.11 1,744.11 1,744.11 1,744.11 1,744.11 1,744.11 1,744.11 1,744.11 1,744.11 1,744.11

    $/tonne MinedRepair Parts 0.0046 0.0072 0.0054 0.0063 0.0067 0.0040 0.0040 0.0040 0.0040 0.0040 0.0048Diesel Fuel 0.0147 0.0231 0.0172 0.0199 0.0215 0.0127 0.0127 0.0127 0.0127 0.0127 0.0154Lube 0.0017 0.0027 0.0020 0.0024 0.0025 0.0015 0.0015 0.0015 0.0015 0.0015 0.0018Tires 0.0010 0.0015 0.0011 0.0013 0.0014 0.0008 0.0008 0.0008 0.0008 0.0008 0.0010

    Total 0.0219 0.0346 0.0258 0.0298 0.0322 0.0191 0.0191 0.0191 0.0191 0.0191 0.0231Roads $ Dumps Total

    $/tonne MinedRepair Parts 0.0152 0.0240 0.0241 0.0279 0.0273 0.0217 0.0217 0.0183 0.0134 0.0134 0.0166Diesel Fuel 0.0379 0.0597 0.0582 0.0673 0.0704 0.0510 0.0510 0.0403 0.0332 0.0332 0.0412Lube 0.0061 0.0097 0.0098 0.0113 0.0117 0.0089 0.0089 0.0069 0.0056 0.0056 0.0067Tires 0.0041 0.0064 0.0066 0.0076 0.0080 0.0066 0.0066 0.0066 0.0052 0.0052 0.0046GEC 0.0041 0.0065 0.0073 0.0084 0.0089 0.0072 0.0072 0.0037 0.0036 0.0036 0.0046

    Total 0.0674 0.1062 0.1060 0.1226 0.1264 0.0954 0.0954 0.0758 0.0610 0.0610 0.0738

    GENERAL MINE$/tonne mined

    Miscelaneous 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300GENERAL MAINTENANCE

    $/tonne minedMiscelaneous 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400

    MINE ADMINISTRATION$/tonne mined

    Miscelaneous 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500TOTAL COST

  • 8/22/2019 7.0 Operating Cost

    25/34

    Year -3 Year -2 Year -1 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8

    ktonnes Mined 8,213 20,788 30,303 68,010 89,997 90,001 90,000 90,004 90,000 89,999 90,000DRILLING

    Operating Labor 0.0088 0.0069 0.0071 0.0063 0.0080 0.0080 0.0072 0.0080 0.0080 0.0072 0.0080Maintenance Labor 0.0117 0.0129 0.0134 0.0122 0.0147 0.0146 0.0143 0.0149 0.0148 0.0141 0.0146Repair Parts 0.0101 0.0112 0.0116 0.0105 0.0127 0.0127 0.0124 0.0129 0.0128 0.0122 0.0127Power 0.0033 0.0037 0.0038 0.0035 0.0042 0.0041 0.0040 0.0042 0.0042 0.0040 0.0041Lube 0.0057 0.0063 0.0066 0.0060 0.0072 0.0072 0.0070 0.0073 0.0073 0.0069 0.0072Bits & Steel 0.0115 0.0127 0.0132 0.0120 0.0144 0.0144 0.0141 0.0146 0.0146 0.0138 0.0144

    0.0510 0.0537 0.0557 0.0505 0.0612 0.0609 0.0590 0.0619 0.0616 0.0582 0.0610BLASTING

    Operating Labor 0.0062 0.0049 0.0067 0.0030 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023Explosives 0.1128 0.1128 0.1128 0.1128 0.1128 0.1128 0.1128 0.1128 0.1128 0.1128 0.1128Blasting Supplies 0.0451 0.0451 0.0451 0.0451 0.0451 0.0451 0.0451 0.0451 0.0451 0.0451 0.0451

    0.1641 0.1628 0.1647 0.1609 0.1602 0.1602 0.1602 0.1602 0.1602 0.1602 0.1602LOADING

    Operating Labor 0.0000 0.0157 0.0135 0.0132 0.0127 0.0127 0.0127 0.0127 0.0127 0.0127 0.0127Maintenance Labor 0.0000 0.0248 0.0246 0.0245 0.0243 0.0244 0.0244 0.0243 0.0243 0.0244 0.0243Repair Parts 0.0000 0.0417 0.0415 0.0412 0.0410 0.0410 0.0411 0.0409 0.0409 0.0410 0.0410Power 0.0000 0.0196 0.0195 0.0194 0.0193 0.0193 0.0193 0.0192 0.0192 0.0193 0.0193Lube 0.0000 0.0105 0.0105 0.0104 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103Ground Engaging Components 0.0000 0.0044 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043

    0.0000 0.1167 0.1139 0.1130 0.1119 0.1120 0.1121 0.1117 0.1118 0.1120 0.1119HAULING

    Operating Labor 0.1035 0.0818 0.0863 0.0654 0.0712 0.0770 0.0901 0.0828 0.0763 0.0843 0.0922Maintenance Labor 0.0859 0.0683 0.0729 0.0557 0.0605 0.0657 0.0765 0.0704 0.0651 0.0719 0.0786Repair Parts 0.0847 0.0673 0.0718 0.0548 0.0596 0.0647 0.0754 0.0694 0.0642 0.0709 0.0774Diesel Fuel 0.3079 0.2449 0.2612 0.1994 0.2168 0.2353 0.2743 0.2522 0.2334 0.2577 0.2816Lube 0.0774 0.0615 0.0656 0.0501 0.0545 0.0591 0.0689 0.0634 0.0586 0.0647 0.0708Tires 0.0789 0.0627 0.0669 0.0511 0.0555 0.0602 0.0702 0.0646 0.0598 0.0660 0.0721

    0.7382 0.5866 0.6247 0.4765 0.5180 0.5620 0.6555 0.6027 0.5574 0.6155 0.6728ROADS & DUMPS

    Operating Labor 0.1035 0.0723 0.0582 0.0346 0.0261 0.0261 0.0261 0.0261 0.0261 0.0261 0.0261Maintenance Labor 0.0660 0.0441 0.0343 0.0209 0.0158 0.0158 0.0158 0.0158 0.0158 0.0158 0.0158

    Table 7-9

    Mine Operating Cost Summary($/tonne of Material Mined)

    Repair Parts 0.0635 0.0413 0.0320 0.0195 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147

    Diesel Fuel 0.1577 0.1023 0.0802 0.0485 0.0366 0.0366 0.0366 0.0366 0.0366 0.0366 0.0366Lube 0.0286 0.0167 0.0131 0.0079 0.0059 0.0059 0.0059 0.0059 0.0059 0.0059 0.0059Tires 0.0476 0.0119 0.0104 0.0052 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039Ground Engaging Components 0.0151 0.0115 0.0079 0.0053 0.0040 0.0040 0.0040 0.0040 0.0040 0.0040 0.0040

    0.4820 0.3002 0.2361 0.1418 0.1071 0.1071 0.1071 0.1071 0.1071 0.1071 0.1071GENERAL MINE

    Operating Labor 0.0239 0.0189 0.0129 0.0058 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044Miscelaneous 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300

    0.0539 0.0489 0.0429 0.0358 0.0344 0.0344 0.0344 0.0344 0.0344 0.0344 0.0344GENERAL MAINTENANCE

    Maintenance Labor 0.0624 0.0502 0.0626 0.0325 0.0274 0.0281 0.0292 0.0290 0.0285 0.0291 0.0294Miscelaneous 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400

    0.1024 0.0902 0.1026 0.0725 0.0674 0.0681 0.0692 0.0690 0.0685 0.0691 0.0694MINE ADMINISTRATION

    Salaried Labor 0.2285 0.1805 0.1238 0.0552 0.0417 0.0417 0.0417 0.0417 0.0417 0.0417 0.0417Miscelaneous 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500

    0.2785 0.2305 0.1738 0.1052 0.0917 0.0917 0.0917 0.0917 0.0917 0.0917 0.0917

    TOTAL 1.8702 1.5896 1.5145 1.1561 1.1519 1.1964 1.2892 1.2388 1.1928 1.2481 1.3084SUMMARY:

    Operating Labor 0.2457 0.2005 0.1848 0.1283 0.1246 0.1304 0.1427 0.1362 0.1297 0.1369 0.1457Maintenance Labor 0.2261 0.2003 0.2079 0.1457 0.1427 0.1485 0.1602 0.1543 0.1485 0.1552 0.1627Repair Parts 0 1583 0 1615 0 1569 0 1261 0 1280 0 1331 0 1436 0 1379 0 1327 0 1388 0 1458

  • 8/22/2019 7.0 Operating Cost

    26/34

    Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19

    ktonnes Mined 90,000 89,997 90,000 90,003 89,898 89,997 89,998 90,003 89,998 89,999 82,745DRILLING

    Operating Labor 0.0080 0.0080 0.0080 0.0080 0.0080 0.0080 0.0080 0.0080 0.0080 0.0080 0.0087Maintenance Labor 0.0150 0.0155 0.0156 0.0154 0.0157 0.0156 0.0155 0.0153 0.0154 0.0156 0.0157Repair Parts 0.0130 0.0134 0.0135 0.0134 0.0136 0.0135 0.0135 0.0133 0.0133 0.0135 0.0136Power 0.0043 0.0044 0.0044 0.0044 0.0045 0.0044 0.0044 0.0043 0.0044 0.0044 0.0045Lube 0.0074 0.0076 0.0076 0.0076 0.0077 0.0077 0.0076 0.0075 0.0075 0.0076 0.0077Bits & Steel 0.0148 0.0152 0.0153 0.0152 0.0154 0.0153 0.0153 0.0151 0.0151 0.0153 0.0154

    0.0625 0.0640 0.0644 0.0639 0.0649 0.0645 0.0643 0.0636 0.0637 0.0644 0.0656BLASTING

    Operating Labor 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0024Explosives 0.1128 0.1128 0.1128 0.1128 0.1128 0.1128 0.1128 0.1128 0.1128 0.1128 0.1128Blasting Supplies 0.0451 0.0451 0.0451 0.0451 0.0451 0.0451 0.0451 0.0451 0.0451 0.0451 0.0451

    0.1602 0.1602 0.1602 0.1602 0.1602 0.1602 0.1602 0.1602 0.1602 0.1602 0.1604LOADING

    Operating Labor 0.0127 0.0127 0.0127 0.0127 0.0127 0.0127 0.0127 0.0127 0.0127 0.0127 0.0128Maintenance Labor 0.0243 0.0243 0.0243 0.0243 0.0243 0.0243 0.0243 0.0243 0.0243 0.0243 0.0243Repair Parts 0.0409 0.0409 0.0409 0.0409 0.0409 0.0409 0.0409 0.0409 0.0409 0.0409 0.0408Power 0.0192 0.0192 0.0192 0.0192 0.0192 0.0192 0.0192 0.0192 0.0192 0.0192 0.0192Lube 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103Ground Engaging Components 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043

    0.1117 0.1116 0.1117 0.1117 0.1116 0.1117 0.1117 0.1117 0.1117 0.1117 0.1117HAULING

    Operating Labor 0.0763 0.0734 0.0784 0.0835 0.0851 0.0828 0.0821 0.0879 0.0908 0.0886 0.0908Maintenance Labor 0.0646 0.0621 0.0666 0.0709 0.0726 0.0706 0.0699 0.0749 0.0774 0.0757 0.0770Repair Parts 0.0636 0.0612 0.0656 0.0698 0.0716 0.0696 0.0689 0.0738 0.0762 0.0746 0.0759Diesel Fuel 0.2314 0.2225 0.2385 0.2540 0.2603 0.2530 0.2505 0.2683 0.2773 0.2712 0.2760Lube 0.0581 0.0559 0.0599 0.0638 0.0654 0.0636 0.0629 0.0674 0.0697 0.0681 0.0693Tires 0.0592 0.0570 0.0611 0.0650 0.0667 0.0648 0.0641 0.0687 0.0710 0.0694 0.0707

    0.5532 0.5321 0.5701 0.6071 0.6216 0.6043 0.5984 0.6409 0.6623 0.6475 0.6598ROADS & DUMPS

    Operating Labor 0.0261 0.0261 0.0261 0.0261 0.0262 0.0261 0.0261 0.0261 0.0261 0.0261 0.0284Maintenance Labor 0.0158 0.0158 0.0158 0.0158 0.0158 0.0158 0.0158 0.0158 0.0158 0.0158 0.0172

    Table 7-9 (Continued)

    Mine Operating Cost Summary($/tonne of Material Mined)

    Repair Parts 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0147 0.0160

    Diesel Fuel 0.0366 0.0366 0.0366 0.0366 0.0367 0.0366 0.0366 0.0366 0.0366 0.0366 0.0399Lube 0.0059 0.0059 0.0059 0.0059 0.0059 0.0059 0.0059 0.0059 0.0059 0.0059 0.0065Tires 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0043Ground Engaging Components 0.0040 0.0040 0.0040 0.0040 0.0040 0.0040 0.0040 0.0040 0.0040 0.0040 0.0043

    0.1071 0.1071 0.1071 0.1071 0.1073 0.1071 0.1071 0.1071 0.1071 0.1071 0.1165GENERAL MINE

    Operating Labor 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0047Miscelaneous 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300

    0.0344 0.0344 0.0344 0.0344 0.0344 0.0344 0.0344 0.0344 0.0344 0.0344 0.0347GENERAL MAINTENANCE

    Maintenance Labor 0.0280 0.0276 0.0280 0.0288 0.0286 0.0289 0.0289 0.0291 0.0291 0.0289 0.0310Miscelaneous 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400

    0.0680 0.0676 0.0680 0.0688 0.0686 0.0689 0.0689 0.0691 0.0691 0.0689 0.0710MINE ADMINISTRATION

    Salaried Labor 0.0417 0.0417 0.0417 0.0417 0.0417 0.0417 0.0417 0.0417 0.0417 0.0417 0.0454Miscelaneous 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500

    0.0917 0.0917 0.0917 0.0917 0.0917 0.0917 0.0917 0.0917 0.0917 0.0917 0.0954

    TOTAL 1.1888 1.1687 1.2076 1.2449 1.2604 1.2428 1.2366 1.2787 1.3002 1.2859 1.3152SUMMARY:

    Operating Labor 0.1297 0.1268 0.1319 0.1370 0.1386 0.1363 0.1355 0.1413 0.1442 0.1421 0.1480Maintenance Labor 0.1477 0.1452 0.1502 0.1552 0.1570 0.1552 0.1544 0.1594 0.1619 0.1602 0.1652Repair Parts 0 1323 0 1302 0 1347 0 1388 0 1408 0 1387 0 1379 0 1427 0 1452 0 1437 0 1464

  • 8/22/2019 7.0 Operating Cost

    27/34

    Life ofYear20 Year 21 Year 22 Year 23 Year 24 Year25 Year 26 Year 27 Year 28 Year 29 Mine

    ktonnes Mined 87,022 55,262 49,385 42,667 39,596 33,360 33,360 33,360 33,360 3,657 2,150,982DRILLING

    Operating Labor 0.0083 0.0091 0.0087 0.0084 0.0054 0.0000 0.0000 0.0000 0.0000 0.0000 0.0074Maintenance Labor 0.0161 0.0162 0.0162 0.0161 0.0083 0.0000 0.0000 0.0000 0.0000 0.0000 0.0140Repair Parts 0.0139 0.0140 0.0140 0.0140 0.0072 0.0000 0.0000 0.0000 0.0000 0.0000 0.0121Power 0.0045 0.0046 0.0046 0.0046 0.0024 0.0000 0.0000 0.0000 0.0000 0.0000 0.0040Lube 0.0079 0.0079 0.0079 0.0079 0.0041 0.0000 0.0000 0.0000 0.0000 0.0000 0.0069Bits & Steel 0.0158 0.0159 0.0159 0.0159 0.0082 0.0000 0.0000 0.0000 0.0000 0.0000 0.0138

    0.0664 0.0678 0.0673 0.0669 0.0355 0.0000 0.0000 0.0000 0.0000 0.0000 0.0581BLASTING

    Operating Labor 0.0012 0.0018 0.0021 0.0024 0.0026 0.0000 0.0000 0.0000 0.0000 0.0000 0.0022Explosives 0.1128 0.1128 0.1128 0.1128 0.1128 0.0000 0.0000 0.0000 0.0000 0.0000 0.1056Blasting Supplies 0.0451 0.0451 0.0451 0.0451 0.0451 0.0000 0.0000 0.0000 0.0000 0.0000 0.0423

    0.1591 0.1598 0.1600 0.1603 0.1605 0.0000 0.0000 0.0000 0.0000 0.0000 0.1501LOADING

    Operating Labor 0.0122 0.0133 0.0132 0.0134 0.0124 0.0122 0.0122 0.0122 0.0122 0.0122 0.0127Maintenance Labor 0.0242 0.0242 0.0241 0.0241 0.0242 0.0243 0.0243 0.0243 0.0243 0.0243 0.0242Repair Parts 0.0408 0.0407 0.0406 0.0406 0.0407 0.0408 0.0408 0.0408 0.0408 0.0408 0.0408Power 0.0192 0.0191 0.0191 0.0191 0.0191 0.0192 0.0192 0.0192 0.0192 0.0192 0.0192Lube 0.0103 0.0102 0.0102 0.0102 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103Ground Engaging Components 0.0043 0.0042 0.0042 0.0042 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043

    0.1110 0.1117 0.1116 0.1116 0.1110 0.1111 0.1111 0.1111 0.1111 0.1111 0.1114HAULING

    Operating Labor 0.0796 0.0887 0.1019 0.1134 0.0924 0.0509 0.0490 0.0451 0.0411 0.0451 0.0814Maintenance Labor 0.0674 0.0757 0.0863 0.0960 0.0789 0.0425 0.0404 0.0383 0.0352 0.0385 0.0692Repair Parts 0.0665 0.0746 0.0850 0.0946 0.0777 0.0419 0.0398 0.0378 0.0347 0.0379 0.0682Diesel Fuel 0.2417 0.2713 0.3093 0.3440 0.2826 0.1523 0.1448 0.1373 0.1261 0.1378 0.2479Lube 0.0607 0.0682 0.0777 0.0864 0.0710 0.0382 0.0364 0.0345 0.0317 0.0346 0.0623Tires 0.0619 0.0695 0.0792 0.0881 0.0724 0.0390 0.0371 0.0352 0.0323 0.0353 0.0635

    0.5778 0.6479 0.7394 0.8225 0.6749 0.3648 0.3475 0.3282 0.3012 0.3291 0.5925ROADS & DUMPS

    Operating Labor 0.0270 0.0426 0.0450 0.0521 0.0528 0.0411 0.0411 0.0314 0.0235 0.0235 0.0301Maintenance Labor 0.0163 0.0257 0.0248 0.0287 0.0294 0.0217 0.0217 0.0179 0.0142 0.0142 0.0179

    Table 7-9 (Continued)

    Mine Operating Cost Summary($/tonne of Material Mined)

    Repair Parts 0.0152 0.0240 0.0241 0.0279 0.0273 0.0217 0.0217 0.0183 0.0134 0.0134 0.0168

    Diesel Fuel 0.0379 0.0597 0.0582 0.0673 0.0704 0.0510 0.0510 0.0403 0.0332 0.0332 0.0417Lube 0.0061 0.0097 0.0098 0.0113 0.0117 0.0089 0.0089 0.0069 0.0056 0.0056 0.0068Tires 0.0041 0.0064 0.0066 0.0076 0.0080 0.0066 0.0066 0.0066 0.0052 0.0052 0.0047Ground Engaging Components 0.0041 0.0065 0.0073 0.0084 0.0089 0.0072 0.0072 0.0037 0.0036 0.0036 0.0046

    0.1108 0.1745 0.1758 0.2035 0.2086 0.1583 0.1583 0.1251 0.0987 0.0987 0.1227GENERAL MINE

    Operating Labor 0.0045 0.0071 0.0079 0.0092 0.0050 0.0059 0.0059 0.0059 0.0059 0.0059 0.0051Miscelaneous 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300 0.0300

    0.0345 0.0371 0.0379 0.0392 0.0350 0.0359 0.0359 0.0359 0.0359 0.0359 0.0351GENERAL MAINTENANCE

    Maintenance Labor 0.0287 0.0403 0.0446 0.0496 0.0506 0.0531 0.0529 0.0520 0.0498 0.3208 0.0331Miscelaneous 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400 0.0400

    0.0687 0.0803 0.0846 0.0896 0.0906 0.0931 0.0929 0.0920 0.0898 0.3608 0.0731MINE ADMINISTRATION

    Salaried Labor 0.0431 0.0679 0.0760 0.0880 0.0948 0.0000 0.0714 0.0000 0.0714 0.0000 0.0484Miscelaneous 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500 0.0500

    0.0931 0.1179 0.1260 0.1380 0.1448 0.0500 0.1214 0.0500 0.1214 0.0500 0.0984

    TOTAL 1.2215 1.3970 1.5027 1.6315 1.4609 0.8131 0.8670 0.7422 0.7581 0.9856 1.2413SUMMARY:

    Operating Labor 0.1328 0.1626 0.1789 0.1989 0.1706 0.1102 0.1083 0.0945 0.0828 0.0867 0.1389Maintenance Labor 0.1527 0.1820 0.1961 0.2146 0.1914 0.1415 0.1393 0.1325 0.1235 0.3977 0.1584Repair Parts 0 1364 0 1533 0 1638 0 1771 0 1529 0 1044 0 1024 0 0969 0 0889 0 0921 0 1379

  • 8/22/2019 7.0 Operating Cost

    28/34

    Year -3 Year -2 Year -1 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8

    years in period 0.50 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00ktonnes 8,213 20,788 30,303 68,010 89,997 90,001 90,000 90,004 90,000 89,999 90,000diesel cost ($/tonne) 0.4656 0.3472 0.3414 0.2479 0.2534 0.2719 0.3109 0.2889 0.2701 0.2943 0.3183diesel $x1000 3,824 7,218 10,344 16,862 22,807 24,473 27,983 26,000 24,307 26,491 28,646$/liter 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66kliters/period 5,790 10,929 15,663 25,532 34,534 37,056 42,371 39,369 36,804 40,111 43,374kliters/day 32 30 43 70 95 102 116 108 101 110 119Powder factor

    kg/tonne 0.200 0.200 0.200 0.200 0.200 0.200 0.200 0.200 0.200 0.200 0.200ANFO

    tonnes/period 1,643 4,158 6,061 13,602 17,999 18,000 18,000 18,001 18,000 18,000 18,000tonnes/day 9.00 11.39 16.60 37.27 49.31 49.32 49.32 49.32 49.32 49.31 49.32

    prills @ 94%tonnes/day 8.46 10.71 15.61 35.03 46.35 46.36 46.36 46.36 46.36 46.36 46.36

    Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19

    years in period 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00ktonnes 90,000 89,997 90,000 90,003 89,898 89,997 89,998 90,003 89,998 89,999 82,745diesel cost ($/tonne) 0.2680 0.2592 0.2752 0.2906 0.2970 0.2896 0.2871 0.3049 0.3139 0.3078 0.3159diesel $x1000 24,120 23,326 24,764 26,158 26,698 26,067 25,839 27,446 28,251 27,701 26,138$/liter 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66kliters/period 36,521 35,319 37,497 39,607 40,426 39,469 39,125 41,558 42,776 41,944 39,577

    Table 7-10

    Mine Diesel Fuel and Prill Consumption

    kliters/day 100 97 103 109 111 108 107 114 117 115 108

    Powder factorkg/tonne 0.200 0.200 0.200 0.200 0.200 0.200 0.200 0.200 0.200 0.200 0.200ANFO

    tonnes/period 18,000 17,999 18,000 18,001 17,980 17,999 18,000 18,001 18,000 18,000 16,549tonnes/day 49.32 49.31 49.32 49.32 49.26 49.31 49.31 49.32 49.31 49.31 45.34

    prills @ 94%tonnes/day 46.36 46.35 46.36 46.36 46.30 46.35 46.36 46.36 46.36 46.36 42.62

    Life ofYear 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26 Year 27 Year 28 Year 29 Mine

    years in period 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.11 30.61ktonnes 87,022 55,262 49,385 42,667 39,596 33,360 33,360 33,360 33,360 3,657 2,150,982diesel cost ($/tonne) 0.2796 0.3310 0.3674 0.4113 0.3530 0.2033 0.1958 0.1776 0.1594 0.1710 0.2896diesel $x1000 24,328 18,290 18,146 17,550 13,976 6,782 6,533 5,925 5,316 625 622,935$/liter 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66kliters/period 36,836 27,694 27,476 26,574 21,162 10,268 9,892 8,971 8,049 947 943,223kliters/day 101 76 75 73 58 28 27 25 22 24 84Powder factor

    kg/tonne 0.200 0.200 0.200 0.200 0.200 0.000 0.000 0.000 0.000 0.000ANFO

    tonnes/period 17,404 11,052 9,877 8,533 7,919 0 0 0 0 0 402,777t /d 47 68 30 28 27 06 23 38 21 70 0 00 0 00 0 00 0 00 0 00 36 05

  • 8/22/2019 7.0 Operating Cost

    29/34

    DeliveredUnitPrice

    Item ($x1000) No. $x1000 No. $x1000 No. $x1000 No. $x1000 No. $x1000 No. $x1000 No. $x1000 No. $x1000 No. $x1000 No. $x1000 No. $x1000

    Ktonnes minedPreproduction strippingktonnes$/tonne$x1000

    Mine EquipmentP&H 3200XPC blasthole drill 3,903 1 3,903 1 3,903 1 3,903 1 3,903 0 0 0 0 0 0 0 0 0 0 0 0 0 0P&H 2800XPC cable shovel 18,975 0 0 1 18,975 1 18,975 1 18,975 1 18,975 0 0 0 0 0 0 0 0 0 0 0 0Caterpillar 793D haul truck 3,352 8 26,816 0 0 4 13,408 9 30,168 8 26,816 3 10,056 5 16,760 0 0 0 0 0 0 1 3,352Caterpillar 994F wheel loader 3,064 1 3,064 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Caterpillar D10T track dozer 1,195 4 4,780 0 0 0 0 2 2,390 0 0 0 0 0 0 0 0 0 0 4 4,780 0 0Caterpillar 834H wheel dozer 824 2 1,648 0 0 2 1,648 0 0 0 0 0 0 0 0 0 0 0 0 2 1,648 0 0Caterpillar 16M grader 726 2 1,452 0 0 0 0 1 726 0 0 0 0 0 0 0 0 0 0 2 1,452 0 0Caterpillar 777F WW water truck 1,623 2 3,246 0 0 0 0 1 1,623 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    Subtotal 44,909 22,878 37,934 57,785 45,791 10,056 16,760 0 0 7,880 3,352Initial spare parts @ 5% 2,245 1,144 1,897 2,889 2,290 0 0 0 0 0 0Small equipment @ 10% 4,491 2,288 3,793 5,779 4,579 1,006 1,676 0 0 788 335

    Mine equipment total 51,645 26,310 43,624 66,453 52,660 11,062 18,436 0 0 8,668 3,687i ili i

    56,673 108,107 136,301

    Table 7-11

    Mine Capital Costs

    30,303 68,010 89,9971.87 1.59 1.51

    89,999 90,0008,213 20,788 30,303 68,010 89,997 90,001 90,000 90,004 90,000

    Year -3 Year -2 Year -1 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8

    i ili iMine shop/warehouse

    Facility 8,000Initial tools and equipment @ 25% 2,000 0 0 0 0 0 0 0 0 0 0

    Fuel storageDiesel average liters/day (x1000) 84

    Store 15 days @ $4/liter of capacity 5,065 0 0 0 0 0 0 0 0 0 0Gasoline @ 10% of diesel 507 0 0 0 0 0 0 0 0 0 0

    Explosives storageMagazine 50

    Prills (average tonnes/day) 33.9Store 10 days @ $5,000/tonne 169 0 0 0 0 0 0 0 0 0 0Mine facilities total 15,741 0 0 0 0 0 0 0 0 0 0

    Mine equipment and facilities ($x1000) 67,387 26,310 43,624 66,453 52,660 11,062 18,436 0 0 8,668 3,687Contingency @ 10% 6,739 2,631 4,362 6,645 5,266 1,106 1,844 0 0 867 369

    Total mine capital 74,125 28,941 47,987 73,098 57,926 12,168 20,280 0 0 9,535 4,056

  • 8/22/2019 7.0 Operating Cost

    30/34

    DeliveredUnitPrice

    Item ($x1000) No. $x1000 No. $x1000 No. $x1000 No. $x1000 No. $x1000 No. $x1000 No. $x1000 No. $x1000 No. $x1000 No. $x1000 No. $x1000

    Ktonnes minedPreproduction strippingktonnes$/tonne$x1000

    Mine EquipmentP&H 3200XPC blasthole drill 3,903 0 0 0 0 0 0 0 0 0 0 1 3,903 1 3,903 1 3,903 1 3,903 0 0 0 0P&H 2800XPC cable shovel 18,975 0 0 0 0 0 0 0 0 0 0 1 18,975 1 18,975 1 18,975 1 18,975 0 0 0 0Caterpillar 793D haul truck 3,352 0 0 0 0 2 6,704 6 20,112 10 33,520 8 26,816 2 6,704 7 23,464 1 3,352 0 0 0 0Caterpillar 994F wheel loader 3,064 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Caterpillar D10T track dozer 1,195 0 0 2 2,390 0 0 0 0 0 0 0 0 0 0 0 0 4 4,780 0 0 2 2,390Caterpillar 834H wheel dozer 824 2 1,648 0 0 0 0 0 0 0 0 0 0 0 0 2 1,648 0 0 0 0 2 1,648Caterpillar 16M grader 726 0 0 1 726 0 0 0 0 0 0 0 0 2 1,452 0 0 0 0 0 0 1 726Caterpillar 777F WW water truck 1,623 0 0 2 3,246 0 0 0 0 1 1,623 0 0 0 0 0 0 0 0 0 0 0 0

    Subtotal 1,648 6,362 6,704 20,112 35,143 49,694 31,034 47,990 31,010 0 4,764Initial spare parts @ 5% 0 0 0 0 0 0 0 0 0 0 0Small equipment @ 10% 165 636 670 2,011 3,514 4,969 3,103 4,799 3,101 0 476

    Mine equipment total 1,813 6,998 7,374 22,123 38,657 54,663 34,137 52,789 34,111 0 5,240i ili i

    Table 7-11 (Continued)

    Mine Capital Costs

    82,74589,898 89,997 89,998 90,003 89,998 89,99990,000 89,997 90,000 90,003

    Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19Year 11Year 9 Year 10

    i ili iMine shop/warehouse

    FacilityInitial tools and equipment @ 25% 0 0 0 0 0 0 0 0 0 0 0

    Fuel storageDiesel average liters/day (x1000)

    Store 15 days @ $4/liter of capacity 0 0 0 0 0 0 0 0 0 0 0Gasoline @ 10% of diesel 0 0 0 0 0 0 0 0 0 0 0

    Explosives storageMagazine

    Prills (average tonnes/day)Store 10 days @ $5,000/tonne 0 0 0 0 0 0 0 0 0 0 0Mine facilities total 0 0 0 0 0 0 0 0 0 0 0

    Mine equipment and facilities ($x1000) 1,813 6,998 7,374 22,123 38,657 54,663 34,137 52,789 34,111 0 5,240Contingency @ 10% 181 700 737 2,212 3,866 5,466 3,414 5,279 3,411 0 524

    Total mine capital 1,994 7,698 8,112 24,336 42,523 60,130 37,551 58,068 37,522 0 5,764

  • 8/22/2019 7.0 Operating Cost

    31/34

    DeliveredUnitPrice

    Item ($x1000) No. $x1000 No. $x1000 No. $x1000 No. $x1000 No. $x1000 No. $x1000 No. $x1000 No. $x1000 No. $x1000 No. $x1000 No. $x1000

    Ktonnes minedPreproduction strippingktonnes$/tonne$x1000

    Mine EquipmentP&H 3200XPC blasthole drill 3,903 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 31,224P&H 2800XPC cable shovel 18,975 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 151,800Caterpillar 793D haul truck 3,352 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 74 248,048Caterpillar 994F wheel loader 3,064 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 3,064Caterpillar D10T track dozer 1,195 0 0 0 0 0 0 0 0 0 0 2 2,390 0 0 0 0 0 0 0 0 18 23,900Caterpillar 834H wheel dozer 824 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 9,888Caterpillar 16M grader 726 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 6,534Caterpillar 777F WW water truck 1,623 0 0 0 0 1 1,623 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 11,361

    Subtotal 0 0 1,623 0 0 2,390 0 0 0 0 485,819Initial spare parts @ 5% 0 0 0 0 0 0 0 0 0 0 10,465Small equipment @ 10% 0 0 162 0 0 239 0 0 0 0 48,582

    Mine equipment total 0 0 1,785 0 0 2,629 0 0 0 0 544,866i ili i

    301,081

    Table 7-11 (Continued)

    Mine Capital Costs

    188,3101.60

    33,360 33,360 33,360 33,360 3,657 2,150,98287,022 55,262 49,385 42,667 39,596

    Life of MineYear 24 Year 25 Year 26 Year 27 Year 28 Year 29Year 23Year 20 Year 21 Year 22

    i ili iMine shop/warehouse

    Facility 8,000Initial tools and equipment @ 25% 0 0 0 0 0 0 0 0 0 0 2,000

    Fuel storageDiesel average liters/day (x1000)

    Store 15 days @ $4/liter of capacity 0 0 0 0 0 0 0 0 0 0 5,065Gasoline @ 10% of diesel 0 0 0 0 0 0 0 0 0 0 507

    Explosives storageMagazine

    Prills (average tonnes/day)Store 10 days @ $5,000/tonne 0 0 0 0 0 0 0 0 0 0 169Mine facilities total 0 0 0 0 0 0 0 0 0 0 15,741

    Mine equipment and facilities ($x1000) 0 0 1,785 0 0 2,629 0 0 0 0 560,607Contingency @ 10% 0 0 179 0 0 263 0 0 0 0 56,061

    Total mine capital 0 0 1,964 0 0 2,892 0 0 0 0 616,668

  • 8/22/2019 7.0 Operating Cost

    32/34

    Year -3 Year -2 Year -1 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8

    Years in period 0.50 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Total mateial mined (ktonnes) 8,213 20,788 30,303 68,010 89,997 90,001 90,000 90,004 90,000 89,999 90,000

    ktonnes per day 45 57 83 186 247 247 247 247 247 247 247Haul distance (EqKm) 9.38 8.34 9.00 6.50 7.20 7.95 9.53 8.64 7.88 8.86 9.83Equipment required

    Blasthole drills 1 1 2 3 4 4 4 4 4 4 4

    Cable shovels 0 1 2 3 4 4 4 4 4 4 4Haul trucks 8 8 12 21 29 32 37 34 32 35 38Wheel loaders (shvl bkup) 1 1 1 1 1 1 1 1 1 1 1Track dozers 4 4 4 6 6 6 6 6 6 6 6Wheel dozers 2 2 4 4 4 4 4 4 4 4 4Graders 2 2 2 3 3 3 3 3 3 3 3Water trucks 2 2 2 3 3 3 3 3 3 3 3

    ManpowerSalaried 42 42 42 42 42 42 42 42 42 42 42Operations hourly 64 65 87 133 170 178 195 186 177 187 199Maintenance hourly 52 58 89 137 176 183 197 190 183 191 200Total 158 165 218 312 388 403 434 418 402 420 441

    Functional operating cost ($/ton)Drilling 0.05 0.05 0.06 0.05 0.06 0.06 0.06 0.06 0.06 0.06 0.06Blasting 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16

    Table 7-12

    Mining Summary

    Loading 0.00 0.12 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11Hauling 0.74 0.59 0.62 0.48 0.52 0.56 0.66 0.60 0.56 0.62 0.67Roads & dumps 0.48 0.30 0.24 0.14 0.11 0.11 0.11 0.11 0.11 0.11 0.11General mine 0.05 0.05 0.04 0.04 0.03 0.03 0.03 0.03 0.03 0.03 0.03General maintenance 0.10 0.09 0.10 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07Mine administration 0.28 0.23 0.17 0.11 0.09 0.09 0.09 0.09 0.09 0.09 0.09Total 1.87 1.59 1.51 1.16 1.15 1.20 1.29 1.24 1.19 1.25 1.31

    Operating cost ($/ton)

    Salaried labor 0.23 0.18 0.12 0.06 0.04 0.04 0.04 0.04 0.04 0.04 0.04Operating labor 0.25 0.20 0.18 0.13 0.12 0.13 0.14 0.14 0.13 0.14 0.15Maintenance labor 0.23 0.20 0.21 0.15 0.14 0.15 0.16 0.15 0.15 0.16 0.16Parts and consumables 1.17 1.01 1.00 0.83 0.84 0.88 0.94 0.91 0.87 0.91 0.96Total 1.87 1.59 1.51 1.16 1.15 1.20 1.29 1.24 1.19 1.25 1.31

    Mine capital cost ($x1000)Equipment 51,645 26,310 43,624 66,453 52,660 11,062 18,436 0 0 8,668 3,687Facilities 15,741 0 0 0 0 0 0 0 0 0 0Contingency @ 10% 6,739 2,631 4,362 6,645 5,266 1,106 1,844 0 0 867 369

    Subtotal 74,125 28,94