7 March 2014 2014 Virginia Concrete Paving Conference, Richmond, VA

23
1 7 March 2014 2014 Virginia Concrete Paving Conference, Richmond, VA DFW Connector Pavement Design and Construction Challenges and Solutions By: Dan Dawood, P.E.

description

DFW Connector Pavement Design and Construction Challenges and Solutions. 7 March 2014 2014 Virginia Concrete Paving Conference, Richmond, VA. By: Dan Dawood, P.E. DFW Connector. Owner: TxDOT D-B Firm: NorthGate Constructors Lead Design: PB Americas Pavement Design: Transtec - PowerPoint PPT Presentation

Transcript of 7 March 2014 2014 Virginia Concrete Paving Conference, Richmond, VA

Page 1: 7 March 2014 2014 Virginia Concrete Paving Conference,  Richmond, VA

1

7 March 20142014 Virginia Concrete Paving Conference,

Richmond, VA

DFW ConnectorPavement Design and Construction

Challenges and Solutions

By: Dan Dawood, P.E.

Page 2: 7 March 2014 2014 Virginia Concrete Paving Conference,  Richmond, VA

2

DFW Connector

Owner: TxDOT D-B Firm: NorthGate

Constructors Lead Design: PB Americas Pavement Design: Transtec Cost: Over $1.0 billion Publicly funded CDA:

$667 million from public gas taxes, $250 million from ARRA funds, and $107 million from bond proceeds for ROW

acquisition.

www.dfwconnector.com

Page 3: 7 March 2014 2014 Virginia Concrete Paving Conference,  Richmond, VA

3

DFW Connector

Project Length: 8.4-mile initial phase of 14.4-mile project,

Existing 12 Lanes Expanding to 24 lanes

2-3 lanes 6-7 lanes 2 lanes

CL

Page 4: 7 March 2014 2014 Virginia Concrete Paving Conference,  Richmond, VA

4

DFW Connector Design Tasks

Page 5: 7 March 2014 2014 Virginia Concrete Paving Conference,  Richmond, VA

5

Thickness design Reinforcement design Temporary pavement design Block-out solutions Terminal joint design Pavement transitions Pavement widenings Gore area design Mix and materials Resilient modulus verification

Pavement Design Tasks

Page 6: 7 March 2014 2014 Virginia Concrete Paving Conference,  Richmond, VA

6

PCC Thickness Design 10” CRCP for Frontage Roads 13” CRCP for Main lanes, Ramps, and Managed

lanes 2.5” HMA Base Layer 12-36” Lime Stabilized Subgrade/Crushed

Concrete Base (Effective Plasticity Index Requirements)

CRCP Thickness Design

Page 7: 7 March 2014 2014 Virginia Concrete Paving Conference,  Richmond, VA

7

Reinforcement Design

Adopted updated reinforcement standardCRCP (1) -03

Longitudinal Steel 13” CRCP: #6 bar @ 5.5” 10” CRCP: #6 bar @ 7”

Transverse steel Varies as a function of pavement width (PW) For 13”: #6 @ 2.5’ for PW < 60 ft up to @1.0’ for PW <

120 ft,

CRCP (1) -09 Same Longitudinal Steel as CRCP (1) -03 Transverse steel: #5 @ 48” for PW up to 100 ft

Page 8: 7 March 2014 2014 Virginia Concrete Paving Conference,  Richmond, VA

8

#57 stone, pea gravel, and natural sand

Optimized PCCP Mix

Page 9: 7 March 2014 2014 Virginia Concrete Paving Conference,  Richmond, VA

9

Toll Gantry Area Blockouts

Page 10: 7 March 2014 2014 Virginia Concrete Paving Conference,  Richmond, VA

10

Other Pavement Design Tasks

CRCP Transition Design CRCP to HMA CRCP to existing CRCP CRCP to new CRCP CRCP Thickness Transition

Design of Pavement Widenings Drainage Considerations Remaining Life of Existing CRCP Future Rehabilitation Needs

ProVAL Analysis - PI vs. IRI

Page 11: 7 March 2014 2014 Virginia Concrete Paving Conference,  Richmond, VA

11

Construction Schedule: 4 years (2010-2014)

Design-Build contracting process

Accelerated Construction Challenges and Solutions

Page 12: 7 March 2014 2014 Virginia Concrete Paving Conference,  Richmond, VA

12

Keep all lanes open during peak travel times

Temporary pavement to shift traffic

Accelerated Construction Challenges and Solutions

Page 13: 7 March 2014 2014 Virginia Concrete Paving Conference,  Richmond, VA

13

Keep all lanes open during peak travel times

Most lane closures scheduled to occur at night (off-peak)

Accelerated Construction Challenges and Solutions

Page 14: 7 March 2014 2014 Virginia Concrete Paving Conference,  Richmond, VA

14

Varying paving widths:12’ lanes, 10’-12’ shoulders, 16’-24’ ramps10’, 12’, 16’, 22’ and 24’ paving widths

10”-13” paving thicknesses Short pours

due to MOT and bridge construction

Accelerated Construction Challenges and Solutions

EB & WB managed lanes – SH 114

Page 15: 7 March 2014 2014 Virginia Concrete Paving Conference,  Richmond, VA

15

Four new Guntert & Zimmerman paversS600 – 10’-18’ paving widthsS850 – 18’-24’ paving widths

Accelerated Construction Challenges and Solutions

Page 16: 7 March 2014 2014 Virginia Concrete Paving Conference,  Richmond, VA

16

Four new Guntert & Zimmerman paversStringless compatibleMobility – Tracks steer 90°Telescoping End Sections

Easy to change widths – 2 hrs

226 lane miles of CRCP (535,000 yd3)

Accelerated Construction Challenges and Solutions

Page 17: 7 March 2014 2014 Virginia Concrete Paving Conference,  Richmond, VA

17

Terex Batch Plant Model S

RexCon Dual Drum 12 yd3 plant Capacity 600 yph. Typical batch size is

11 yd3 on flowboy rear discharge trailers 7 yd3 on tandem dump trucks

Page 18: 7 March 2014 2014 Virginia Concrete Paving Conference,  Richmond, VA

18

Location of Batch Plant and Yards

Page 19: 7 March 2014 2014 Virginia Concrete Paving Conference,  Richmond, VA

19

Completed Manage Lanes

Page 20: 7 March 2014 2014 Virginia Concrete Paving Conference,  Richmond, VA

20

Leica Stringless System

Page 21: 7 March 2014 2014 Virginia Concrete Paving Conference,  Richmond, VA

21

Leica Stringless System

North bound widening on SH121

Page 22: 7 March 2014 2014 Virginia Concrete Paving Conference,  Richmond, VA

22

Leica Stringless System

Advantages: Smoother ride Eliminates man-hours in

the field  (production and safety).

Eliminates schedule impacts/coordination (stringline setup/removal). 

Flexibility Haul route Trucks entrances and exits jump around from area to

area (easier set-up)

Page 23: 7 March 2014 2014 Virginia Concrete Paving Conference,  Richmond, VA

www.thetranstecgroup.com